{"schema":"f250.library-documents/v1","extractor_version":"3","ocr_enabled":true,"document_id":"doc-149d1458a6a84ee84b9b","title":"CAMPAIGN PLAN 2026-09-26","work_ids":["banking-artifact:149d1458a6a84ee84b9b"],"source":{"scope":"workbench","path":"Research Packages/Fintech and Private Rails/Major Bank Digital Transition 2026-09-26/CAMPAIGN_PLAN_2026-09-26.md"},"source_sha256":"955fc764484980c4e321f237f9c9c2710f8d3118aec68da7d8b060f9d5ccd846","format":".md","evidence_cutoffs":{"banking-artifact:149d1458a6a84ee84b9b":"2026-10-03T10:20:00-04:00"},"text":"---\ntitle: Major Bank Digital Transition — Campaign Plan\nstatus: current\nartifact_role: research-plan\nopened: 2026-09-26\nevidence_cutoff: 2026-09-26T15:58:59-04:00\n---\n\n# Major Bank Digital Transition — Campaign Plan\n\n## Research contract\n\n- **Question:** Where are major incumbent financial institutions in the\n  transition from conventional account, custody and market infrastructure to\n  tokenized money, assets, collateral and settlement?\n- **Scope:** sixteen institutions; institution-authored research and strategy;\n  official launches, filings and operating receipts; seven separately assessed\n  capability surfaces.\n- **Exclusions:** investment recommendations; token-price implications;\n  unsourced rankings; treating pilots, consortium membership, patents or\n  forecasts as operation; treating an asset manager as a deposit-taking bank.\n- **Evidence cutoff:** 2026-09-26 15:58 EDT (-04:00).\n- **Owners:** `major-bank-digital-transition` owns the comparison;\n  `tokenization-entity-control-map` owns the Hub projection;\n  `overall-dlt-transition`, `private-monetary-stack` and\n  `fed-clearing-treasury` retain their component questions.\n\n## Cohort rule\n\nUse a bounded cohort instead of claiming a universal top-sixteen ranking:\n\n1. U.S. G-SIBs with major deposit, markets, custody or wealth functions;\n2. non-U.S. G-SIBs with unusually material public digital-asset infrastructure;\n3. incumbent asset managers whose tokenized fund records or collateral routes\n   materially change the bank/FMI transition picture; and\n4. enough low-receipt institutions to expose absence and asymmetry rather than\n   selecting only obvious leaders.\n\n## Maturity grammar\n\nEvery capability receives one state:\n\n| State | Meaning |\n|---|---|\n| `M0` | No public institution-specific operating receipt located. |\n| `M1` | Institution-authored thesis, research or strategy only. |\n| `M2` | Announced build, roadmap, conditional approval or intended launch. |\n| `M3` | Pilot, sandbox or controlled test. |\n| `M4` | Completed single transaction or bounded live product/client/jurisdiction. |\n| `M5` | Recurring production with identified users, routes or material volume. |\n| `M6` | Recurring scale plus publicly documented stress, correction, recovery or legacy retirement. |\n\nThe seven capability surfaces are client access, money, asset issuance and\nrecord, custody and keys, payment and settlement, collateral and financing, and\nscale/recovery. Maturity is assessed by surface; no institution receives a\nsingle prestige score.\n\n## Waves\n\n### Wave 0 — owner and method reconciliation\n\n- Read the Crypto Infrastructure Hub, Overall DLT Transition and existing Citi\n  case audit.\n- Reuse the Hub's operational-state, legal-seat and source disciplines.\n- Select the cohort and prevent duplication of existing corporate-stack work.\n\n### Wave 1 — institution doctrine and research\n\n- Locate institution-authored papers, annual reports, strategy pages and\n  research.\n- Extract each institution's model of money, tokenization, custody,\n  interoperability and client transition.\n- Separate research claims and forecasts from company actions.\n\n### Wave 2 — operating receipts\n\n- Locate official product, transaction, launch, regulatory and filing receipts.\n- Assess all seven capabilities using the common M0–M6 grammar.\n- Record the decisive boundary and next receipt for every institution.\n\n### Wave 3 — comparative constitution\n\n- Identify transition archetypes, common dependencies, concentrations and\n  negative findings.\n- Compare public versus private chains, proprietary versus federated stacks,\n  bank money versus stablecoins, and direct records versus mirrors.\n- State what has and has not changed in the larger DLT thesis.\n\n### Wave 4 — governed visual and validation\n\n- Add one canonical structured-data owner to the existing Crypto\n  Infrastructure Hub package.\n- Generate an interactive matrix with institution, capability, archetype and\n  evidence-detail views.\n- Rebuild the Hub and dependent Research Library/Search projections; verify\n  routes at desktop and mobile widths.\n\n### Wave 5 — lifecycle close\n\n- Register first-class artifacts, add the Catalog identity and connect it to\n  the existing monetary-and-crypto research family.\n- Add only source-triggered return questions.\n- Report scoped validation separately from unrelated global workspace findings.\n\n## Completion gate\n\nThe campaign is complete when all sixteen institutions have:\n\n- at least one institution-authored research or strategy source where public;\n- at least one primary operating or negative-evidence route;\n- seven capability states with claim and boundary text;\n- a named frontier and return receipt;\n- a generated visual path; and\n- valid Catalog, Registry and schema checks for the changed surfaces.\n","sections":[{"section_id":"s00001","ordinal":1,"label":"Opening section","source_page":null,"start_character":0,"end_character":4776,"start_line":1,"end_line":115,"text":"---\ntitle: Major Bank Digital Transition — Campaign Plan\nstatus: current\nartifact_role: research-plan\nopened: 2026-09-26\nevidence_cutoff: 2026-09-26T15:58:59-04:00\n---\n\n# Major Bank Digital Transition — Campaign Plan\n\n## Research contract\n\n- **Question:** Where are major incumbent financial institutions in the\n  transition from conventional account, custody and market infrastructure to\n  tokenized money, assets, collateral and settlement?\n- **Scope:** sixteen institutions; institution-authored research and strategy;\n  official launches, filings and operating receipts; seven separately assessed\n  capability surfaces.\n- **Exclusions:** investment recommendations; token-price implications;\n  unsourced rankings; treating pilots, consortium membership, patents or\n  forecasts as operation; treating an asset manager as a deposit-taking bank.\n- **Evidence cutoff:** 2026-09-26 15:58 EDT (-04:00).\n- **Owners:** `major-bank-digital-transition` owns the comparison;\n  `tokenization-entity-control-map` owns the Hub projection;\n  `overall-dlt-transition`, `private-monetary-stack` and\n  `fed-clearing-treasury` retain their component questions.\n\n## Cohort rule\n\nUse a bounded cohort instead of claiming a universal top-sixteen ranking:\n\n1. U.S. G-SIBs with major deposit, markets, custody or wealth functions;\n2. non-U.S. G-SIBs with unusually material public digital-asset infrastructure;\n3. incumbent asset managers whose tokenized fund records or collateral routes\n   materially change the bank/FMI transition picture; and\n4. enough low-receipt institutions to expose absence and asymmetry rather than\n   selecting only obvious leaders.\n\n## Maturity grammar\n\nEvery capability receives one state:\n\n| State | Meaning |\n|---|---|\n| `M0` | No public institution-specific operating receipt located. |\n| `M1` | Institution-authored thesis, research or strategy only. |\n| `M2` | Announced build, roadmap, conditional approval or intended launch. |\n| `M3` | Pilot, sandbox or controlled test. |\n| `M4` | Completed single transaction or bounded live product/client/jurisdiction. |\n| `M5` | Recurring production with identified users, routes or material volume. |\n| `M6` | Recurring scale plus publicly documented stress, correction, recovery or legacy retirement. |\n\nThe seven capability surfaces are client access, money, asset issuance and\nrecord, custody and keys, payment and settlement, collateral and financing, and\nscale/recovery. Maturity is assessed by surface; no institution receives a\nsingle prestige score.\n\n## Waves\n\n### Wave 0 — owner and method reconciliation\n\n- Read the Crypto Infrastructure Hub, Overall DLT Transition and existing Citi\n  case audit.\n- Reuse the Hub's operational-state, legal-seat and source disciplines.\n- Select the cohort and prevent duplication of existing corporate-stack work.\n\n### Wave 1 — institution doctrine and research\n\n- Locate institution-authored papers, annual reports, strategy pages and\n  research.\n- Extract each institution's model of money, tokenization, custody,\n  interoperability and client transition.\n- Separate research claims and forecasts from company actions.\n\n### Wave 2 — operating receipts\n\n- Locate official product, transaction, launch, regulatory and filing receipts.\n- Assess all seven capabilities using the common M0–M6 grammar.\n- Record the decisive boundary and next receipt for every institution.\n\n### Wave 3 — comparative constitution\n\n- Identify transition archetypes, common dependencies, concentrations and\n  negative findings.\n- Compare public versus private chains, proprietary versus federated stacks,\n  bank money versus stablecoins, and direct records versus mirrors.\n- State what has and has not changed in the larger DLT thesis.\n\n### Wave 4 — governed visual and validation\n\n- Add one canonical structured-data owner to the existing Crypto\n  Infrastructure Hub package.\n- Generate an interactive matrix with institution, capability, archetype and\n  evidence-detail views.\n- Rebuild the Hub and dependent Research Library/Search projections; verify\n  routes at desktop and mobile widths.\n\n### Wave 5 — lifecycle close\n\n- Register first-class artifacts, add the Catalog identity and connect it to\n  the existing monetary-and-crypto research family.\n- Add only source-triggered return questions.\n- Report scoped validation separately from unrelated global workspace findings.\n\n## Completion gate\n\nThe campaign is complete when all sixteen institutions have:\n\n- at least one institution-authored research or strategy source where public;\n- at least one primary operating or negative-evidence route;\n- seven capability states with claim and boundary text;\n- a named frontier and return receipt;\n- a generated visual path; and\n- valid Catalog, Registry and schema checks for the changed surfaces.\n","next_section_id":null,"end_of_document":true,"data_url":"https://freedom-250-observatory.katiekaim.chatgpt.site/readings/sections/doc-149d1458a6a84ee84b9b-s00001.json","next_section_url":null,"data_url_absolute_url":"https://freedom-250-observatory.katiekaim.chatgpt.site/readings/sections/doc-149d1458a6a84ee84b9b-s00001.json","data_url_relative_path":"sections/doc-149d1458a6a84ee84b9b-s00001.json"}],"reading_state":"complete_text","warnings":[],"text_sha256":"955fc764484980c4e321f237f9c9c2710f8d3118aec68da7d8b060f9d5ccd846","original_url":"https://freedom-250-observatory.katiekaim.chatgpt.site/Research%20Packages/Fintech%20and%20Private%20Rails/Major%20Bank%20Digital%20Transition%202026-09-26/CAMPAIGN_PLAN_2026-09-26.md","characters":4776,"original_url_absolute_url":"https://freedom-250-observatory.katiekaim.chatgpt.site/Research%20Packages/Fintech%20and%20Private%20Rails/Major%20Bank%20Digital%20Transition%202026-09-26/CAMPAIGN_PLAN_2026-09-26.md","original_url_relative_path":"../../../../Research%20Packages/Fintech%20and%20Private%20Rails/Major%20Bank%20Digital%20Transition%202026-09-26/CAMPAIGN_PLAN_2026-09-26.md"}
