Skip to content

Research sweep source records · 361

31,545 research records. 15 records referring to separate-lane material are withheld from this public copy. The full original is preserved privately. Record dates and qualifications are unchanged; this is not a new factual review.

Set non-national-security-system discovery, pilot, migration, TLS 1.3, crypto-inventory and vendor-responsibility clocks. — Agency plan, prioritized inventory/CBOM, pilot, procurement requirement and completed migration.

{
  "worker": "D06",
  "package": "Federal Science Operating System",
  "register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_QUANTUM_CRYPTOGRAPHIC_ACCEPTANCE_REGISTRY_2026-08-19.json#cases",
  "record_id": "omb-m2615-clock",
  "record_type": "body",
  "body": "Office of Management and Budget",
  "parent_body": "Agency leadership and authorizing officials implement; OMB governs the federal non-NSS schedule.",
  "what": "Set non-national-security-system discovery, pilot, migration, TLS 1.3, crypto-inventory and vendor-responsibility clocks. — Agency plan, prioritized inventory/CBOM, pilot, procurement requirement and completed migration.",
  "step_type": "federal PQC migration",
  "date": "2026-06-24",
  "date_kind": "first date stated in entity_clock",
  "other_dates": "entity_clock: M-26-15 was issued 2026-06-24; non-NSS agency plans are due 2026-10-22.",
  "stage_or_status": "binding_non_nss_migration_policy",
  "codex_grade": "evidence=A; fit=4; path=4",
  "codex_reason": "missing_gate: DOE plan and target-specific prioritization after the due date.",
  "written_up_in": "",
  "source_url": "https://www.whitehouse.gov/wp-content/uploads/2026/06/M-26-15-Execution-of-the-Migration-to-Post-Quantum-Cryptography.pdf"
}

Operate federal PKI shared services and supply validated HSM infrastructure with PQC algorithm implementations under separate evidence objects. — Security policy proving PQC approved service, exact product/version/environment mapping, certificate profile, interoperability and target ATO.

{
  "worker": "D06",
  "package": "Federal Science Operating System",
  "register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_QUANTUM_CRYPTOGRAPHIC_ACCEPTANCE_REGISTRY_2026-08-19.json#cases",
  "record_id": "entrust-pki-hsm",
  "record_type": "body",
  "body": "Entrust Corporation",
  "parent_body": "NIST validates modules; FPKI/GSA govern trust service; agency AO accepts target deployment.",
  "what": "Operate federal PKI shared services and supply validated HSM infrastructure with PQC algorithm implementations under separate evidence objects. — Security policy proving PQC approved service, exact product/version/environment mapping, certificate profile, interoperability and target ATO.",
  "step_type": "federal PKI and HSM",
  "date": "2026-06-15",
  "date_kind": "first date stated in entity_clock",
  "other_dates": "entity_clock: Entrust remains a current GSA PKI shared-service-provider contractor; nShield 5s CMVP certificate 5329 issued 2026-06-15.",
  "stage_or_status": "operating_pki_cmvp_link_incomplete",
  "codex_grade": "evidence=A; fit=4; path=3",
  "codex_reason": "missing_gate: Exact PQC-to-module approved-service linkage and deployed target profile.",
  "written_up_in": "",
  "source_url": "https://www.gsaelibrary.gsa.gov/ElibMain/home.do/sinDetails.do?executeQuery=YES&scheduleNumber=MAS&specialItemNumber=541519PKI | https://www.idmanagement.gov/fpki/ | https://csrc.nist.gov/projects/cryptographic-module-validation-program/certificate/5329"
}

Operate FPKI/ECA trust services and legacy certificate infrastructure that can become a migration chokepoint. — PQC CAVP/CMVP record, updated certificate profile, relying-party interoperability and target ATO.

{
  "worker": "D06",
  "package": "Federal Science Operating System",
  "register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_QUANTUM_CRYPTOGRAPHIC_ACCEPTANCE_REGISTRY_2026-08-19.json#cases",
  "record_id": "widepoint-pki",
  "record_type": "body",
  "body": "WidePoint Cybersecurity Solutions Corp.",
  "parent_body": "FPKI/GSA and subscriber agencies govern the trust relationship; WidePoint operates the service.",
  "what": "Operate FPKI/ECA trust services and legacy certificate infrastructure that can become a migration chokepoint. — PQC CAVP/CMVP record, updated certificate profile, relying-party interoperability and target ATO.",
  "step_type": "federal PKI",
  "date": "",
  "date_kind": "",
  "other_dates": "entity_clock: WidePoint remains one of two current GSA MAS 541519PKI shared-service-provider contractors.",
  "stage_or_status": "operating_pki_no_public_pqc_evidence",
  "codex_grade": "evidence=A; fit=4; path=2",
  "codex_reason": "missing_gate: Public PQC product, validation and deployment evidence.",
  "written_up_in": "",
  "source_url": "https://www.gsaelibrary.gsa.gov/ElibMain/home.do/sinDetails.do?executeQuery=YES&scheduleNumber=MAS&specialItemNumber=541519PKI | https://www.idmanagement.gov/trust-services/ | https://crl.gds.disa.mil/pke/config/eca_crldps.html"
}

Prototype post-quantum cryptographic inventory analysis and performance benchmarking. — Follow-on award, production inventory deployment, target CBOM and agency acceptance.

{
  "worker": "D06",
  "package": "Federal Science Operating System",
  "register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_QUANTUM_CRYPTOGRAPHIC_ACCEPTANCE_REGISTRY_2026-08-19.json#cases",
  "record_id": "sandboxaq-federal",
  "record_type": "body",
  "body": "SB Technology Federal Inc. / SandboxAQ",
  "parent_body": "The agency owns migration prioritization and accepts the inventory output.",
  "what": "Prototype post-quantum cryptographic inventory analysis and performance benchmarking. — Follow-on award, production inventory deployment, target CBOM and agency acceptance.",
  "step_type": "cryptographic inventory",
  "date": "2022-11-01",
  "date_kind": "first date stated in entity_clock",
  "other_dates": "entity_clock: Air Force Phase I FA8649-23-P-0197 ran 2022-11-01 to 2023-01-31; official SBIR text ties the recipient to SandboxAQ.",
  "stage_or_status": "completed_phase_i_inventory_rd",
  "codex_grade": "evidence=A; fit=4; path=2",
  "codex_reason": "missing_gate: Production federal deployment and target acceptance.",
  "written_up_in": "",
  "source_url": "https://www.sbir.gov/awards/204722 | https://www.disa.mil/partners/tech-watchlist-2026"
}

Supply a sovereign HSM platform with PQC implementations and validated entropy. — Issued FIPS 140-3 certificate and security policy explicitly listing PQC approved services, then exact product and target mapping.

{
  "worker": "D06",
  "package": "Federal Science Operating System",
  "register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_QUANTUM_CRYPTOGRAPHIC_ACCEPTANCE_REGISTRY_2026-08-19.json#cases",
  "record_id": "crypto4a-qasm",
  "record_type": "body",
  "body": "Crypto4A Technologies Inc.",
  "parent_body": "NIST CMVP validates the module; customer AO accepts deployment.",
  "what": "Supply a sovereign HSM platform with PQC implementations and validated entropy. — Issued FIPS 140-3 certificate and security policy explicitly listing PQC approved services, then exact product and target mapping.",
  "step_type": "hardware security module",
  "date": "2026-09-21",
  "date_kind": "first date stated in entity_clock",
  "other_dates": "entity_clock: QASM has PQC CAVP A5631; FIPS 140-2 certificate 4250 reaches the new-use cliff 2026-09-21; a FIPS 140-3 submission remained in process in July 2026.",
  "stage_or_status": "algorithm_validated_module_transitioning",
  "codex_grade": "evidence=A; fit=4; path=3",
  "codex_reason": "missing_gate: Active 140-3 certificate with PQC approved-service linkage.",
  "written_up_in": "",
  "source_url": "https://csrc.nist.gov/projects/cryptographic-module-validation-program/entropy-validations/certificate/96 | https://csrc.nist.gov/projects/cryptographic-module-validation-program/certificate/4250 | https://csrc.nist.gov/projects/cryptographic-module-validation-program/modules-in-process/modules-in-process-list"
}

Provide an OEM-embeddable cryptographic module with PQC algorithms. — Active CMVP certificate, security policy, OEM product/version mapping and target approved-mode evidence.

{
  "worker": "D06",
  "package": "Federal Science Operating System",
  "register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_QUANTUM_CRYPTOGRAPHIC_ACCEPTANCE_REGISTRY_2026-08-19.json#cases",
  "record_id": "safelogic-cryptocomply",
  "record_type": "body",
  "body": "SafeLogic, Inc.",
  "parent_body": "NIST validates the module; OEM and agency establish product and use-boundary mapping.",
  "what": "Provide an OEM-embeddable cryptographic module with PQC algorithms. — Active CMVP certificate, security policy, OEM product/version mapping and target approved-mode evidence.",
  "step_type": "embedded cryptographic module",
  "date": "",
  "date_kind": "",
  "other_dates": "entity_clock: CryptoComply FIPS Provider held PQC CAVP A8228 and entropy validation E241; its FIPS 140-3 module remained in CMVP review in July 2026.",
  "stage_or_status": "cavp_and_entropy_cmvp_pending",
  "codex_grade": "evidence=A; fit=4; path=3",
  "codex_reason": "missing_gate: Issued 140-3 validation and exact OEM/target mapping.",
  "written_up_in": "",
  "source_url": "https://csrc.nist.gov/projects/cryptographic-algorithm-validation-program/details?validation=8228 | https://csrc.nist.gov/projects/cryptographic-module-validation-program/modules-in-process/modules-in-process-list"
}

Develop Itus, a flexible bridge between classical and post-quantum HSM functions. — Phase II/III, CAVP, entropy validation, CMVP certificate, product mapping and deployment acceptance.

{
  "worker": "D06",
  "package": "Federal Science Operating System",
  "register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_QUANTUM_CRYPTOGRAPHIC_ACCEPTANCE_REGISTRY_2026-08-19.json#cases",
  "record_id": "secure-micro-itus",
  "record_type": "body",
  "body": "Secure Micro Technologies LLC",
  "parent_body": "NIST administers R&D; CMVP and customer AO govern later validation and use.",
  "what": "Develop Itus, a flexible bridge between classical and post-quantum HSM functions. — Phase II/III, CAVP, entropy validation, CMVP certificate, product mapping and deployment acceptance.",
  "step_type": "PQC HSM bridge",
  "date": "",
  "date_kind": "",
  "other_dates": "entity_clock: NIST SBIR 70NANB25H071 is a small-business prototype award.",
  "stage_or_status": "prototype_rd",
  "codex_grade": "evidence=A; fit=3; path=2",
  "codex_reason": "missing_gate: Follow-on, independent validation and accepted product deployment.",
  "written_up_in": "",
  "source_url": "https://www.sbir.gov/awards/220249"
}

Supply embedded software libraries and hardware cores implementing standardized PQC algorithms. — Entropy record, active CMVP module, OEM mapping, integration test and target acceptance.

{
  "worker": "D06",
  "package": "Federal Science Operating System",
  "register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_QUANTUM_CRYPTOGRAPHIC_ACCEPTANCE_REGISTRY_2026-08-19.json#cases",
  "record_id": "pqsecure-cores",
  "record_type": "body",
  "body": "PQSecure Technologies, LLC",
  "parent_body": "NIST validates algorithms/modules; OEM and agency accept the integrated product.",
  "what": "Supply embedded software libraries and hardware cores implementing standardized PQC algorithms. — Entropy record, active CMVP module, OEM mapping, integration test and target acceptance.",
  "step_type": "embedded PQC cores",
  "date": "",
  "date_kind": "",
  "other_dates": "entity_clock: Multiple PQC CAVP records were active through the cutoff.",
  "stage_or_status": "algorithm_validated_components",
  "codex_grade": "evidence=A; fit=3; path=2",
  "codex_reason": "missing_gate: Active 140-3 module and named federal product/deployment.",
  "written_up_in": "",
  "source_url": "https://csrc.nist.gov/projects/cryptographic-algorithm-validation-program"
}

Supply enterprise HSMs with PQC algorithm capability. — Active 140-3 certificate/security policy, U.S. product mapping, PKI interoperability and target ATO.

{
  "worker": "D06",
  "package": "Federal Science Operating System",
  "register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_QUANTUM_CRYPTOGRAPHIC_ACCEPTANCE_REGISTRY_2026-08-19.json#cases",
  "record_id": "securosys-primus",
  "record_type": "body",
  "body": "Securosys SA",
  "parent_body": "NIST validates modules; customer AO accepts the system.",
  "what": "Supply enterprise HSMs with PQC algorithm capability. — Active 140-3 certificate/security policy, U.S. product mapping, PKI interoperability and target ATO.",
  "step_type": "hardware security module",
  "date": "2026-07-09",
  "date_kind": "first date stated in entity_clock",
  "other_dates": "entity_clock: Primus PQC held CAVP A8744 on 2026-07-09; earlier FIPS 140-2 certificate 4583 was historical and FIPS 140-3 work remained under review.",
  "stage_or_status": "cavp_with_1403_pending",
  "codex_grade": "evidence=A; fit=3; path=2",
  "codex_reason": "missing_gate: Issued 140-3 validation expressly covering approved PQC services.",
  "written_up_in": "",
  "source_url": "https://csrc.nist.gov/projects/cryptographic-module-validation-program/modules-in-process/modules-in-process-list"
}

Provide Java/.NET and Go cryptographic software layers that can propagate into many downstream products. — Active CMVP certificate, dependency inventory, exact downstream product version, approved-mode test and ATO.

{
  "worker": "D06",
  "package": "Federal Science Operating System",
  "register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_QUANTUM_CRYPTOGRAPHIC_ACCEPTANCE_REGISTRY_2026-08-19.json#cases",
  "record_id": "bouncycastle-geomys",
  "record_type": "body",
  "body": "Legion of the Bouncy Castle Inc. / Geomys LLC",
  "parent_body": "NIST validates; downstream OEM/customer maps the dependency and accepts use.",
  "what": "Provide Java/.NET and Go cryptographic software layers that can propagate into many downstream products. — Active CMVP certificate, dependency inventory, exact downstream product version, approved-mode test and ATO.",
  "step_type": "software cryptographic modules",
  "date": "",
  "date_kind": "",
  "other_dates": "entity_clock: BC-FJA and Geomys Go modules held 2026 PQC CAVP records while associated 140-3 paths remained incomplete.",
  "stage_or_status": "algorithm_validated_software_modules_pending",
  "codex_grade": "evidence=A; fit=4; path=2",
  "codex_reason": "missing_gate: Active module certificate and exact dependency-to-product mapping.",
  "written_up_in": "",
  "source_url": "https://csrc.nist.gov/projects/cryptographic-module-validation-program/modules-in-process/modules-in-process-list"
}

Separate algorithm conformance, accredited laboratory testing and cryptographic-module validation. — CAVP records, entropy evidence, laboratory report, issued CMVP certificate/security policy and exact product mapping.

{
  "worker": "D06",
  "package": "Federal Science Operating System",
  "register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_QUANTUM_CRYPTOGRAPHIC_ACCEPTANCE_REGISTRY_2026-08-19.json#cases",
  "record_id": "cavp-cmvp-ladder",
  "record_type": "body",
  "body": "NIST CAVP / NVLAP / CMVP",
  "parent_body": "NIST CMVP validates modules; it does not issue a system ATO.",
  "what": "Separate algorithm conformance, accredited laboratory testing and cryptographic-module validation. — CAVP records, entropy evidence, laboratory report, issued CMVP certificate/security policy and exact product mapping.",
  "step_type": "cryptographic acceptance governance",
  "date": "",
  "date_kind": "",
  "other_dates": "entity_clock: NIST's 2026 implementation guidance supports ML-KEM, ML-DSA and SLH-DSA testing; FIPS 206 remains in development.",
  "stage_or_status": "operating_validation_system",
  "codex_grade": "evidence=A; fit=4; path=4",
  "codex_reason": "missing_gate: Target product, environment, approved-mode and ATO mapping.",
  "written_up_in": "",
  "source_url": "https://csrc.nist.gov/Projects/Post-Quantum-Cryptography/Post-Quantum-Cryptography-Standardization | https://csrc.nist.gov/projects/cryptographic-module-validation-program"
}

Accredit the finite independent laboratory base that tests modules before CMVP validation. — Accredited lab scope, queue position, completed test report and CMVP disposition.

{
  "worker": "D06",
  "package": "Federal Science Operating System",
  "register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_QUANTUM_CRYPTOGRAPHIC_ACCEPTANCE_REGISTRY_2026-08-19.json#cases",
  "record_id": "nvlap-capacity-pause",
  "record_type": "body",
  "body": "NIST National Voluntary Laboratory Accreditation Program",
  "parent_body": "NVLAP accredits laboratories; CMVP validates modules.",
  "what": "Accredit the finite independent laboratory base that tests modules before CMVP validation. — Accredited lab scope, queue position, completed test report and CMVP disposition.",
  "step_type": "validation capacity",
  "date": "2025-01-01",
  "date_kind": "first date stated in entity_clock",
  "other_dates": "entity_clock: NIST paused acceptance of new cryptographic/security-testing laboratory applications from 2025-01-01; bulletin LB-163-2026 was published 2026-03-09.",
  "stage_or_status": "operating_with_capacity_constraint",
  "codex_grade": "evidence=A; fit=4; path=4",
  "codex_reason": "missing_gate: Demonstrated throughput sufficient for the migration wave and product-specific completed reviews.",
  "written_up_in": "",
  "source_url": "https://www.nist.gov/nvlap/nvlap-lab-bulletin-lb-163-2026"
}

Produce independent module and entropy test evidence for CMVP/NIST review. — Product-specific test report, CMVP submission and issued certificate.

{
  "worker": "D06",
  "package": "Federal Science Operating System",
  "register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_QUANTUM_CRYPTOGRAPHIC_ACCEPTANCE_REGISTRY_2026-08-19.json#cases",
  "record_id": "lightship-lab",
  "record_type": "body",
  "body": "Lightship Security, Inc.",
  "parent_body": "Lightship tests; NIST validates; agency AO accepts deployment.",
  "what": "Produce independent module and entropy test evidence for CMVP/NIST review. — Product-specific test report, CMVP submission and issued certificate.",
  "step_type": "independent cryptographic testing",
  "date": "",
  "date_kind": "",
  "other_dates": "entity_clock: Lightship is an active NVLAP cryptographic/security testing laboratory and tested Entrust nShield 5s and multiple entropy implementations.",
  "stage_or_status": "operating_evidence_producer",
  "codex_grade": "evidence=A; fit=4; path=3",
  "codex_reason": "missing_gate: Target product assignment and issued validation.",
  "written_up_in": "",
  "source_url": "https://csrc.nist.gov/projects/cryptographic-module-validation-program/certificate/5329"
}

Test cryptographic software/modules and produce evidence packages for NIST validation. — Target module test report, issued certificate and product/ATO mapping.

{
  "worker": "D06",
  "package": "Federal Science Operating System",
  "register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_QUANTUM_CRYPTOGRAPHIC_ACCEPTANCE_REGISTRY_2026-08-19.json#cases",
  "record_id": "atsec-lab",
  "record_type": "body",
  "body": "atsec information security corporation",
  "parent_body": "atsec tests; NIST and the agency retain validation and authorization decisions.",
  "what": "Test cryptographic software/modules and produce evidence packages for NIST validation. — Target module test report, issued certificate and product/ATO mapping.",
  "step_type": "independent cryptographic testing",
  "date": "2026-09-30",
  "date_kind": "first date stated in entity_clock",
  "other_dates": "entity_clock: atsec's NVLAP accreditation runs through 2026-09-30; it tested AWS-LC CMVP certificate 5429.",
  "stage_or_status": "operating_evidence_producer",
  "codex_grade": "evidence=A; fit=4; path=3",
  "codex_reason": "missing_gate: Genesis-specific target module/assessment assignment.",
  "written_up_in": "",
  "source_url": "https://csrc.nist.gov/projects/cryptographic-module-validation-program/certificate/5429"
}

Create independent test evidence for cloud HSM modules. — Current certificate, target module inventory and system-boundary assessment.

{
  "worker": "D06",
  "package": "Federal Science Operating System",
  "register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_QUANTUM_CRYPTOGRAPHIC_ACCEPTANCE_REGISTRY_2026-08-19.json#cases",
  "record_id": "intertek-acumen-lab",
  "record_type": "body",
  "body": "Intertek Acumen Security",
  "parent_body": "NIST validates the module; DOE/NNSA AO decides target use.",
  "what": "Create independent test evidence for cloud HSM modules. — Current certificate, target module inventory and system-boundary assessment.",
  "step_type": "independent cryptographic testing",
  "date": "",
  "date_kind": "",
  "other_dates": "entity_clock: Intertek acquired Acumen Security in 2017; Acumen is named as the test lab on AWS KMS HSM CMVP certificate 4884.",
  "stage_or_status": "operating_evidence_producer",
  "codex_grade": "evidence=A; fit=4; path=3",
  "codex_reason": "missing_gate: Genesis-specific module mapping and authorization evidence.",
  "written_up_in": "",
  "source_url": "https://csrc.nist.gov/projects/cryptographic-module-validation-program/certificate/4884"
}

Provide scarce independent conformance and module-test capacity. — Target engagement, lab scope, completed report, CMVP disposition and conflict controls.

{
  "worker": "D06",
  "package": "Federal Science Operating System",
  "register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_QUANTUM_CRYPTOGRAPHIC_ACCEPTANCE_REGISTRY_2026-08-19.json#cases",
  "record_id": "other-cst-labs",
  "record_type": "body",
  "body": "Gossamer Security Solutions, Inc.; Leidos, Inc. AT&E; AEGISOLVE, INC.; Penumbra Security, Inc.; Advanced Data Security, LLC",
  "parent_body": "Labs create evidence; NIST validates; agencies authorize.",
  "what": "Provide scarce independent conformance and module-test capacity. — Target engagement, lab scope, completed report, CMVP disposition and conflict controls.",
  "step_type": "independent cryptographic testing",
  "date": "",
  "date_kind": "",
  "other_dates": "entity_clock: These firms appear in the active NVLAP cryptographic/security-testing laboratory population with different 2026 accreditation clocks.",
  "stage_or_status": "operating_validation_capacity",
  "codex_grade": "evidence=A; fit=4; path=2",
  "codex_reason": "missing_gate: Named PQC product assignments and resulting active certificates.",
  "written_up_in": "",
  "source_url": "https://www.nist.gov/nvlap/cryptographic-and-security-testing-laboratory-accreditation-program"
}

Develop migration practices, interoperability experiments, discovery methods and reference architectures through CRADAs. — Published practice guide, test configuration, interoperable profile and separate target deployment.

{
  "worker": "D06",
  "package": "Federal Science Operating System",
  "register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_QUANTUM_CRYPTOGRAPHIC_ACCEPTANCE_REGISTRY_2026-08-19.json#cases",
  "record_id": "nccoe-pqc-consortium",
  "record_type": "body",
  "body": "NIST National Cybersecurity Center of Excellence PQC Migration Project Consortium",
  "parent_body": "NIST publishes guidance; consortium membership does not validate products or authorize systems.",
  "what": "Develop migration practices, interoperability experiments, discovery methods and reference architectures through CRADAs. — Published practice guide, test configuration, interoperable profile and separate target deployment.",
  "step_type": "PQC interoperability",
  "date": "",
  "date_kind": "",
  "other_dates": "entity_clock: The consortium and migration project remain active with public participants.",
  "stage_or_status": "collaborative_rd_not_procurement",
  "codex_grade": "evidence=A; fit=4; path=2",
  "codex_reason": "missing_gate: Final guidance and target-specific adoption/ATO.",
  "written_up_in": "",
  "source_url": "https://www.nccoe.nist.gov/applied-cryptography/migration-to-pqc"
}

Broker OAuth2/OIDC identity and delegated access for national-facility compute; subscriber IdP authenticates and resource owner authorizes. — Genesis SSP/ATO, token-signing profile, endpoint FIPS/PQC configuration, CBOM and target logs.

{
  "worker": "D06",
  "package": "Federal Science Operating System",
  "register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_QUANTUM_CRYPTOGRAPHIC_ACCEPTANCE_REGISTRY_2026-08-19.json#cases",
  "record_id": "genesis-globus",
  "record_type": "body",
  "body": "The University of Chicago / Globus",
  "parent_body": "Globus brokers access; the subscriber/resource owner and DOE AO govern authorization and risk acceptance.",
  "what": "Broker OAuth2/OIDC identity and delegated access for national-facility compute; subscriber IdP authenticates and resource owner authorizes. — Genesis SSP/ATO, token-signing profile, endpoint FIPS/PQC configuration, CBOM and target logs.",
  "step_type": "Genesis federated identity",
  "date": "",
  "date_kind": "",
  "other_dates": "entity_clock: Argonne identifies the ALCF Inference Service as a Genesis/AmSC tool relying on Globus Compute and Auth.",
  "stage_or_status": "operating_direct_identity_join_no_pqc_join",
  "codex_grade": "evidence=A; fit=4; path=4",
  "codex_reason": "missing_gate: Any public Genesis-specific PQC configuration or system authorization evidence.",
  "written_up_in": "",
  "source_url": "https://www.alcf.anl.gov/news/alcf-launches-first-large-scale-ai-inference-service-open-science | https://www.globus.org/events/Improving-Scientific-Software-2026"
}

Operate authorized Secret/Restricted Data cloud infrastructure and optional ML-KEM/ML-DSA-capable services. — Target KMS/HSM identifiers, client versions, negotiated key exchange, ML-DSA chain, SSP/SAR and ATO boundary.

{
  "worker": "D06",
  "package": "Federal Science Operating System",
  "register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_QUANTUM_CRYPTOGRAPHIC_ACCEPTANCE_REGISTRY_2026-08-19.json#cases",
  "record_id": "genesis-aws",
  "record_type": "body",
  "body": "Amazon Web Services, Inc.",
  "parent_body": "NNSA AO accepts target risk and configuration; AWS supplies infrastructure and cryptographic services.",
  "what": "Operate authorized Secret/Restricted Data cloud infrastructure and optional ML-KEM/ML-DSA-capable services. — Target KMS/HSM identifiers, client versions, negotiated key exchange, ML-DSA chain, SSP/SAR and ATO boundary.",
  "step_type": "Genesis classified cloud cryptography",
  "date": "2026-06-30",
  "date_kind": "first date stated in entity_clock",
  "other_dates": "entity_clock: NNSA announced on 2026-06-30 that its first enterprise-authorized S/RD cloud will house inaugural Genesis workloads.",
  "stage_or_status": "authorized_infrastructure_pqc_configuration_unproven",
  "codex_grade": "evidence=A; fit=4; path=4",
  "codex_reason": "missing_gate: Public evidence that PQC capability is enabled for a named Genesis workload.",
  "written_up_in": "",
  "source_url": "https://www.energy.gov/nnsa/articles/nnsa-launches-secretrestricted-data-enterprise-cloud-environment-collaboration-amazon | https://aws.amazon.com/security/post-quantum-cryptography/aws-pq-readiness-confidentiality/"
}

Aggregate entitlements and bridge InCommon SAML identities into OAuth/OIDC/JWT pathways. — Genesis responsibility matrix, issuer/audience metadata, service-identity scope, target token trace and ATO inheritance.

{
  "worker": "D06",
  "package": "Federal Science Operating System",
  "register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_QUANTUM_CRYPTOGRAPHIC_ACCEPTANCE_REGISTRY_2026-08-19.json#cases",
  "record_id": "genesis-upstream-trust",
  "record_type": "body",
  "body": "Saviynt, Inc.; NCSA at the University of Illinois / CILogon",
  "parent_body": "DOE authoritative identity sources and resource owners decide identity/authorization; Saviynt and CILogon support the chain.",
  "what": "Aggregate entitlements and bridge InCommon SAML identities into OAuth/OIDC/JWT pathways. — Genesis responsibility matrix, issuer/audience metadata, service-identity scope, target token trace and ATO inheritance.",
  "step_type": "Genesis identity governance",
  "date": "",
  "date_kind": "",
  "other_dates": "entity_clock: Saviynt operates DOE MyIdentity; CILogon is an upstream federation bridge used by Globus, but neither has a public Genesis-specific assignment.",
  "stage_or_status": "operating_adjacent_no_target_assignment",
  "codex_grade": "evidence=B; fit=3; path=2",
  "codex_reason": "missing_gate: Genesis-specific SSP or configuration naming either service.",
  "written_up_in": "",
  "source_url": "https://www.energy.gov/cio/articles/privacy-impact-assessments | https://www.cilogon.org/oidc"
}

Executed site-control instrument — Lease, sublease, development agreement or facility-use agreement identifying parcel, improvement owner, term and termination rights.

{
  "worker": "D06",
  "package": "Federal Science Operating System",
  "register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_TRANSACTION_TRIGGER_REGISTRY_2026-08-19.json#cases",
  "record_id": "az-natcast-site-loi",
  "record_type": "body",
  "body": "Natcast, Inc. | Arizona State University | Arizona Commerce Authority",
  "parent_body": "The exact land controller and counterparty bind the site; NIST's Natcast award does not itself execute Arizona real-estate control.",
  "what": "Executed site-control instrument — Lease, sublease, development agreement or facility-use agreement identifying parcel, improvement owner, term and termination rights.",
  "step_type": "Advanced packaging site control",
  "date": "2025-01-06",
  "date_kind": "first date stated in entity_clock",
  "other_dates": "entity_clock: NIST's 2025-01-06 announcement says Natcast accepted a nonbinding LOI from ACA and ASU; the final site contract remained subject to diligence, negotiation and refined terms.",
  "stage_or_status": "funded_and_site_selected_not_publicly_site_controlled",
  "codex_grade": "evidence=A; fit=4; path=2",
  "codex_reason": "missing_gate: Executed PPF site agreement and parcel-specific public record.",
  "written_up_in": "",
  "source_url": "https://www.nist.gov/news-events/news/2025/01/biden-harris-administration-announces-arizona-state-university-research | https://www.nist.gov/news-events/news/2025/01/us-department-commerce-announces-14-billion-final-awards-support-next"
}

Parcel and improvement disposition — Master-lease amendment, sublease, recorded memorandum, legal description, P3 record or board/delegated approval.

{
  "worker": "D06",
  "package": "Federal Science Operating System",
  "register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_TRANSACTION_TRIGGER_REGISTRY_2026-08-19.json#cases",
  "record_id": "az-research-park-master-lessee",
  "record_type": "body",
  "body": "Arizona State University Research Park, Inc. | Arizona Board of Regents",
  "parent_body": "ABOR controls university property; the nonprofit manages the park but is not an ASU subsidiary and ASU is not automatically liable for its obligations.",
  "what": "Parcel and improvement disposition — Master-lease amendment, sublease, recorded memorandum, legal description, P3 record or board/delegated approval.",
  "step_type": "Advanced packaging land control",
  "date": "",
  "date_kind": "",
  "other_dates": "entity_clock: The park nonprofit is a legally separate ASU component unit and master lessee of 323 acres at 8750 S. Science Drive under a 1984-2101 ground lease; improvement ownership is reported as varied.",
  "stage_or_status": "confirmed_land_chain_target_disposition_unresolved",
  "codex_grade": "evidence=A; fit=4; path=4",
  "codex_reason": "missing_gate: PPF-specific sublease or development instrument and exact improvement owner.",
  "written_up_in": "",
  "source_url": "https://www.azregents.edu/sites/default/files/reports/2027-2030-ASU-Capital-Improvement-Plan.pdf | https://www.asu.edu/fs/documents/annual_reports/ASU-2025-Annual-comp-fin-rpt.pdf | https://www.azleg.gov/ars/15/01625.htm | https://www.azleg.gov/ars/15/01636.htm"
}

Target development or asset-management engagement — PPF-specific management, development, leasing or procurement agreement naming the exact Sunbelt entity.

{
  "worker": "D06",
  "package": "Federal Science Operating System",
  "register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_TRANSACTION_TRIGGER_REGISTRY_2026-08-19.json#cases",
  "record_id": "az-sunbelt-asset-manager",
  "record_type": "body",
  "body": "Sunbelt Holdings",
  "parent_body": "An asset manager may administer the site but does not become landowner, federal award authority or construction acceptor by adjacency.",
  "what": "Target development or asset-management engagement — PPF-specific management, development, leasing or procurement agreement naming the exact Sunbelt entity.",
  "step_type": "Advanced packaging site management",
  "date": "",
  "date_kind": "",
  "other_dates": "entity_clock: ASU identified Sunbelt Holdings as ASU Research Park asset manager in 2024 and described a multi-decade relationship.",
  "stage_or_status": "confirmed_park_role_no_public_ppf_instrument",
  "codex_grade": "evidence=A; fit=3; path=2",
  "codex_reason": "missing_gate: Exact legal entity, target scope, authority delegation and fee/term.",
  "written_up_in": "",
  "source_url": "https://news.asu.edu/20240618-university-news-asu-research-park-celebrates-40-years-collaboration-innovation"
}

Procurement and acceptance delegation — Construction/operations agreement, project account, solicitation, award, GMP, notice to proceed and acceptance matrix.

{
  "worker": "D06",
  "package": "Federal Science Operating System",
  "register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_TRANSACTION_TRIGGER_REGISTRY_2026-08-19.json#cases",
  "record_id": "az-asu-construction-partner",
  "record_type": "body",
  "body": "Arizona State University | Natcast, Inc.",
  "parent_body": "The unseen agreement determines whether ASU, Natcast or another project entity procures and accepts the work.",
  "what": "Procurement and acceptance delegation — Construction/operations agreement, project account, solicitation, award, GMP, notice to proceed and acceptance matrix.",
  "step_type": "Advanced packaging delivery authority",
  "date": "",
  "date_kind": "",
  "other_dates": "entity_clock: ASU says it will partner with Natcast on construction, launch and ongoing operations, but no public design, construction or operations agreement was located by the cutoff.",
  "stage_or_status": "named_partner_downstream_instruments_unresolved",
  "codex_grade": "evidence=A; fit=4; path=3",
  "codex_reason": "missing_gate: Exact construction, operating and acceptance responsibilities.",
  "written_up_in": "",
  "source_url": "https://news.asu.edu/20250106-science-and-technology-asu-selected-chips-act-funded-national-facility-semiconductor-advanced-packaging | https://cfo.asu.edu/purchasing-construction"
}

Permit, inspection and occupancy file — Owner name on plans, project number, building permit, environmental notices, inspection record, clearance letter and CO.

{
  "worker": "D06",
  "package": "Federal Science Operating System",
  "register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_TRANSACTION_TRIGGER_REGISTRY_2026-08-19.json#cases",
  "record_id": "az-asu-permit-ahj",
  "record_type": "body",
  "body": "Arizona State University Construction Support Services",
  "parent_body": "The exact improvement owner determines whether ASU or another local/state AHJ path applies; occupancy still does not equal semiconductor-process qualification.",
  "what": "Permit, inspection and occupancy file — Owner name on plans, project number, building permit, environmental notices, inspection record, clearance letter and CO.",
  "step_type": "Advanced packaging permits and occupancy",
  "date": "",
  "date_kind": "",
  "other_dates": "entity_clock: For ASU-permitted work, Construction Support Services reviews plans, issues permits, inspects construction, tests utility systems and initiates certificate-of-occupancy documentation.",
  "stage_or_status": "authority_path_known_target_permit_not_found",
  "codex_grade": "evidence=A; fit=4; path=2",
  "codex_reason": "missing_gate: PPF permit/AHJ determination and final occupancy record.",
  "written_up_in": "",
  "source_url": "https://cfo.asu.edu/section-1-%E2%80%93-building-permit-application-information | https://cfo.asu.edu/section-8-%E2%80%93-certificate-occupancy | https://www.azleg.gov/ars/34/00461.htm"
}

Reserved utility capacity — Load study, service agreement, feeder/substation scope, UHP-gas purity and volume agreement, water/discharge allocation and energization record.

{
  "worker": "D06",
  "package": "Federal Science Operating System",
  "register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_TRANSACTION_TRIGGER_REGISTRY_2026-08-19.json#cases",
  "record_id": "az-park-utilities",
  "record_type": "body",
  "body": "Salt River Project Agricultural Improvement and Power District | Air Products and Chemicals, Inc. | Southwest Gas Corporation",
  "parent_body": "Each utility controls its service boundary; the owner, process authority and AHJ accept the on-site system.",
  "what": "Reserved utility capacity — Load study, service agreement, feeder/substation scope, UHP-gas purity and volume agreement, water/discharge allocation and energization record.",
  "step_type": "Advanced packaging utility capacity",
  "date": "",
  "date_kind": "",
  "other_dates": "entity_clock: ASU lists SRP, Air Products and Southwest Gas among utilities in place at the Research Park; no PPF service or capacity reservation is public.",
  "stage_or_status": "park_level_infrastructure_only",
  "codex_grade": "evidence=A; fit=4; path=1",
  "codex_reason": "missing_gate: PPF-specific service, capacity, permit and acceptance instruments.",
  "written_up_in": "",
  "source_url": "https://economicdevelopment.asu.edu/innovation-zone/asu-research-park/"
}

Target-specific design or construction award — PPF solicitation, contract, site plan, GMP, notice to proceed and turnover package.

{
  "worker": "D06",
  "package": "Federal Science Operating System",
  "register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_TRANSACTION_TRIGGER_REGISTRY_2026-08-19.json#cases",
  "record_id": "az-mtw-false-positive",
  "record_type": "body",
  "body": "JE Dunn Construction Company | Diamondback Design Group, LLC | Applied Materials, Inc.",
  "parent_body": "ASU/ABOR records control the comparator projects; Natcast target assignment requires its own instrument.",
  "what": "Target-specific design or construction award — PPF solicitation, contract, site plan, GMP, notice to proceed and turnover package.",
  "step_type": "Advanced packaging same-campus comparator",
  "date": "",
  "date_kind": "",
  "other_dates": "entity_clock: JE Dunn and Diamondback are named on the separate Materials-to-Fab renovation; Applied Materials is named in separate MTW partnership renovations. Neither record names the PPF.",
  "stage_or_status": "same_campus_comparators_quarantined",
  "codex_grade": "evidence=A; fit=3; path=1",
  "codex_reason": "missing_gate: Any record naming one of these companies on PPF scope.",
  "written_up_in": "",
  "source_url": "https://cfo.asu.edu/macrotechnology-works-renovation | https://cfo.asu.edu/mtw-partnership-upgrades | https://www.azregents.edu/sites/default/files/reports/2026-ASU-Annual-Capital-Plan.pdf"
}

Lab purchase requisition, subcontract and technical acceptance — ANL-451/PARIS requisition, solicitation, subcontract, invoice/technical acceptance and successor M&O action.

{
  "worker": "D06",
  "package": "Federal Science Operating System",
  "register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_TRANSACTION_TRIGGER_REGISTRY_2026-08-19.json#cases",
  "record_id": "genesis-uchicago-argonne",
  "record_type": "body",
  "body": "UChicago Argonne, LLC",
  "parent_body": "Argonne procurement and technical owners administer commercial awards; DOE retains M&O oversight.",
  "what": "Lab purchase requisition, subcontract and technical acceptance — ANL-451/PARIS requisition, solicitation, subcontract, invoice/technical acceptance and successor M&O action.",
  "step_type": "AI scientific computing procurement",
  "date": "2026-09-30",
  "date_kind": "first date stated in entity_clock",
  "other_dates": "entity_clock: UChicago Argonne operates Argonne under M&O contract DE-AC02-06CH11357; DOE's July 2026 public contract table lists 2026-09-30 as the current and ultimate end date.",
  "stage_or_status": "confirmed_procurement_node_genesis_awards_not_public",
  "codex_grade": "evidence=A; fit=4; path=4",
  "codex_reason": "missing_gate: Genesis-specific subcontract and post-2026-09-30 M&O clock.",
  "written_up_in": "",
  "source_url": "https://www.energy.gov/management/doennsa-major-site-facility-management-contracts | https://www.anl.gov/doe-resources-for-vendors"
}

Solicitation, respondent record or award after RFI close — Final RFI history, respondent list, RFP/OTA/subcontract, financing/capacity agreement and accepted deployment.

{
  "worker": "D06",
  "package": "Federal Science Operating System",
  "register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_TRANSACTION_TRIGGER_REGISTRY_2026-08-19.json#cases",
  "record_id": "genesis-rfi-private-finance",
  "record_type": "body",
  "body": "UChicago Argonne, LLC",
  "parent_body": "The RFI gathers information only and commits Argonne to no award or agreement.",
  "what": "Solicitation, respondent record or award after RFI close — Final RFI history, respondent list, RFP/OTA/subcontract, financing/capacity agreement and accepted deployment.",
  "step_type": "AI scientific computing market research",
  "date": "2026-08-21",
  "date_kind": "first date stated in entity_clock",
  "other_dates": "entity_clock: AI-Capability-RFI was active with responses due 2026-08-21 at 3:00 p.m. CDT and contemplated substantial private financing for a National Genesis Mission Supercomputing Center of Innovation; 2026-08-26 was the superseded original response date.",
  "stage_or_status": "sources_sought_only",
  "codex_grade": "evidence=A; fit=4; path=2",
  "codex_reason": "missing_gate: Any post-close procurement, partnership or financing instrument.",
  "written_up_in": "",
  "source_url": "https://sam.gov/opp/e526498e24924e268dfc64c44d243276/view"
}

System subcontract through production closeout — Signed subcontract, configuration, benchmark, user opening, node-hour delivery, issue closure and project closeout.

{
  "worker": "D06",
  "package": "Federal Science Operating System",
  "register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_TRANSACTION_TRIGGER_REGISTRY_2026-08-19.json#cases",
  "record_id": "genesis-aurora-acceptance-precedent",
  "record_type": "body",
  "body": "Intel Federal LLC | Cray Inc. | Hewlett Packard Enterprise Company",
  "parent_body": "Argonne accepted the system under DOE oversight; independent benchmarks corroborate performance but are not the acceptance certificate.",
  "what": "System subcontract through production closeout — Signed subcontract, configuration, benchmark, user opening, node-hour delivery, issue closure and project closeout.",
  "step_type": "AI scientific computing acceptance",
  "date": "",
  "date_kind": "",
  "other_dates": "entity_clock: Aurora used Argonne CORAL2 Subcontract 8F-30005 with Intel Federal and Cray as lower-tier subcontractor; HPE later acquired Cray. Aurora opened to users in 2025 and delivered more than 60 million node-hours in its first year.",
  "stage_or_status": "accepted_argonne_comparator_no_genesis_center_award",
  "codex_grade": "evidence=A; fit=4; path=4",
  "codex_reason": "missing_gate: Equivalent Solstice, Equinox or Center transaction and acceptance dossier.",
  "written_up_in": "",
  "source_url": "https://www.energy.gov/gc/articles/advance-patent-waiver-wa2017-007 | https://www.energy.gov/articles/us-department-energy-and-intel-build-first-exascale-supercomputer | https://ar25.alcf.anl.gov/year-in-review/year-in-review"
}

Integrator order and production release — Argonne order, seller of record, installed configuration, security and performance acceptance, warranty and service obligations.

{
  "worker": "D06",
  "package": "Federal Science Operating System",
  "register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_TRANSACTION_TRIGGER_REGISTRY_2026-08-19.json#cases",
  "record_id": "genesis-wwt-minerva",
  "record_type": "body",
  "body": "World Wide Technology LLC | NVIDIA Corporation",
  "parent_body": "WWT integrates; ALCF controls onboarding, authentication, model availability and production release.",
  "what": "Integrator order and production release — Argonne order, seller of record, installed configuration, security and performance acceptance, warranty and service obligations.",
  "step_type": "AI stack integration",
  "date": "",
  "date_kind": "",
  "other_dates": "entity_clock: Argonne says Minerva was built with WWT and NVIDIA; current ALCF documentation marks the B200 endpoint active.",
  "stage_or_status": "operating_argonne_comparator_no_center_award",
  "codex_grade": "evidence=A; fit=4; path=3",
  "codex_reason": "missing_gate: Public Argonne instrument and any Center/Solstice/Equinox assignment.",
  "written_up_in": "",
  "source_url": "https://www.alcf.anl.gov/news/argonne-expands-nation-s-ai-infrastructure-powerful-new-supercomputers-and-public-private | https://www.alcf.anl.gov/minerva | https://docs.alcf.anl.gov/services/inference-endpoints/"
}

Genesis load and energization instrument — Load request, impact study, service/construction agreement, capacity reservation, protection settings and energization witness.

{
  "worker": "D06",
  "package": "Federal Science Operating System",
  "register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_TRANSACTION_TRIGGER_REGISTRY_2026-08-19.json#cases",
  "record_id": "genesis-comed-power",
  "record_type": "body",
  "body": "Commonwealth Edison Company",
  "parent_body": "ComEd controls the distribution-service boundary; Argonne controls and accepts its on-site infrastructure.",
  "what": "Genesis load and energization instrument — Load request, impact study, service/construction agreement, capacity reservation, protection settings and energization witness.",
  "step_type": "AI scientific computing electricity",
  "date": "",
  "date_kind": "",
  "other_dates": "entity_clock: ComEd serves Argonne at 138 kV; Argonne owns on-site 138/13-kV transformers and has previously expanded its high-voltage system.",
  "stage_or_status": "physical_incumbent_no_public_genesis_capacity_commitment",
  "codex_grade": "evidence=A; fit=4; path=3",
  "codex_reason": "missing_gate: Genesis-specific load study, upgrade, service and energization record.",
  "written_up_in": "",
  "source_url": "https://icc.illinois.gov/docket/P2007-0566/documents/119990/files/215392.pdf | https://www.anl.gov/sites/www/files/2024-12/F%26I%20Strategic%20Investment%20Plan%202024.pdf"
}

Platform procurement and transition to production — Purchase instrument, installed-system acceptance, security boundary, production SLO, allocation and support record.

{
  "worker": "D06",
  "package": "Federal Science Operating System",
  "register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_TRANSACTION_TRIGGER_REGISTRY_2026-08-19.json#cases",
  "record_id": "genesis-sambanova-metis",
  "record_type": "body",
  "body": "SambaNova Systems, Inc.",
  "parent_body": "SambaNova supplies the platform; ALCF controls service integration, allocations and operating release.",
  "what": "Platform procurement and transition to production — Purchase instrument, installed-system acceptance, security boundary, production SLO, allocation and support record.",
  "step_type": "AI inference service",
  "date": "2026-05-26",
  "date_kind": "first date stated in entity_clock",
  "other_dates": "entity_clock: Metis is an active SN40L endpoint in ALCF's inference service, launched for open science on 2026-05-26.",
  "stage_or_status": "operating_platform_procurement_instrument_not_public",
  "codex_grade": "evidence=A; fit=4; path=3",
  "codex_reason": "missing_gate: Exact Argonne order and any Genesis Center or AmSC enterprise acceptance.",
  "written_up_in": "",
  "source_url": "https://www.alcf.anl.gov/news/alcf-launches-first-large-scale-ai-inference-service-open-science | https://docs.alcf.anl.gov/services/inference-endpoints/"
}

Exact commercial instrument and system IOC — Contracting affiliate, consideration, delivery, facility/utility scope, commissioning criteria, ATO and final acceptance.

{
  "worker": "D06",
  "package": "Federal Science Operating System",
  "register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_TRANSACTION_TRIGGER_REGISTRY_2026-08-19.json#cases",
  "record_id": "genesis-solstice-equinox-partnership",
  "record_type": "body",
  "body": "Oracle America, Inc. | NVIDIA Corporation | UChicago Argonne, LLC",
  "parent_body": "DOE/Argonne control deployment and operational acceptance; partnership announcements do not reveal the commercial vehicle.",
  "what": "Exact commercial instrument and system IOC — Contracting affiliate, consideration, delivery, facility/utility scope, commissioning criteria, ATO and final acceptance.",
  "step_type": "AI public-private infrastructure",
  "date": "",
  "date_kind": "",
  "other_dates": "entity_clock: DOE announced Solstice and Equinox partnerships with Oracle and NVIDIA; Argonne still describes both systems as early-stage as of the cutoff.",
  "stage_or_status": "formal_partnership_system_level_ioc_not_public",
  "codex_grade": "evidence=A; fit=4; path=3",
  "codex_reason": "missing_gate: Public order/subcontract, accepted installation and signed production transition.",
  "written_up_in": "",
  "source_url": "https://www.energy.gov/articles/energy-department-announces-new-partnership-nvidia-and-oracle-build-largest-doe-ai | https://www.alcf.anl.gov/genesis-mission"
}

Award-date exact-entity resolution — Asset purchase agreement, closing, solicitation amendment, award notice, UEI and receiving/acceptance record.

{
  "worker": "D06",
  "package": "Federal Science Operating System",
  "register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_TRANSACTION_TRIGGER_REGISTRY_2026-08-19.json#cases",
  "record_id": "award-edwards-sdc-clock",
  "record_type": "body",
  "body": "Edwards Semiconductor Solutions LLC | Stainless Design Concepts | CVD Equipment Corporation | Atlas Copco AB",
  "parent_body": "NIST awards and accepts the Boulder system; the asset sale determines the current legal supplier and inherited capability.",
  "what": "Award-date exact-entity resolution — Asset purchase agreement, closing, solicitation amendment, award notice, UEI and receiving/acceptance record.",
  "step_type": "Semiconductor facility delivery",
  "date": "2026-04-01",
  "date_kind": "first date stated in entity_clock",
  "other_dates": "entity_clock: CVD sold the SDC business to Edwards Semiconductor Solutions LLC effective 2026-04-01; NIST later amended its intended source and awarded the buyer a Boulder silane-distribution system on 2026-07-31.",
  "stage_or_status": "current_nist_award_comparator_not_natcast_assignment",
  "codex_grade": "evidence=A; fit=4; path=4",
  "codex_reason": "missing_gate: Any PPF/ASU order plus its installed acceptance dossier.",
  "written_up_in": "",
  "source_url": "https://sam.gov/opp/ad8aeeaf6a254219827fb697e98a781c/view | https://www.sec.gov/Archives/edgar/data/766792/000149315226023044/ex10-1.htm | https://www.atlascopcogroup.com/en/media/press-releases/2026/2026-sdc-closing"
}

Small exact lab purchase order — Award, wafer specification, delivery, incoming inspection and research acceptance.

{
  "worker": "D06",
  "package": "Federal Science Operating System",
  "register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_TRANSACTION_TRIGGER_REGISTRY_2026-08-19.json#cases",
  "record_id": "award-skywater-cmos",
  "record_type": "body",
  "body": "SkyWater Technology Foundry, Inc.",
  "parent_body": "NIST controls the order and receiving acceptance.",
  "what": "Small exact lab purchase order — Award, wafer specification, delivery, incoming inspection and research acceptance.",
  "step_type": "Semiconductor research supply",
  "date": "2026-07-09",
  "date_kind": "first date stated in entity_clock",
  "other_dates": "entity_clock: NIST awarded 1333ND26PNB030073 for CMOS wafers on 2026-07-09 for $26,955.",
  "stage_or_status": "current_nist_comparator_no_ppf_assignment",
  "codex_grade": "evidence=A; fit=3; path=2",
  "codex_reason": "missing_gate: Target-specific Natcast/PPF order and qualification.",
  "written_up_in": "",
  "source_url": "https://sam.gov/opp/1944bc40a19441bd880229b26b42ebc6/view"
}

Instrument purchase and lab acceptance — Award, serial/configuration record, calibration, installation and acceptance test.

{
  "worker": "D06",
  "package": "Federal Science Operating System",
  "register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_TRANSACTION_TRIGGER_REGISTRY_2026-08-19.json#cases",
  "record_id": "award-teledyne-euv-camera",
  "record_type": "body",
  "body": "Teledyne Digital Imaging US, Inc.",
  "parent_body": "NIST's technical owner accepts the instrument; the supplier does not confer program acceptance.",
  "what": "Instrument purchase and lab acceptance — Award, serial/configuration record, calibration, installation and acceptance test.",
  "step_type": "Semiconductor metrology",
  "date": "2026-07-21",
  "date_kind": "first date stated in entity_clock",
  "other_dates": "entity_clock: NIST awarded 1333ND26PNB030130 for an in-vacuum EUV camera on 2026-07-21 for $152,600.",
  "stage_or_status": "current_nist_comparator_no_target_assignment",
  "codex_grade": "evidence=A; fit=3; path=2",
  "codex_reason": "missing_gate: PPF-specific order, tool boundary and accepted installed performance.",
  "written_up_in": "",
  "source_url": "https://sam.gov/opp/a2663a99136746599676ef085be13618/view"
}

Specialist equipment award and acceptance — Exact legal recipient, export/import record, calibration, site acceptance and payment.

{
  "worker": "D06",
  "package": "Federal Science Operating System",
  "register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_TRANSACTION_TRIGGER_REGISTRY_2026-08-19.json#cases",
  "record_id": "award-laserspec-ir",
  "record_type": "body",
  "body": "Laserspec",
  "parent_body": "NIST controls acceptance; the brand-level notice does not resolve every legal-entity field.",
  "what": "Specialist equipment award and acceptance — Exact legal recipient, export/import record, calibration, site acceptance and payment.",
  "step_type": "Scientific instrumentation",
  "date": "2026-07-06",
  "date_kind": "first date stated in entity_clock",
  "other_dates": "entity_clock: NIST awarded a Belgian supplier $200,124.15 for a narrowband mid-IR laser on 2026-07-06; the notice exposes a current cross-border specialist procurement comparator.",
  "stage_or_status": "current_lab_comparator_exact_entity_needs_instrument",
  "codex_grade": "evidence=A; fit=2; path=1",
  "codex_reason": "missing_gate: Award instrument resolving legal identity and any Science Strategy target order.",
  "written_up_in": "",
  "source_url": "https://sam.gov/opp/4b8708942c4246ef9952677fdadb8a9a/view"
}

Defined facility modification and turnover — Statement of work, permit, test/balance, environmental controls, punch list and owner acceptance.

{
  "worker": "D06",
  "package": "Federal Science Operating System",
  "register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_TRANSACTION_TRIGGER_REGISTRY_2026-08-19.json#cases",
  "record_id": "award-xenturis-cleanroom",
  "record_type": "body",
  "body": "Xenturis LLC",
  "parent_body": "The Air Force accepts the modification; the award is only a federal cleanroom-delivery comparator.",
  "what": "Defined facility modification and turnover — Statement of work, permit, test/balance, environmental controls, punch list and owner acceptance.",
  "step_type": "Cleanroom modification",
  "date": "2026-08-04",
  "date_kind": "first date stated in entity_clock",
  "other_dates": "entity_clock: The Air Force awarded FA812526P0062 for a small composite cleanroom modification on 2026-08-04 for $275,000.",
  "stage_or_status": "federal_comparator_no_science_strategy_target_assignment",
  "codex_grade": "evidence=A; fit=3; path=1",
  "codex_reason": "missing_gate: Target-specific facility award and turnover evidence.",
  "written_up_in": "",
  "source_url": "https://sam.gov/opp/b3e3f26bbff84463871a96b14d984ecc/view"
}

Named design and construction team — Project page, design agreement, GMP, commissioning and closeout.

{
  "worker": "D06",
  "package": "Federal Science Operating System",
  "register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_TRANSACTION_TRIGGER_REGISTRY_2026-08-19.json#cases",
  "record_id": "award-asu-mtf-delivery",
  "record_type": "body",
  "body": "JE Dunn Construction Company | Diamondback Design Group, LLC",
  "parent_body": "ASU accepts this MTW project; it does not authorize a PPF inference.",
  "what": "Named design and construction team — Project page, design agreement, GMP, commissioning and closeout.",
  "step_type": "Semiconductor facility delivery",
  "date": "",
  "date_kind": "",
  "other_dates": "entity_clock: ASU identifies JE Dunn and Diamondback on the separate $80 million Materials-to-Fab renovation ending May 2026.",
  "stage_or_status": "same_ecosystem_delivery_comparator",
  "codex_grade": "evidence=A; fit=4; path=1",
  "codex_reason": "missing_gate: PPF-specific contract, site and acceptance role.",
  "written_up_in": "",
  "source_url": "https://cfo.asu.edu/macrotechnology-works-renovation"
}

Downstream delivery contract — Partnership agreement, design and construction award, tool order, cost share and accepted facility scope.

{
  "worker": "D06",
  "package": "Federal Science Operating System",
  "register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_TRANSACTION_TRIGGER_REGISTRY_2026-08-19.json#cases",
  "record_id": "award-applied-materials-mtw",
  "record_type": "body",
  "body": "Applied Materials, Inc. | Arizona State University Research Park, Inc.",
  "parent_body": "ABOR/ASU control the MTW approval; the downstream contracting entity controls delivery awards.",
  "what": "Downstream delivery contract — Partnership agreement, design and construction award, tool order, cost share and accepted facility scope.",
  "step_type": "Semiconductor facility partnership",
  "date": "",
  "date_kind": "",
  "other_dates": "entity_clock: ABOR's FY2026 capital plan identified $17 million of MTW renovation work tied to Applied Materials within a larger $42 million project, with no CMAR/JOC/design professional selected at approval.",
  "stage_or_status": "real_same_campus_signal_not_ppf_proof",
  "codex_grade": "evidence=A; fit=4; path=1",
  "codex_reason": "missing_gate: Exact Applied Materials agreement and any PPF-specific instrument.",
  "written_up_in": "",
  "source_url": "https://www.azregents.edu/sites/default/files/reports/2026-ASU-Annual-Capital-Plan.pdf | https://cfo.asu.edu/mtw-partnership-upgrades"
}

Target expert engagement after delay, dispute or rate review — Native schedules, critical-path windows, cost coding, change chronology, damage model and expert report.

{
  "worker": "D06",
  "package": "Federal Science Operating System",
  "register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_TRANSACTION_TRIGGER_REGISTRY_2026-08-19.json#cases",
  "record_id": "risk-js-held",
  "record_type": "body",
  "body": "J.S. Held LLC",
  "parent_body": "The commission, owner, insurer, surety or tribunal decides reliance; the expert does not decide coverage or restart.",
  "what": "Target expert engagement after delay, dispute or rate review — Native schedules, critical-path windows, cost coding, change chronology, damage model and expert report.",
  "step_type": "Construction delay and prudence",
  "date": "",
  "date_kind": "",
  "other_dates": "entity_clock: Georgia's utility commission engaged J.S. Held for Vogtle construction, commissioning, forensic delay/disruption and prudence analysis.",
  "stage_or_status": "strong_major_project_comparator_no_target_assignment",
  "codex_grade": "evidence=A; fit=4; path=2",
  "codex_reason": "missing_gate: Named Science Strategy engagement and public work product.",
  "written_up_in": "",
  "source_url": "https://services.psc.ga.gov/api/v1/External/Public/Get/Document/DownloadFile/216173/97413"
}

Policy, inspection contract or post-loss assignment — Policy/reinsurance certificate, inspection record, teardown protocol, cause report, repair estimate and interruption chronology.

{
  "worker": "D06",
  "package": "Federal Science Operating System",
  "register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_TRANSACTION_TRIGGER_REGISTRY_2026-08-19.json#cases",
  "record_id": "risk-hsb",
  "record_type": "body",
  "body": "The Hartford Steam Boiler Inspection and Insurance Company | The Hartford Steam Boiler Inspection and Insurance Company of Connecticut | Munich Re",
  "parent_body": "Carrier/cedent decides initial coverage; owner, AHJ and regulator control repair acceptance and restart.",
  "what": "Policy, inspection contract or post-loss assignment — Policy/reinsurance certificate, inspection record, teardown protocol, cause report, repair estimate and interruption chronology.",
  "step_type": "Equipment breakdown and inspection",
  "date": "",
  "date_kind": "",
  "other_dates": "entity_clock: HSB's insurance and Connecticut inspection entities are distinct within Munich Re; public records show federal inspection and equipment-breakdown claim roles.",
  "stage_or_status": "equipment_failure_comparator_no_target_assignment",
  "codex_grade": "evidence=A; fit=4; path=2",
  "codex_reason": "missing_gate: Exact target entity, policy/contract, asset and assignment.",
  "written_up_in": "",
  "source_url": "https://www.munichre.com/hsb/en/general/legal/terms-of-use.hsb.html | https://www.oversight.gov/reports/audit/hartford-steam-boiler"
}

Bound builder's-risk/property policy or adopted design condition — Policy and endorsements, testing/commissioning clauses, survey recommendations, PML study, impairment report and claim file.

{
  "worker": "D06",
  "package": "Federal Science Operating System",
  "register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_TRANSACTION_TRIGGER_REGISTRY_2026-08-19.json#cases",
  "record_id": "risk-fm",
  "record_type": "body",
  "body": "Factory Mutual Insurance Company | FM Approvals LLC",
  "parent_body": "FM decides initial policy response; recommendations bind only through policy, loan, owner specification or code adoption; AHJ/operator controls return.",
  "what": "Bound builder's-risk/property policy or adopted design condition — Policy and endorsements, testing/commissioning clauses, survey recommendations, PML study, impairment report and claim file.",
  "step_type": "Builder's risk and loss prevention",
  "date": "",
  "date_kind": "",
  "other_dates": "entity_clock: Factory Mutual rebranded from FM Global to FM in July 2024; its insurance company and approvals entity remain distinct.",
  "stage_or_status": "major_project_comparator_no_target_placement",
  "codex_grade": "evidence=A; fit=4; path=1",
  "codex_reason": "missing_gate: Target policy, broker placement, lender schedule or basis of design.",
  "written_up_in": "",
  "source_url": "https://www.fm.com/uk/insights/fms-new-brand | https://www.fm.com/About-Us/our-leadership"
}

Bond claim and executed takeover/completion agreement — SF 25/SF 25A or private bond, penal sum, default demand, investigation, completion estimate and takeover agreement.

{
  "worker": "D06",
  "package": "Federal Science Operating System",
  "register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_TRANSACTION_TRIGGER_REGISTRY_2026-08-19.json#cases",
  "record_id": "risk-zurich-surety",
  "record_type": "body",
  "body": "Zurich American Insurance Company | Fidelity and Deposit Company of Maryland",
  "parent_body": "Owner or federal contracting officer terminates/defaults and accepts a surety remedy; surety has no unilateral federal completion right.",
  "what": "Bond claim and executed takeover/completion agreement — SF 25/SF 25A or private bond, penal sum, default demand, investigation, completion estimate and takeover agreement.",
  "step_type": "Performance bond and completion",
  "date": "",
  "date_kind": "",
  "other_dates": "entity_clock: Zurich American and F&D are separate Zurich U.S. entities; a 2023 public takeover agreement shows the surety-completion mechanism after contractor default.",
  "stage_or_status": "surety_takeover_comparator_no_target_bond",
  "codex_grade": "evidence=A; fit=4; path=2",
  "codex_reason": "missing_gate: Exact target bond, Treasury eligibility, default demand or takeover instrument.",
  "written_up_in": "",
  "source_url": "https://www.sec.gov/Archives/edgar/data/1131227/000119312523290782/d365366dex1020.htm | https://www.acquisition.gov/far/49.404 | https://www.acquisition.gov/far/52.228-15"
}

Public owner default and surety remedy — Exact bond, termination, reservation of rights, takeover agreement, completion contract and final allocation.

{
  "worker": "D06",
  "package": "Federal Science Operating System",
  "register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_TRANSACTION_TRIGGER_REGISTRY_2026-08-19.json#cases",
  "record_id": "risk-travelers-surety",
  "record_type": "body",
  "body": "Travelers Casualty and Surety Company of America",
  "parent_body": "The owner accepts the remedy; court/tribunal resolves disputed rights.",
  "what": "Public owner default and surety remedy — Exact bond, termination, reservation of rights, takeover agreement, completion contract and final allocation.",
  "step_type": "Public-project completion",
  "date": "",
  "date_kind": "",
  "other_dates": "entity_clock: New York court records document Travelers proceeding under performance bonds and a takeover agreement after a public-project termination while reserving the principal's rights.",
  "stage_or_status": "public_project_comparator_no_target_bond",
  "codex_grade": "evidence=A; fit=4; path=1",
  "codex_reason": "missing_gate: Target bond or takeover instrument naming this exact Travelers entity.",
  "written_up_in": "",
  "source_url": "https://www.nycourts.gov/reporter/3dseries/2025/2025_05997.htm"
}

TPA/adjusting appointment plus forensic assignment — First notice, coverage chronology, evidence custody, origin-and-cause report, remediation scope and adjusted quantum.

{
  "worker": "D06",
  "package": "Federal Science Operating System",
  "register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_TRANSACTION_TRIGGER_REGISTRY_2026-08-19.json#cases",
  "record_id": "risk-sedgwick-efi",
  "record_type": "body",
  "body": "Sedgwick Claims Management Services, Inc. | EFI Global, Inc.",
  "parent_body": "Carrier or self-insured client retains delegated coverage/settlement authority; EFI supplies technical facts; owner/AHJ controls restart.",
  "what": "TPA/adjusting appointment plus forensic assignment — First notice, coverage chronology, evidence custody, origin-and-cause report, remediation scope and adjusted quantum.",
  "step_type": "Claims and forensic engineering",
  "date": "",
  "date_kind": "",
  "other_dates": "entity_clock: Sedgwick remains Carlyle-controlled after a 2024 minority investment by Altas; EFI Global is a wholly owned forensic-engineering subsidiary.",
  "stage_or_status": "role_compressed_comparator_no_target_assignment",
  "codex_grade": "evidence=A; fit=4; path=2",
  "codex_reason": "missing_gate: Target adjusting agreement, forensic retention and raw-data protocol.",
  "written_up_in": "",
  "source_url": "https://www.sedgwick.com/press-release/sedgwick-announces-investments-from-altas-partners-carlyle-and-stone-point/ | https://www.sedgwick.com/press-release/sedgwick-expands-efi-global-capabilities-in-europe/"
}

ASU/ADOA loss assignment — ASU claim number, ADOA assignment, appraisal, coverage/repair disposition and payment record.

{
  "worker": "D06",
  "package": "Federal Science Operating System",
  "register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_TRANSACTION_TRIGGER_REGISTRY_2026-08-19.json#cases",
  "record_id": "risk-adoa-appraisers",
  "record_type": "body",
  "body": "Sedgwick Claims Management Services, Inc. | Frontier Adjusters, Inc. | Arizona Department of Administration Risk Management Division",
  "parent_body": "ASU reports and administers locally; ADOA/self-insurance authorities decide the state claim; vendor appraisers do not decide coverage.",
  "what": "ASU/ADOA loss assignment — ASU claim number, ADOA assignment, appraisal, coverage/repair disposition and payment record.",
  "step_type": "Arizona state claims administration",
  "date": "2027-05-31",
  "date_kind": "first date stated in entity_clock",
  "other_dates": "entity_clock: Arizona statewide contracts list Sedgwick and Frontier for vehicle/property damage appraisal services through 2027-05-31, subject to contract terms and tasking.",
  "stage_or_status": "current_statewide_vehicle_no_ppf_claim",
  "codex_grade": "evidence=A; fit=4; path=2",
  "codex_reason": "missing_gate: Whether the PPF asset is within state coverage and any target loss order.",
  "written_up_in": "",
  "source_url": "https://spo.az.gov/ctr070340 | https://spo.az.gov/ctr070338 | https://cfo.asu.edu/claims"
}

Accredited target test order — PO entity, exact-lab ISO/IEC 17025 scope, custody, calibration, raw data, deviation log and signed result.

{
  "worker": "D06",
  "package": "Federal Science Operating System",
  "register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_TRANSACTION_TRIGGER_REGISTRY_2026-08-19.json#cases",
  "record_id": "risk-element-nts",
  "record_type": "body",
  "body": "National Technical Systems, Inc. | Element Materials Technology US Holdings Inc. | Temasek Holdings (Private) Limited",
  "parent_body": "The customer/program accepts the item; lab accreditation establishes scoped competence, not fitness for return to service.",
  "what": "Accredited target test order — PO entity, exact-lab ISO/IEC 17025 scope, custody, calibration, raw data, deviation log and signed result.",
  "step_type": "Qualification and root-cause testing",
  "date": "",
  "date_kind": "",
  "other_dates": "entity_clock: Element acquired NTS in 2022 and is Temasek-owned; exact laboratory and PO entity must be resolved for each test.",
  "stage_or_status": "qualification_comparator_no_target_order",
  "codex_grade": "evidence=A; fit=4; path=2",
  "codex_reason": "missing_gate: Target test order, method/site scope and government acceptance plan.",
  "written_up_in": "",
  "source_url": "https://www.element.com/about-element/news/2022/09/22/element-acquires-nts | https://www.element.com/about-element/news/2022/07/05/element-announces-completion-of-its-acquisition-by-temasek"
}

Independent retention or peer review — Joint examination protocol, custody, nondestructive/destructive test data, causal matrix, uncertainty and peer-reviewed report.

{
  "worker": "D06",
  "package": "Federal Science Operating System",
  "register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_TRANSACTION_TRIGGER_REGISTRY_2026-08-19.json#cases",
  "record_id": "risk-exponent",
  "record_type": "body",
  "body": "Exponent, Inc.",
  "parent_body": "Investigating agency, owner, carrier or tribunal decides reliance; OEM/owner/regulator determines repair and return.",
  "what": "Independent retention or peer review — Joint examination protocol, custody, nondestructive/destructive test data, causal matrix, uncertainty and peer-reviewed report.",
  "step_type": "Independent failure reconstruction",
  "date": "",
  "date_kind": "",
  "other_dates": "entity_clock: Exponent is a public engineering consultancy with current utilities, BESS and failure-analysis work; NTSB records provide a joint-protocol comparator.",
  "stage_or_status": "failure_analysis_comparator_no_target_retention",
  "codex_grade": "evidence=A; fit=4; path=1",
  "codex_reason": "missing_gate: Target engagement, protocol and evidence-access terms.",
  "written_up_in": "",
  "source_url": "https://www.ntsb.gov/investigations/AccidentReports/Reports/RAR0303.pdf | https://www.sec.gov/Archives/edgar/data/851520/000119312526082508/expo-20260102.htm"
}