workbench: Research Packages/Data Center Federal Legal Spine 2025-2026/DATA_CENTER_FEDERAL_LEGAL_OBJECT_REGISTRY_2026-08-20.json
Canonical source SHA-256: edccdab9b5a1ed1a3d8adcd53787560fd39d5768a783980c454f62f9098ac888
Served copy SHA-256: edccdab9b5a1ed1a3d8adcd53787560fd39d5768a783980c454f62f9098ac888
Owner evidence cutoffs: {"data-center-federal-legal-spine": "2026-10-05"}
These are package-level cutoffs, not a claim that this source was rechecked on those dates. Use its own publication and capture dates.
Owners: data-center-federal-legal-spine
Section 1 of 3
{ "registry_id": "data-center-federal-legal-spine-wave-1-2026-08-20", "title": "Data Center Federal Legal Object Registry", "evidence_cutoff": "2026-08-20", "timezone": "America/New_York", "authority_boundary": "Pending Freedom 250 Research Workbench evidence. Not live-vault authority.", "allowed_legal_states": [ "operative_executive_order", "enacted_statute", "final_rule", "proposed_rule", "nonbinding_guidance", "interpretive_guidance", "priority_review_workflow", "solicitation", "site_selection", "selection_for_negotiation", "conditional_selection", "sponsor_selection", "publicly_confirmed_lease", "agency_decision_appeal_pending", "fast41_covered_in_progress", "categorical_exclusion_determination", "final_general_permit", "permit_application_notice", "introduced_referred", "passed_one_chamber", "bounded_public_record_gap" ], "objects": [ { "id": "EO-14318", "lane": "executive", "date": "2025-07-23", "title": "Executive Order 14318 - Accelerating Federal Permitting of Data Center Infrastructure", "actor": "President", "instrument_type": "executive_order", "legal_state": "operative_executive_order", "current_effect": "Directs federal finance coordination, permitting acceleration, environmental implementation and federal-land actions for defined Data Center and Qualifying Projects.", "not_proved": "No appropriation, private award, lease, permit, pollution waiver, construction or operation is created by the order alone.", "primary_url": "https://www.federalregister.gov/documents/2025/07/28/2025-14212/accelerating-federal-permitting-of-data-center-infrastructure" }, { "id": "DOE-FOUR-SITES", "lane": "federal_land", "date": "2025-07-24", "title": "DOE selects INL, Oak Ridge, Paducah and Savannah River for future solicitations", "actor": "Department of Energy", "instrument_type": "administrative_site_selection", "legal_state": "site_selection", "current_effect": "Moves four federal sites into site-specific private-development solicitation planning.", "not_proved": "No developer selection, lease, permit, financing, construction or operation.", "primary_url": "https://www.energy.gov/articles/doe-announces-site-selection-ai-data-center-and-energy-infrastructure-development-federal" }, { "id": "DOE-INL-RFA", "lane": "federal_land", "date": "2025-09-09", "title": "INL AI data-center and energy lease RFA", "actor": "Department of Energy", "instrument_type": "request_for_applications", "legal_state": "solicitation", "current_effect": "Invites applicant-funded long-term lease proposals on approximately 44000 acres.", "not_proved": "No public official sponsor selection or executed lease located by cutoff.", "primary_url": "https://www.energy.gov/ne/articles/energy-department-seeks-proposals-ai-data-centers-energy-projects-idaho-national" }, { "id": "DOE-OAK-RIDGE-RFP", "lane": "federal_land", "date": "2025-09-30", "title": "Oak Ridge AI data-center and energy lease RFP", "actor": "Department of Energy", "instrument_type": "request_for_proposals", "legal_state": "solicitation", "current_effect": "Invites applicant-funded long-term lease proposals at two Oak Ridge sites.", "not_proved": "No public official sponsor selection or executed AI-data-center lease located by cutoff.", "primary_url": "https://www.energy.gov/em/articles/us-energy-department-seeks-proposals-ai-data-centers-energy-projects-oak-ridge" }, { "id": "DOE-SRS-RFP", "lane": "federal_land", "date": "2025-09-30", "title": "Savannah River AI infrastructure and energy generation RFP", "actor": "NNSA", "instrument_type": "request_for_proposals", "legal_state": "solicitation", "current_effect": "Invites proposals for long-term lease development across ten tracts totaling 3103 acres.", "not_proved": "The solicitation was not a lease or sponsor selection.", "primary_url": "https://www.energy.gov/nnsa/articles/nnsa-seeks-proposals-ai-data-centers-energy-projects-savannah-river-site-0" }, { "id": "DOE-SRS-AMENTUM-SELECTION", "lane": "federal_land", "date": "2026-07-20", "title": "Amentum selected for Savannah River phased-lease negotiations", "actor": "NNSA", "instrument_type": "selection_announcement", "legal_state": "selection_for_negotiation", "current_effect": "Selects Amentum to negotiate a proposed 1 GW data center and approximately 2 GW of on-site generation.", "not_proved": "DOE expressly states this is not a final lease award; negotiation, permitting, safety, security and other approvals remain.", "primary_url": "https://www.energy.gov/nnsa/articles/nnsa-selects-amentum-ai-data-center-and-energy-project-savannah-river-site" }, { "id": "DOE-PADUCAH-RFO", "lane": "federal_land", "date": "2025-11-04", "title": "Paducah AI data-center and energy lease request for offers", "actor": "Department of Energy", "instrument_type": "request_for_offers", "legal_state": "solicitation", "current_effect": "Invites applicant-funded long-term lease offers due January 30, 2026.", "not_proved": "Not a sponsor selection, lease or permit.", "primary_url": "https://www.energy.gov/em/articles/us-energy-department-seeks-proposals-ai-data-centers-energy-projects-paducah-site" }, { "id": "DOE-PADUCAH-SELECTION", "lane": "federal_land", "date": "2026-07-29", "title": "Brookfield and NextEra selected for Paducah data-center and energy development", "actor": "Department of Energy", "instrument_type": "selection_and_partnership_announcement", "legal_state": "sponsor_selection", "current_effect": "Selects Brookfield for a 1.8 GW campus and NextEra for 2 GW gas generation plus up to 2.6 GW storage on or near approximately 785 acres.", "not_proved": "Not operating proof; the power service agreement remains subject to Kentucky PSC approval and every lease and permit is not established as final.", "primary_url": "https://www.energy.gov/articles/energy-department-announces-partnership-expand-reliable-affordable-energy-access-and-power" }, { "id": "DOE-PORTSMOUTH-LEASE", "lane": "federal_land", "date": "2026-03-20", "title": "Portsmouth federal-land lease and project announcement", "actor": "Department of Energy and Department of Commerce", "instrument_type": "lease_and_project_announcement", "legal_state": "publicly_confirmed_lease", "current_effect": "DOE publicly confirms an SB Energy affiliate is leasing federal land; initial phase is 189 acres and groundbreaking occurred March 20, 2026.", "not_proved": "Public release is not the lease instrument or full terms and does not prove the entire announced 10 GW campus lies on DOE land.", "primary_url": "https://www.energy.gov/articles/energy-department-announces-partnership-ensure-affordable-energy-and-power-americas-ai" }, { "id": "DOE-CX-270875", "lane": "nepa", "date": "2025-11-17", "title": "Portsmouth Batch 1 real-property lease categorical exclusion", "actor": "Department of Energy", "instrument_type": "categorical_exclusion_determination", "legal_state": "categorical_exclusion_determination", "current_effect": "Applies a DOE categorical exclusion to the described 189-acre lease action.", "not_proved": "Not a full campus permit or approval of every associated action.", "primary_url": "https://www.energy.gov/nepa/listings/categorical-exclusion-determinations-b124?page=2" }, { "id": "DOE-CX-270900", "lane": "nepa", "date": "2026-02-04", "title": "Portsmouth AEP 138-kV transmission easement categorical exclusion", "actor": "Department of Energy", "instrument_type": "categorical_exclusion_determination", "legal_state": "categorical_exclusion_determination", "current_effect": "Applies a DOE categorical exclusion to an easement for five 138-kV lines and related right-of-way work.", "not_proved": "Does not establish completed or energized transmission service.", "primary_url": "https://www.energy.gov/nepa/listings/categorical-exclusion-determinations-portsmouth-paducah-project-office?page=0" }, { "id": "DOE-CX-270956", "lane": "nepa", "date": "2026-04-29", "title": "Portsmouth Batch 1 environmental site assessment categorical exclusion", "actor": "Department of Energy", "instrument_type": "categorical_exclusion_determination", "legal_state": "categorical_exclusion_determination", "current_effect": "Applies a DOE categorical exclusion to environmental site assessment activities on the leased 189 acres.", "not_proved": "Assessment activity is not final design or construction approval.", "primary_url": "https://www.energy.gov/sites/default/files/2026-04/CX-270956.pdf" }, { "id": "DOE-CX-270955", "lane": "nepa", "date": "2026-04-29", "title": "Paducah Parcel C lease categorical exclusion", "actor": "Department of Energy", "instrument_type": "categorical_exclusion_determination", "legal_state": "categorical_exclusion_determination", "current_effect": "Applies a DOE categorical exclusion to the proposed lease of approximately 188 acres.", "not_proved": "Not sponsor selection, project permit or operation.", "primary_url": "https://www.energy.gov/nepa/articles/cx-270955-lease-real-property-leasing-parcel-c-paducah-gaseous-diffusion-plant4511a" }, { "id": "DOE-CX-270971", "lane": "nepa", "date": "2026-05-04", "title": "Paducah Parcel B lease categorical exclusion", "actor": "Department of Energy", "instrument_type": "categorical_exclusion_determination", "legal_state": "categorical_exclusion_determination", "current_effect": "Applies a DOE categorical exclusion to the proposed lease of approximately 785 acres.", "not_proved": "Not a completed lease, project permit, construction or operation.", "primary_url": "https://www.energy.gov/nepa/listings/categorical-exclusion-determinations-portsmouth-paducah-project-office?page=0" }, { "id": "ARMY-FORT-BLISS-DUGWAY", "lane": "federal_land", "date": "2026-03-26", "title": "Army conditional selections for Fort Bliss and Dugway data centers", "actor": "Department of the Army", "instrument_type": "conditional_selection", "legal_state": "conditional_selection", "current_effect": "Selects Carlyle and CyrusOne for exclusive 10 U.S.C. 2667 lease negotiations.", "not_proved": "Army says the deal is not final; no executed lease, construction or IOC.", "primary_url": "https://www.army.mil/article/291360/army_reaches_conditional_agreement_with_private_industry_for_hyperscaled_data_centers" }, { "id": "AIR-FORCE-RFLP-FIVE", "lane": "federal_land", "date": "2025-10-15", "title": "Air Force AI data-center RFLP at five installations", "actor": "Department of the Air Force", "instrument_type": "request_for_lease_proposals", "legal_state": "solicitation", "current_effect": "Solicits long-term lease proposals at Arnold, Davis-Monthan, Edwards, JB McGuire-Dix-Lakehurst and Robins.", "not_proved": "Arnold reported no proposal; no final award or lease located for the other sites.", "primary_url": "https://www.afcec.af.mil/Energy/Opportunities/" }, { "id": "AIR-FORCE-RFLP-ALASKA", "lane": "federal_land",
Section 2 of 3
"date": "2026-04-10",
"title": "Air Force Alaska AI data-center RFLP",
"actor": "Department of the Air Force",
"instrument_type": "request_for_lease_proposals",
"legal_state": "solicitation",
"current_effect": "Solicits 10 U.S.C. 2667 proposals at JBER, Eielson and Clear SFS.",
"not_proved": "No public final selection or executed lease located; government use or power purchase is not guaranteed.",
"primary_url": "https://sam.gov/opp/01a3e5dd181b44e98c0a1c867669a7ef/view"
},
{
"id": "BLM-TOWNSITE-ROW",
"lane": "federal_land",
"date": "2026-06-26",
"title": "BLM Townsite Data Center right-of-way decision",
"actor": "Bureau of Land Management",
"instrument_type": "right_of_way_decision",
"legal_state": "agency_decision_appeal_pending",
"current_effect": "Approves a Nevada lands-and-realty right-of-way case consistent with EO 14318.",
"not_proved": "Not final unappealable authorization or operation; official sources contain an unresolved acreage discrepancy.",
"primary_url": "https://www.blm.gov/announcement/approved-decision-townsite-data-center"
},
{
"id": "FAST41-QTS-RIC5",
"lane": "fast41",
"date": "2026-04-01",
"title": "QTS Richmond Technology Park Data Center 5 FAST-41 coverage",
"actor": "Federal Permitting Improvement Steering Council",
"instrument_type": "fast41_covered_project_posting",
"legal_state": "fast41_covered_in_progress",
"current_effect": "Places the project on a coordinated public federal permitting timetable.",
"not_proved": "Not permit issuance, funding, endorsement or EO-specific transparency designation.",
"primary_url": "https://www.permits.performance.gov/permitting-project/fast-41-covered-projects/qts-richmond-technology-park-data-center-5-ric5"
},
{
"id": "FAST41-PORTS",
"lane": "fast41",
"date": "2026-06-11",
"title": "PORTS Technology Campus FAST-41 coverage",
"actor": "Federal Permitting Improvement Steering Council",
"instrument_type": "fast41_covered_project_posting",
"legal_state": "fast41_covered_in_progress",
"current_effect": "Places the project on a USACE-led coordinated public federal permitting timetable.",
"not_proved": "Not approval, funding, completion or proof that the full announced campus occupies federal land.",
"primary_url": "https://www.permits.performance.gov/permitting-project/fast-41-covered-projects/ports-technology-campus"
},
{
"id": "EPA-CERCLA-BROWNFIELDS-GUIDANCE",
"lane": "environment",
"date": "2026-01-19",
"title": "Guidance on Redevelopment of Superfund and Brownfield Sites as AI Data Centers",
"actor": "Environmental Protection Agency",
"instrument_type": "guidance",
"legal_state": "nonbinding_guidance",
"date_basis": "EO deadline date used for the return audit; the guidance document itself is dated January 2026.",
"current_effect": "Provides screening, liability, remedy-consistency, institutional-control and reuse considerations.",
"not_proved": "No site designation, cleanup waiver, land-use approval or permit.",
"primary_url": "https://www.epa.gov/system/files/documents/2026-01/guidance-on-the-redevelopment-of-superfund-and-brownfield-sites-as-ai-data-centers.pdf"
},
{
"id": "EPA-TSCA-PRIORITY",
"lane": "environment",
"date": "2025-09-29",
"title": "TSCA new-chemical priority review for qualifying data-center projects",
"actor": "Environmental Protection Agency",
"instrument_type": "review_workflow",
"legal_state": "priority_review_workflow",
"current_effect": "Allows documented qualifying submissions to receive priority handling.",
"not_proved": "No amended review standard, PMN waiver, authorization or changed statutory deadline.",
"primary_url": "https://www.epa.gov/newsreleases/epa-prioritizes-review-new-chemicals-used-data-center-projects-supporting-american"
},
{
"id": "EPA-CAA-ISLANDED-ARP",
"lane": "environment",
"date": "2026-07-16",
"title": "Islanded power generators and Acid Rain Program interpretive memorandum",
"actor": "Environmental Protection Agency",
"instrument_type": "interpretive_memorandum",
"legal_state": "interpretive_guidance",
"current_effect": "Provides a fact-dependent view that truly islanded units serving one private consumer generally fall outside the Acid Rain Program definitions.",
"not_proved": "Not a rule or final facility determination; expressly does not address any other Clean Air Act program.",
"primary_url": "https://www.epa.gov/system/files/documents/2026-07/epa-issues-clarification-on-islanded-power-generators-and-acid-rain-program-provisions.pdf"
},
{
"id": "EPA-NSR-BEGIN-CONSTRUCTION",
"lane": "environment",
"date": "2026-05-13",
"title": "Begin Actual Construction in the NSR Preconstruction Permitting Program",
"actor": "Environmental Protection Agency",
"instrument_type": "notice_of_proposed_rulemaking",
"legal_state": "proposed_rule",
"current_effect": "Proposes to distinguish specified non-emitting construction from work that must await a major NSR permit.",
"not_proved": "No final-rule effect or authority to rely on proposed text.",
"primary_url": "https://www.federalregister.gov/documents/2026/05/13/2026-09524/begin-actual-construction-in-the-new-source-review-nsr-preconstruction-permitting-program"
},
{
"id": "USACE-NWP-39",
"lane": "environment",
"date": "2026-01-08",
"title": "Reissuance and Modification of Nationwide Permits - NWP 39",
"actor": "Army Corps of Engineers",
"instrument_type": "final_nationwide_permit",
"legal_state": "final_general_permit",
"current_effect": "NWP 39 expressly includes data centers; effective March 15, 2026, generally with a one-half-acre waters-loss cap and preconstruction notification.",
"not_proved": "Not blanket authorization; regional/general conditions, district review, ESA and other permits remain.",
"primary_url": "https://www.federalregister.gov/documents/2026/01/08/2026-00121/reissuance-and-modification-of-nationwide-permits"
},
{
"id": "USACE-PROJECT-SKYE-NOTICE",
"lane": "environment",
"date": "2026-06-29",
"title": "Project Skye data-center individual permit notice",
"actor": "Army Corps of Engineers Norfolk District",
"instrument_type": "public_notice_of_application",
"legal_state": "permit_application_notice",
"current_effect": "Publishes an individual section 404 application for five data centers and stated wetland and stream impacts.",
"not_proved": "Application and public notice are not an issued permit or final environmental finding.",
"primary_url": "https://www.nao.usace.army.mil/Media/Public-Notices/Article/4524288/nao-2026-00282-vmrc-26-0360-project-skye-data-center-chesterfield-county-virgin/"
},
{
"id": "BILL-MORATORIUM",
"lane": "congress",
"date": "2026-03-25",
"title": "S.4214 / H.R.9442 - Artificial Intelligence Data Center Moratorium Act",
"actor": "119th Congress",
"instrument_type": "bill_pair",
"legal_state": "introduced_referred",
"current_effect": "No operative effect. Would impose a covered-construction and upgrade moratorium until later legislation meets specified conditions.",
"not_proved": "No federal moratorium exists.",
"primary_url": "https://www.govinfo.gov/app/details/BILLS-119s4214is"
},
{
"id": "BILL-POWER-FOR-PEOPLE",
"lane": "congress",
"date": "2026-01-15",
"title": "S.3682 / H.R.8241 - Power for the People Act",
"actor": "119th Congress",
"instrument_type": "bill_pair",
"legal_state": "introduced_referred",
"current_effect": "No operative effect. Would create FERC large-load queues and specified cost-allocation and state-rate consideration duties above 50 MW.",
"not_proved": "No queue, allocation or rate rule created by the bills.",
"primary_url": "https://www.govinfo.gov/app/details/BILLS-119s3682is"
},
{
"id": "BILL-PRICE",
"lane": "congress",
"date": "2026-01-08",
"title": "H.R.6983 - Preventing Rate Inflation in Consumer Energy Act",
"actor": "119th Congress",
"instrument_type": "bill",
"legal_state": "introduced_referred",
"current_effect": "No operative effect. Would require annual generation matching and future clean-energy percentages at data centers using at least 50 MW daily.",
"not_proved": "No current self-generation or federal clean-percentage mandate.",
"primary_url": "https://www.govinfo.gov/app/details/BILLS-119hr6983ih"
},
{
"id": "BILL-TRANSPARENCY",
"lane": "congress",
"date": "2026-01-08",
"title": "H.R.6984 - Data Center Transparency Act",
"actor": "119th Congress",
"instrument_type": "bill",
"legal_state": "introduced_referred",
"current_effect": "No operative effect. Would create recurring EPA water/environment and EIA electricity reporting.",
"not_proved": "No federal reporting regime created by the bill.",
"primary_url": "https://www.govinfo.gov/app/details/BILLS-119hr6984ih"
},
{
"id": "BILL-CLEAN-CLOUD",
"lane": "congress",
"date": "2025-04-10",
"title": "S.1475 / H.R.6179 - Clean Cloud Act",
"actor": "119th Congress",
"instrument_type": "bill_pair",
"legal_state": "introduced_referred",
"current_effect": "No operative effect. Would impose reporting and an escalating excess-emissions-intensity fee above 100 kW IT nameplate.",
"not_proved": "Proposed 2025-2026 clocks passed without effect because the bill was not enacted.",
"primary_url": "https://www.govinfo.gov/app/details/BILLS-119s1475is"
},
{
"id": "BILL-DPA-AI-POWER",
"lane": "congress",
"date": "2025-11-07",
"title": "H.R.5927 - Securing Reliable Power for Advanced Technologies Act",
"actor": "119th Congress",
"instrument_type": "bill",
"legal_state": "introduced_referred",
"current_effect": "No operative effect. Would create DPA priority, financing and consolidated permitting for defined critical AI infrastructure.",
"not_proved": "No designation, DPA finance or permitting entitlement created.",
"primary_url": "https://www.govinfo.gov/app/details/BILLS-119hr5927ih"
},
{
"id": "BILL-NO-HARM",
"lane": "congress",
"date": "2026-03-20",
"title": "H.R.8033 - No Harm Data Centers Act",
"actor": "119th Congress",
"instrument_type": "bill",
"legal_state": "introduced_referred",
"current_effect": "No operative effect. Would assign specified utility upgrade costs to covered data centers and give FERC specified retail-charge authority.",
"not_proved": "No federal full-cost-allocation rule created.",
"primary_url": "https://www.govinfo.gov/app/details/BILLS-119hr8033ih"
},
{
"id": "BILL-FAIR-DATA",
"lane": "congress",
"date": "2026-07-13",
"title": "H.R.9655 - Fair Allocation of Infrastructure Responsibility for Data Act",
"actor": "119th Congress",
"instrument_type": "bill",
"legal_state": "introduced_referred",
"current_effect": "No operative effect. Would create a PURPA state-consideration standard against shifting specified costs above 75 MW.",
"not_proved": "No current PURPA data-center cost standard.",
"primary_url": "https://www.govinfo.gov/app/details/BILLS-119hr9655ih"
},
{
"id": "BILL-WATER-ENERGY-REPORTING",
"lane": "congress",
"date": "2026-03-25",
Section 3 of 3
"title": "S.4213 / H.R.9825 - Data Center Water and Energy Transparency Act",
"actor": "119th Congress",
"instrument_type": "bill_pair",
"legal_state": "introduced_referred",
"current_effect": "No operative effect. Would require annual and predevelopment energy, water, generation, PUE, WUE and projection reporting above 25 MW.",
"not_proved": "No operator reporting duty or penalty exists under the bills.",
"primary_url": "https://www.govinfo.gov/app/details/BILLS-119s4213is"
},
{
"id": "BILL-TAX-DISCLOSURE",
"lane": "congress",
"date": "2026-07-21",
"title": "S.5054 - Data Center Tax Accountability and Disclosure Act",
"actor": "119th Congress",
"instrument_type": "bill",
"legal_state": "introduced_referred",
"current_effect": "No operative effect. Would condition bonus depreciation and require broad disclosures for defined centers.",
"not_proved": "No current federal tax exclusion or disclosure penalty under the bill.",
"primary_url": "https://www.govinfo.gov/app/details/BILLS-119s5054is"
},
{
"id": "BILL-SITE-TRANSPARENCY",
"lane": "congress",
"date": "2026-04-23",
"title": "H.R.8488 - AI Data Center Site Selection Transparency Act",
"actor": "119th Congress",
"instrument_type": "bill",
"legal_state": "introduced_referred",
"current_effect": "No operative effect. Would require 180-day predevelopment location/impact disclosure, outreach and third-party assessment.",
"not_proved": "No current federal predevelopment disclosure duty under the bill.",
"primary_url": "https://www.govinfo.gov/app/details/BILLS-119hr8488ih"
},
{
"id": "BILL-LOCAL-CONTROL",
"lane": "congress",
"date": "2026-06-11",
"title": "H.R.9262 - Local Control Protection Act",
"actor": "119th Congress",
"instrument_type": "bill",
"legal_state": "introduced_referred",
"current_effect": "No operative effect. Would limit federal challenges to documented local zoning denials and condition federal tax credits on local agreements.",
"not_proved": "No jurisdictional bar, permit hold or tax-credit condition exists under the bill.",
"primary_url": "https://www.govinfo.gov/app/details/BILLS-119hr9262ih"
},
{
"id": "BILL-PROTECT-AMERICAN-AI",
"lane": "congress",
"date": "2026-03-24",
"title": "H.R.8037 - Protect American AI Act",
"actor": "119th Congress",
"instrument_type": "bill",
"legal_state": "introduced_referred",
"current_effect": "No operative effect. Would limit vacatur and expedite judicial review for specified permits.",
"not_proved": "No current remand-without-vacatur or 90-day review rule under the bill.",
"primary_url": "https://www.govinfo.gov/app/details/BILLS-119hr8037ih"
},
{
"id": "BILL-NO-FEDERAL-LANDS",
"lane": "congress",
"date": "2026-07-23",
"title": "H.R.9939 - No AI Data Centers on Federal Lands Act",
"actor": "119th Congress",
"instrument_type": "bill",
"legal_state": "introduced_referred",
"current_effect": "No operative effect. Would prohibit covered AI data centers and supporting infrastructure on federal land and begin removal.",
"not_proved": "No current federal-land prohibition or removal duty exists under the bill.",
"primary_url": "https://www.govinfo.gov/app/details/BILLS-119hr9939ih"
},
{
"id": "BILL-AI-ENVIRONMENTAL-IMPACTS",
"lane": "congress",
"date": "2026-06-09",
"title": "S.4727 / H.R.9183 - Artificial Intelligence Environmental Impacts Act",
"actor": "119th Congress",
"instrument_type": "bill_pair",
"legal_state": "introduced_referred",
"current_effect": "No operative effect. Would create federal studies, hearings, a NIST consortium and operator environmental reporting above 50 MW.",
"not_proved": "No current reporting or hearing duty under the bills.",
"primary_url": "https://www.govinfo.gov/app/details/BILLS-119s4727is"
},
{
"id": "BILL-COMMUNITY-REINVESTMENT",
"lane": "congress",
"date": "2026-08-13",
"title": "H.R.10102 - Data Center Community Reinvestment Act",
"actor": "119th Congress",
"instrument_type": "bill",
"legal_state": "introduced_referred",
"current_effect": "No operative effect. Would impose a one-cent-per-kWh federal excise tax above 1 MW.",
"not_proved": "No current federal data-center electricity excise tax under the bill.",
"primary_url": "https://www.govinfo.gov/app/details/BILLS-119hr10102ih"
},
{
"id": "NDAA-2026-SEC-321",
"lane": "congress",
"date": "2025-12-18",
"title": "P.L. 119-60 section 321 - Navy nuclear-energy pilot",
"actor": "119th Congress",
"instrument_type": "public_law_section",
"legal_state": "enacted_statute",
"current_effect": "Requires Navy initiation of a ten-year pilot by December 18, 2026; possible data-center co-location is a site-selection consideration.",
"not_proved": "No commercial data-center or reactor approval and no displacement of ordinary permits.",
"primary_url": "https://www.govinfo.gov/content/pkg/PLAW-119publ60/pdf/PLAW-119publ60.pdf"
},
{
"id": "NDAA-2026-SEC-1531",
"lane": "congress",
"date": "2025-12-18",
"title": "P.L. 119-60 section 1531 - military-installation data-center planning estimates",
"actor": "119th Congress",
"instrument_type": "public_law_section",
"legal_state": "enacted_statute",
"current_effect": "Requires recurring DOD roadmap estimates for footprint, electricity, water, local effects, mitigation and resilience for military-installation data centers.",
"not_proved": "Reporting duty is not construction authorization, utility tariff or environmental permit.",
"primary_url": "https://www.govinfo.gov/content/pkg/PLAW-119publ60/pdf/PLAW-119publ60.pdf"
},
{
"id": "BILL-SPEED-ACT",
"lane": "congress_adjacent",
"date": "2025-12-18",
"title": "H.R.4776 - SPEED Act",
"actor": "119th Congress",
"instrument_type": "broader_permitting_bill",
"legal_state": "passed_one_chamber",
"current_effect": "No operative effect. House-passed broader permitting bill with an official CRS-described nexus to data-center energy infrastructure.",
"not_proved": "Not law and not a direct data-center code.",
"primary_url": "https://www.congress.gov/bill/119th-congress/house-bill/4776/actions"
},
{
"id": "GAP-COMMERCE-OSTP-SECTION-3",
"lane": "public_gap",
"date": "2026-08-20",
"title": "Public Commerce-OSTP section 3 implementation gap",
"actor": "Research audit",
"instrument_type": "bounded_negative",
"legal_state": "bounded_public_record_gap",
"current_effect": "No consolidated public initiative, agency support inventory or named section 3 support award was located.",
"not_proved": "Does not prove internal coordination or submissions did not occur.",
"primary_url": "https://www.whitehouse.gov/wp-content/uploads/2026/01/WHOSTP-2025-Wins.pdf"
},
{
"id": "GAP-CEQ-CE-INVENTORY",
"lane": "public_gap",
"date": "2026-08-20",
"title": "Public CEQ data-center categorical-exclusion inventory gap",
"actor": "Research audit",
"instrument_type": "bounded_negative",
"legal_state": "bounded_public_record_gap",
"current_effect": "No public compilation of EO 14318 ten-day submissions or newly titled data-center CE was located.",
"not_proved": "The order did not require publication; no-public-record does not prove non-submission or noncompliance.",
"primary_url": "https://ceq.doe.gov/docs/ceq-regulations-and-guidance/Categorical-Exclusion-Guidance-2026.pdf"
},
{
"id": "GAP-ESA-PROGRAMMATIC",
"lane": "public_gap",
"date": "2026-08-20",
"title": "Public EO-specific ESA programmatic consultation gap",
"actor": "Research audit",
"instrument_type": "bounded_negative",
"legal_state": "bounded_public_record_gap",
"current_effect": "No posted ten-year EO-specific consultation or biological opinion was located.",
"not_proved": "Does not prove consultation was not initiated; project-level ESA duties remain.",
"primary_url": "https://www.energy.gov/articles/doe-announces-site-selection-ai-data-center-and-energy-infrastructure-development-federal"
}
] }