{"schema":"f250.library-documents/v1","document_id":"doc-086af05efbcefca2da6f","title":"ATLAS_DATA","source":{"scope":"workbench","path":"Research Packages/Federal Government Movement Atlas/generated/ATLAS_DATA.json"},"source_sha256":"5169ebdd58ea3733731dd632b71b45c8b18f7b9dc5a0b5c2fc8b161c526580a4","text_sha256":"9187a6d8d54abaaf427590e99a1f73567b3986f402b4f838b0e6fc94fea51c7d","evidence_cutoffs":{"artifact:086af05efbcefca2da6f":"2026-09-22T11:51:46-04:00"},"reading_state":"complete_text","warnings":[],"section_id":"s00472","ordinal":472,"label":"Section 472 (continued)","source_page":null,"start_character":5609160,"end_character":5621157,"start_line":81549,"end_line":81716,"text":"          \"DOE tribal nuclear webinar August 13 2026\",\n          \"tribal microreactor data center\",\n          \"Office of Indian Energy webinar\",\n          \"nuclear compute partnership\"\n        ],\n        \"research_titles\": [\n          \"Data centers where tribal, state and federal power meet\"\n        ],\n        \"unknown_research_ids\": []\n      },\n      {\n        \"return_id\": \"ret-doj-ai-controls-reconciliation\",\n        \"research_ids\": [\n          \"federal-agency-ai-plans-infrastructure\"\n        ],\n        \"question\": \"What happened to DOJ's 73 deployed or high-impact rows after the April 3 minimum-practices clock?\",\n        \"note\": \"It tests whether rights-affecting AI moved from declared deployment into documented controls, waivers or termination.\",\n        \"current_answer\": \"October 5 refresh: DOJ's public inventory remains the January 30 snapshot, the AI hub still exposes the superseded M-24-10 plan, and the FY2025 CDO report still describes the Interim AI Policy, M-25-21 Strategy and Compliance Plan, Governance Rubric and Literacy campaign as deliverables to complete. No row-level completion, waiver, discontinuation or CAIO disposition was located for the 73 deployed/high-impact rows.\",\n        \"revisit_on\": null,\n        \"revisit_when\": \"A current DOJ strategy or compliance plan, or a row-specific control disposition, appears. Look for: Completed controls, a waiver, discontinuation or CAIO disposition are keyed to a named row or system.\",\n        \"source_refs\": [\n          {\n            \"path\": \"Research Packages/Federal Agency AI Plans and Infrastructure 2025-2026/FEDERAL_AGENCY_AI_CLAIM_AUDIT_AND_RETURN_WATCHBOARD_2026-08-23.md\",\n            \"anchor\": \"P0 — immediate reconciliation returns\"\n          }\n        ],\n        \"last_checked\": \"2026-10-05\",\n        \"status\": \"open\",\n        \"watch_id\": null,\n        \"result_refs\": [\n          \"Research Packages/Federal Agency AI Plans and Infrastructure 2025-2026/DOJ_TSA_AI_CONTROL_RETURN_REFRESH_2026-10-05.md :: 1. DOJ's 73-row control question remains open\"\n        ],\n        \"superseded_by\": null,\n        \"tags\": [\n          \"DOJ M-25-21 compliance plan\",\n          \"73 high-impact AI\",\n          \"CAIO disposition\",\n          \"minimum practices waiver\"\n        ],\n        \"research_titles\": [\n          \"Trump added a super-intelligence team without taking power from agencies\"\n        ],\n        \"unknown_research_ids\": []\n      },\n      {\n        \"return_id\": \"ret-dow-audit-reports-2026-08-31\",\n        \"research_ids\": [\n          \"education-university-funding\",\n          \"federal-science-operating-system\"\n        ],\n        \"question\": \"Did the 30 unnamed institutions submit their research-security findings and actions, and what did the Department do with them?\",\n        \"note\": \"This is the first gate from institution-level review toward an eligibility, remediation, award or funding consequence.\",\n        \"current_answer\": \"October 5 return: no Department recipient list, public receipt log, institution-specific finding, accepted mitigation, eligibility disposition, award action or SAM exclusion was located. The journalist-attributed aggregate claim that all 30 responded remains below a public primary receipt. The passed deadline proves neither acceptance nor funding consequence.\",\n        \"revisit_on\": null,\n        \"revisit_when\": \"A Department receipt log, cohort/result summary, institution-specific determination, SAM/FR/award object, or FOIA production appears. The watchboard already names September 1–30 for adequacy/mitigation/funding decisions. Keep the October 1 Confucius waiver as a separate return.\",\n        \"source_refs\": [\n          {\n            \"path\": \"Research Packages/Education/Department of War Research Security Audits 2026-08-17/DOW_RESEARCH_SECURITY_AUDIT_WATCHBOARD_2026-08-17.md\",\n            \"anchor\": \"Dated watch\"\n          }\n        ],\n        \"last_checked\": \"2026-10-05\",\n        \"status\": \"open\",\n        \"watch_id\": \"w-2026-08-31-dow-research-security-audit-reports\",\n        \"result_refs\": [\n          \"Research Packages/Matured Research Returns 2026-10-05/README.md :: 2. The university questions reached a legal cutoff, not a public disposition\"\n        ],\n        \"superseded_by\": null,\n        \"tags\": [\n          \"DoW 30 institutions\",\n          \"research security audit reports\",\n          \"August 31 findings\",\n          \"institution reports actions\"\n        ],\n        \"research_titles\": [\n          \"University money now comes with more checks around the payment\",\n          \"How Washington plans to turn science strategy into funded work\"\n        ],\n        \"unknown_research_ids\": []\n      },\n      {\n        \"return_id\": \"ret-election-real-time-patch-certification-route\",\n        \"research_ids\": [\n          \"election-integrity-release\"\n        ],\n        \"question\": \"Does CISA's call for real-time election-system security updates produce a changed EAC or state certification route and a named patch that reaches deployed production systems?\",\n        \"note\": \"The plan identifies certification delay as a major vulnerability-management constraint, but CISA cannot itself waive EAC, state, laboratory, vendor or local acceptance gates.\",\n        \"current_answer\": \"CISA recommends harmonizing patch management and certification so cybersecurity updates can move in real time without unnecessarily affecting certification. Current EAC rules still require VSTL review and EAC approval for minimal engineering changes, while non-minimal changes require modification testing and review; state law can add separate gates. No changed EAC manual, state emergency route, named product/version approval, jurisdiction deployment or independent production retest was located in the plan bundle. Do not assume: that a CISA recommendation authorizes a patch or that vendor remediation reached certified fielded builds.\",\n        \"revisit_on\": null,\n        \"revisit_when\": \"EAC or a state certification authority adopts a new patch route, or a vendor submits a security fix through the existing route. Look for: Product/version, vulnerability/CVE, test plan and report, EAC/state approval, local acceptance, deployment date and independent retest.\",\n        \"source_refs\": [\n          {\n            \"path\": \"Research Packages/Election Integrity/White House Election Integrity Release 2026-07-16/CISA_2026_ELECTION_INFRASTRUCTURE_PLAN_RETURN_2026-10-05.md\",\n            \"anchor\": \"The patch/certification sentence is a policy bomb, not a rule\"\n          }\n        ],\n        \"last_checked\": \"2026-10-05\",\n        \"status\": \"open\",\n        \"watch_id\": null,\n        \"result_refs\": [\n          \"Research Packages/Election Integrity/White House Election Integrity Release 2026-07-16/CISA_2026_ELECTION_INFRASTRUCTURE_PLAN_RETURN_2026-10-05.md\",\n          \"Research Packages/Election Integrity/White House Election Integrity Release 2026-07-16/WHITE_HOUSE_ELECTION_INTEGRITY_SOURCE_WATCHBOARD.md\"\n        ],\n        \"superseded_by\": null,\n        \"tags\": [\n          \"election system patches\",\n          \"EAC certification\",\n          \"engineering change order\",\n          \"production deployment validation\"\n        ],\n        \"research_titles\": [\n          \"White House election files show real risks, not proof of changed results\"\n        ],\n        \"unknown_research_ids\": []\n      },\n      {\n        \"return_id\": \"ret-fatf-r16-final-guidance-2026\",\n        \"research_ids\": [\n          \"g7-g20-coordination-architecture\",\n          \"private-monetary-stack\",\n          \"fraud-payment-integrity\"\n        ],\n        \"question\": \"Did FATF publish final guidance for revised Recommendation 16 after the August 21, 2026 consultation close, and what implementation objects did it require?\",\n        \"note\": \"The final guidance is the next technical object linking standardized payment data to recipient verification, fraud/error controls, privacy and domestic implementation through end-2030.\",\n        \"current_answer\": \"The revised Recommendation 16 and Interpretive Note are part of the FATF Standards, but no final implementation guidance was located through October 5. FATF's guidance page still exposes the closed June 24-August 21 consultation, explanatory memorandum and draft guidance; FATF's explanatory note expressly says it is not formal guidance and expected guidance later in 2026. No final version, consultation-response synthesis, draft-to-final change map or mutual-evaluation implementation method is public. Do not assume: that consultation text is final, that a domestic or operator implementation is FATF-wide transposition, or that a live global confirmation-of-payee, freeze or recovery network exists.\",\n        \"revisit_on\": null,\n        \"revisit_when\": \"Activate on FATF publication of the final R.16 implementation guidance. Look for: Record the final version/effective state, changes from consultation, data and fraud-control requirements, privacy treatment, domestic readiness clock and mutual-evaluation path.\",\n        \"source_refs\": [\n          {\n            \"path\": \"Research Packages/G7 and G20 Coordination Architecture 2025-2026/Financial Rails and Project Transmission 2025-2026/FINANCIAL_RAIL_SOURCE_AND_RETURN_LEDGER_2025-2027.md\",\n            \"anchor\": \"Deduplicated return board\"\n          }\n        ],\n        \"last_checked\": \"2026-10-05\",\n        \"status\": \"open\",\n        \"watch_id\": null,\n        \"result_refs\": [\n          \"Research Packages/G7 and G20 Coordination Architecture 2025-2026/Financial Rails and Project Transmission 2025-2026/FATF_R16_FINAL_GUIDANCE_RETURN_REFRESH_2026-10-05.md\"\n        ],\n        \"superseded_by\": null,\n        \"tags\": [\n          \"FATF final Recommendation 16 guidance 2026\",\n          \"FATF payment transparency guidance final\",\n          \"R16 recipient verification implementation\"\n        ],\n        \"research_titles\": [\n          \"G7 and G20 set goals, but other bodies make them happen\",\n          \"Which companies connect the new private money system\",\n          \"No public record yet follows a federal dollar all the way down\"\n        ],\n        \"unknown_research_ids\": []\n      },\n      {\n        \"return_id\": \"ret-fbi-backbone-ai-operation-proof-2026-10-03\",\n        \"research_ids\": [\n          \"federal-agency-ai-plans-infrastructure\"\n        ],\n        \"question\": \"What official records reconcile the FBI's claimed 140 AI use cases and 605% increase, establish the current NERI completion state, and measure whether AI-assisted TIPS triage actually shortened response times or improved outcomes?\",\n        \"note\": \"Keep network consolidation, equipment replacement, cloud and data readiness, use-case inventory stage, ATO, human review, referral latency, investigative action and measured prevention or enforcement effect separate.\",\n        \"current_answer\": \"As of October 3, NERI had consolidated more than 600 fragmented networks and TIPS was publicly reported as deployed with an ATO and human second-review routing. The March 2026 FBI budget still described only about one-third of the enterprise network as modernized through FY2024, significant end-of-life classified infrastructure and continuing FY2027 requests. The January 2026 public inventory contained 50 FBI rows, not a reconciled current 140-row list. No denominator for 605%, NERI closeout, TIPS latency/error series or case-linked causal evaluation was located.\",\n        \"revisit_on\": null,\n        \"revisit_when\": \"Return when DOJ publishes the 2026 AI inventory, the FBI publishes a current row-level use-case or NERI completion record, Congress acts on the FY2027 cybersecurity request, DOJ OIG updates the AFEDT or FY2025 FISMA recommendations, or the FBI publishes TIPS performance or case-linked evaluation evidence.\",\n        \"source_refs\": [\n          {\n            \"path\": \"Research Packages/Federal Agency AI Plans and Infrastructure 2025-2026/FBI_TECHNOLOGY_BACKBONE_AI_TRIAGE_AND_MODERNIZATION_STATE_2026-10-03.md\",\n            \"anchor\": \"Exact receipts needed next\"\n          }\n","next_section_id":"s00473","end_of_document":false,"data_url":"https://freedom-250-observatory.katiekaim.chatgpt.site/readings/sections/doc-086af05efbcefca2da6f-s00472.json","next_section_url":"https://freedom-250-observatory.katiekaim.chatgpt.site/readings/sections/doc-086af05efbcefca2da6f-s00473.json","section_count":1055,"document_index_url":"https://freedom-250-observatory.katiekaim.chatgpt.site/readings/doc-086af05efbcefca2da6f.sections.json","data_url_absolute_url":"https://freedom-250-observatory.katiekaim.chatgpt.site/readings/sections/doc-086af05efbcefca2da6f-s00472.json","next_section_url_absolute_url":"https://freedom-250-observatory.katiekaim.chatgpt.site/readings/sections/doc-086af05efbcefca2da6f-s00473.json","document_index_url_absolute_url":"https://freedom-250-observatory.katiekaim.chatgpt.site/readings/doc-086af05efbcefca2da6f.sections.json","data_url_relative_path":"doc-086af05efbcefca2da6f-s00472.json","next_section_url_relative_path":"doc-086af05efbcefca2da6f-s00473.json","document_index_url_relative_path":"../doc-086af05efbcefca2da6f.sections.json"}
