31,545 research records. 15 records referring to separate-lane material are withheld from this public copy. The full original is preserved privately. Record dates and qualifications are unchanged; this is not a new factual review.
Simulation and physical-test integration on RTX Technology Research Center's selected QTIME Topic 2 team. — Named participant on a selected America Makes QTIME team.
{
"worker": "D06",
"package": "Federal Science Operating System",
"register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_HIDDEN_SUPPLY_CHAIN_CANDIDATE_REGISTRY_2026-08-19.json#candidates",
"record_id": "hidden-intact-solutions",
"record_type": "body",
"body": "Intact Solutions, Inc.",
"parent_body": "Independent company",
"what": "Simulation and physical-test integration on RTX Technology Research Center's selected QTIME Topic 2 team. — Named participant on a selected America Makes QTIME team.",
"step_type": "additive manufacturing | simulation | physical-test integration | QTIME",
"date": "",
"date_kind": "",
"other_dates": "",
"stage_or_status": "direct_federal_path_target_unassigned",
"codex_grade": "evidence=A; fit=4; path=4",
"codex_reason": "missing_gate: Work-share agreement, delivered validation artifacts, government acceptance and transition-user adoption.",
"written_up_in": "",
"source_url": "https://www.americamakes.us/america-makes-announces-winners-of-qtime-project-call-worth-5m-in-funding/ | https://intact-solutions.com/company/"
}
Build and evaluate load models, affected systems, required facilities, reliability criteria and utility interconnection conditions. — large-load interconnection and reliability study — NYISO commissioned Qualus for the January 2025 System Impact Study of Micron New York Semiconductor Manufacturing LLC's White Pine Phase 1 load project; it also holds current Austin Energy SCADA/EMS consulting work.
{
"worker": "D06",
"package": "Federal Science Operating System",
"register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_PIVOTAL_THIRD_PARTY_CONTROL_REGISTRY_2026-08-19.json#candidates",
"record_id": "third-qualus",
"record_type": "body",
"body": "Qualus, LLC",
"parent_body": "Majority-owned by New Mountain Capital; exact task-performing subsidiary must be preserved",
"what": "Build and evaluate load models, affected systems, required facilities, reliability criteria and utility interconnection conditions. — large-load interconnection and reliability study — NYISO commissioned Qualus for the January 2025 System Impact Study of Micron New York Semiconductor Manufacturing LLC's White Pine Phase 1 load project; it also holds current Austin Energy SCADA/EMS consulting work.",
"step_type": "",
"date": "",
"date_kind": "",
"other_dates": "",
"stage_or_status": "no_public_target_award_or_study_found",
"codex_grade": "evidence=A; fit=4; path=2; control_strength=delegated_execution",
"codex_reason": "missing_gate: Named target-campus utility study, task order, completed model and accepted interconnection output.",
"written_up_in": "",
"source_url": "https://documents.dps.ny.gov/public/Common/ViewDoc.aspx?DocRefId=%7BC016B994-0000-CA3E-A2D6-3CE5799351F7%7D | https://financeonline.austintexas.gov/afo/contract_catalog/OCCViewMA.cfm?cat=050&cd=MA&dd=1100&id=NA240000156"
}
Model dynamic large loads, test controls and protection, develop interconnection requirements and support owner/utility decisions. — grid analytics, protection testing and interconnection design — Current Danovo materials address data-center load models, utility coordination, lab testing, commissioning and behind-the-meter integration; DOE records other grid-analytics and charging-test awards to the legal entity.
{
"worker": "D06",
"package": "Federal Science Operating System",
"register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_PIVOTAL_THIRD_PARTY_CONTROL_REGISTRY_2026-08-19.json#candidates",
"record_id": "third-danovo",
"record_type": "body",
"body": "Quanta Technology, LLC d/b/a Danovo Energy Solutions",
"parent_body": "Quanta Services, Inc. family; Danovo Energy Solutions is the current trade name and Quanta Technology, LLC remains the legal entity",
"what": "Model dynamic large loads, test controls and protection, develop interconnection requirements and support owner/utility decisions. — grid analytics, protection testing and interconnection design — Current Danovo materials address data-center load models, utility coordination, lab testing, commissioning and behind-the-meter integration; DOE records other grid-analytics and charging-test awards to the legal entity.",
"step_type": "",
"date": "",
"date_kind": "",
"other_dates": "",
"stage_or_status": "no_public_target_award_or_study_found",
"codex_grade": "evidence=A; fit=4; path=3; control_strength=advisory_influence",
"codex_reason": "missing_gate: Target task, named study, test assignment or accepted utility filing.",
"written_up_in": "",
"source_url": "https://www.danovoenergy.com/wp-content/uploads/2026/02/DES-BR-131-V1-01-26_Data_Centers-2.pdf | https://www.danovoenergy.com/about-us/ | https://www.energy.gov/sites/default/files/2024-07/CX-030773.pdf"
}
Automate power-flow model construction, constraint identification, mitigation selection and upgrade-cost estimation. — interconnection queue modeling and mitigation selection — MISO uses the SUGAR platform in its generator-interconnection study process; Pearl Street has DOE and ARPA-E Grid Optimization competition history.
{
"worker": "D06",
"package": "Federal Science Operating System",
"register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_PIVOTAL_THIRD_PARTY_CONTROL_REGISTRY_2026-08-19.json#candidates",
"record_id": "third-pearl-street",
"record_type": "body",
"body": "Pearl Street Technologies, LLC",
"parent_body": "Owned by Enverus Holdings, Inc.; exact operating entity retained",
"what": "Automate power-flow model construction, constraint identification, mitigation selection and upgrade-cost estimation. — interconnection queue modeling and mitigation selection — MISO uses the SUGAR platform in its generator-interconnection study process; Pearl Street has DOE and ARPA-E Grid Optimization competition history.",
"step_type": "",
"date": "",
"date_kind": "",
"other_dates": "",
"stage_or_status": "no_public_target_award_or_queue_assignment_found",
"codex_grade": "evidence=A; fit=4; path=3; control_strength=delegated_execution",
"codex_reason": "missing_gate: Target load or associated network-upgrade study using SUGAR and an accepted study result.",
"written_up_in": "",
"source_url": "https://extranet.misoenergy.org/planning/resource-utilization/GI_Studies/ | https://cdn.misoenergy.org/20250128%20IPWG%20Item%2004%20Draft%20MISO%20Transmission%20Mitigation%20Selection%20and%20Cost%20Estimation%20Approach%20Whitepaper674296.pdf | https://arpa-e.energy.gov/news-and-events/news-and-insights/announcing-grid-optimization-go-competition-challenge-2-winners"
}
Build and run power-flow models, review results, develop upgrades and support cost allocation through TARA. — cluster-study automation and upgrade-cost workflow — TVA and PowerGEM presented a current Order 2023 cluster-interconnection automation workflow at FERC's 2026 software conference.
{
"worker": "D06",
"package": "Federal Science Operating System",
"register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_PIVOTAL_THIRD_PARTY_CONTROL_REGISTRY_2026-08-19.json#candidates",
"record_id": "third-powergem",
"record_type": "body",
"body": "PowerGEM, LLC",
"parent_body": "Independent power-system software and consulting company",
"what": "Build and run power-flow models, review results, develop upgrades and support cost allocation through TARA. — cluster-study automation and upgrade-cost workflow — TVA and PowerGEM presented a current Order 2023 cluster-interconnection automation workflow at FERC's 2026 software conference.",
"step_type": "",
"date": "",
"date_kind": "",
"other_dates": "",
"stage_or_status": "no_public_target_model_or_task_found",
"codex_grade": "evidence=A; fit=4; path=2; control_strength=advisory_influence",
"codex_reason": "missing_gate: Named target-load model, utility assignment and accepted study output.",
"written_up_in": "",
"source_url": "https://www.ferc.gov/news-events/events/increasing-real-time-and-day-ahead-market-and-planning-efficiency-through-1"
}
Determine transmission impacts, necessary upgrades and reliability mitigations. — affected-system, HVDC and reliability studies — EPE authored SPP-posted affected-system analyses, appears in ERCOT's Pecos West HVDC reliability record and received a CPS Energy engineering-services purchase order.
{
"worker": "D06",
"package": "Federal Science Operating System",
"register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_PIVOTAL_THIRD_PARTY_CONTROL_REGISTRY_2026-08-19.json#candidates",
"record_id": "third-electric-power-engineers",
"record_type": "body",
"body": "Electric Power Engineers, LLC",
"parent_body": "Exact current parent/control should be rechecked at target assignment",
"what": "Determine transmission impacts, necessary upgrades and reliability mitigations. — affected-system, HVDC and reliability studies — EPE authored SPP-posted affected-system analyses, appears in ERCOT's Pecos West HVDC reliability record and received a CPS Energy engineering-services purchase order.",
"step_type": "",
"date": "",
"date_kind": "",
"other_dates": "",
"stage_or_status": "no_public_target_load_study_found",
"codex_grade": "evidence=A; fit=4; path=2; control_strength=delegated_execution",
"codex_reason": "missing_gate: Target large-load or science-campus interconnection study and accepted utility result.",
"written_up_in": "",
"source_url": "https://opsportal.spp.org/documents/studies/files/2023_Generation_Studies/MPC_ASA_DISIS-2023-001_Phase_2_Study_Final_8_21_25_Public.pdf | https://www.ercot.com/files/docs/2022/07/15/Pecos%20West%20Intertie%20ERCOT%20RPG%2020220719.pdf"
}
Administer resource solicitations, perform power-supply and transmission planning and help utilities define large-load operating conditions. — utility resource solicitation and large-load planning — GDS's Soar platform administered a 1,600 MW cooperative solicitation responding to Georgia data-center demand; the company also addresses NERC large-computational-load modeling and commissioning requirements.
{
"worker": "D06",
"package": "Federal Science Operating System",
"register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_PIVOTAL_THIRD_PARTY_CONTROL_REGISTRY_2026-08-19.json#candidates",
"record_id": "third-gds",
"record_type": "body",
"body": "GDS Associates, Inc.",
"parent_body": "Independent Georgia corporation",
"what": "Administer resource solicitations, perform power-supply and transmission planning and help utilities define large-load operating conditions. — utility resource solicitation and large-load planning — GDS's Soar platform administered a 1,600 MW cooperative solicitation responding to Georgia data-center demand; the company also addresses NERC large-computational-load modeling and commissioning requirements.",
"step_type": "",
"date": "",
"date_kind": "",
"other_dates": "",
"stage_or_status": "no_public_target_utility_assignment_found",
"codex_grade": "evidence=B; fit=3; path=1; control_strength=delegated_execution",
"codex_reason": "missing_gate: Target utility RFP administration, NERC-alert work or campus power-supply study.",
"written_up_in": "",
"source_url": "https://soar.gdsassociates.com/Rfps/Detail?handler=ArchiveRfp&id=9ba71c67-48bd-4193-b026-70730ecd2e15 | https://www.gdsassociates.com/news/what-nercs-level-3-alert-means-for-large-computational-loads/"
}
Perform technical and commercial due diligence, fatal-flaw analysis, construction monitoring and independent-engineer reporting for lenders and investors. — lender independent engineering and financial close — E3 reports review of more than 2,500 projects valued above $200 billion and documents lender independent-engineer work on major transmission financing.
{
"worker": "D06",
"package": "Federal Science Operating System",
"register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_PIVOTAL_THIRD_PARTY_CONTROL_REGISTRY_2026-08-19.json#candidates",
"record_id": "third-e3",
"record_type": "body",
"body": "E3 Consulting Services, LLC",
"parent_body": "NAES family company; confirm exact contracting entity for each engagement",
"what": "Perform technical and commercial due diligence, fatal-flaw analysis, construction monitoring and independent-engineer reporting for lenders and investors. — lender independent engineering and financial close — E3 reports review of more than 2,500 projects valued above $200 billion and documents lender independent-engineer work on major transmission financing.",
"step_type": "",
"date": "",
"date_kind": "",
"other_dates": "",
"stage_or_status": "no_public_target_lender_or_owner_assignment_found",
"codex_grade": "evidence=B; fit=4; path=1; control_strength=formal_gate",
"codex_reason": "missing_gate: Named target financing, lender reliance letter, independent-engineer report and milestone certificate.",
"written_up_in": "",
"source_url": "https://www.e3co.com/services/independent-engineering-project-financing/ | https://www.e3co.com/financing-completed-for-chile-transmission-projects-e3-plays-key-role-as-independent-engineer/"
}
Prepare environmental analyses and the factual record agencies use for NEPA and state authorization decisions. — environmental record and permitting — DOE and Montana DEQ directed ERM to prepare the January 2026 North Plains Connector draft EIS for 422 miles of 525-kV HVDC and associated facilities.
{
"worker": "D06",
"package": "Federal Science Operating System",
"register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_PIVOTAL_THIRD_PARTY_CONTROL_REGISTRY_2026-08-19.json#candidates",
"record_id": "third-erm",
"record_type": "body",
"body": "Environmental Resources Management, Inc.",
"parent_body": "ERM corporate group; retain the exact U.S. entity named on an instrument",
"what": "Prepare environmental analyses and the factual record agencies use for NEPA and state authorization decisions. — environmental record and permitting — DOE and Montana DEQ directed ERM to prepare the January 2026 North Plains Connector draft EIS for 422 miles of 525-kV HVDC and associated facilities.",
"step_type": "",
"date": "",
"date_kind": "",
"other_dates": "",
"stage_or_status": "no_public_target_nepa_or_permitting_instrument_found",
"codex_grade": "evidence=A; fit=3; path=3; control_strength=acceptance_evidence",
"codex_reason": "missing_gate: Target environmental-contract instrument, accepted environmental record and agency decision.",
"written_up_in": "",
"source_url": "https://www.energy.gov/sites/default/files/2026-01/draft-eis-0568-north-plains-connector-2026-01.pdf"
}
Screen sites for environmental and geotechnical fatal flaws, perform field exploration, materials testing, special inspection and building-envelope commissioning. — site feasibility, geotechnical and construction-material acceptance — Terracon reports more than 3,100 data-center projects and supplies site selection, NEPA, wetlands, thermal-resistivity, QA/QC and commissioning services across the digital-infrastructure lifecycle.
{
"worker": "D06",
"package": "Federal Science Operating System",
"register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_PIVOTAL_THIRD_PARTY_CONTROL_REGISTRY_2026-08-19.json#candidates",
"record_id": "third-terracon",
"record_type": "body",
"body": "Terracon Consultants, Inc.",
"parent_body": "Private, employee-owned company",
"what": "Screen sites for environmental and geotechnical fatal flaws, perform field exploration, materials testing, special inspection and building-envelope commissioning. — site feasibility, geotechnical and construction-material acceptance — Terracon reports more than 3,100 data-center projects and supplies site selection, NEPA, wetlands, thermal-resistivity, QA/QC and commissioning services across the digital-infrastructure lifecycle.",
"step_type": "",
"date": "",
"date_kind": "",
"other_dates": "",
"stage_or_status": "no_public_target_site_or_testing_assignment_found",
"codex_grade": "evidence=B; fit=4; path=1; control_strength=acceptance_evidence",
"codex_reason": "missing_gate: Named target parcel, study authorization, field report, permit use or accepted construction test package.",
"written_up_in": "",
"source_url": "https://www.terracon.com/sector/digital-infrastructure/ | https://www.terracon.com/about/"
}
Test transformer, bushing, breaker and relay condition to support repair, replacement and re-energization decisions. — transformer and substation diagnostic acceptance — DOE/WAPA purchased phase-shifter offline transformer testing with a Doble engineer; Austin Energy and Silicon Valley Power records show continuing diagnostic equipment, software and support.
{
"worker": "D06",
"package": "Federal Science Operating System",
"register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_PIVOTAL_THIRD_PARTY_CONTROL_REGISTRY_2026-08-19.json#candidates",
"record_id": "third-doble",
"record_type": "body",
"body": "Doble Engineering Company",
"parent_body": "ESCO Technologies Inc. subsidiary",
"what": "Test transformer, bushing, breaker and relay condition to support repair, replacement and re-energization decisions. — transformer and substation diagnostic acceptance — DOE/WAPA purchased phase-shifter offline transformer testing with a Doble engineer; Austin Energy and Silicon Valley Power records show continuing diagnostic equipment, software and support.",
"step_type": "",
"date": "",
"date_kind": "",
"other_dates": "",
"stage_or_status": "no_public_target_asset_test_order_found",
"codex_grade": "evidence=A; fit=4; path=3; control_strength=acceptance_evidence",
"codex_reason": "missing_gate: Target transformer/substation service order, diagnostic result and owner permission to return to service.",
"written_up_in": "",
"source_url": "https://www.usaspending.gov/award/CONT_AWD_89503124PWA000761_8900_-NONE-_-NONE- | https://services.austintexas.gov/edims/document.cfm?id=425037"
}
Perform ATS, relay, switchgear, breaker, transformer and substation testing before equipment is placed in service. — electrical startup and field acceptance — Public municipal and utility records show ATS commissioning, relay and breaker upgrades, transformer inspection, substation maintenance and preventive switchgear testing.
{
"worker": "D06",
"package": "Federal Science Operating System",
"register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_PIVOTAL_THIRD_PARTY_CONTROL_REGISTRY_2026-08-19.json#candidates",
"record_id": "third-eps-international",
"record_type": "body",
"body": "Electric Power Systems International, Inc. d/b/a Electric Power Systems",
"parent_body": "Exact current ownership should be checked at target assignment",
"what": "Perform ATS, relay, switchgear, breaker, transformer and substation testing before equipment is placed in service. — electrical startup and field acceptance — Public municipal and utility records show ATS commissioning, relay and breaker upgrades, transformer inspection, substation maintenance and preventive switchgear testing.",
"step_type": "",
"date": "",
"date_kind": "",
"other_dates": "",
"stage_or_status": "no_public_target_commissioning_plan_or_purchase_order_found",
"codex_grade": "evidence=A; fit=4; path=1; control_strength=acceptance_evidence",
"codex_reason": "missing_gate: Target commissioning plan, purchase order, passed test package and owner energization acceptance.",
"written_up_in": "",
"source_url": "https://www.clewiston-fl.gov/media/2441 | https://www.clewiston-fl.gov/media/2721 | https://www.fairfaxcounty.gov/cregister/DownloadPDF.aspx?AttachmentID=4839ec24-52bb-4e87-a6a7-1194be237315"
}
Verify electrical installation, calibration, protection and safe operating readiness. — medium- and high-voltage field testing — Phoenix authorized a five-year LV/MV testing, calibration and repair contract beginning in 2025; Collin County named Shermco a 2026 secondary awardee for MV/HV services.
{
"worker": "D06",
"package": "Federal Science Operating System",
"register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_PIVOTAL_THIRD_PARTY_CONTROL_REGISTRY_2026-08-19.json#candidates",
"record_id": "third-shermco",
"record_type": "body",
"body": "Shermco Industries, Inc.",
"parent_body": "Exact current private-equity control should be rechecked at target assignment",
"what": "Verify electrical installation, calibration, protection and safe operating readiness. — medium- and high-voltage field testing — Phoenix authorized a five-year LV/MV testing, calibration and repair contract beginning in 2025; Collin County named Shermco a 2026 secondary awardee for MV/HV services.",
"step_type": "",
"date": "",
"date_kind": "",
"other_dates": "",
"stage_or_status": "no_public_target_site_scope_found",
"codex_grade": "evidence=A; fit=4; path=1; control_strength=acceptance_evidence",
"codex_reason": "missing_gate: Target-site purchase order, exact equipment list, passed commissioning package and energization record.",
"written_up_in": "",
"source_url": "https://www.phoenix.gov/content/dam/phoenix/cityclerksite/city-council-meeting-files/4-23-25%20Formal%20Agenda%20-%20FINAL.pdf | https://eagenda.collincountytx.gov/docs/2026/CC/20260413_3196/59918_Contract%20Award%20Data%20Sheet%20%281%29.pdf"
}
Manage issues, schedules, quality, contract administration and integrated-system testing for secure or laboratory facilities. — owner-side program controls and integrated commissioning — MBP performed program, construction, QA and commissioning management for NGA New Campus East and independent commissioning for Labcorp's clinical laboratory and central energy plant.
{
"worker": "D06",
"package": "Federal Science Operating System",
"register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_PIVOTAL_THIRD_PARTY_CONTROL_REGISTRY_2026-08-19.json#candidates",
"record_id": "third-mbp",
"record_type": "body",
"body": "McDonough Bolyard Peck, Inc.",
"parent_body": "Employee/shareholder-owned company",
"what": "Manage issues, schedules, quality, contract administration and integrated-system testing for secure or laboratory facilities. — owner-side program controls and integrated commissioning — MBP performed program, construction, QA and commissioning management for NGA New Campus East and independent commissioning for Labcorp's clinical laboratory and central energy plant.",
"step_type": "",
"date": "",
"date_kind": "",
"other_dates": "",
"stage_or_status": "no_public_target_task_order_found",
"codex_grade": "evidence=A; fit=3; path=2; control_strength=acceptance_evidence",
"codex_reason": "missing_gate: DOE, NNSA, laboratory or target data-center task with power or integrated-systems scope and owner acceptance.",
"written_up_in": "",
"source_url": "https://www.mbpce.com/projects/national-geospatial-intelligence-agency-new-campus-east-u-s-army-corps-of-engineers-baltimore-district/ | https://www.mbpce.com/projects/labcorp-project-infinity-new-clinical-laboratory/"
}
Independently assess whether design, construction and operations satisfy a selected Tier objective through document review and live performance demonstrations. — data-center design, constructed-facility and operational certification — Uptime states it is the only entity licensed to certify against the Tier Classification System and that constructed-facility certification includes live demonstrations and applies only to installed capacity and configuration.
{
"worker": "D06",
"package": "Federal Science Operating System",
"register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_PIVOTAL_THIRD_PARTY_CONTROL_REGISTRY_2026-08-19.json#candidates",
"record_id": "third-uptime",
"record_type": "body",
"body": "Uptime Institute, LLC",
"parent_body": "Delaware limited liability company within the 451 Group corporate family",
"what": "Independently assess whether design, construction and operations satisfy a selected Tier objective through document review and live performance demonstrations. — data-center design, constructed-facility and operational certification — Uptime states it is the only entity licensed to certify against the Tier Classification System and that constructed-facility certification includes live demonstrations and applies only to installed capacity and configuration.",
"step_type": "",
"date": "",
"date_kind": "",
"other_dates": "",
"stage_or_status": "no_public_target_certification_engagement_found",
"codex_grade": "evidence=B; fit=4; path=1; control_strength=formal_gate",
"codex_reason": "missing_gate: Target owner selects a Tier objective, submits documents, completes constructed-facility tests and receives a site-specific certification.",
"written_up_in": "",
"source_url": "https://connect.uptimeinstitute.com/tier-certification | https://connect.uptimeinstitute.com/tier-certification/construction | https://uptimeinstitute.com/inside-track-terms-of-use"
}
Evaluate electrical load, power quality, cooling, enclosure, ICT, cybersecurity and turnover documentation; certify products within recognized scope. — testing, inspection, commissioning and certification — OSHA recognizes the exact entity as an NRTL; Intertek's current data-center offering covers independent lifecycle testing, integrated commissioning and utility-interconnection-related validation.
{
"worker": "D06",
"package": "Federal Science Operating System",
"register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_PIVOTAL_THIRD_PARTY_CONTROL_REGISTRY_2026-08-19.json#candidates",
"record_id": "third-intertek",
"record_type": "body",
"body": "Intertek Testing Services NA, Inc.",
"parent_body": "Intertek Group plc subsidiary; exact data-center service entity must match the quotation or task",
"what": "Evaluate electrical load, power quality, cooling, enclosure, ICT, cybersecurity and turnover documentation; certify products within recognized scope. — testing, inspection, commissioning and certification — OSHA recognizes the exact entity as an NRTL; Intertek's current data-center offering covers independent lifecycle testing, integrated commissioning and utility-interconnection-related validation.",
"step_type": "",
"date": "",
"date_kind": "",
"other_dates": "",
"stage_or_status": "no_public_target_test_or_certification_assignment_found",
"codex_grade": "evidence=A; fit=4; path=1; control_strength=formal_gate",
"codex_reason": "missing_gate: Exact target contracting entity, recognized scope, test plan, completed results and AHJ/owner acceptance.",
"written_up_in": "",
"source_url": "https://www.osha.gov/nationally-recognized-testing-laboratory-program/its | https://www.intertek.com/datacenters/ | https://www.intertek.com/resources/fact-sheets/2026/data-center-power-infrastructure-testing-and-validation/"
}
Test and certify data-center facilities, modular systems, electrical equipment, batteries and immersion-cooling fluids; support AHJ compliance. — facility and component safety certification — UL's data-center facility terms cover building-plan review, site inspection, electrical/mechanical/telecom and commissioning validation; UL Solutions launched AI-data-center immersion-fluid testing in 2025.
{
"worker": "D06",
"package": "Federal Science Operating System",
"register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_PIVOTAL_THIRD_PARTY_CONTROL_REGISTRY_2026-08-19.json#candidates",
"record_id": "third-ul",
"record_type": "body",
"body": "UL Solutions Inc. / UL LLC contracting-entity seam",
"parent_body": "UL Solutions Inc. is the public parent; UL LLC and other contracting parties issue certifications within their scopes",
"what": "Test and certify data-center facilities, modular systems, electrical equipment, batteries and immersion-cooling fluids; support AHJ compliance. — facility and component safety certification — UL's data-center facility terms cover building-plan review, site inspection, electrical/mechanical/telecom and commissioning validation; UL Solutions launched AI-data-center immersion-fluid testing in 2025.",
"step_type": "",
"date": "",
"date_kind": "",
"other_dates": "",
"stage_or_status": "no_public_target_certification_assignment_found",
"codex_grade": "evidence=A; fit=4; path=1; control_strength=formal_gate",
"codex_reason": "missing_gate: Exact UL contracting party, target standard and scope, completed test report and certificate or AHJ acceptance.",
"written_up_in": "",
"source_url": "https://www.ul.com/sites/default/files/2024-03/Terms_DCFIC_UL_02_26_2018-b.pdf | https://ir.ul.com/news/news-details/2025/UL-Solutions-Launches-New-Testing-to-Help-Performance-and-Sustainability-of-Data-Centers-Needed-for-AI/default.aspx | https://www.osha.gov/laws-regs/interlinking/standards/1910.7/all"
}
Translate site, fire, power, battery, cooling and business-continuity findings into underwriting, coverage and loss-prevention requirements. — property insurance capacity and loss-prevention conditions — FM reports protecting about 1,100 data centers representing roughly $250 billion of insurable value; its data-center loss-prevention standard addresses utility loss, standby power, UPS, liquid cooling and power isolation.
{
"worker": "D06",
"package": "Federal Science Operating System",
"register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_PIVOTAL_THIRD_PARTY_CONTROL_REGISTRY_2026-08-19.json#candidates",
"record_id": "third-fm",
"record_type": "body",
"body": "Factory Mutual Insurance Company",
"parent_body": "Policyholder-owned mutual insurance organization; FM Approvals LLC remains a separate certification entity",
"what": "Translate site, fire, power, battery, cooling and business-continuity findings into underwriting, coverage and loss-prevention requirements. — property insurance capacity and loss-prevention conditions — FM reports protecting about 1,100 data centers representing roughly $250 billion of insurable value; its data-center loss-prevention standard addresses utility loss, standby power, UPS, liquid cooling and power isolation.",
"step_type": "",
"date": "",
"date_kind": "",
"other_dates": "",
"stage_or_status": "no_public_target_underwriting_or_engineering_assignment_found",
"codex_grade": "evidence=B; fit=3; path=1; control_strength=formal_gate",
"codex_reason": "missing_gate: Target policy, engineering survey, recommendation response and bound coverage or lender reliance.",
"written_up_in": "",
"source_url": "https://www.fm.com/newsroom/news/2025/fm-launches-intellium-program-amid-cloud-and-ai-boom-and-surging-data-center-and-power-demand | https://www.fm.com/FMAApi/data/ApprovalStandardsDownload?itemId=%7B2D62FBAB-83CA-4B26-A447-72D7EF6D574D%7D"
}
Create NIST-traceable calibration and facility/equipment qualification records supporting defensible data and regulatory readiness. — calibration, metrology and IQ/OQ/PQ validation — Transcat's SEC filings describe ISO/IEC 17025 calibration centers and validation services; a Charles River case documents facility/equipment qualification, building-management-system IQ/OQ/PQ and clean-gas utility validation.
{
"worker": "D06",
"package": "Federal Science Operating System",
"register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_PIVOTAL_THIRD_PARTY_CONTROL_REGISTRY_2026-08-19.json#candidates",
"record_id": "third-transcat",
"record_type": "body",
"body": "Transcat, Inc.",
"parent_body": "Public U.S. corporation; individual calibration centers retain method-specific accreditation scopes",
"what": "Create NIST-traceable calibration and facility/equipment qualification records supporting defensible data and regulatory readiness. — calibration, metrology and IQ/OQ/PQ validation — Transcat's SEC filings describe ISO/IEC 17025 calibration centers and validation services; a Charles River case documents facility/equipment qualification, building-management-system IQ/OQ/PQ and clean-gas utility validation.",
"step_type": "",
"date": "",
"date_kind": "",
"other_dates": "",
"stage_or_status": "no_public_target_order_or_subcontract_found",
"codex_grade": "evidence=A; fit=4; path=1; control_strength=acceptance_evidence",
"codex_reason": "missing_gate: Target order, correct site accreditation scope, approved intervals and completed IQ/OQ/PQ package.",
"written_up_in": "",
"source_url": "https://www.sec.gov/Archives/edgar/data/99302/000143774925018483/trns20250331_10k.htm | https://www.transcat.ca/charles-river-laboratories-gene-therapy-division-cqv-validation-case-study"
}
Provide controlled transport, rigging, cleanroom tool installation, millwrighting, storage, staging and utility-module hookup. — tool, rack and utility-module move-in — MEI documents semiconductor cleanroom handling, prebuilt utility-module installation and four million square feet of industrial storage including powered test space.
{
"worker": "D06",
"package": "Federal Science Operating System",
"register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_PIVOTAL_THIRD_PARTY_CONTROL_REGISTRY_2026-08-19.json#candidates",
"record_id": "third-mei",
"record_type": "body",
"body": "MEI Rigging & Crating, LLC d/b/a MEI Industrial Solutions",
"parent_body": "Private company; exact legal and trade names confirmed in company terms",
"what": "Provide controlled transport, rigging, cleanroom tool installation, millwrighting, storage, staging and utility-module hookup. — tool, rack and utility-module move-in — MEI documents semiconductor cleanroom handling, prebuilt utility-module installation and four million square feet of industrial storage including powered test space.",
"step_type": "",
"date": "",
"date_kind": "",
"other_dates": "",
"stage_or_status": "no_public_argonne_or_napmp_site_package_found",
"codex_grade": "evidence=B; fit=4; path=1; control_strength=critical_path_supply",
"codex_reason": "missing_gate: Site rigging package, OEM authorization, cleanroom and security protocol, completed hookup and site acceptance test.",
"written_up_in": "",
"source_url": "https://meiindustrialsolutions.com/privacy-policy/ | https://meiindustrialsolutions.com/ | https://meiindustrialsolutions.com/case-studies/mei-rides-a-wave-of-the-future-for-factories/"
}
Clean, treat, monitor and control facility and technology cooling loops to limit corrosion, fouling, microbial growth and heat-transfer loss. — liquid-cooling water chemistry and operational reliability — ChemTreat reports supporting more than 200 North American data centers and documents direct-to-chip cooling treatment at an unnamed DOE national laboratory with HPC systems.
{
"worker": "D06",
"package": "Federal Science Operating System",
"register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_PIVOTAL_THIRD_PARTY_CONTROL_REGISTRY_2026-08-19.json#candidates",
"record_id": "third-chemtreat",
"record_type": "body",
"body": "ChemTreat, Inc.",
"parent_body": "Operating company of Veralto Corporation",
"what": "Clean, treat, monitor and control facility and technology cooling loops to limit corrosion, fouling, microbial growth and heat-transfer loss. — liquid-cooling water chemistry and operational reliability — ChemTreat reports supporting more than 200 North American data centers and documents direct-to-chip cooling treatment at an unnamed DOE national laboratory with HPC systems.",
"step_type": "",
"date": "",
"date_kind": "",
"other_dates": "",
"stage_or_status": "no_public_named_target_engagement_found",
"codex_grade": "evidence=B; fit=4; path=2; control_strength=critical_path_supply",
"codex_reason": "missing_gate: Named facility, treatment specification, compatibility test, pre-operational cleaning and accepted long-duration water-quality performance.",
"written_up_in": "",
"source_url": "https://www.chemtreat.com/industries/data-centers/ | https://www.chemtreat.com/resource/direct-to-chip-liquid-cooling-treatment-helps-doe-national-laboratory-improve-system-performance/"
}
Perform packaging/assembly, post-processing, burn-in, reliability and environmental qualification bridging experimental packaging to trusted use. — trusted packaging, test and reliability qualification — DMEA lists Micross AIT as an accredited trusted supplier for post-processing and packaging/assembly; DLA records qualified manufacturing and environmental test operations.
{
"worker": "D06",
"package": "Federal Science Operating System",
"register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_PIVOTAL_THIRD_PARTY_CONTROL_REGISTRY_2026-08-19.json#candidates",
"record_id": "third-micross",
"record_type": "body",
"body": "Micross Components, Inc.",
"parent_body": "Private company; Micross Advanced Interconnect Technology is a facility/division rather than a separate assumed awardee",
"what": "Perform packaging/assembly, post-processing, burn-in, reliability and environmental qualification bridging experimental packaging to trusted use. — trusted packaging, test and reliability qualification — DMEA lists Micross AIT as an accredited trusted supplier for post-processing and packaging/assembly; DLA records qualified manufacturing and environmental test operations.",
"step_type": "",
"date": "",
"date_kind": "",
"other_dates": "",
"stage_or_status": "no_public_napmp_piloting_facility_agreement_found",
"codex_grade": "evidence=A; fit=4; path=2; control_strength=acceptance_evidence",
"codex_reason": "missing_gate: PPF project agreement or order, baseline-flow interface, test vehicle, acceptance limits and government-approved report.",
"written_up_in": "",
"source_url": "https://www.acq.osd.mil/asds/dmea/tapo/docs/tp/AccreditedSuppliers_18Aug2025.pdf | https://landandmaritimeapps.dla.mil/programs/psearch/Location.aspx?Company=7QZQ8&QMLQPLNUM=38535&mode=Address"
}
Manage FAT/SAT, validation plans, IQ/OQ/PQ, SOPs, controls, utilities and fit-for-intended-use turnover. — biomanufacturing commissioning, qualification and operational readiness — IPS documents full CQV services aligned with ASTM E2500 and ISPE and a named United Therapeutics aseptic-facility project spanning design, construction management and validation.
{
"worker": "D06",
"package": "Federal Science Operating System",
"register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_PIVOTAL_THIRD_PARTY_CONTROL_REGISTRY_2026-08-19.json#candidates",
"record_id": "third-ips",
"record_type": "body",
"body": "IPS-Integrated Project Services, LLC",
"parent_body": "Private life-sciences design, engineering and qualification company",
"what": "Manage FAT/SAT, validation plans, IQ/OQ/PQ, SOPs, controls, utilities and fit-for-intended-use turnover. — biomanufacturing commissioning, qualification and operational readiness — IPS documents full CQV services aligned with ASTM E2500 and ISPE and a named United Therapeutics aseptic-facility project spanning design, construction management and validation.",
"step_type": "",
"date": "",
"date_kind": "",
"other_dates": "",
"stage_or_status": "no_public_dbpc_team_or_subcontract_found",
"codex_grade": "evidence=B; fit=4; path=2; control_strength=acceptance_evidence",
"codex_reason": "missing_gate: DBPC team or subcontract, Hawaii site requirements, deployable-system acceptance plan and demonstrated production utility.",
"written_up_in": "",
"source_url": "https://www.ipsdb.com/expertise/services/core-cq-services | https://www.ipsdb.com/expertise/services/factory-acceptance-testing | https://www.ipsdb.com/projects/biotech-aseptic-fill-finish-facility"
}
Integrate, power, cool, test and validate AI racks before deployment and provide lifecycle maintenance. — AI/HPC rack staging, burn-in and liquid-cooling validation — TSS's 2025 Form 10-K describes more than $40 million invested in a Georgetown integration plant with power, cooling and test stations for air- and liquid-cooled AI racks.
{
"worker": "D06",
"package": "Federal Science Operating System",
"register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_PIVOTAL_THIRD_PARTY_CONTROL_REGISTRY_2026-08-19.json#candidates",
"record_id": "third-tss",
"record_type": "body",
"body": "TSS, Inc.",
"parent_body": "Public Delaware corporation",
"what": "Integrate, power, cool, test and validate AI racks before deployment and provide lifecycle maintenance. — AI/HPC rack staging, burn-in and liquid-cooling validation — TSS's 2025 Form 10-K describes more than $40 million invested in a Georgetown integration plant with power, cooling and test stations for air- and liquid-cooled AI racks.",
"step_type": "",
"date": "",
"date_kind": "",
"other_dates": "",
"stage_or_status": "no_public_argonne_genesis_or_amsc_response_or_award_found",
"codex_grade": "evidence=A; fit=4; path=1; control_strength=acceptance_evidence",
"codex_reason": "missing_gate: Target team evidence, secure-facility credentials, rack BOM, flow-downs, acceptance protocol and completed delivery.",
"written_up_in": "",
"source_url": "https://www.sec.gov/Archives/edgar/data/1320760/000165495426002342/tssi_10k.htm"
}
Identify contamination, delamination, bond, material and device failure mechanisms using advanced analytical methods. — semiconductor-package failure analysis and materials qualification — EAG documents electronics and 3D-package failure analysis, materials characterization, reliability qualification and IP-secured laboratory workflows; its legal page identifies EAG, Inc.
{
"worker": "D06",
"package": "Federal Science Operating System",
"register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_PIVOTAL_THIRD_PARTY_CONTROL_REGISTRY_2026-08-19.json#candidates",
"record_id": "third-eag",
"record_type": "body",
"body": "EAG, Inc. d/b/a Eurofins EAG Laboratories",
"parent_body": "Eurofins Scientific group company",
"what": "Identify contamination, delamination, bond, material and device failure mechanisms using advanced analytical methods. — semiconductor-package failure analysis and materials qualification — EAG documents electronics and 3D-package failure analysis, materials characterization, reliability qualification and IP-secured laboratory workflows; its legal page identifies EAG, Inc.",
"step_type": "",
"date": "",
"date_kind": "",
"other_dates": "",
"stage_or_status": "no_public_napmp_or_qtime_order_found",
"codex_grade": "evidence=B; fit=4; path=1; control_strength=acceptance_evidence",
"codex_reason": "missing_gate: Target test order, exact lab and method scope, approved witness plan, report and transition-user acceptance.",
"written_up_in": "",
"source_url": "https://www.eag.com/legal/ | https://www.eag.com/services/failure-analysis/ | https://www.eag.com/wp-content/uploads/2025/04/M-084325_Reliability_brochure_w_c.pdf"
}
Test powders, witness coupons and finished AM parts through chemical, mechanical, CT/NDT, failure and fatigue methods. — independent additive-manufacturing materials and NDT qualification — Element documents additive-manufacturing testing from powder characterization to performance validation, while U.S. labs carry location-specific A2LA and Nadcap scopes.
{
"worker": "D06",
"package": "Federal Science Operating System",
"register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_PIVOTAL_THIRD_PARTY_CONTROL_REGISTRY_2026-08-19.json#candidates",
"record_id": "third-element",
"record_type": "body",
"body": "Element Materials Technology Holding USA Inc.",
"parent_body": "Element Materials Technology group; the exact performing U.S. laboratory entity and scope must be named",
"what": "Test powders, witness coupons and finished AM parts through chemical, mechanical, CT/NDT, failure and fatigue methods. — independent additive-manufacturing materials and NDT qualification — Element documents additive-manufacturing testing from powder characterization to performance validation, while U.S. labs carry location-specific A2LA and Nadcap scopes.",
"step_type": "",
"date": "",
"date_kind": "",
"other_dates": "",
"stage_or_status": "no_public_qtime_order_or_subcontract_found",
"codex_grade": "evidence=B; fit=4; path=1; control_strength=acceptance_evidence",
"codex_reason": "missing_gate: QTIME order, exact U.S. lab and accredited method scope, government witness plan, blind or round-robin tests and accepted report.",
"written_up_in": "",
"source_url": "https://www.element.com/materials-testing-services/additive-manufacturing-testing | https://www.element.com/locations/the-americas/cincinnati | https://www.element.com/terms/terms-and-conditions"
}
Supply, purify, analyze and manage electronic-grade gases and gas-handling systems required for semiconductor and packaging tools. — ultra-high-purity gas continuity and contamination control — Current certifications cover U.S. manufacture, purification, packaging and distribution of electronic and specialty gases plus on-site gas and chemical handling at electronics customers.
{
"worker": "D06",
"package": "Federal Science Operating System",
"register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_PIVOTAL_THIRD_PARTY_CONTROL_REGISTRY_2026-08-19.json#candidates",
"record_id": "third-matheson",
"record_type": "body",
"body": "Matheson Tri-Gas, Inc.",
"parent_body": "Nippon Sanso Holdings Corporation group company",
"what": "Supply, purify, analyze and manage electronic-grade gases and gas-handling systems required for semiconductor and packaging tools. — ultra-high-purity gas continuity and contamination control — Current certifications cover U.S. manufacture, purification, packaging and distribution of electronic and specialty gases plus on-site gas and chemical handling at electronics customers.",
"step_type": "",
"date": "",
"date_kind": "",
"other_dates": "",
"stage_or_status": "no_public_napmp_piloting_facility_supply_order_found",
"codex_grade": "evidence=A; fit=4; path=1; control_strength=critical_path_supply",
"codex_reason": "missing_gate: PPF tool and chemistry specification, purchase agreement, point-of-use qualification, CoA acceptance and supply-continuity plan.",
"written_up_in": "",
"source_url": "https://mathesongas.com/pdfs/certs/Matheson%20Tri-Gas%20Inc%20-%2012426567%20-%20ISO14001%20Final%20Certificate%20-%2001082024.pdf | https://store.mathesongas.com/content/ISO_9001_Matheson.pdf"
}
Plan routes, obtain permits, coordinate utilities and railroads, transport oversized assets and place them on foundations. — heavy transport and final setting of transformers and scientific equipment — Barnhart documents emergency transport of a 597,000-pound transformer to a nuclear plant and other transformer moves requiring bridge, utility, police and DOT coordination.
{
"worker": "D06",
"package": "Federal Science Operating System",
"register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_PIVOTAL_THIRD_PARTY_CONTROL_REGISTRY_2026-08-19.json#candidates",
"record_id": "third-barnhart",
"record_type": "body",
"body": "Barnhart Crane & Rigging Co.",
"parent_body": "Private U.S. heavy-lift and transport company",
"what": "Plan routes, obtain permits, coordinate utilities and railroads, transport oversized assets and place them on foundations. — heavy transport and final setting of transformers and scientific equipment — Barnhart documents emergency transport of a 597,000-pound transformer to a nuclear plant and other transformer moves requiring bridge, utility, police and DOT coordination.",
"step_type": "",
"date": "",
"date_kind": "",
"other_dates": "",
"stage_or_status": "no_public_target_logistics_package_found",
"codex_grade": "evidence=B; fit=4; path=1; control_strength=critical_path_supply",
"codex_reason": "missing_gate: Target equipment list, route survey, permits, security plan, transport contract and successful set/turnover.",
"written_up_in": "",
"source_url": "https://www.barnhartcrane.com/projects/nuclear-transformer-haul/ | https://www.barnhartcrane.com/projects/transformer-transport/"
}
Provide commissioning, staffing, care/custody/control O&M, compliance, fuel, market administration, maintenance and asset management. — operator mobilization and delegated plant control — CAMS reports responsibility for more than 100 facilities totaling about 72 GW and current data-center-power services; Hallador's 2025 10-K confirms continuing CAMS O&M and asset management at the 1,080 MW Merom plant.
{
"worker": "D06",
"package": "Federal Science Operating System",
"register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_PIVOTAL_THIRD_PARTY_CONTROL_REGISTRY_2026-08-19.json#candidates",
"record_id": "third-cams",
"record_type": "body",
"body": "Consolidated Asset Management Services, LLC",
"parent_body": "Private Delaware LLC with investor ownership; public court record does not fully identify all investor members",
"what": "Provide commissioning, staffing, care/custody/control O&M, compliance, fuel, market administration, maintenance and asset management. — operator mobilization and delegated plant control — CAMS reports responsibility for more than 100 facilities totaling about 72 GW and current data-center-power services; Hallador's 2025 10-K confirms continuing CAMS O&M and asset management at the 1,080 MW Merom plant.",
"step_type": "",
"date": "",
"date_kind": "",
"other_dates": "",
"stage_or_status": "no_public_federal_science_or_target_site_engagement_found",
"codex_grade": "evidence=B; fit=3; path=1; control_strength=delegated_execution",
"codex_reason": "missing_gate: Named target owner, mobilization agreement, operating authority, staffing plan and accepted commercial operation.",
"written_up_in": "",
"source_url": "https://camstex.com/services/ | https://camstex.com/cams-to-deliver-customized-power-solutions-for-data-centers/ | https://www.sec.gov/Archives/edgar/data/788965/000110465926027174/hnrg-20251231x10k.htm"
}
Develop models, functional requirements, procurement specifications, power-quality studies and field-validation plans. — lab-grid requirements and technology validation — DOE and INL materials name EnerNex on grid-enhancing-technology and DER-cyber work with national laboratories.
{
"worker": "D06",
"package": "Federal Science Operating System",
"register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_PIVOTAL_THIRD_PARTY_CONTROL_REGISTRY_2026-08-19.json#candidates",
"record_id": "third-enernex",
"record_type": "body",
"body": "EnerNex, LLC",
"parent_body": "CESI USA, Inc. and ultimate parent CESI S.p.A.",
"what": "Develop models, functional requirements, procurement specifications, power-quality studies and field-validation plans. — lab-grid requirements and technology validation — DOE and INL materials name EnerNex on grid-enhancing-technology and DER-cyber work with national laboratories.",
"step_type": "",
"date": "",
"date_kind": "",
"other_dates": "",
"stage_or_status": "no_public_target_task_or_subaward_found",
"codex_grade": "evidence=A; fit=3; path=3; control_strength=advisory_influence",
"codex_reason": "missing_gate: Live target study, laboratory task, procurement specification or field demonstration with accepted results.",
"written_up_in": "",
"source_url": "https://inl.gov/national-security/advanced-grid-solutions/ | https://www.energy.gov/ceser/articles/doe-announces-39-million-research-funding-enhance-cybersecurity-clean-distributed | https://www.cesi.it/news/2018/enernex-joins-cesi/"
}
Execute power and fuel management, trading, hedging, portfolio optimization and settlement for public-power members. — power-supply, fuel, trading and settlement execution — TEA began full power-supply and fuel-management service for LIPA in January 2026 and added Grant PUD as a member effective April 2026.
{
"worker": "D06",
"package": "Federal Science Operating System",
"register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_PIVOTAL_THIRD_PARTY_CONTROL_REGISTRY_2026-08-19.json#candidates",
"record_id": "third-tea",
"record_type": "body",
"body": "The Energy Authority, Inc.",
"parent_body": "Public-power-owned and directed organization",
"what": "Execute power and fuel management, trading, hedging, portfolio optimization and settlement for public-power members. — power-supply, fuel, trading and settlement execution — TEA began full power-supply and fuel-management service for LIPA in January 2026 and added Grant PUD as a member effective April 2026.",
"step_type": "",
"date": "",
"date_kind": "",
"other_dates": "",
"stage_or_status": "no_public_target_utility_or_federal_power_management_assignment_found",
"codex_grade": "evidence=B; fit=3; path=1; control_strength=delegated_execution",
"codex_reason": "missing_gate: Appointment by a utility serving a target campus or a named federal power/fuel-management agreement.",
"written_up_in": "",
"source_url": "https://www3.teainc.org/about-us/ | https://www3.teainc.org/whats-new/"
}
Generate repeatable GNSS, M-Code, jamming, spoofing, multipath and inertial-sensor scenarios used to test PNT subsystems under defined attack conditions. — resilient-PNT threat simulation and repeatable test truth — NIST used a Spirent GSS8000 in GPS-interference testing; current federal products support authorized military-signal and threat-scenario simulation.
{
"worker": "D06",
"package": "Federal Science Operating System",
"register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_PIVOTAL_THIRD_PARTY_SECTOR_EXPANSION_REGISTRY_2026-08-19.json#candidates",
"record_id": "sector-spirent-federal",
"record_type": "body",
"body": "Spirent Federal Systems, Inc.",
"parent_body": "Keysight Technologies acquired Spirent Communications plc on 2025-10-15; PNT and satellite emulation remained with Keysight while specified other assets moved to VIAVI",
"what": "Generate repeatable GNSS, M-Code, jamming, spoofing, multipath and inertial-sensor scenarios used to test PNT subsystems under defined attack conditions. — resilient-PNT threat simulation and repeatable test truth — NIST used a Spirent GSS8000 in GPS-interference testing; current federal products support authorized military-signal and threat-scenario simulation.",
"step_type": "Quantum information, sensing and resilient PNT",
"date": "",
"date_kind": "",
"other_dates": "",
"stage_or_status": "no_public_science_strategy_target_assignment_found",
"codex_grade": "evidence=A; fit=4; path=2; control_strength=acceptance_evidence",
"codex_reason": "missing_gate: Named target requirement, authorized-signal approval, government-approved threat library, calibrated RF chain, blind execution, thresholds and custody of raw scenario data.",
"written_up_in": "",
"source_url": "https://investor.keysight.com/investor-news-and-events/financial-press-releases/press-release-details/2025/Keysight-Technologies-Completes-Acquisition-of-Spirent-Communications-PLC/default.aspx | https://spirentfederal.com/wp-content/uploads/Spirent-Federal-MS10000-Issue-1-08-PNT-X-Datasheet-with-Product-Specifcation-min.pdf | https://www.nist.gov/document/revised-test-plan-impact-lte-gps-22-july-2016pdf"
}
Screen quantum devices at cryogenic temperature before scarce millikelvin integration time and create incoming-inspection or wafer-sort evidence. — cryogenic wafer and device prequalification — NIST Boulder's Cryogenic Quantum Testbed uses a FormFactor dilution refrigerator in an open device-characterization environment.
{
"worker": "D06",
"package": "Federal Science Operating System",
"register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_PIVOTAL_THIRD_PARTY_SECTOR_EXPANSION_REGISTRY_2026-08-19.json#candidates",
"record_id": "sector-formfactor",
"record_type": "body",
"body": "FormFactor, Inc.",
"parent_body": "Independent Delaware public corporation",
"what": "Screen quantum devices at cryogenic temperature before scarce millikelvin integration time and create incoming-inspection or wafer-sort evidence. — cryogenic wafer and device prequalification — NIST Boulder's Cryogenic Quantum Testbed uses a FormFactor dilution refrigerator in an open device-characterization environment.",
"step_type": "Quantum information, sensing and resilient PNT",
"date": "",
"date_kind": "",
"other_dates": "",
"stage_or_status": "no_public_science_strategy_target_assignment_found",
"codex_grade": "evidence=A; fit=4; path=2; control_strength=acceptance_evidence",
"codex_reason": "missing_gate: Target-qualified recipes, golden devices, 4 K-to-mK correlation, contact and de-embedding controls, measurement uncertainty and signed FAT/SAT.",
"written_up_in": "",
"source_url": "https://www.sec.gov/Archives/edgar/data/1039399/000103939926000009/form-20251227.htm | https://www.formfactor.com/products/quantum-cryo/?_all_filters=dilution-refrigerators | https://www.nist.gov/programs-projects/quantum-characterization"
}
Provide and commission dilution refrigeration, pulse-tube cryocooling, thermalized RF I/O, cooldown automation and diagnostic logs. — dilution-refrigerator commissioning and stable cryogenic operation — Berkeley Lab's Advanced Quantum Testbed reported seven dilution refrigerators, including a large Bluefors system providing 160 RF lines at 10 mK.
{
"worker": "D06",
"package": "Federal Science Operating System",
"register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_PIVOTAL_THIRD_PARTY_SECTOR_EXPANSION_REGISTRY_2026-08-19.json#candidates",
"record_id": "sector-bluefors",
"record_type": "body",
"body": "Bluefors Oy / Bluefors Cryocooler Technologies Inc.",
"parent_body": "Bluefors Oy is the Finnish parent; Bluefors Cryocooler Technologies Inc. is the U.S. Syracuse operation",
"what": "Provide and commission dilution refrigeration, pulse-tube cryocooling, thermalized RF I/O, cooldown automation and diagnostic logs. — dilution-refrigerator commissioning and stable cryogenic operation — Berkeley Lab's Advanced Quantum Testbed reported seven dilution refrigerators, including a large Bluefors system providing 160 RF lines at 10 mK.",
"step_type": "Quantum information, sensing and resilient PNT",
"date": "",
"date_kind": "",
"other_dates": "",
"stage_or_status": "no_public_science_strategy_target_assignment_found",
"codex_grade": "evidence=A; fit=4; path=2; control_strength=critical_path_supply",
"codex_reason": "missing_gate: Named target BOM, security and foreign-supplier review, full-wiring-load base-temperature, cooling-power, vibration, cooldown and uptime tests, helium-3 plan and signed SAT.",
"written_up_in": "",
"source_url": "https://bluefors.com/privacy-notice/ | https://bluefors.com/contact/bluefors-syracuse/ | https://aqt.lbl.gov/wp-content/uploads/sites/2/2025/06/4-CSAO-9071-AQT-Five-Year-Impact-Report_FINAL-rev-1-1.pdf"
}
Operate authorized military-signal, interference and threat-injection test benches and maintain incumbent PNT simulation equipment. — cleared NAVWAR and military-PNT simulation — A 2026 Navy notice identifies Talen-X, Inc. d.b.a. Safran Federal Systems as the OEM and only source for maintenance of an incumbent GPS simulator.
{
"worker": "D06",
"package": "Federal Science Operating System",
"register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_PIVOTAL_THIRD_PARTY_SECTOR_EXPANSION_REGISTRY_2026-08-19.json#candidates",
"record_id": "sector-talenx",
"record_type": "body",
"body": "Talen-X, Inc. d.b.a. Safran Federal Systems",
"parent_body": "Safran proxy-company structure; CAGE 7NK54 must remain separate from Orolia Government Systems, Inc.",
"what": "Operate authorized military-signal, interference and threat-injection test benches and maintain incumbent PNT simulation equipment. — cleared NAVWAR and military-PNT simulation — A 2026 Navy notice identifies Talen-X, Inc. d.b.a. Safran Federal Systems as the OEM and only source for maintenance of an incumbent GPS simulator.",
"step_type": "Quantum information, sensing and resilient PNT",
"date": "",
"date_kind": "",
"other_dates": "",
"stage_or_status": "no_public_science_strategy_target_assignment_found",
"codex_grade": "evidence=A; fit=4; path=2; control_strength=acceptance_evidence",
"codex_reason": "missing_gate: Exact CAGE/entity selection, M-Code authorization, approved waveforms, calibration, independent operator, government-owned thresholds and data custody.",
"written_up_in": "",
"source_url": "https://www.safranfederalsystems.com/proxy-information | https://www.safranfederalsystems.com/business-credentials | https://sam.gov/workspace/contract/opp/09226e12eae240dcbd8ca9ce53970d1b/view"
}
Measure end-face condition, insertion loss, reflectance, OTDR events, dispersion, bit error rate and synchronization and preserve serialized handover records. — classical fiber commissioning beneath quantum networks — EXFO identifies F-35 fiber inspection and Navy-approved optical-loss software as defense acceptance uses.
{
"worker": "D06",
"package": "Federal Science Operating System",
"register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_PIVOTAL_THIRD_PARTY_SECTOR_EXPANSION_REGISTRY_2026-08-19.json#candidates",
"record_id": "sector-exfo",
"record_type": "body",
"body": "EXFO Inc.",
"parent_body": "Quebec-based private company following its 2021 going-private transaction",
"what": "Measure end-face condition, insertion loss, reflectance, OTDR events, dispersion, bit error rate and synchronization and preserve serialized handover records. — classical fiber commissioning beneath quantum networks — EXFO identifies F-35 fiber inspection and Navy-approved optical-loss software as defense acceptance uses.",
"step_type": "Quantum information, sensing and resilient PNT",
"date": "",
"date_kind": "",
"other_dates": "",
"stage_or_status": "no_public_science_strategy_target_assignment_found",
"codex_grade": "evidence=B; fit=4; path=1; control_strength=acceptance_evidence",
"codex_reason": "missing_gate: Target QKD link budget, approved methods and thresholds, calibrated instruments, dark-fiber custody, immutable results, independent witnessing and separate quantum-metric validation.",
"written_up_in": "",
"source_url": "https://www.exfo.com/en/policies/user-privacy-notice/ | https://www.exfo.com/en/products/field-network-testing/ | https://www.exfo.com/contentassets/cd87a2e368fc414d80cde1d160a68c3c/20240208_flyer_west-2025_v1_en.pdf"
}
Test PTP, SyncE, NTP and telecom timing under packet-delay variation, wander, holdover and failover conditions. — distributed timing-budget and failover acceptance — Current Calnex field procedures define repeatable SyncE and Assisted Partial Timing Support measurements used for network commissioning.
{
"worker": "D06",
"package": "Federal Science Operating System",
"register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_PIVOTAL_THIRD_PARTY_SECTOR_EXPANSION_REGISTRY_2026-08-19.json#candidates",
"record_id": "sector-calnex",
"record_type": "body",
"body": "Calnex Solutions plc",
"parent_body": "Scottish public limited company SC299625",
"what": "Test PTP, SyncE, NTP and telecom timing under packet-delay variation, wander, holdover and failover conditions. — distributed timing-budget and failover acceptance — Current Calnex field procedures define repeatable SyncE and Assisted Partial Timing Support measurements used for network commissioning.",
"step_type": "Quantum information, sensing and resilient PNT",
"date": "",
"date_kind": "",
"other_dates": "",
"stage_or_status": "no_public_science_strategy_target_assignment_found",
"codex_grade": "evidence=A; fit=4; path=1; control_strength=acceptance_evidence",
"codex_reason": "missing_gate: Target timing budget and profile, UTC traceability, calibrated reference and analyzer, impairment plan, uncertainty statement and signed field acceptance.",
"written_up_in": "",
"source_url": "https://find-and-update.company-information.service.gov.uk/company/SC299625 | https://calnexsol.com/product/paragon-x/ | https://info.calnexsol.com/acton/attachment/28343/f-cb485e41-5953-4f94-b13e-7829ceb0b61f/1/-/-/-/-/Setting%20up%20a%20SyncE%20Network%20Test.pdf"
}
Control hydrogen and other residual gases in trapped-ion, neutral-atom, optical-clock and quantum-sensor packages through getter and combination pumping. — passive ultra-high-vacuum lifetime control — A NIST optical-clock vacuum study used a SAES ion/NEG combination pump and linked hydrogen partial pressure to clock uptime and contamination behavior.
{
"worker": "D06",
"package": "Federal Science Operating System",
"register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_PIVOTAL_THIRD_PARTY_SECTOR_EXPANSION_REGISTRY_2026-08-19.json#candidates",
"record_id": "sector-saes",
"record_type": "body",
"body": "SAES Getters S.p.A.",
"parent_body": "Italian public company",
"what": "Control hydrogen and other residual gases in trapped-ion, neutral-atom, optical-clock and quantum-sensor packages through getter and combination pumping. — passive ultra-high-vacuum lifetime control — A NIST optical-clock vacuum study used a SAES ion/NEG combination pump and linked hydrogen partial pressure to clock uptime and contamination behavior.",
"step_type": "Quantum information, sensing and resilient PNT",
"date": "",
"date_kind": "",
"other_dates": "",
"stage_or_status": "no_public_science_strategy_target_assignment_found",
"codex_grade": "evidence=A; fit=4; path=1; control_strength=critical_path_supply",
"codex_reason": "missing_gate: Target vacuum BOM, outgassing review, activation and bake procedure, residual-gas and base-pressure evidence, lifetime model and demonstrated ion lifetime.",
"written_up_in": "",
"source_url": "https://www.saesgetters.com/corporate-information/ | https://www.saesgetters.com/highvacuum/applications/quantum-computing/ | https://www.nist.gov/system/files/documents/2023/05/09/Clements_2022.pdf"
}
Provide serial-specific cryogenic thermometer curves, field instrumentation, controllers and operational verification. — millikelvin temperature and magnetic-field traceability — NIST SRM 3452 documentation describes a Lake Shore sensor calibrated against ITS-90 and PLTS-2000 with national-metrology traceability.
{
"worker": "D06",
"package": "Federal Science Operating System",
"register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_PIVOTAL_THIRD_PARTY_SECTOR_EXPANSION_REGISTRY_2026-08-19.json#candidates",
"record_id": "sector-lake-shore",
"record_type": "body",
"body": "Lake Shore Cryotronics, LLC",
"parent_body": "DwyerOmega acquired Lake Shore on 2026-06-10; older certificates use Lake Shore Cryotronics, Inc.",
"what": "Provide serial-specific cryogenic thermometer curves, field instrumentation, controllers and operational verification. — millikelvin temperature and magnetic-field traceability — NIST SRM 3452 documentation describes a Lake Shore sensor calibrated against ITS-90 and PLTS-2000 with national-metrology traceability.",
"step_type": "Quantum information, sensing and resilient PNT",
"date": "",
"date_kind": "",
"other_dates": "",
"stage_or_status": "no_public_science_strategy_target_assignment_found",
"codex_grade": "evidence=A; fit=4; path=1; control_strength=acceptance_evidence",
"codex_reason": "missing_gate: Confirm exact accredited scope, serial calibration, uncertainty at operating temperature and field, in-situ corrections, interval and conformity statement.",
"written_up_in": "",
"source_url": "https://www.lakeshore.com/about-us/press-releases/2026/06/10/arcline-backed-dwyeromega-acquires-lake-shore-cryotronics | https://www.lakeshore.com/about-us/iso-certifications | https://tsapps.nist.gov/srmext/certificates/3452.pdf"
}
Perform hybrid PIC assembly, precision fiber attach, RF and electrical interconnection, thermal and mechanical packaging and end-of-line testing. — photonic quantum package assembly and lot evidence — PHIX participated in the EU PIXAPP packaging pilot line and quantum-related projects involving ion-trap packaging, high-density interposers and photonic inertial sensing.
{
"worker": "D06",
"package": "Federal Science Operating System",
"register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_PIVOTAL_THIRD_PARTY_SECTOR_EXPANSION_REGISTRY_2026-08-19.json#candidates",
"record_id": "sector-phix",
"record_type": "body",
"body": "PHIX B.V. / PHIX Inc.",
"parent_body": "PHIX B.V. is the Netherlands manufacturing headquarters; PHIX Inc. is the U.S. subsidiary",
"what": "Perform hybrid PIC assembly, precision fiber attach, RF and electrical interconnection, thermal and mechanical packaging and end-of-line testing. — photonic quantum package assembly and lot evidence — PHIX participated in the EU PIXAPP packaging pilot line and quantum-related projects involving ion-trap packaging, high-density interposers and photonic inertial sensing.",
"step_type": "Quantum information, sensing and resilient PNT",
"date": "",
"date_kind": "",
"other_dates": "",
"stage_or_status": "no_public_science_strategy_target_assignment_found",
"codex_grade": "evidence=B; fit=4; path=1; control_strength=critical_path_supply",
"codex_reason": "missing_gate: U.S. target-approved source, export and IP review, DFM, golden module, qualified process, lot genealogy, reliability testing and domestic second-source plan.",
"written_up_in": "",
"source_url": "https://www.phix.com/contact/ | https://www.phix.com/markets/quantum/ | https://cordis.europa.eu/project/id/731954"
}
Bridge optical atomic transitions to countable RF references, calibrate lasers and spectrographs and transfer stable frequency. — optical-frequency traceability — NIST publications document Menlo frequency-comb characterization and use, including an explicit systematic-error budget for NEID calibration.
{
"worker": "D06",
"package": "Federal Science Operating System",
"register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_PIVOTAL_THIRD_PARTY_SECTOR_EXPANSION_REGISTRY_2026-08-19.json#candidates",
"record_id": "sector-menlo",
"record_type": "body",
"body": "Menlo Systems GmbH / Menlo Systems, Inc.",
"parent_body": "Menlo Systems GmbH is the German parent; Menlo Systems, Inc. is the U.S. subsidiary",
"what": "Bridge optical atomic transitions to countable RF references, calibrate lasers and spectrographs and transfer stable frequency. — optical-frequency traceability — NIST publications document Menlo frequency-comb characterization and use, including an explicit systematic-error budget for NEID calibration.",
"step_type": "Quantum information, sensing and resilient PNT",
"date": "",
"date_kind": "",
"other_dates": "",
"stage_or_status": "no_public_science_strategy_target_assignment_found",
"codex_grade": "evidence=A; fit=4; path=1; control_strength=acceptance_evidence",
"codex_reason": "missing_gate: Target frequency-chain design, self-reference and traceability, phase-noise and stability requirements, independent intercomparison, installation acceptance and service plan.",
"written_up_in": "",
"source_url": "https://www.menlosystems.com/company/ | https://tf.nist.gov/general/pdf/2603.pdf | https://tf.boulder.nist.gov/general/pdf/2862.pdf"
}
Inspect and verify flight-termination installation compliance and oversee ordnance, propellant, cryogenic, radiological, pressure and critical-handling operations. — pad safety, hazardous operations and flight-termination compliance — Metis holds PSSC II through 2031 supporting Space Launch Delta 45 range-user safety and flight-termination compliance.
{
"worker": "D06",
"package": "Federal Science Operating System",
"register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_PIVOTAL_THIRD_PARTY_SECTOR_EXPANSION_REGISTRY_2026-08-19.json#candidates",
"record_id": "sector-metis",
"record_type": "body",
"body": "Metis Technology Partners LLC",
"parent_body": "Independent U.S. contractor; exact task order controls assignment",
"what": "Inspect and verify flight-termination installation compliance and oversee ordnance, propellant, cryogenic, radiological, pressure and critical-handling operations. — pad safety, hazardous operations and flight-termination compliance — Metis holds PSSC II through 2031 supporting Space Launch Delta 45 range-user safety and flight-termination compliance.",
"step_type": "Space, hypersonics, missile defense and advanced sensing",
"date": "",
"date_kind": "",
"other_dates": "",
"stage_or_status": "no_public_science_strategy_target_task_found",
"codex_grade": "evidence=A; fit=4; path=3; control_strength=acceptance_evidence",
"codex_reason": "missing_gate: Mission-specific PSSC task, hazardous-operations procedure review or flight-termination compliance record naming the target vehicle or site.",
"written_up_in": "",
"source_url": "https://www.defense.gov/News/Contracts/Contract/Article/2918328/ | https://www.patrick.spaceforce.mil/Portals/14/Prime%20Subcontracting%20Opportunities%20_%20Apr%202026.pdf"
}
Supply engineering and test personnel and produce evidence for missiles, sensors, directed energy, explosives, targets and low-observable systems at White Sands. — White Sands test execution and acceptance evidence — The company won the 2026 White Sands Missile Range mission-support award evaluated at approximately $449.4 million.
{
"worker": "D06",
"package": "Federal Science Operating System",
"register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_PIVOTAL_THIRD_PARTY_SECTOR_EXPANSION_REGISTRY_2026-08-19.json#candidates",
"record_id": "sector-southwest-range",
"record_type": "body",
"body": "Southwest Range Services, LLC",
"parent_body": "Populated joint venture of Systems Application and Technologies, Inc., Amentum Services, Inc. and EWA Warrior Services",
"what": "Supply engineering and test personnel and produce evidence for missiles, sensors, directed energy, explosives, targets and low-observable systems at White Sands. — White Sands test execution and acceptance evidence — The company won the 2026 White Sands Missile Range mission-support award evaluated at approximately $449.4 million.",
"step_type": "Space, hypersonics, missile defense and advanced sensing",
"date": "",
"date_kind": "",
"other_dates": "",
"stage_or_status": "no_public_science_strategy_target_test_found",
"codex_grade": "evidence=A; fit=4; path=3; control_strength=delegated_execution",
"codex_reason": "missing_gate: Target test plan, range schedule, instrumentation request or ATEC report naming the system.",
"written_up_in": "",
"source_url": "https://www.gao.gov/products/b-424271%2Cb-424271.2%2Cb-424271.3"
}
Operate and sustain wind tunnels, propulsion and rocket test cells, space environmental chambers, arc heaters and ballistic ranges at AEDC. — hypersonic and space environmental-test facility operation — Beyond New Horizons holds the current AEDC TOS II contract through 2036; public acquisition records anticipated sharply increasing hypersonic workload.
{
"worker": "D06",
"package": "Federal Science Operating System",
"register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_PIVOTAL_THIRD_PARTY_SECTOR_EXPANSION_REGISTRY_2026-08-19.json#candidates",
"record_id": "sector-beyond-new-horizons",
"record_type": "body",
"body": "Beyond New Horizons, LLC",
"parent_body": "Joint venture of Fluor Federal Services, Inc. and Engineering Research and Consulting, Inc.",
"what": "Operate and sustain wind tunnels, propulsion and rocket test cells, space environmental chambers, arc heaters and ballistic ranges at AEDC. — hypersonic and space environmental-test facility operation — Beyond New Horizons holds the current AEDC TOS II contract through 2036; public acquisition records anticipated sharply increasing hypersonic workload.",
"step_type": "Space, hypersonics, missile defense and advanced sensing",
"date": "",
"date_kind": "",
"other_dates": "",
"stage_or_status": "no_public_science_strategy_target_test_found",
"codex_grade": "evidence=A; fit=4; path=3; control_strength=delegated_execution",
"codex_reason": "missing_gate: Target facility reservation, test authorization, security package or accepted test report.",
"written_up_in": "",
"source_url": "https://www.gao.gov/products/b-422471%2Cb-422471.2 | https://www.defense.gov/serve-from-netstorage/News/Contracts/Contract/Article/4215471/index.html"
}
Operate and maintain communications infrastructure supporting Space Launch Deltas 45 and 30 and Missile Defense Agency range activities. — launch-range voice, video and data continuity — Full Spectrum Operations holds EWOCS through March 2028 for communications in dynamic launch environments.
{
"worker": "D06",
"package": "Federal Science Operating System",
"register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_PIVOTAL_THIRD_PARTY_SECTOR_EXPANSION_REGISTRY_2026-08-19.json#candidates",
"record_id": "sector-full-spectrum",
"record_type": "body",
"body": "Full Spectrum Operations LLC",
"parent_body": "Current EWOCS contracting entity",
"what": "Operate and maintain communications infrastructure supporting Space Launch Deltas 45 and 30 and Missile Defense Agency range activities. — launch-range voice, video and data continuity — Full Spectrum Operations holds EWOCS through March 2028 for communications in dynamic launch environments.",
"step_type": "Space, hypersonics, missile defense and advanced sensing",
"date": "",
"date_kind": "",
"other_dates": "",
"stage_or_status": "no_public_science_strategy_target_service_order_found",
"codex_grade": "evidence=A; fit=3; path=3; control_strength=delegated_execution",
"codex_reason": "missing_gate: Target-named communications service order, interface-control document or mission-network support record.",
"written_up_in": "",
"source_url": "https://www.defense.gov/News/Contracts/Contract/Article/2459893/ | https://www.patrick.spaceforce.mil/Portals/14/Prime%20Subcontracting%20Opportunities%20_%20Apr%202026.pdf"
}
Operate, maintain and engineer launch, payload-processing, ordnance and other mission-critical support facilities. — critical launch, payload-processing and ordnance facility readiness — Space Launch Delta 45 identifies NetCentric as the current CLOIS III prime through 2032.
{
"worker": "D06",
"package": "Federal Science Operating System",
"register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_PIVOTAL_THIRD_PARTY_SECTOR_EXPANSION_REGISTRY_2026-08-19.json#candidates",
"record_id": "sector-netcentric",
"record_type": "body",
"body": "NetCentric Technology, LLC",
"parent_body": "Current CLOIS III prime",
"what": "Operate, maintain and engineer launch, payload-processing, ordnance and other mission-critical support facilities. — critical launch, payload-processing and ordnance facility readiness — Space Launch Delta 45 identifies NetCentric as the current CLOIS III prime through 2032.",
"step_type": "Space, hypersonics, missile defense and advanced sensing",
"date": "",
"date_kind": "",
"other_dates": "",
"stage_or_status": "no_public_science_strategy_target_work_package_found",
"codex_grade": "evidence=A; fit=4; path=3; control_strength=delegated_execution",
"codex_reason": "missing_gate: Target site assignment, payload-processing support order, ordnance work package or facility-readiness record.",
"written_up_in": "",
"source_url": "https://www.patrick.spaceforce.mil/Portals/14/Prime%20Subcontracting%20Opportunities%20_%20Apr%202026.pdf"
}
Perform launch-vibration, thermal, environmental and energetic testing and issue qualification data and reports. — independent environmental and energetic qualification — NASA documented CADRE rover vibration testing and starshade thermal acceptance cycling at NTS facilities.
{
"worker": "D06",
"package": "Federal Science Operating System",
"register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_PIVOTAL_THIRD_PARTY_SECTOR_EXPANSION_REGISTRY_2026-08-19.json#candidates",
"record_id": "sector-nts",
"record_type": "body",
"body": "National Technical Systems, Inc.",
"parent_body": "Element Materials Technology acquired NTS in 2022; exact contracting laboratory must be confirmed",
"what": "Perform launch-vibration, thermal, environmental and energetic testing and issue qualification data and reports. — independent environmental and energetic qualification — NASA documented CADRE rover vibration testing and starshade thermal acceptance cycling at NTS facilities.",
"step_type": "Space, hypersonics, missile defense and advanced sensing",
"date": "",
"date_kind": "",
"other_dates": "",
"stage_or_status": "no_public_science_strategy_target_test_order_found",
"codex_grade": "evidence=A; fit=4; path=3; control_strength=acceptance_evidence",
"codex_reason": "missing_gate: Target purchase order, approved test request and procedure, performing-lab accreditation and signed report.",
"written_up_in": "",
"source_url": "https://science.nasa.gov/photojournal/cadre-rover-gets-a-big-shake/ | https://www.element.com/about-element/news/2022/09/22/element-acquires-nts | https://www.defense.gov/News/Contracts/Contract/Article/2814130/"
}
Capture, transport, display and support analysis of high-speed flight-test and telemetry data. — flight-test data acquisition and post-flight analysis — Air Force HSDAS sustainment contracts run through January 2028; NASA flew Curtiss-Wright high-data-rate telemetry on SubTEC-8.
{
"worker": "D06",
"package": "Federal Science Operating System",
"register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_PIVOTAL_THIRD_PARTY_SECTOR_EXPANSION_REGISTRY_2026-08-19.json#candidates",
"record_id": "sector-teletronics",
"record_type": "body",
"body": "Teletronics Technology Corporation d.b.a. Curtiss-Wright Defense Solutions Inc.",
"parent_body": "Curtiss-Wright corporate family; preserve the Teletronics contracting identity on HSDAS instruments",
"what": "Capture, transport, display and support analysis of high-speed flight-test and telemetry data. — flight-test data acquisition and post-flight analysis — Air Force HSDAS sustainment contracts run through January 2028; NASA flew Curtiss-Wright high-data-rate telemetry on SubTEC-8.",
"step_type": "Space, hypersonics, missile defense and advanced sensing",
"date": "",
"date_kind": "",
"other_dates": "",
"stage_or_status": "no_public_science_strategy_target_instrumentation_found",
"codex_grade": "evidence=A; fit=4; path=3; control_strength=acceptance_evidence",
"codex_reason": "missing_gate: Target instrumentation BOM, data-system order, telemetry configuration or post-flight analysis package.",
"written_up_in": "",
"source_url": "https://www.defense.gov/News/Contracts/Contract/Article/3279554/ | https://rscience.gsfc.nasa.gov/keydocs/Annual_Report_2020.pdf"
}
Supply energetics, release devices and separation mechanisms with lot and manufacturing evidence. — energetic, ordnance and separation-mechanism supply — Current Army explosives procurement, DPA-funded hypersonic capacity expansion and NASA mechanism inventories establish relevant operating paths.
{
"worker": "D06",
"package": "Federal Science Operating System",
"register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_PIVOTAL_THIRD_PARTY_SECTOR_EXPANSION_REGISTRY_2026-08-19.json#candidates",
"record_id": "sector-ebad",
"record_type": "body",
"body": "Ensign-Bickford Aerospace & Defense Company",
"parent_body": "Ensign-Bickford Industries family",
"what": "Supply energetics, release devices and separation mechanisms with lot and manufacturing evidence. — energetic, ordnance and separation-mechanism supply — Current Army explosives procurement, DPA-funded hypersonic capacity expansion and NASA mechanism inventories establish relevant operating paths.",
"step_type": "Space, hypersonics, missile defense and advanced sensing",
"date": "",
"date_kind": "",
"other_dates": "",
"stage_or_status": "no_public_science_strategy_target_bom_found",
"codex_grade": "evidence=A; fit=4; path=3; control_strength=critical_path_supply",
"codex_reason": "missing_gate: Target drawing, approved-source record, lot-acceptance test, explosive-site plan or mission BOM.",
"written_up_in": "",
"source_url": "https://www.defense.gov/News/Contracts/Contract/Article/3353555/ | https://www.defense.gov/News/Releases/Release/Article/3701760/department-of-defense-to-expand-manufacturing-of-printed-circuit-board-assembli/ | https://www.nasa.gov/smallsat-institute/sst-soa/structures-materials-and-mechanisms/"
}
Design and execute modal and ground-vibration tests and correlate results to structural models used for flight-clearance decisions. — structural-dynamics and modal-test correlation — NASA documents ATA modal-testing work on VIPER and collaboration on fixed-base correction methods for ground-vibration testing.
{
"worker": "D06",
"package": "Federal Science Operating System",
"register_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_PIVOTAL_THIRD_PARTY_SECTOR_EXPANSION_REGISTRY_2026-08-19.json#candidates",
"record_id": "sector-ata-engineering",
"record_type": "body",
"body": "ATA Engineering, Inc.",
"parent_body": "Employee-owned engineering company",
"what": "Design and execute modal and ground-vibration tests and correlate results to structural models used for flight-clearance decisions. — structural-dynamics and modal-test correlation — NASA documents ATA modal-testing work on VIPER and collaboration on fixed-base correction methods for ground-vibration testing.",
"step_type": "Space, hypersonics, missile defense and advanced sensing",
"date": "",
"date_kind": "",
"other_dates": "",
"stage_or_status": "no_public_science_strategy_target_subcontract_found",
"codex_grade": "evidence=A; fit=4; path=2; control_strength=acceptance_evidence",
"codex_reason": "missing_gate: Target structural-dynamics subcontract, approved test plan, analysis report or accepted correlation record.",
"written_up_in": "",
"source_url": "https://ntrs.nasa.gov/citations/20250002846 | https://www.nasa.gov/centers-and-facilities/armstrong/flight-and-ground-experimental-test-capabilities/"
}