# Active buildout — science, industrial, cyber and critical infrastructure **As of:** September 28, 2026 **Status:** proposal artifact; not promoted into the package registry, coverage ledger, synthesis or projection surfaces **Scope reviewed:** all 23 completed `science_industrial` and `cyber_critical_infrastructure` denominator surfaces **Admitted:** 24 live builds across 10 surfaces — 13 science/industrial and 11 cyber/critical-infrastructure **Machine-readable register:** `ACTIVE_BUILDOUT_SCIENCE_CYBER_CANDIDATES_2026-09-28.json` ## Result The sweep found a live middle layer between committee speech and completed policy: **24 unfinished objects with an official owner and an observable next gate**. The largest concentrations are six freshly tasked FCC workgroups, four current STIB efforts, three NSF/NSB reform-and-measurement builds, three applied FFRDC builds, two JCDC planning products and two DCSA/NISPPAC operating-system changes. That concentration matters. It is not evidence that the whole state is being replaced, and it does not allow an advisory object to inherit implementation. It does show a repeatable construction pattern: ```text committee or statutory task -> bounded working object -> agency disposition -> implementation or deployment -> operation -> measurement still owed ``` The live objects are distributed across this ladder rather than clustered at the rhetoric end. | Stage | Count | What is actually present | |---|---:|---| | `tasked` | 6 | Six formal CSRIC X work programs; meeting occurrence and products remain unproved | | `workgroup_active` | 5 | Four STIB current efforts and one JCDC cloud-identity guidance effort | | `decision_pending` | 5 | Current-PCAST activation, DoD actuarial approvals, NIST 5G paper, CIRCIA final rule and NCIRP finalization | | `implementation_planning` | 3 | NSF merit-review reform, NSF proposal/award burden APG and NIST-MITRE AI centers | | `deployment_underway` | 2 | FAA Mobile Clearance evaluation and continuing NBIS deployment | | `operating_unmeasured` | 2 | National Geophysical Facility performance and cleared-industry open-storage self-approval | | `paused_or_access_limited` | 1 | NAIAC nomination/reconstitution channel with no scheduled meeting | Evidence state is deliberately stricter than build stage: 20 records are `official_verified`, three are `official_partial`, and one is `access_limited`. A stale promised product remains partial even when the initiating event was official. ## Strongest live build clusters ### 1. NSF is rewiring selection, administration and measurement together The National Science Board's December 2025 merit-review recommendations did not stop at publication. The Board and NSF publicly returned to merit-review reform in February 2026, while NSF's FY 2026–2030 plan and FY 2027 performance plan create separate operating builds for proposal/award burden and research- infrastructure measurement. The three clocks must remain separate: 1. **Selection clock:** [the Board's merit-review recommendations](https://www.nsf.gov/nsb/updates/merit-review-new-era-nsf) still need an NSF policy or workflow receipt. 2. **Administration clock:** [the agency priority goal](https://www.nsf.gov/about/performance/strategic-plan/nsf-fy-2026-2030) commits NSF to streamline two proposal-and-award functions by September 30, 2027. 3. **Measurement clock:** [the FY 2027 performance plan](https://www.nsf.gov/about/performance/annual-performance-reports/fy-27-app-and-fy-25-apr) says NSF is building common facility-uptime measurement in FY 2026 and research-translation tracking in FY 2027. The operating National Geophysical Facility is therefore not merely a completed award story. It is now a clean test of whether a Board-to-award-to- operator chain can return service-level and translation evidence. ### 2. STIB is running four simultaneous translation chambers The [STIB current-efforts page](https://stib.cto.mil/current-efforts/) still identifies four live objects: - the congressionally mandated Kwajalein Major Range and Test Facility Base study; - the digital-solutions and software-delivery organizational study; - the Permanent Subcommittee on Strategic Options; and - the Permanent Subcommittee on National Security Innovation. This is a strong instance of distributed translation: Congress or Department leadership supplies a bounded problem; a mixed expert board develops options; the full board must adopt a product; Department leadership still holds the reorganization, designation, investment or implementation decision. No public adopted product or Department disposition was located through the cutoff. ### 3. The FFRDC interface has moved from analysis into testbeds and field evaluation Three builds attached to the FY 2026 FFRDC denominator are materially farther downstream than a report: - [NIST's $20 million MITRE award](https://www.nist.gov/news-events/news/2025/12/nist-launches-centers-ai-manufacturing-and-critical-infrastructure) is standing up AI Economic Security Centers for manufacturing and critical-infrastructure cybersecurity, but still needs a center/pilot receipt. - [NIST CSWP 36F](https://csrc.nist.gov/pubs/cswp/36/f/initial-nas-message-security-applying-5g-cybersecu/ipd) documents a 5G security capability implemented on an operational testbed; public review closed September 7, 2026 and final disposition remains pending. - [FAA Mobile Clearance](https://www.faa.gov/air_traffic/technology/mobile_clearance) is in a multi-site operational evaluation with a February 2027 closeout and planned nationwide-deployment decision. These are not private bypasses. Public agencies retain standards, safety, award, and deployment authority while FFRDC operators supply translation and engineering capacity. ### 4. Cyber incident governance is being built on three different clocks The cyber lane contains three related but non-interchangeable builds: - **reporting law:** [CIRCIA RIN 1670-AA04](https://www.reginfo.gov/public/do/eAgendaViewRule?RIN=1670-AA04&operation=OPERATION_PRINT_RULE&pubId=202510) remains at final-rule stage, with a September 2026 Unified Agenda target and unresolved scope, burden and harmonization decisions; - **national response plan:** the [NCIRP public-comment draft](https://www.cisa.gov/news-events/alerts/2024/12/16/cisa-requests-public-comment-draft-national-cyber-incident-response-plan-update) closed February 14, 2025, but no final plan was located; and - **technical guidance:** the [JCDC core-cloud-identity exchange](https://www.cisa.gov/news-events/news/securing-core-cloud-identity-infrastructure-addressing-advanced-threats-through-public-private) promised threat-informed guidance and inputs to later NIST/NSA standards, but no downstream product was located. A final CIRCIA rule would not itself finalize the NCIRP, and neither would prove that cloud providers implemented the future identity guidance or that incident response improved. ### 5. DCSA is changing both the vetting system and the government-industry operating boundary The NISPPAC surface now exposes two different construction depths: - DCSA identifies continuing [NBIS development and deployment](https://www.dcsa.mil/About-Us/News/Article/Article/4479547/joseph-m-tonon-named-director-of-the-defense-counterintelligence-and-security-a/) as a 2026 leadership priority, with legacy migration and agency onboarding still in motion. - The [open-storage self-approval procedure](https://www.dcsa.mil/Portals/128/Documents/CTP/tools/260130%20VOI%20Newsletter.pdf) has operated since January 1, 2026: qualified industry security professionals can approve bounded facilities while DCSA retains inspection and withdrawal powers. The first needs deployment receipts. The second needs measurement: facility uptake, processing time, inspection findings, withdrawals and security effects. ### 6. CSRIC X is a six-lane workbench, not yet six products [FCC DA 26-463](https://docs.fcc.gov/public/attachments/DA-26-463A1.pdf) formally appointed CSRIC X and created workgroups for dark fiber, submarine cables, SIM farms, non-disaster outages, NG911 multimedia/accessibility, and advanced threats/ransomware. Each is retained as a separate task because each has a distinct evidence base, recommendation object and downstream authority. The cutoff supports `tasked`, not `workgroup_active`: an FCC notice announced the first meeting, but the sweep did not locate certified minutes or another official post-event record proving occurrence. The next common receipt is therefore meeting certification; the next substantive receipt is an adopted workgroup report. ## Exact next receipts | Build | Current stage | Exact next observable receipt | |---|---|---| | Current PCAST activation | `decision_pending` | Additional-member appointment or first current-body meeting notice, agenda, minutes or post-event record | | NAIAC reconstitution | `paused_or_access_limited` | Appointment/meeting notice, updated roster, agenda, minutes or adopted recommendation | | NSF merit-review reform | `implementation_planning` | NSF memorandum, revised PAPPG, reviewer protocol or award-portfolio rule expressly implementing the Board recommendations | | NSF proposal/award APG | `implementation_planning` | FY 2026 progress result naming the functions and changes; FY 2027 completion result | | NGF measurement | `operating_unmeasured` | Common uptime mechanism and target plus an NGF-specific service-level or translation result | | STIB Kwajalein | `workgroup_active` | Adopted study or vote, then Department designation/investment disposition | | STIB digital solutions | `workgroup_active` | Adopted organizational study, then reorganization decision memorandum or rejection | | STIB Strategic Options | `workgroup_active` | Adopted subcommittee/full-board product, then Department disposition | | STIB National Security Innovation | `workgroup_active` | Adopted subcommittee/full-board product, then Department disposition | | DoD Board of Actuaries | `decision_pending` | Certified July 24 minutes and the corresponding valuation/assumptions products | | NIST-MITRE AI centers | `implementation_planning` | Named center governance/participants, then a pilot protocol or accepted output | | NIST 5G NAS security | `decision_pending` | Final or revised CSWP 36F with comment disposition | | FAA Mobile Clearance | `deployment_underway` | February 2027 evaluation closeout and FAA deployment/modify/stop decision | | CIRCIA | `decision_pending` | Federal Register final rule or official timetable revision, withdrawal or supplemental proposal | | NCIRP update | `decision_pending` | Final NCIRP, revised draft or official withdrawal/supersession disposition | | JCDC cloud identity | `workgroup_active` | Promised CISA guidance or expressly linked NIST/NSA draft | | NBIS | `deployment_underway` | Dated function/cohort transition, legacy retirement, and operating-performance measures | | Open-storage self-approval | `operating_unmeasured` | Uptake, cycle-time, inspection, withdrawal, burden and security-effect data | | CSRIC X WG1 dark fiber | `tasked` | Certified occurrence, then adopted report and FCC disposition | | CSRIC X WG2 submarine cables | `tasked` | Certified occurrence, then adopted report and FCC disposition | | CSRIC X WG3 SIM farms | `tasked` | Certified occurrence, then adopted report and FCC disposition | | CSRIC X WG4 sunny-day outages | `tasked` | Certified occurrence, then adopted report and FCC disposition | | CSRIC X WG5 NG911 | `tasked` | Certified occurrence, then adopted report and FCC/911-authority disposition | | CSRIC X WG6 APT/ransomware | `tasked` | Certified occurrence, then adopted report and FCC disposition | ## Access holds and non-admissions The review covered all 23 surfaces, but 13 did not yield an admissible, object-specific live build under the current-source rule. That is a research result, not a claim that the bodies are inactive. - **NAIAC** is the one admitted access/activity hold: NIST continuously seeks nominations but reports no scheduled meeting. - **Current PCAST** is admitted because the White House itself promised additional members and first-meeting information; the missing meeting is the unresolved gate. - **DoD Board of Actuaries** remains partial because a noticed July 24 approval agenda was found but certified minutes were not. - **CSRIC X** remains at tasking because the meeting notice does not prove meeting occurrence. - **NCIRP and JCDC cloud-identity guidance** remain partial because the initiating drafts/exchange are official but the promised downstream products were not located. - **CSAC, NIAC, NSTAC, CIPAC, FSLC, CSRB and NASA ITMB** exposed current identity or architecture, but no sufficiently specific unresolved 2025–2026 build with a public next receipt was located. - **DIB, DSB, STPI, NASA APMC, the Medicare-Eligible Retiree Health Care Board of Actuaries and CSRIC IX** had completed products, historical interfaces or oversight records, but no official current successor, expansion, open implementation obligation or item-specific unresolved gate sufficient for admission. Restricted or missing records remain an access boundary. They are not evidence that a classified board adopted a recommendation, that an agency accepted it, or that an implementation exists outside public view. ## Clock discipline The register preserves six clocks that would otherwise collapse into “work is happening”: | Clock | Receipt that advances it | |---|---| | Research/tasking | Signed task, charter, terms of reference or named work program | | Decision | Adopted report, vote, final rule, standard, award or agency disposition | | Implementation | Policy, procedure, staffed center, funded plan or system-change instrument | | Deployment | Named site, cohort, release, transition or rollout receipt | | Operation | Recurring use under identified actors and controls | | Effect | Measured service, safety, security, burden, reliability or public-benefit result | No record in this sweep advances merely because its next gate is plausible. Known dates are included only where an official source supplied them; null dates mean the receipt is known but its timing is not. ## Interpretation — the delightful five percent This is the particularly exciting part of the Observatory's “incremental refactoring” thesis. The visible architecture is not one master committee issuing a revolution. It is 24 small construction objects moving through different gates: reviewer admission, award administration, facility metrics, defense organization design, 5G testbeds, aviation deployment, incident reporting, identity guidance, personnel-vetting software, delegated industrial security and communications resilience. The pattern is almost architectural joinery: public authority stays distributed, private expertise repeatedly enters through bounded interfaces, and the real question is whether each joint returns the next receipt. That is interpretation, not an evidence-state promotion—but it is a very good place for the Observatory to keep watching.