Freedom 250 · Order map

EO 14154 — Unleashing American Energy

The order states an energy-production policy, directs all agencies to review agency actions that burden domestic energy and within 30 days begin action plans to suspend, revise or rescind them, revokes twelve listed orders and abolishes offices they established, revokes EO 11991, directs the CEQ Chairman within 30 days to issue NEPA guidance and propose rescinding CEQ's NEPA regulations, disbands the greenhouse-gas cost working group, directs all agencies to pause disbursement of Inflation Reduction Act and Infrastructure Investment and Jobs Act funds pending review, and gives specific LNG-export, deepwater-port and mineral directions to named officers.

Signed 2025-01-20 · published 2025-01-29

Sec. 2 States nine policies, including encouraging energy production on Federal lands and waters, leading in non-fuel minerals, eliminating the 'electric vehicle (EV) mandate', reporting global effects of rules separately from domestic costs and benefits, and not funding contrary to the policy unless required by law. No separate result assessment recorded

States nine policies, including encouraging energy production on Federal lands and waters, leading in non-fuel minerals, eliminating the 'electric vehicle (EV) mandate', reporting global effects of rules separately from domestic costs and benefits, and not funding contrary to the policy unless required by law.

Addressed to

  • United States (policy statement)
Order text
It is the policy of the United States:
Sec. 3(a) Review all existing regulations, orders, guidance, policies, settlements, consent orders and other agency actions to identify those that unduly burden domestic energy resources or conflict with the Sec. 2 policy. No separate result assessment recorded

Review all existing regulations, orders, guidance, policies, settlements, consent orders and other agency actions to identify those that unduly burden domestic energy resources or conflict with the Sec. 2 policy.

Addressed to

  • The heads of all agencies
Order text
The heads of all agencies shall review all existing regulations, orders, guidance documents, policies, settlements, consent orders, and any other agency actions (collectively, agency actions) to identify those agency actions that impose an undue burden on the identification, development, or use of domestic energy resources
Sec. 3(b) Develop and begin implementing action plans to suspend, revise or rescind the burdensome agency actions; an agency with none submits a written statement to the OMB Director. Not found in the notes

Develop and begin implementing action plans to suspend, revise or rescind the burdensome agency actions; an agency with none submits a written statement to the OMB Director.

Addressed to

  • the head of each agency

Deadline

Words
Within 30 days of the date of this order
Date
2025-02-19

What the notes record

Searched
  • 1 stories (batch 3, batch 4, upgraded) by order number
  • 2 thread register by order number and title words
  • 3 research packages grep for EO/E.O./Executive Order <number> (.md/.json/.csv)
Deadline passed
True
Pass
2
Date
2025-02-19
Kind of date
deadline on an officer or body
Order text
Within 30 days of the date of this order, the head of each agency shall, in consultation with the director of the Office of Management and Budget (OMB) and the National Economic Council (NEC), develop and begin implementing action plans to suspend, revise, or rescind all agency actions identified as unduly burdensome
Sec. 3(c) Notify the Attorney General of steps taken under Sec. 3(a) so that the Attorney General may give notice to courts and seek stays of pending litigation. Not found in the notes

Notify the Attorney General of steps taken under Sec. 3(a) so that the Attorney General may give notice to courts and seek stays of pending litigation.

Addressed to

  • Agencies

Deadline

Words
promptly

What the notes record

Searched
  • 1 stories (batch 3, batch 4, upgraded) by order number
  • 2 thread register by order number and title words
  • 3 research packages grep for EO/E.O./Executive Order <number> (.md/.json/.csv)
Pass
2
Deadline passed
False
Order text
Agencies shall promptly notify the Attorney General of any steps taken pursuant to subsection (a) of this section so that the Attorney General may, as appropriate:
Sec. 3(d) Consider whether pending litigation against 'illegal, dangerous, or harmful policies' should be resolved through stays or other relief. No separate result assessment recorded

Consider whether pending litigation against 'illegal, dangerous, or harmful policies' should be resolved through stays or other relief.

Addressed to

  • the Attorney General
Order text
the Attorney General shall consider whether pending litigation against illegal, dangerous, or harmful policies should be resolved through stays or other relief.
Sec. 4(a) Revokes Executive Orders 13990, 13992, 14008, 14007, 14013, 14027, 14030, 14037, 14057, 14072, 14082 and 14096. No separate result assessment recorded

Revokes Executive Orders 13990, 13992, 14008, 14007, 14013, 14027, 14030, 14037, 14057, 14072, 14082 and 14096.

Addressed to

  • The President (self-executing)
Order text
The following are revoked and any offices established therein are abolished:
Sec. 4(a) Abolishes any offices established by the twelve revoked orders. No separate result assessment recorded

Abolishes any offices established by the twelve revoked orders.

Addressed to

  • The President (self-executing)
Order text
The following are revoked and any offices established therein are abolished:
Sec. 4(b) Terminates all activities, programs and operations of the American Climate Corps. Not found in the notes

Terminates all activities, programs and operations of the American Climate Corps.

Addressed to

  • All activities, programs, and operations associated with the American Climate Corps, including actions taken by any agency

Deadline

Words
immediately
Date
2025-01-20

What the notes record

Searched
  • 1 stories (batch 3, batch 4, upgraded) by order number
  • 2 thread register by order number and title words
  • 3 research packages grep for EO/E.O./Executive Order <number> (.md/.json/.csv)
Deadline passed
False
Pass
2
Date
2025-01-20
Kind of date
date the order sets for its own effect (not a deadline on an officer)
Order text
All activities, programs, and operations associated with the American Climate Corps, including actions taken by any agency shall be terminated immediately.
Sec. 4(b) Send a letter to all parties to the December 2023 American Climate Corps Memorandum of Understanding to terminate it; each party's head agrees to termination in writing. Not found in the notes

Send a letter to all parties to the December 2023 American Climate Corps Memorandum of Understanding to terminate it; each party's head agrees to termination in writing.

Addressed to

  • the Secretary of the Interior
  • the head of each party to the memorandum

Deadline

Words
Within one day of the date of this order
Date
2025-01-21

What the notes record

Searched
  • 1 stories (batch 3, batch 4, upgraded) by order number
  • 2 thread register by order number and title words
  • 3 research packages grep for EO/E.O./Executive Order <number> (.md/.json/.csv)
Deadline passed
False
Pass
2
Date
2025-01-21
Kind of date
date the order sets for its own effect (not a deadline on an officer)
Order text
Within one day of the date of this order, the Secretary of the Interior shall submit a letter to all parties to the ``American Climate Corps Memorandum of Understanding'' dated December 2023 to terminate the memorandum, and the head of each party to the memorandum shall agree to the termination in writing.
Sec. 4(c) Assets, funds or resources allocated to an abolished entity or program are to be redirected or disposed of in accordance with law. No separate result assessment recorded

Assets, funds or resources allocated to an abolished entity or program are to be redirected or disposed of in accordance with law.

Addressed to

  • (none named: 'Any assets, funds, or resources ... shall be redirected or disposed of')
Order text
Any assets, funds, or resources allocated to an entity or program abolished by subsection (a) of this section shall be redirected or disposed of in accordance with applicable law.
Sec. 4(d) Ensure actions respecting the abolished offices and programs are terminated or, where required, transitioned to other agencies. No separate result assessment recorded

Ensure actions respecting the abolished offices and programs are terminated or, where required, transitioned to other agencies.

Addressed to

  • The head of any agency that has taken action respecting offices and programs in subsection (a)
Order text
The head of any agency that has taken action respecting offices and programs in subsection (a) shall take all necessary steps to ensure that all such actions are terminated
Sec. 4(e) Contracts or agreements with third parties on behalf of the abolished entities or programs are to be terminated. Not found in the notes

Contracts or agreements with third parties on behalf of the abolished entities or programs are to be terminated.

Addressed to

  • (none named: 'Any contract or agreement ... shall be terminated')

What the notes record

Searched
  • 1 stories (batch 3, batch 4, upgraded) by order number
  • 2 thread register by order number and title words
  • 3 research packages grep for EO/E.O./Executive Order <number> (.md/.json/.csv)
Pass
2
Deadline passed
False
Order text
Any contract or agreement between the United States and any third party on behalf of the entities or programs abolished in subsection (a) of this section, or in furtherance of them, shall be terminated for convenience, or otherwise, as quickly as permissible under the law.
Sec. 5(a) Revokes Executive Order 11991 of May 24, 1977. No separate result assessment recorded

Revokes Executive Order 11991 of May 24, 1977.

Addressed to

  • The President (self-executing)
Order text
Executive Order 11991 of May 24, 1977 (Relating to protection and enhancement of environmental quality) is hereby revoked.
Sec. 5(b) Provide guidance on implementing NEPA and propose rescinding CEQ's NEPA regulations at 40 CFR 1500 et seq. Found in part

Provide guidance on implementing NEPA and propose rescinding CEQ's NEPA regulations at 40 CFR 1500 et seq.

Addressed to

  • the Chairman of the Council on Environmental Quality (CEQ)

Deadline

Words
within 30 days of the date of this order
Date
2025-02-19

What the notes record

What it shows
final: CEQ's removal of its NEPA regulations (interim final February 25, 2025; final January 8, 2026); the file does not cite EO 14154, and no Sec. 5(b) NEPA guidance from CEQ is recorded there
Pass
2
Evidence kind
formal step toward the result
Date
2025-02-19
Kind of date
deadline on an officer or body
Deadline passed
True
Interim final Feb. 25, 2025; final Jan. 8, 2026
EO_14318_IMPLEMENTATION_RETURN_AUDIT_2026-08-20.md
Order text
within 30 days of the date of this order, the Chairman of the Council on Environmental Quality (CEQ) shall provide guidance on implementing the National Environmental Policy Act (NEPA), 42 U.S.C. 4321 et seq., and propose rescinding CEQ's NEPA regulations found at 40 CFR 1500 et seq.
Sec. 5(c) After the guidance, convene a working group to coordinate revision of agency-level NEPA implementing regulations for consistency. Found in part

After the guidance, convene a working group to coordinate revision of agency-level NEPA implementing regulations for consistency.

Addressed to

  • the Chairman of CEQ

Deadline

Words
Following the provision of the guidance

What the notes record

Thread
agency-nepa-procedures
What it shows
took effect: one agency (USPS) NEPA procedure rule after CEQ's removal; the register does not tie it to EO 14154 or to a CEQ working group
Pass
2
Evidence kind
formal step toward the result
Deadline passed
False
USPS's interim final rule effective September 25.
THREAD_REGISTER_whole_workbench.json
Order text
Following the provision of the guidance, the Chairman of CEQ shall convene a working group to coordinate the revision of agency-level implementing regulations for consistency.
Sec. 5(c) The guidance and resulting regulations must expedite permitting and meet Fiscal Responsibility Act of 2023 deadlines, and agencies must prioritize efficiency and certainty over other objectives. No separate result assessment recorded

The guidance and resulting regulations must expedite permitting and meet Fiscal Responsibility Act of 2023 deadlines, and agencies must prioritize efficiency and certainty over other objectives.

Addressed to

  • all agencies
Order text
all agencies must prioritize efficiency and certainty over any other objectives, including those of activist groups
Sec. 5(d) Eliminate delays in their permitting processes (including general permits and permit by rule), use all possible authorities including emergency authorities to expedite permits for projects deemed essential, and work with project sponsors. No separate result assessment recorded

Eliminate delays in their permitting processes (including general permits and permit by rule), use all possible authorities including emergency authorities to expedite permits for projects deemed essential, and work with project sponsors.

Addressed to

  • The Secretaries of Defense, Interior, Agriculture, Commerce, Housing and Urban Development, Transportation, Energy, Homeland Security, the Administrator of the Environmental Protection Agency (EPA), the Chairman of CEQ, and the heads of any other relevant agencies
Order text
shall undertake all available efforts to eliminate all delays within their respective permitting processes, including through, but not limited to, the use of general permitting and permit by rule.
Sec. 5(e) Prepare recommendations to Congress to facilitate permitting of interstate energy transportation and critical energy infrastructure and to streamline judicial review of NEPA. Not found in the notes

Prepare recommendations to Congress to facilitate permitting of interstate energy transportation and critical energy infrastructure and to streamline judicial review of NEPA.

Addressed to

  • The Director of the NEC and the Director of the Office of Legislative Affairs

What the notes record

Searched
  • 1 stories (batch 3, batch 4, upgraded) by order number
  • 2 thread register by order number and title words
  • 3 research packages grep for EO/E.O./Executive Order <number> (.md/.json/.csv)
Pass
2
Deadline passed
False
Order text
The Director of the NEC and the Director of the Office of Legislative Affairs shall jointly prepare recommendations to Congress
Sec. 6(a) In permitting and regulatory processes, consider only legislated environmental requirements and use the most robust, non-ideological assessment methods. No separate result assessment recorded

In permitting and regulatory processes, consider only legislated environmental requirements and use the most robust, non-ideological assessment methods.

Addressed to

  • all agencies
Order text
In all Federal permitting adjudications or regulatory processes, all agencies shall adhere to only the relevant legislated requirements for environmental considerations and any considerations beyond these requirements are eliminated.
Sec. 6(b) Disbands the Interagency Working Group on the Social Cost of Greenhouse Gases established under EO 13990. No separate result assessment recorded

Disbands the Interagency Working Group on the Social Cost of Greenhouse Gases established under EO 13990.

Addressed to

  • The President (self-executing)
Order text
The Interagency Working Group on the Social Cost of Greenhouse Gases (IWG), which was established pursuant to Executive Order 13990, is hereby disbanded
Sec. 6(b) Withdraws all IWG guidance and documents, including the Presidential Memorandum of January 27, 2021 on scientific integrity, the November 2023 greenhouse-gas measurement strategy report, the February 2021 technical support document and social-cost estimates. No separate result assessment recorded

Withdraws all IWG guidance and documents, including the Presidential Memorandum of January 27, 2021 on scientific integrity, the November 2023 greenhouse-gas measurement strategy report, the February 2021 technical support document and social-cost estimates.

Addressed to

  • The President (self-executing)
Order text
any guidance, instruction, recommendation, or document issued by the IWG is withdrawn as no longer representative of governmental policy
Sec. 6(c) Finds that the 'social cost of carbon' calculation has logical deficiencies, a poor empirical basis and no foundation in legislation. No separate result assessment recorded

Finds that the 'social cost of carbon' calculation has logical deficiencies, a poor empirical basis and no foundation in legislation.

Addressed to

  • The President (finding)
Order text
The calculation of the ``social cost of carbon'' is marked by logical deficiencies, a poor basis in empirical science, politicization, and the absence of a foundation in legislation.
Sec. 6(c) Issue guidance addressing the social-cost-of-carbon inadequacies, including considering eliminating it from permitting and regulatory decisions. Not found in the notes

Issue guidance addressing the social-cost-of-carbon inadequacies, including considering eliminating it from permitting and regulatory decisions.

Addressed to

  • the Administrator of the EPA

Deadline

Words
within 60 days of the date of this order
Date
2025-03-21

What the notes record

Searched
  • 1 stories (batch 3, batch 4, upgraded) by order number
  • 2 thread register by order number and title words
  • 3 research packages grep for EO/E.O./Executive Order <number> (.md/.json/.csv)
Deadline passed
True
Pass
2
Date
2025-03-21
Kind of date
deadline on an officer or body
Order text
within 60 days of the date of this order, the Administrator of the EPA shall issue guidance to address these harmful and detrimental inadequacies
Sec. 6(d) Until the EPA guidance, keep greenhouse-gas valuation estimates consistent with OMB Circular A-4 of September 17, 2003. No separate result assessment recorded

Until the EPA guidance, keep greenhouse-gas valuation estimates consistent with OMB Circular A-4 of September 17, 2003.

Addressed to

  • agencies
Order text
agencies shall ensure estimates to assess the value of changes in greenhouse gas emissions resulting from agency actions
Sec. 6(e) Initiate a process to change rules, regulations, policies or actions as needed for consistency with the Regulatory Analysis (Circular A-4). Not found in the notes

Initiate a process to change rules, regulations, policies or actions as needed for consistency with the Regulatory Analysis (Circular A-4).

Addressed to

  • the head of each agency

What the notes record

Searched
  • 1 stories (batch 3, batch 4, upgraded) by order number
  • 2 thread register by order number and title words
  • 3 research packages grep for EO/E.O./Executive Order <number> (.md/.json/.csv)
Pass
2
Deadline passed
False
Order text
the head of each agency shall, as appropriate and consistent with applicable law, initiate a process to make such changes to
Sec. 6(f) Submit joint recommendations to the OMB Director on the legality and continuing applicability of the 2009 greenhouse-gas endangerment finding (74 FR 66496). Not found in the notes

Submit joint recommendations to the OMB Director on the legality and continuing applicability of the 2009 greenhouse-gas endangerment finding (74 FR 66496).

Addressed to

  • the Administrator of the EPA

Deadline

Words
Within 30 days of the date of this order
Date
2025-02-19

What the notes record

Searched
  • 1 stories (batch 3, batch 4, upgraded) by order number
  • 2 thread register by order number and title words
  • 3 research packages grep for EO/E.O./Executive Order <number> (.md/.json/.csv)
Deadline passed
True
Pass
2
Date
2025-02-19
Kind of date
deadline on an officer or body
Order text
Within 30 days of the date of this order, the Administrator of the EPA, in collaboration with the heads of any other relevant agencies, shall submit joint recommendations to the Director of OMB on the legality and continuing applicability of the Administrator's findings
Sec. 7(a) Pause disbursement of funds appropriated through the Inflation Reduction Act of 2022 or the Infrastructure Investment and Jobs Act (including NEVI and Charging and Fueling Infrastructure funds) and review their grant, loan and contract processes for consistency with law and policy. Not found in the notes

Pause disbursement of funds appropriated through the Inflation Reduction Act of 2022 or the Infrastructure Investment and Jobs Act (including NEVI and Charging and Fueling Infrastructure funds) and review their grant, loan and contract processes for consistency with law and policy.

Addressed to

  • All agencies

Deadline

Words
immediately
Date
2025-01-20

What the notes record

Searched
  • 1 stories (batch 3, batch 4, upgraded) by order number
  • 2 thread register by order number and title words
  • 3 research packages grep for EO/E.O./Executive Order <number> (.md/.json/.csv)
Deadline passed
True
Pass
2
Date
2025-01-20
Kind of date
deadline on an officer or body
Order text
All agencies shall immediately pause the disbursement of funds appropriated through the Inflation Reduction Act of 2022 (Public Law 117-169) or the Infrastructure Investment and Jobs Act (Public Law 117-58)
Sec. 7(a) Report the review's findings and recommendations to the Director of the NEC and the Director of OMB. Not found in the notes

Report the review's findings and recommendations to the Director of the NEC and the Director of OMB.

Addressed to

  • all agency heads

Deadline

Words
Within 90 days of the date of this order
Date
2025-04-20

What the notes record

Searched
  • 1 stories (batch 3, batch 4, upgraded) by order number
  • 2 thread register by order number and title words
  • 3 research packages grep for EO/E.O./Executive Order <number> (.md/.json/.csv)
Deadline passed
True
Pass
2
Date
2025-04-20
Kind of date
deadline on an officer or body
Order text
Within 90 days of the date of this order, all agency heads shall submit a report to the Director of the NEC and Director of OMB that details the findings of this review
Sec. 7(a) No paused funds may be disbursed until the OMB Director and the Assistant to the President for Economic Policy determine the disbursements are consistent with adopted review recommendations. Not found in the notes

No paused funds may be disbursed until the OMB Director and the Assistant to the President for Economic Policy determine the disbursements are consistent with adopted review recommendations.

Addressed to

  • a given agency
  • the Director of OMB and Assistant to the President for Economic Policy

What the notes record

Searched
  • 1 stories (batch 3, batch 4, upgraded) by order number
  • 2 thread register by order number and title words
  • 3 research packages grep for EO/E.O./Executive Order <number> (.md/.json/.csv)
Pass
2
Deadline passed
False
Order text
No funds identified in this subsection (a) shall be disbursed by a given agency until the Director of OMB and Assistant to the President for Economic Policy have determined that such disbursements are consistent with any review recommendations they have chosen to adopt.
Sec. 7(b) In procurement, leases and other disbursements, prioritize cost-effectiveness and American workers and businesses; the OMB Director finalizes and circulates implementing guidelines. Not found in the notes

In procurement, leases and other disbursements, prioritize cost-effectiveness and American workers and businesses; the OMB Director finalizes and circulates implementing guidelines.

Addressed to

  • agencies
  • the Director of OMB

What the notes record

Searched
  • 1 stories (batch 3, batch 4, upgraded) by order number
  • 2 thread register by order number and title words
  • 3 research packages grep for EO/E.O./Executive Order <number> (.md/.json/.csv)
Pass
2
Deadline passed
False
Order text
The Director of OMB shall finalize and circulate guidelines to further implement this subsection.
Sec. 7(c) Assess whether enforcement discretion can advance the Sec. 2 policy and report instances to the OMB Director. Not found in the notes

Assess whether enforcement discretion can advance the Sec. 2 policy and report instances to the OMB Director.

Addressed to

  • All agencies
  • each agency

Deadline

Words
Within 30 days of the date of this order
Date
2025-02-19

What the notes record

Searched
  • 1 stories (batch 3, batch 4, upgraded) by order number
  • 2 thread register by order number and title words
  • 3 research packages grep for EO/E.O./Executive Order <number> (.md/.json/.csv)
Deadline passed
True
Pass
2
Date
2025-02-19
Kind of date
deadline on an officer or body
Order text
Within 30 days of the date of this order, each agency shall submit a report to the Director of OMB identifying any such instances.
Sec. 8(a) Restart reviews of applications for LNG export approvals as expeditiously as possible, and in the public-interest assessment consider U.S. economic and employment impacts and allies' security. Not found in the notes

Restart reviews of applications for LNG export approvals as expeditiously as possible, and in the public-interest assessment consider U.S. economic and employment impacts and allies' security.

Addressed to

  • The Secretary of Energy

Deadline

Words
as expeditiously as possible

What the notes record

Searched
  • 1 stories (batch 3, batch 4, upgraded) by order number
  • 2 thread register by order number and title words
  • 3 research packages grep for EO/E.O./Executive Order <number> (.md/.json/.csv)
Pass
2
Deadline passed
False
Order text
The Secretary of Energy is directed restart reviews of applications for approvals of liquified natural gas export projects as expeditiously as possible, consistent with applicable law.
Sec. 8(b) For LNG deepwater-port projects with a favorable record of decision, determine whether later refinements present 'seriously different consequences', and submit the determination with justification to the Secretary of Transportation and the President. Not found in the notes

For LNG deepwater-port projects with a favorable record of decision, determine whether later refinements present 'seriously different consequences', and submit the determination with justification to the Secretary of Transportation and the President.

Addressed to

  • the Administrator of the Maritime Administration (MARAD)

Deadline

Words
within 30 days of the date of this order
Date
2025-02-19

What the notes record

Searched
  • 1 stories (batch 3, batch 4, upgraded) by order number
  • 2 thread register by order number and title words
  • 3 research packages grep for EO/E.O./Executive Order <number> (.md/.json/.csv)
Deadline passed
True
Pass
2
Date
2025-02-19
Kind of date
deadline on an officer or body
Order text
the Administrator of the Maritime Administration (MARAD) shall, within 30 days of the date of this order and consistent with applicable law, determine whether any refinements to the project proposed subsequent to the ROD are likely to result in adverse environmental consequences
Sec. 8(c) If refinements are not likely to cause seriously different consequences, describe them to supplement the ROD and issue a Deepwater Port Act license within 30 additional days. Not found in the notes

If refinements are not likely to cause seriously different consequences, describe them to supplement the ROD and issue a Deepwater Port Act license within 30 additional days.

Addressed to

  • MARAD

Deadline

Words
no later than 30 additional days (after the Sec. 8(b) determination)

What the notes record

Searched
  • 1 stories (batch 3, batch 4, upgraded) by order number
  • 2 thread register by order number and title words
  • 3 research packages grep for EO/E.O./Executive Order <number> (.md/.json/.csv)
Pass
2
Deadline passed
False
Order text
then no later than 30 additional days, he shall issue a DWPA license.
Sec. 8(d) If refinements are likely to cause seriously different consequences, issue an Environmental Assessment within 60 days, an addendum to the ROD within 30 days after it, and a DWPA license within 30 more days. Not found in the notes

If refinements are likely to cause seriously different consequences, issue an Environmental Assessment within 60 days, an addendum to the ROD within 30 days after it, and a DWPA license within 30 more days.

Addressed to

  • MARAD (with concurrence from the Secretary of Transportation)

Deadline

Words
within 60 days after the determination (EA); 30 days after the EA (ROD addendum); 30 additional days (license)

What the notes record

Searched
  • 1 stories (batch 3, batch 4, upgraded) by order number
  • 2 thread register by order number and title words
  • 3 research packages grep for EO/E.O./Executive Order <number> (.md/.json/.csv)
Pass
2
Deadline passed
False
Order text
it shall, within 60 days after submitting such determination, issue an Environmental Assessment (EA) examining such consequences
Sec. 9(a) Identify agency actions that unduly burden domestic mining and processing of non-fuel minerals and revise or rescind them. Not found in the notes

Identify agency actions that unduly burden domestic mining and processing of non-fuel minerals and revise or rescind them.

Addressed to

  • The Secretary of the Interior, Secretary of Agriculture, Administrator of the EPA, Chairman of CEQ, and the heads of any other relevant agencies

What the notes record

Searched
  • 1 stories (batch 3, batch 4, upgraded) by order number
  • 2 thread register by order number and title words
  • 3 research packages grep for EO/E.O./Executive Order <number> (.md/.json/.csv)
Pass
2
Deadline passed
False
Order text
shall identify all agency actions that impose undue burdens on the domestic mining and processing of non- fuel minerals and undertake steps to revise or rescind such actions.
Sec. 9(b) Reassess public lands withdrawals for potential revision. No separate result assessment recorded

Reassess public lands withdrawals for potential revision.

Addressed to

  • The Secretaries of the Interior and Agriculture
Order text
The Secretaries of the Interior and Agriculture shall reassess any public lands withdrawals for potential revision.
Sec. 9(c) Instruct the USGS Director to consider updating the critical minerals list, including possibly uranium. Not found in the notes

Instruct the USGS Director to consider updating the critical minerals list, including possibly uranium.

Addressed to

  • The Secretary of the Interior

What the notes record

Searched
  • 1 stories (batch 3, batch 4, upgraded) by order number
  • 2 thread register by order number and title words
  • 3 research packages grep for EO/E.O./Executive Order <number> (.md/.json/.csv)
Pass
2
Deadline passed
False
Order text
The Secretary of the Interior shall instruct the Director of the U.S. Geological Survey to consider updating the Survey's list of critical minerals, including for the potential of including uranium.
Sec. 9(d) Accelerate geologic mapping of the United States focused on unknown critical-mineral deposits. No separate result assessment recorded

Accelerate geologic mapping of the United States focused on unknown critical-mineral deposits.

Addressed to

  • The Secretary of the Interior
Order text
The Secretary of the Interior shall prioritize efforts to accelerate the ongoing, detailed geologic mapping of the United States
Sec. 9(e) Ensure critical mineral projects, including processing, receive consideration for Federal support, contingent on appropriated funds. No separate result assessment recorded

Ensure critical mineral projects, including processing, receive consideration for Federal support, contingent on appropriated funds.

Addressed to

  • The Secretary of Energy
Order text
The Secretary of Energy shall ensure that critical mineral projects, including the processing of critical minerals, receive consideration for Federal support, contingent on the availability of appropriated funds.
Sec. 9(f) Assess whether exploitative practices and state-assisted mineral projects abroad are unlawful or unduly burden U.S. commerce. Not found in the notes

Assess whether exploitative practices and state-assisted mineral projects abroad are unlawful or unduly burden U.S. commerce.

Addressed to

  • The United States Trade Representative

What the notes record

Searched
  • 1 stories (batch 3, batch 4, upgraded) by order number
  • 2 thread register by order number and title words
  • 3 research packages grep for EO/E.O./Executive Order <number> (.md/.json/.csv)
Pass
2
Deadline passed
False
Order text
The United States Trade Representative shall assess whether exploitative practices and state- assisted mineral projects abroad are unlawful or unduly burden or restrict United States commerce.
Sec. 9(g) Assess the national security implications of mineral reliance and the potential for trade action. Not found in the notes

Assess the national security implications of mineral reliance and the potential for trade action.

Addressed to

  • The Secretary of Commerce

What the notes record

Searched
  • 1 stories (batch 3, batch 4, upgraded) by order number
  • 2 thread register by order number and title words
  • 3 research packages grep for EO/E.O./Executive Order <number> (.md/.json/.csv)
Pass
2
Deadline passed
False
Order text
The Secretary of Commerce shall assess the national security implications of the Nation's mineral reliance and the potential for trade action.
Sec. 9(h) Assess the inflow of minerals likely made with forced labor and whether it threatens national security, and give the assessment to the NEC Director. Not found in the notes

Assess the inflow of minerals likely made with forced labor and whether it threatens national security, and give the assessment to the NEC Director.

Addressed to

  • The Secretary of Homeland Security

Deadline

Words
within 90 days of the date of this order
Date
2025-04-20

What the notes record

Searched
  • 1 stories (batch 3, batch 4, upgraded) by order number
  • 2 thread register by order number and title words
  • 3 research packages grep for EO/E.O./Executive Order <number> (.md/.json/.csv)
Deadline passed
True
Pass
2
Date
2025-04-20
Kind of date
deadline on an officer or body
Order text
within 90 days of the date of this order, shall provide this assessment to the Director of the NEC.
Sec. 9(i) Consider National Defense Stockpile needs, review the legal authorities for managing it, and ensure it provides a robust supply of critical minerals. No separate result assessment recorded

Consider National Defense Stockpile needs, review the legal authorities for managing it, and ensure it provides a robust supply of critical minerals.

Addressed to

  • The Secretary of Defense
Order text
The Secretary of Defense shall consider the needs of the United States in supplying and maintaining the National Defense Stockpile
Sec. 9(j) Report to the Assistant to the President for Economic Policy with recommendations to enhance competitiveness of American mining and refining companies in other mineral-wealthy nations. Not found in the notes

Report to the Assistant to the President for Economic Policy with recommendations to enhance competitiveness of American mining and refining companies in other mineral-wealthy nations.

Addressed to

  • the Secretary of State, Secretary of Commerce, Secretary of Labor, the United States Trade Representative, and the heads of any other relevant agencies

Deadline

Words
Within 60 days of the date of this order
Date
2025-03-21

What the notes record

Searched
  • 1 stories (batch 3, batch 4, upgraded) by order number
  • 2 thread register by order number and title words
  • 3 research packages grep for EO/E.O./Executive Order <number> (.md/.json/.csv)
Deadline passed
True
Pass
2
Date
2025-03-21
Kind of date
deadline on an officer or body
Order text
shall submit a report to the Assistant to the President for Economic Policy that includes policy recommendations to enhance the competitiveness of American mining and refining companies in other mineral-wealthy nations.
Sec. 9(k) Consider opportunities to advance U.S. mineral mining and processing through the Quadrilateral Security Dialogue. No separate result assessment recorded

Consider opportunities to advance U.S. mineral mining and processing through the Quadrilateral Security Dialogue.

Addressed to

  • The Secretary of State
Order text
The Secretary of State shall consider opportunities to advance the mining and processing of minerals within the United States through the Quadrilateral Security Dialogue.