  "id": "nrc-licensing-overhaul",
  "title": "The Nuclear Regulatory Commission's revision of reactor licensing rules under Executive Order 14300",
  "one_line": "NRC published its contested-hearing final rule on November 3, effective December 3, and an ACRS-functions direct final rule on November 17, conditionally effective February 1, 2027. The earlier DOE/military-design rule has its separate November 25 date.",
  "system": "civilian-nuclear-licensing-and-fuel",
  "path": "agency-rule (with presidential-instrument, advisory-committee, agency-order-or-decision, oversight and nomination steps)",
  "how_it_entered": {
    "earliest_thread_file": {
      "date": "2026-08-08",
      "file": "Federal Government Weekly Delta 2026-08-08/waves/WAVE_4_PHYSICAL_PRODUCTION.md",
      "note": "Records NRC release 26-075 (first use of the modernized mandatory hearing, 5 August)."
    },
    "earliest_file_on_subject": {
      "date": "2026-08-04",
      "file": "Federal Government Whole-Site Recertification 2026-08-01/Physical Production Systems Full-Surface Wave 2026-08-04/PHYSICAL_PRODUCTION_SYSTEMS_FULL_SURFACE_WAVE_2026-08-04.md",
      "note": "A related file, not on the thread: records the 3-6 August NRC meetings on licensing, oversight and siting modernization and says 'the existing nuclear executive-order/rulemaking stack' was already in its 1 August baseline."
    },
    "katie_requests": [
      {
        "date": "2026-08-01",
        "request": "K02-050",
        "her_words": "We haven't done a broad government site sweep in a while, and I think we should gather agents and do a deep dive!!",
        "package": "Federal Government Whole-Site Recertification 2026-08-01",
        "why": "not stated"
      },
      {
        "date": "2026-08-08",
        "request": "K03-012",
        "her_words": "I'm thinking we should plan another government wide sweep to see what took place this past week.",
        "package": "Federal Government Weekly Delta 2026-08-08",
        "why": "To see what happened that week."
      },
      {
        "date": "2026-07-22",
        "request": "K02-001",
        "her_words": "This was just released - might be interesting to add into our innovation plotlines - let's read and analyze and discuss!!",
        "package": "Federal Science Operating System",
        "why": "A new White House science page had just been released; the package's spine later gained the 'Reactor' reconciliations (7 September) that carry the NRC rules."
      }
    ],
    "summary": "No request of Katie's names the NRC, nuclear licensing or Executive Order 14300. The subject came in through her government-wide sweeps of 1 and 8 August 2026 and through the Federal Science Operating System package she opened on 22 July 2026, whose factual spine reconciled the nuclear orders and NRC rules on 7 September."
  },
  "actors": [
    {
      "name": "The President (Donald Trump)",
      "role": "Signed Executive Order 14300 on 23 May 2025 (published 29 May 2025). Acts in this story only through that order."
    },
    {
      "name": "U.S. Nuclear Regulatory Commission (NRC)",
      "role": "The deciding body for every rule, permit and hearing here. An independent multi-member commission; the order addresses it with 'shall' throughout. Files mostly write 'NRC' without saying whether the Commission voted or staff acted; the notes record no Commission vote on these rules."
    },
    {
      "name": "NRC Chairman Ho K. Nieh",
      "role": "Named as the NRC's head in the 11 September 2026 file. The Senate committee listed his nomination hearing as a Commission member for 8 October 2025."
    },
    {
      "name": "Advisory Committee on Reactor Safeguards (ACRS), NRC",
      "role": "Statutory advisory committee that gives safety advice to the Commission. The order directs its personnel and functions cut to the statutory minimum. In 2026 it issued letter reports on Part 57, the Clinch River permit and licensing/oversight/siting modernization."
    },
    {
      "name": "NRC Committee to Review Generic Requirements (CRGR)",
      "role": "Advises the NRC Executive Director for Operations on proposed backfits. Not another name for ACRS (the file says so)."
    },
    {
      "name": "NRC's DOGE Team (as defined in Executive Order 14158)",
      "role": "Named in the order as the team the NRC is to consult on reorganization and work with on the rule revision. The notes record no action by it."
    },
    {
      "name": "Office of Management and Budget (OMB)",
      "role": "Named in section 5 of the order as working with the NRC on the revision. The notes record no review of these rules by OMB or its Office of Information and Regulatory Affairs."
    },
    {
      "name": "Office of the Federal Register",
      "role": "Published the proposals and final rules."
    },
    {
      "name": "Tennessee Valley Authority (TVA)",
      "role": "Applicant for the Clinch River Unit 1 (BWRX-300) construction permit; confirmed the permit on 29 September 2026. A federal corporation, not an NRC office."
    },
    {
      "name": "U.S. Department of Energy (DOE) and Department of War (Department of Defense)",
      "role": "Their earlier reactor authorizations and tests may be relied on in NRC review under the 26 October final rule. The rule uses 'Department of War' and 'Department of Defense' interchangeably. DOE's Office of Nuclear Energy is the source cited for the Clinch River docketing."
    },
    {
      "name": "Senate Committee on Environment and Public Works; House Committee on Energy and Commerce, Subcommittee on Energy",
      "role": "Held or listed NRC oversight, budget and nomination hearings. The files record titles and dates only."
    },
    {
      "name": "Federal Energy Regulatory Commission (FERC)",
      "role": "Not an actor in this story. The thread register lists it as a main body because a FERC item (CIP-014-4) sat beside the NRC proposal in the same weekly files."
    }
  ],
  "strands": [
    {
      "strand": "The order",
      "steps": [
        1,
        4
      ]
    },
    {
      "strand": "Congressional oversight",
      "steps": [
        2,
        3,
        10,
        15
      ]
    },
    {
      "strand": "Hearings and adjudications",
      "steps": [
        5
      ]
    },
    {
      "strand": "ACRS",
      "steps": [
        6,
        12,
        30
      ]
    },
    {
      "strand": "Related NRC rules",
      "steps": [
        7
      ]
    },
    {
      "strand": "DOE/War prior-authorization rule",
      "steps": [
        8,
        32
      ]
    },
    {
      "strand": "Clinch River (first use of the modernized hearing)",
      "steps": [
        9,
        14,
        19,
        22,
        24,
        28
      ]
    },
    {
      "strand": "Foreign ownership",
      "steps": [
        11,
        17
      ]
    },
    {
      "strand": "Microreactors (Part 57)",
      "steps": [
        13,
        16
      ]
    },
    {
      "strand": "Fees",
      "steps": [
        18,
        31
      ]
    },
    {
      "strand": "Licensing, oversight and siting modernization",
      "steps": [
        20,
        21
      ]
    },
    {
      "strand": "Procedural modernization",
      "steps": [
        23,
        29
      ]
    },
    {
      "strand": "Backfit review (CRGR)",
      "steps": [
        25
      ]
    },
    {
      "strand": "The broad reactor-licensing proposal (26-077)",
      "steps": [
        26,
        27,
        34
      ]
    },
    {
      "strand": "Contested adjudications",
      "steps": [
        33
      ]
    },
    {
      "strand": "ACRS",
      "steps": [
        35
      ]
    }
  ],
  "steps": [
    {
      "n": 1,
      "strand": "The order",
      "date": "2025-05-23",
      "date_exactness": "exact day signed; filed 2025-05-28 08:45; published 2025-05-29 (90 FR 22587-22590)",
      "body": "The President (Donald Trump), Executive Order 14300",
      "what": "The President signed Executive Order 14300, 'Ordering the Reform of the Nuclear Regulatory Commission'. It tells the NRC to reorganize with reductions in force in consultation with its DOGE Team (section 4(a)); to cut the Advisory Committee on Reactor Safeguards (ACRS) to the minimum its statute requires (section 4(b)); and to revise its regulations and guidance wholesale, with proposed rules within 9 months and final rules and guidance within 18 months (section 5). Section 5 lists fixed licensing deadlines enforced by caps on hourly fee recovery (5(a)), an expedited path for designs DOE or the Department of Defense have tested (5(d)), high-volume licensing for microreactors and modular reactors (5(e)), and streamlined public hearings (5(j)), among others.",
      "stage": "signed or enacted",
      "status_word": "signed 2025-05-23; published 2025-05-29",
      "path": "presidential-instrument",
      "rests_on": "official record, linked (Federal Register document 2025-09798 and the govinfo PDF); the quote file is a source-text edition of the order",
      "quote": {
        "text": "shall undertake a review and wholesale revision of its regulations and guidance documents, and issue notice(s) of proposed rulemaking effecting this revision within 9 months of the date of this order",
        "file": "Executive Order Source Library/Source Text Editions/eo-5aa6d3a7df9569a3b22c.md"
      },
      "files": [
        "Executive Order Source Library/Source Text Editions/eo-5aa6d3a7df9569a3b22c.md",
        "Federal Science Operating System/FEDERAL_SCIENCE_OPERATING_SYSTEM_FACTUAL_SPINE_2025-2026.md",
        "Government Hidden Control Surfaces 2026/NRC_COMMITTEE_MEETINGS_SCOPE_AND_RECORD_GAPS_2026-10-31.md",
        "Economic Institution Legitimacy Crisis 2025-2026/WAVE_2_EXECUTIVE_ORDER_PROCEDURAL_ENGINE_EVIDENCE_LEDGER_2026-09-24.md",
        "Economic Institution Legitimacy Crisis 2025-2026/WAVE_3_SCIENCE_TECHNOLOGY_MISSION_TO_MACHINE_EVIDENCE_LEDGER_2026-09-24.md"
      ],
      "register_records": [
        "U3-NRC-EO14300"
      ],
      "disagreement": "none recorded",
      "source_check": "none: no Source Check 2026-11-14 result concerns this step",
      "from_register": false,
      "weight": "turning point",
      "where_in_the_system": "(d) Presidential instrument: what it directs, to whom, by when",
      "thesis_words": [],
      "what_moves": "directed: staff (reductions in force; ACRS cut), functions (ACRS review narrowed), the content of NRC rules; legal existence of the NRC and ACRS unchanged",
      "happening_ids": [
        "F7-20",
        "F8-00"
      ],
      "note": "The Executive Order Map's unsure note says the order addresses the NRC, a multi-member commission, with 'shall' throughout; whether the President may command it is not decided in the files.",
      "thesis_words_set_aside_2026-11-14": [
        {
          "term": "mission",
          "sense": "",
          "bears": "supports (a direction, not an act)",
          "why": "My reading: section 3 says the NRC's mission 'shall include' facilitating nuclear power, a change in stated purpose made by order, not by amending the Atomic Energy Act."
        },
        {
          "term": "staff",
          "sense": "",
          "bears": "supports (a direction, not an act)",
          "why": "My reading: the order directs reductions in force and a cut of ACRS personnel; the files show no completed reduction."
        },
        {
          "term": "legal shell",
          "sense": "",
          "bears": "supports (a direction, not an act)",
          "why": "My reading: the research file says the order 'does not repeal the statutory committee' (ACRS); the committee's legal existence is untouched while its personnel and functions are to shrink."
        }
      ],
      "movement_type": "Decided"
    },
    {
      "n": 2,
      "strand": "Congressional oversight",
      "date": "2025-09-03",
      "date_exactness": "held date from the GovInfo hearing record (heldDate 2025-09-03); the printed hearing was ingested by GovInfo on 2026-10-21",
      "body": "Senate Committee on Environment and Public Works",
      "what": "The Senate Environment and Public Works Committee held a hearing titled 'Oversight of the Nuclear Regulatory Commission'. The files record its title and date only; the notes do not record what was said or whether Executive Order 14300 was discussed.",
      "stage": "other (oversight hearing held)",
      "status_word": "held (GovInfo heldDate); the Senate archive listing does not record that it took place",
      "path": "oversight",
      "rests_on": "official record, linked (GovInfo hearing CHRG-119shrg63177; Senate committee archive listing)",
      "quote": {
        "text": "HEARING ON OVERSIGHT OF THE NUCLEAR REGULATORY COMMISSION",
        "file": "Federal Government Catch-up 2026-10-22/Phase 2/GOVINFO_WINDOW_ITEMS.json"
      },
      "files": [
        "Federal Government Catch-up 2026-10-22/Phase 2/GOVINFO_WINDOW_ITEMS.json",
        "Congressional Committee Control Plane/senate_committee_archive_discovery_119th.json"
      ],
      "register_records": [
        "CHRG-119shrg63177",
        "senate.archive.ssev.c6b0882fa2a8e3c7"
      ],
      "disagreement": "none recorded",
      "source_check": "none: no Source Check 2026-11-14 result concerns this step",
      "from_register": true,
      "weight": "detail",
      "where_in_the_system": "(g) What oversight bodies add: congressional hearings",
      "thesis_words": [],
      "what_moves": "",
      "happening_ids": [],
      "note": "",
      "movement_type": "In process"
    },
    {
      "n": 3,
      "strand": "Congressional oversight",
      "date": "2025-10-08",
      "date_exactness": "scheduled date from the Senate committee archive listing; occurrence not verified in the files",
      "body": "Senate Committee on Environment and Public Works",
      "what": "The Senate Environment and Public Works Committee listed a hearing on the nomination of Ho Nieh to be a Member of the NRC. By 11 September 2026 a research file names 'Chairman Ho K. Nieh' as the NRC's head; the notes do not record his confirmation date or his designation as Chairman.",
      "stage": "on an agenda",
      "status_word": "scheduled (archive listing date); the notes do not record that it took place",
      "path": "nomination",
      "rests_on": "official record, linked (Senate committee archive listing)",
      "quote": {
        "text": "Hearing on the Nominations of Ho Nieh to be a Member of the Nuclear Regulatory Commission",
        "file": "Congressional Committee Control Plane/senate_committee_archive_discovery_119th.json"
      },
      "files": [
        "Congressional Committee Control Plane/senate_committee_archive_discovery_119th.json",
        "Federal Government Weekly Delta 2026-09-11/waves/WAVE_3D_INDEPENDENTS_SCIENCE_SAFETY_ECON.md"
      ],
      "register_records": [
        "senate.archive.ssev.23def933c2f93f36"
      ],
      "disagreement": "none recorded",
      "source_check": "none: no Source Check 2026-11-14 result concerns this step",
      "from_register": true,
      "weight": "detail",
      "where_in_the_system": "(e)/(g) Senate nomination hearing (who leads the deciding body)",
      "thesis_words": [],
      "what_moves": "",
      "happening_ids": [],
      "note": "",
      "movement_type": "In process"
    },
    {
      "n": 4,
      "strand": "The order",
      "date": "2026-02-23",
      "date_exactness": "computed: nine months after the 2025-05-23 signing (the Executive Order Map gives the same date)",
      "body": "Nuclear Regulatory Commission (the deadline is set by Executive Order 14300, section 5)",
      "what": "The order's nine-month deadline for the NRC to issue notice(s) of proposed rulemaking for the wholesale revision fell on this date. The earliest NRC proposals on subjects the order lists that the files record are dated after it: the contested-adjudications proposal (dated 27 February, published 3 March 2026) and the DOE/War prior-authorization proposal (published 2 April). The broad reactor-licensing proposal was published on 24 September. The fusion-machine proposal, dated 23 February, rests on a 2019 statute (NEIMA), not on this order. The files do not say whether the NRC treated any earlier document as meeting the deadline.",
      "stage": "deadline (set by Executive Order 14300, section 5)",
      "status_word": "deadline 2026-02-23",
      "path": "agency-rule",
      "rests_on": "official record, linked (the order); the dates of the later proposals rest on their Federal Register entries cited in the spine",
      "quote": {
        "text": "issue notice(s) of proposed rulemaking effecting this revision within 9 months of the date of this order",
        "file": "Executive Order Source Library/Source Text Editions/eo-5aa6d3a7df9569a3b22c.md"
      },
      "files": [
        "Executive Order Source Library/Source Text Editions/eo-5aa6d3a7df9569a3b22c.md",
        "Federal Science Operating System/FEDERAL_SCIENCE_OPERATING_SYSTEM_FACTUAL_SPINE_2025-2026.md"
      ],
      "register_records": [],
      "disagreement": "none recorded",
      "source_check": "none: no Source Check 2026-11-14 result concerns this step",
      "from_register": false,
      "weight": "step",
      "where_in_the_system": "(b) Agency rule, stage 4 (proposed): the order's clock for it",
      "thesis_words": [],
      "what_moves": "nothing moved on this date",
      "happening_ids": [],
      "note": "",
      "movement_type": "Clock date"
    },
    {
      "n": 5,
      "strand": "Hearings and adjudications",
      "date": "2026-03-03",
      "date_exactness": "published 2026-03-03 (91 FR 10450); dated 2026-02-27; filed 2026-03-02 08:45; comments due 2026-04-02",
      "body": "Nuclear Regulatory Commission",
      "what": "The NRC published a proposed rule, 'Streamlining Contested Adjudications in Licensing Proceedings', changing merits submissions, discovery and contested proceedings; comments were due 2 April. The spine says appeals sit outside the order's fixed timeline. The notes record no final rule as of 15 November 2026.",
      "stage": "proposed",
      "status_word": "proposed rule; comments due 2026-04-02",
      "path": "agency-rule",
      "rests_on": "official record, linked (Federal Register document 2026-04187)",
      "quote": {
        "text": "Proposed changes to merits submissions, discovery and contested proceedings. Filing windows vary; appeals sit outside the fixed EO timeline.",
        "file": "Federal Science Operating System/FEDERAL_SCIENCE_OPERATING_SYSTEM_FACTUAL_SPINE_2025-2026.md"
      },
      "files": [
        "Federal Science Operating System/FEDERAL_SCIENCE_OPERATING_SYSTEM_FACTUAL_SPINE_2025-2026.md"
      ],
      "register_records": [],
      "disagreement": "none recorded",
      "source_check": "none: no Source Check 2026-11-14 result concerns this step",
      "from_register": false,
      "weight": "step",
      "where_in_the_system": "(b) Agency rule, stages 4-5 (proposed; comment period)",
      "thesis_words": [],
      "what_moves": "proposed: the rules for challenging a licence (remedy); nothing in force",
      "happening_ids": [
        "F7-15"
      ],
      "note": "",
      "thesis_words_set_aside_2026-11-14": [
        {
          "term": "remedy",
          "sense": "",
          "bears": "bears on it (proposed only)",
          "why": "My reading: contested proceedings are how outsiders challenge a licence; changing discovery and merits submissions changes that route of challenge. Nothing is final in the files."
        }
      ],
      "movement_type": "Proposed or filed"
    },
    {
      "n": 6,
      "strand": "ACRS",
      "date": "2026-03-19",
      "date_exactness": "index date on the ACRS 2026 letter-report index",
      "body": "Advisory Committee on Reactor Safeguards (ACRS), NRC",
      "what": "ACRS issued a letter report on lessons learned from new-reactor reviews. The notes do not record the letter's content; the index's Response cell is blank.",
      "stage": "recommended by an advisory body",
      "status_word": "letter report listed; response cell blank",
      "path": "advisory-committee",
      "rests_on": "official record, linked (ACRS letter-report index; ADAMS ML26069A573)",
      "quote": {
        "text": "Lessons learned from new-reactor reviews",
        "file": "Government Hidden Control Surfaces 2026/Meeting Umbrella Catchup 2026-10-31/NRC_MEETING_AND_REPORT_LOCATORS_2026-10-31.json"
      },
      "files": [
        "Government Hidden Control Surfaces 2026/Meeting Umbrella Catchup 2026-10-31/NRC_MEETING_AND_REPORT_LOCATORS_2026-10-31.json",
        "Government Hidden Control Surfaces 2026/NRC_COMMITTEE_MEETINGS_SCOPE_AND_RECORD_GAPS_2026-10-31.md"
      ],
      "register_records": [
        "acrs-letter-0"
      ],
      "disagreement": "none recorded",
      "source_check": "none: no Source Check 2026-11-14 result concerns this step",
      "from_register": false,
      "weight": "detail",
      "where_in_the_system": "(a) Advisory committee: advice transmitted",
      "thesis_words": [],
      "what_moves": "",
      "happening_ids": [
        "F8-03"
      ],
      "note": "",
      "movement_type": "In process"
    },
    {
      "n": 7,
      "strand": "Related NRC rules",
      "date": "2026-03-30",
      "date_exactness": "published 2026-03-30 (91 FR 15696); rule dated 2026-03-25; effective 2026-04-29; correction published 2026-04-13 kept the effective date",
      "body": "Nuclear Regulatory Commission",
      "what": "The NRC published its final Part 53 rule, an optional risk-informed, technology-inclusive licensing framework for commercial fission reactors alongside Parts 50 and 52, effective 29 April 2026. The spine says this rule is distinct from the broader Executive Order 14300 overhaul.",
      "stage": "published",
      "status_word": "final rule; effective 2026-04-29",
      "path": "agency-rule",
      "rests_on": "official record, linked (Federal Register document 2026-06048 and the 13 April correction 2026-07090)",
      "quote": {
        "text": "Optional commercial fission licensing alongside Parts 50 and 52, including light-water designs. Effective April 29; the April 13 correction retained that date.",
        "file": "Federal Science Operating System/FEDERAL_SCIENCE_OPERATING_SYSTEM_FACTUAL_SPINE_2025-2026.md"
      },
      "files": [
        "Federal Science Operating System/FEDERAL_SCIENCE_OPERATING_SYSTEM_FACTUAL_SPINE_2025-2026.md",
        "Economic Institution Legitimacy Crisis 2025-2026/WAVE_3_SCIENCE_TECHNOLOGY_MISSION_TO_MACHINE_EVIDENCE_LEDGER_2026-09-24.md"
      ],
      "register_records": [],
      "disagreement": "none recorded",
      "source_check": "none: no Source Check 2026-11-14 result concerns this step",
      "from_register": false,
      "weight": "step",
      "where_in_the_system": "(b) Agency rule, stage 7 (published; took effect 2026-04-29)",
      "thesis_words": [],
      "what_moves": "what a rule says (a new optional licensing path, in force); functions, staff and authority unchanged",
      "happening_ids": [
        "F7-12"
      ],
      "note": "Codex's own placing: 'Fusion has a separate rulemaking; this is distinct from the broader EO 14300 overhaul.' The register thread names Part 53, and the 26-077 proposal aligns financial qualification with it.",
      "thesis_words_set_aside_2026-11-14": [
        {
          "term": "absorb new technology and capacity",
          "sense": "",
          "bears": "supports the absorption reading",
          "why": "My reading: an optional path for new designs is added inside the NRC's existing licensing system, not a new regulator."
        }
      ],
      "movement_type": "Published"
    },
    {
      "n": 8,
      "strand": "DOE/War prior-authorization rule",
      "date": "2026-04-02",
      "date_exactness": "published 2026-04-02 (91 FR 16584-16588); dated 2026-03-31; filed 2026-04-01 08:45; comments due 2026-05-04",
      "body": "Nuclear Regulatory Commission",
      "what": "The NRC proposed letting its reviews of reactor designs previously authorized by DOE or the Department of War reuse the tested safety evidence, mapped to NRC requirements and changed conditions; comments were due 4 May.",
      "stage": "proposed",
      "status_word": "proposed rule; comments due 2026-05-04",
      "path": "agency-rule",
      "rests_on": "official record, linked (Federal Register document 2026-06414)",
      "quote": {
        "text": "Proposed reuse of tested DOE/Defense safety evidence in NRC review, with a mapping to NRC requirements and changed conditions.",
        "file": "Federal Science Operating System/FEDERAL_SCIENCE_OPERATING_SYSTEM_FACTUAL_SPINE_2025-2026.md"
      },
      "files": [
        "Federal Science Operating System/FEDERAL_SCIENCE_OPERATING_SYSTEM_FACTUAL_SPINE_2025-2026.md"
      ],
      "register_records": [],
      "disagreement": "none recorded",
      "source_check": "none: no Source Check 2026-11-14 result concerns this step",
      "from_register": false,
      "weight": "step",
      "where_in_the_system": "(b) Agency rule, stages 4-5 (proposed; comment period)",
      "thesis_words": [],
      "what_moves": "proposed: use of DOE and Department of War safety records inside NRC review",
      "happening_ids": [
        "F7-14"
      ],
      "note": "",
      "movement_type": "Proposed or filed"
    },
    {
      "n": 9,
      "strand": "Clinch River (first use of the modernized hearing)",
      "date": "2026-04-07",
      "date_exactness": "meeting date in the ACRS calendar transcription",
      "body": "ACRS subcommittee (New Reactors), NRC",
      "what": "An ACRS subcommittee met on the Clinch River construction-permit application (transcript linked; the notes do not record its content).",
      "stage": "discussed",
      "status_word": "subcommittee meeting held per calendar",
      "path": "advisory-committee",
      "rests_on": "official record, linked (ADAMS ML26118B779)",
      "quote": {
        "text": "NewReactorsClinchRiverCPA",
        "file": "Government Hidden Control Surfaces 2026/Meeting Umbrella Catchup 2026-10-31/NRC_MEETING_AND_REPORT_LOCATORS_2026-10-31.json"
      },
      "files": [
        "Government Hidden Control Surfaces 2026/Meeting Umbrella Catchup 2026-10-31/NRC_MEETING_AND_REPORT_LOCATORS_2026-10-31.json",
        "Government Hidden Control Surfaces 2026/NRC_COMMITTEE_MEETINGS_SCOPE_AND_RECORD_GAPS_2026-10-31.md"
      ],
      "register_records": [
        "acrs-sub-2"
      ],
      "disagreement": "none recorded",
      "source_check": "none: no Source Check 2026-11-14 result concerns this step",
      "from_register": true,
      "weight": "detail",
      "where_in_the_system": "(a) Advisory committee: meeting",
      "thesis_words": [],
      "what_moves": "",
      "happening_ids": [],
      "note": "",
      "movement_type": "Said or announced"
    },
    {
      "n": 10,
      "strand": "Congressional oversight",
      "date": "2026-04-22",
      "date_exactness": "House repository calendar listing date; occurrence not established in the files",
      "body": "House Committee on Energy and Commerce, Subcommittee on Energy",
      "what": "The House Energy Subcommittee listed a hearing, 'Nuclear Regulatory Commission: Oversight of Activities, Priorities, and Fiscal Year 2027 Budget.' The notes do not record whether it was held or what was said.",
      "stage": "on an agenda",
      "status_word": "scheduled (repository listing); the notes do not record that it took place",
      "path": "oversight",
      "rests_on": "official record, linked (House committee repository listing)",
      "quote": {
        "text": "Nuclear Regulatory Commission: Oversight of Activities, Priorities, and Fiscal Year 2027 Budget.",
        "file": "Congressional Committee Control Plane/HOUSE_REPOSITORY_EVENT_DETAIL_MANIFEST_119TH.json"
      },
      "files": [
        "Congressional Committee Control Plane/HOUSE_REPOSITORY_EVENT_DETAIL_MANIFEST_119TH.json"
      ],
      "register_records": [
        "house-repository:119186"
      ],
      "disagreement": "none recorded",
      "source_check": "none: no Source Check 2026-11-14 result concerns this step",
      "from_register": true,
      "weight": "detail",
      "where_in_the_system": "(g) What oversight bodies add: congressional hearings",
      "thesis_words": [],
      "what_moves": "",
      "happening_ids": [],
      "note": "",
      "movement_type": "In process"
    },
    {
      "n": 11,
      "strand": "Foreign ownership",
      "date": "2026-04-23",
      "date_exactness": "published 2026-04-23; proposal and direct final rule dated 2026-04-06; filed 2026-04-22 08:45",
      "body": "Nuclear Regulatory Commission",
      "what": "The NRC published a proposed rule and a companion direct final rule, 'Exceptions From Foreign Ownership, Control, or Domination', allowing listed eligible foreign interests in utilization facilities (37 jurisdictions: 36 eligible OECD members plus India), subject to the NRC's non-inimicality determination. The files do not tie this rule to Executive Order 14300; the spine places it with the order-era licensing rules.",
      "stage": "published",
      "status_word": "proposal and direct final rule published",
      "path": "agency-rule",
      "rests_on": "official record, linked (Federal Register documents 2026-07918 and 2026-07917)",
      "quote": {
        "text": "Proposal and direct final dated 2026-04-06; filed 2026-04-22 08:45; published 2026-04-23.",
        "file": "Federal Science Operating System/FEDERAL_SCIENCE_OPERATING_SYSTEM_FACTUAL_SPINE_2025-2026.md"
      },
      "files": [
        "Federal Science Operating System/FEDERAL_SCIENCE_OPERATING_SYSTEM_FACTUAL_SPINE_2025-2026.md"
      ],
      "register_records": [],
      "disagreement": "none recorded",
      "source_check": "none: no Source Check 2026-11-14 result concerns this step",
      "from_register": false,
      "weight": "step",
      "where_in_the_system": "(b) Agency rule, stage 10 (faster route: direct final rule)",
      "thesis_words": [],
      "what_moves": "what a rule says about who may own a licensee; the notes record no investment or ownership approval",
      "happening_ids": [],
      "note": "",
      "movement_type": "Proposed or filed"
    },
    {
      "n": 12,
      "strand": "ACRS",
      "date": "2026-04-28",
      "date_exactness": "index date on the ACRS 2026 letter-report index",
      "body": "Advisory Committee on Reactor Safeguards (ACRS), NRC",
      "what": "ACRS issued a letter report on the Electric Power Research Institute's (EPRI) alternative licensing strategy (the notes do not record the letter's content; Response cell blank).",
      "stage": "recommended by an advisory body",
      "status_word": "letter report listed; response cell blank",
      "path": "advisory-committee",
      "rests_on": "official record, linked (ADAMS ML26113A352)",
      "quote": {
        "text": "EPRI alternative licensing strategy",
        "file": "Government Hidden Control Surfaces 2026/Meeting Umbrella Catchup 2026-10-31/NRC_MEETING_AND_REPORT_LOCATORS_2026-10-31.json"
      },
      "files": [
        "Government Hidden Control Surfaces 2026/Meeting Umbrella Catchup 2026-10-31/NRC_MEETING_AND_REPORT_LOCATORS_2026-10-31.json",
        "Government Hidden Control Surfaces 2026/NRC_COMMITTEE_MEETINGS_SCOPE_AND_RECORD_GAPS_2026-10-31.md"
      ],
      "register_records": [
        "acrs-letter-1"
      ],
      "disagreement": "none recorded",
      "source_check": "none: no Source Check 2026-11-14 result concerns this step",
      "from_register": false,
      "weight": "detail",
      "where_in_the_system": "(a) Advisory committee: advice transmitted",
      "thesis_words": [],
      "what_moves": "",
      "happening_ids": [
        "F8-03"
      ],
      "note": "",
      "movement_type": "In process"
    },
    {
      "n": 13,
      "strand": "Microreactors (Part 57)",
      "date": "2026-05-01",
      "date_exactness": "published 2026-05-01 (91 FR 23628-23766); dated 2026-04-29; comments due 2026-06-15 23:59 Eastern; correction published 2026-05-15",
      "body": "Nuclear Regulatory Commission",
      "what": "The NRC published the proposed Part 57 rule, 'Licensing Requirements for Microreactors and Other Reactors With Comparable Risk Profiles': an optional path for qualifying designs with conditional construction permission and separate operating approval. Comments were due 15 June; a correction was published on 15 May. The files do not tie Part 57 to a section of the order in words.",
      "stage": "proposed",
      "status_word": "proposed rule; comments due 2026-06-15",
      "path": "agency-rule",
      "rests_on": "official record, linked (Federal Register document 2026-08550 and the 15 May correction)",
      "quote": {
        "text": "Proposed optional microreactor path for qualifying designs, with conditional construction permission and separate operating approval.",
        "file": "Federal Science Operating System/FEDERAL_SCIENCE_OPERATING_SYSTEM_FACTUAL_SPINE_2025-2026.md"
      },
      "files": [
        "Federal Science Operating System/FEDERAL_SCIENCE_OPERATING_SYSTEM_FACTUAL_SPINE_2025-2026.md",
        "Contested Logistics/ENERGY_REACTOR_GRAZING_AND_INDUSTRY_DELTA_2026-10-30.md"
      ],
      "register_records": [],
      "disagreement": "none recorded",
      "source_check": "none: no Source Check 2026-11-14 result concerns this step",
      "from_register": false,
      "weight": "step",
      "where_in_the_system": "(b) Agency rule, stages 4-5 (proposed; comment period)",
      "thesis_words": [],
      "what_moves": "proposed: a new licensing path; nothing in force",
      "happening_ids": [
        "F7-13"
      ],
      "note": "",
      "movement_type": "Proposed or filed"
    },
    {
      "n": 14,
      "strand": "Clinch River (first use of the modernized hearing)",
      "date": "2026-05-12",
      "date_exactness": "'source date (as listed)' for a DOE Office of Nuclear Energy article; the files do not give the NRC docketing date itself",
      "body": "Nuclear Regulatory Commission (docketing); reported by the U.S. Department of Energy, Office of Nuclear Energy",
      "what": "A DOE article listed with this date reports that the NRC docketed the Tennessee Valley Authority's (TVA) BWRX-300 construction-permit application for Clinch River.",
      "stage": "received or under consideration by the deciding body",
      "status_word": "docketed (as reported)",
      "path": "agency-order-or-decision",
      "rests_on": "the body's own statement, linked (DOE Office of Nuclear Energy article), not the NRC record",
      "quote": {
        "text": "NRC dockets TVA BWRX-300 construction-permit application",
        "file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_2_ENERGY_MANUFACTURING_CRITICAL_MATERIALS_REGISTRY_2026-08-18.json"
      },
      "files": [
        "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_2_ENERGY_MANUFACTURING_CRITICAL_MATERIALS_REGISTRY_2026-08-18.json"
      ],
      "register_records": [
        "w2-src-tva"
      ],
      "disagreement": "none recorded",
      "source_check": "none: no Source Check 2026-11-14 result concerns this step",
      "from_register": true,
      "weight": "detail",
      "where_in_the_system": "Licensing action: application received and docketed",
      "thesis_words": [],
      "what_moves": "",
      "happening_ids": [],
      "note": "",
      "movement_type": "In process"
    },
    {
      "n": 15,
      "strand": "Congressional oversight",
      "date": "2026-05-13",
      "date_exactness": "Senate committee archive listing date; occurrence not verified",
      "body": "Senate Committee on Environment and Public Works",
      "what": "The Senate Environment and Public Works Committee listed a hearing to examine the NRC's proposed Fiscal Year 2027 budget. The notes do not record what was said.",
      "stage": "on an agenda",
      "status_word": "scheduled (archive listing); the notes do not record that it took place",
      "path": "oversight",
      "rests_on": "official record, linked (Senate committee archive listing)",
      "quote": {
        "text": "Hearing to Examine the U.S. Nuclear Regulatory Commission’s Proposed Fiscal Year 2027 Budget",
        "file": "Congressional Committee Control Plane/senate_committee_archive_discovery_119th.json"
      },
      "files": [
        "Congressional Committee Control Plane/senate_committee_archive_discovery_119th.json"
      ],
      "register_records": [
        "senate.archive.ssev.28fede9b4ae7633e"
      ],
      "disagreement": "none recorded",
      "source_check": "none: no Source Check 2026-11-14 result concerns this step",
      "from_register": true,
      "weight": "detail",
      "where_in_the_system": "(g) What oversight bodies add: congressional hearings",
      "thesis_words": [],
      "what_moves": "",
      "happening_ids": [],
      "note": "",
      "movement_type": "In process"
    },
    {
      "n": 16,
      "strand": "Microreactors (Part 57)",
      "date": "2026-05-19",
      "date_exactness": "index date on the ACRS 2026 letter-report index",
      "body": "Advisory Committee on Reactor Safeguards (ACRS), NRC",
      "what": "ACRS issued a letter report on the Part 57 microreactor proposed rule, during its comment period (the notes do not record the letter's content; Response cell blank).",
      "stage": "recommended by an advisory body",
      "status_word": "letter report listed; response cell blank",
      "path": "advisory-committee",
      "rests_on": "official record, linked (ADAMS ML26133A238)",
      "quote": {
        "text": "Part57microreactor proposed rule",
        "file": "Government Hidden Control Surfaces 2026/Meeting Umbrella Catchup 2026-10-31/NRC_MEETING_AND_REPORT_LOCATORS_2026-10-31.json"
      },
      "files": [
        "Government Hidden Control Surfaces 2026/Meeting Umbrella Catchup 2026-10-31/NRC_MEETING_AND_REPORT_LOCATORS_2026-10-31.json",
        "Government Hidden Control Surfaces 2026/NRC_COMMITTEE_MEETINGS_SCOPE_AND_RECORD_GAPS_2026-10-31.md"
      ],
      "register_records": [
        "acrs-letter-2"
      ],
      "disagreement": "none recorded",
      "source_check": "none: no Source Check 2026-11-14 result concerns this step",
      "from_register": false,
      "weight": "step",
      "where_in_the_system": "(a) Advisory committee: advice transmitted on a proposed rule",
      "thesis_words": [],
      "what_moves": "",
      "happening_ids": [
        "F8-03"
      ],
      "note": "",
      "movement_type": "In process"
    },
    {
      "n": 17,
      "strand": "Foreign ownership",
      "date": "2026-06-05",
      "date_exactness": "confirmation published 2026-06-05; dated 2026-06-03; filed 2026-06-04 08:45; direct final rule effective 2026-07-07",
      "body": "Nuclear Regulatory Commission",
      "what": "The NRC confirmed that its 23 April direct final rule on foreign-ownership exceptions takes effect on 7 July 2026.",
      "stage": "took effect",
      "status_word": "direct final rule confirmed; effective 2026-07-07",
      "path": "agency-rule",
      "rests_on": "official record, linked (Federal Register confirmation 2026-11363)",
      "quote": {
        "text": "The companion April 23 direct final rule was confirmed June 5 as effective July 7.",
        "file": "Federal Science Operating System/FEDERAL_SCIENCE_OPERATING_SYSTEM_FACTUAL_SPINE_2025-2026.md"
      },
      "files": [
        "Federal Science Operating System/FEDERAL_SCIENCE_OPERATING_SYSTEM_FACTUAL_SPINE_2025-2026.md"
      ],
      "register_records": [],
      "disagreement": "none recorded",
      "source_check": "none: no Source Check 2026-11-14 result concerns this step",
      "from_register": false,
      "weight": "step",
      "where_in_the_system": "(b) Agency rule, stage 10 then 7 (direct final rule confirmed; took effect)",
      "thesis_words": [],
      "what_moves": "what a rule says about who may own a licensee (in force from 2026-07-07)",
      "happening_ids": [
        "F7-17"
      ],
      "note": "",
      "movement_type": "Decided"
    },
    {
      "n": 18,
      "strand": "Fees",
      "date": "2026-06-16",
      "date_exactness": "published 2026-06-16 (91 FR 36470-36509); dated 2026-06-05; generally effective 2026-08-17; fixed caps from 2026-10-01",
      "body": "Nuclear Regulatory Commission",
      "what": "The NRC published its final fee rule for fiscal year 2026, generally effective 17 August, with fixed caps from 1 October on fees for requested activities involving a final safety evaluation. Hourly billing remains, and decision deadlines are deferred.",
      "stage": "published",
      "status_word": "final rule; effective 2026-08-17; caps 2026-10-01",
      "path": "agency-rule",
      "rests_on": "official record, linked (Federal Register document 2026-12067)",
      "quote": {
        "text": "Final fee rule generally effective August 17; fixed caps begin October 1. Hourly billing remains. Caps cover requested activities involving a final safety evaluation; decision deadlines are deferred.",
        "file": "Federal Science Operating System/FEDERAL_SCIENCE_OPERATING_SYSTEM_FACTUAL_SPINE_2025-2026.md"
      },
      "files": [
        "Federal Science Operating System/FEDERAL_SCIENCE_OPERATING_SYSTEM_FACTUAL_SPINE_2025-2026.md",
        "Federal Government Whole-Site Recertification 2026-08-01/Physical Production Systems Full-Surface Wave 2026-08-04/PHYSICAL_PRODUCTION_SYSTEMS_FULL_SURFACE_WAVE_2026-08-04.md"
      ],
      "register_records": [],
      "disagreement": "none recorded",
      "source_check": "none: no Source Check 2026-11-14 result concerns this step",
      "from_register": false,
      "weight": "step",
      "where_in_the_system": "(b) Agency rule, stages 6-7 (final; published; effective date)",
      "thesis_words": [],
      "what_moves": "money (limits on fee recovery from applicants, from 2026-10-01); decision deadlines are deferred",
      "happening_ids": [
        "F7-16"
      ],
      "note": "",
      "thesis_words_set_aside_2026-11-14": [
        {
          "term": "money",
          "sense": "",
          "bears": "bears on it",
          "why": "My reading: caps limit what the NRC may recover from applicants, which changes who bears the cost of a review; the files show no cap applied to any application."
        }
      ],
      "movement_type": "Published"
    },
    {
      "n": 19,
      "strand": "Clinch River (first use of the modernized hearing)",
      "date": "2026-06-20",
      "date_exactness": "index date on the ACRS 2026 letter-report index",
      "body": "Advisory Committee on Reactor Safeguards (ACRS), NRC",
      "what": "ACRS issued a letter report on the safety of the Clinch River construction permit (the notes do not record the letter's content; Response cell blank).",
      "stage": "recommended by an advisory body",
      "status_word": "letter report listed; response cell blank",
      "path": "advisory-committee",
      "rests_on": "official record, linked (ADAMS ML26058A279)",
      "quote": {
        "text": "ClinchRiver construction-permit safety",
        "file": "Government Hidden Control Surfaces 2026/Meeting Umbrella Catchup 2026-10-31/NRC_MEETING_AND_REPORT_LOCATORS_2026-10-31.json"
      },
      "files": [
        "Government Hidden Control Surfaces 2026/Meeting Umbrella Catchup 2026-10-31/NRC_MEETING_AND_REPORT_LOCATORS_2026-10-31.json",
        "Government Hidden Control Surfaces 2026/NRC_COMMITTEE_MEETINGS_SCOPE_AND_RECORD_GAPS_2026-10-31.md"
      ],
      "register_records": [
        "acrs-letter-3"
      ],
      "disagreement": "none recorded",
      "source_check": "none: no Source Check 2026-11-14 result concerns this step",
      "from_register": false,
      "weight": "step",
      "where_in_the_system": "(a) Advisory committee: statutory safety review of a construction permit",
      "thesis_words": [],
      "what_moves": "",
      "happening_ids": [
        "F8-03"
      ],
      "note": "",
      "thesis_words_set_aside_2026-11-14": [
        {
          "term": "function by function",
          "sense": "",
          "bears": "cuts against a full removal",
          "why": "My reading: after the order told ACRS to shrink to its statutory minimum, ACRS still issued its construction-permit safety letter; the function continues."
        }
      ],
      "movement_type": "In process"
    },
    {
      "n": 20,
      "strand": "Licensing, oversight and siting modernization",
      "date": "2026-07-24",
      "date_exactness": "index date on the ACRS 2026 letter-report index",
      "body": "Advisory Committee on Reactor Safeguards (ACRS), NRC",
      "what": "ACRS issued a letter report on 'Modernizing licensing/oversight/siting', regulation identifier RIN 3150-AL44 (the notes do not record the letter's content; Response cell blank). The files do not say whether RIN 3150-AL44 is the rulemaking NRC proposed on 11 September under docket NRC-2025-1138.",
      "stage": "recommended by an advisory body",
      "status_word": "letter report listed; response cell blank",
      "path": "advisory-committee",
      "rests_on": "official record, linked (ADAMS ML26205A160)",
      "quote": {
        "text": "Modernizing licensing/oversight/siting RIN3150-AL44",
        "file": "Government Hidden Control Surfaces 2026/Meeting Umbrella Catchup 2026-10-31/NRC_MEETING_AND_REPORT_LOCATORS_2026-10-31.json"
      },
      "files": [
        "Government Hidden Control Surfaces 2026/Meeting Umbrella Catchup 2026-10-31/NRC_MEETING_AND_REPORT_LOCATORS_2026-10-31.json",
        "Government Hidden Control Surfaces 2026/NRC_COMMITTEE_MEETINGS_SCOPE_AND_RECORD_GAPS_2026-10-31.md"
      ],
      "register_records": [
        "acrs-letter-4"
      ],
      "disagreement": "none recorded",
      "source_check": "none: no Source Check 2026-11-14 result concerns this step",
      "from_register": false,
      "weight": "step",
      "where_in_the_system": "(a) Advisory committee: advice on a draft rule before proposal",
      "thesis_words": [],
      "what_moves": "",
      "happening_ids": [
        "F8-03"
      ],
      "note": "",
      "movement_type": "In process"
    },
    {
      "n": 21,
      "strand": "Licensing, oversight and siting modernization",
      "date": "2026-08-03",
      "date_exactness": "meetings 3-6 August 2026; exact sessions not given",
      "body": "Nuclear Regulatory Commission",
      "what": "The NRC held meetings on 3-6 August on proposed licensing, oversight and siting modernization. The file does not say who met or what was decided.",
      "stage": "discussed",
      "status_word": "process events, not rules",
      "path": "agency-rule",
      "rests_on": "source not stated in the passage (a sweep's bounded-negatives list)",
      "quote": {
        "text": "NRC meetings August 3–6 on proposed licensing, oversight and siting modernization",
        "file": "Federal Government Whole-Site Recertification 2026-08-01/Physical Production Systems Full-Surface Wave 2026-08-04/PHYSICAL_PRODUCTION_SYSTEMS_FULL_SURFACE_WAVE_2026-08-04.md"
      },
      "files": [
        "Federal Government Whole-Site Recertification 2026-08-01/Physical Production Systems Full-Surface Wave 2026-08-04/PHYSICAL_PRODUCTION_SYSTEMS_FULL_SURFACE_WAVE_2026-08-04.md"
      ],
      "register_records": [],
      "disagreement": "none recorded",
      "source_check": "none: no Source Check 2026-11-14 result concerns this step",
      "from_register": false,
      "weight": "step",
      "where_in_the_system": "(b) Agency rule, stage 1 (agenda item or stated direction) before proposal",
      "thesis_words": [],
      "what_moves": "",
      "happening_ids": [
        "A0804-13"
      ],
      "note": "",
      "movement_type": "In process"
    },
    {
      "n": 22,
      "strand": "Clinch River (first use of the modernized hearing)",
      "date": "2026-08-05",
      "date_exactness": "exact day of NRC release 26-075",
      "body": "Nuclear Regulatory Commission",
      "what": "NRC release 26-075 scheduled 13 August as the first use of its modernized mandatory-hearing framework, during its review of TVA's Clinch River BWRX-300 construction permit. The NRC says the framework moves public visibility earlier in its safety and environmental reviews, and it targets construction-permit decisions within 18 months. The release does not cite the order in the file's account.",
      "stage": "scheduled",
      "status_word": "process implementation announced",
      "path": "agency-order-or-decision",
      "rests_on": "the body's own statement, linked (NRC Release 26-075)",
      "quote": {
        "text": "NRC scheduled August 13 as the first use of its modernized mandatory-hearing framework, during review of TVA's proposed Clinch River BWRX-300 construction permit.",
        "file": "Federal Government Weekly Delta 2026-08-08/waves/WAVE_4_PHYSICAL_PRODUCTION.md"
      },
      "files": [
        "Federal Government Weekly Delta 2026-08-08/waves/WAVE_4_PHYSICAL_PRODUCTION.md"
      ],
      "register_records": [],
      "disagreement": "none recorded",
      "source_check": "none: no Source Check 2026-11-14 result concerns this step",
      "from_register": false,
      "weight": "step",
      "where_in_the_system": "Licensing action: mandatory hearing (process changed)",
      "thesis_words": [],
      "what_moves": "functions (how and when the mandatory hearing is held); final decision authority stays with the Commission",
      "happening_ids": [
        "F0-13"
      ],
      "note": "",
      "movement_type": "Clock date"
    },
    {
      "n": 23,
      "strand": "Procedural modernization",
      "date": "2026-08-11",
      "date_exactness": "published 2026-08-11; effective 2026-10-26 unless significant adverse comments by 2026-09-10",
      "body": "Nuclear Regulatory Commission",
      "what": "The NRC published a direct final rule, 'NRC Modernization: Rulemaking Procedure, Federal Advisory Committee Act Alignment, Access and Security', streamlining information-withholding and post-promulgation procedures, aligning advisory-committee rules with government-wide standards and updating national-security eligibility criteria. The files do not tie it to Executive Order 14300.",
      "stage": "published",
      "status_word": "conditional direct final rule",
      "path": "agency-rule",
      "rests_on": "official record, linked (Federal Register document 2026-16374)",
      "quote": {
        "text": "It is scheduled to take effect October 26 unless significant adverse comments arrive by September 10.",
        "file": "Federal Government Weekly Delta 2026-08-13/waves/WAVE_4_PHYSICAL_PRODUCTION.md"
      },
      "files": [
        "Federal Government Weekly Delta 2026-08-13/waves/WAVE_4_PHYSICAL_PRODUCTION.md"
      ],
      "register_records": [],
      "disagreement": "none recorded",
      "source_check": "none: no Source Check 2026-11-14 result concerns this step",
      "from_register": false,
      "weight": "detail",
      "where_in_the_system": "(b) Agency rule, stage 10 (faster route: direct final rule)",
      "thesis_words": [],
      "what_moves": "",
      "happening_ids": [
        "D0813-04"
      ],
      "note": "",
      "movement_type": "Published"
    },
    {
      "n": 24,
      "strand": "Clinch River (first use of the modernized hearing)",
      "date": "2026-08-13",
      "date_exactness": "scheduled date",
      "body": "Nuclear Regulatory Commission (the Commission conducts the mandatory hearing)",
      "what": "The first modernized mandatory hearing was scheduled for this date. The notes record no result as of 15 November 2026; the 8 August file lists it as a date to watch.",
      "stage": "scheduled",
      "status_word": "hearing date (scheduled by NRC release 26-075)",
      "path": "agency-order-or-decision",
      "rests_on": "the body's own statement, linked (NRC Release 26-075, for the schedule)",
      "quote": {
        "text": "NRC scheduled August 13 as the first use of its modernized mandatory-hearing framework, during review of TVA's proposed Clinch River BWRX-300 construction permit.",
        "file": "Federal Government Weekly Delta 2026-08-08/waves/WAVE_4_PHYSICAL_PRODUCTION.md"
      },
      "files": [
        "Federal Government Weekly Delta 2026-08-08/waves/WAVE_4_PHYSICAL_PRODUCTION.md"
      ],
      "register_records": [],
      "disagreement": "none recorded",
      "source_check": "none: no Source Check 2026-11-14 result concerns this step",
      "from_register": false,
      "weight": "detail",
      "where_in_the_system": "Licensing action: mandatory hearing",
      "thesis_words": [],
      "what_moves": "",
      "happening_ids": [],
      "note": "",
      "movement_type": "Past due, no record"
    },
    {
      "n": 25,
      "strand": "Backfit review (CRGR)",
      "date": "2026-08-19",
      "date_exactness": "paper dated 2026-08-19; publicly released 2026-09-02",
      "body": "NRC Committee to Review Generic Requirements (CRGR), which advises the NRC Executive Director for Operations",
      "what": "The CRGR annual report, SECY-26-0103, is dated 19 August and was released 2 September. The notes do not record its period, cases or conclusions; the public review-results page shows years only through 2023. CRGR reviews backfits.",
      "stage": "studied or staff paper",
      "status_word": "issued; released 2026-09-02",
      "path": "agency-plan-or-report",
      "rests_on": "official record, linked (NRC Commission-paper index; ADAMS ML26194A089)",
      "quote": {
        "text": "lists SECY-26-0103, the CRGR annual report, dated August19",
        "file": "Government Hidden Control Surfaces 2026/NRC_COMMITTEE_MEETINGS_SCOPE_AND_RECORD_GAPS_2026-10-31.md"
      },
      "files": [
        "Government Hidden Control Surfaces 2026/NRC_COMMITTEE_MEETINGS_SCOPE_AND_RECORD_GAPS_2026-10-31.md",
        "Government Hidden Control Surfaces 2026/Meeting Umbrella Catchup 2026-10-31/NRC_MEETING_AND_REPORT_LOCATORS_2026-10-31.json"
      ],
      "register_records": [
        "crgr"
      ],
      "disagreement": "none recorded",
      "source_check": "none: no Source Check 2026-11-14 result concerns this step",
      "from_register": false,
      "weight": "detail",
      "where_in_the_system": "Backfit review (advice to the Executive Director for Operations)",
      "thesis_words": [],
      "what_moves": "",
      "happening_ids": [
        "F8-05"
      ],
      "note": "",
      "movement_type": "In process"
    },
    {
      "n": 26,
      "strand": "The broad reactor-licensing proposal (26-077)",
      "date": "2026-09-11",
      "date_exactness": "news release dated 2026-09-11; one file gives a 21:25 EDT stamp (from Law360)",
      "body": "Nuclear Regulatory Commission (Chairman Ho K. Nieh named as head)",
      "what": "NRC news release 26-077 announced a proposed rule, 'Regulatory Enhancements for Reactor Licensing, Decommissioning, and Operational Oversight', which it presents as carrying out Executive Order 14300. Its stated changes: more risk-informed graded earthquake design; no expiration date for standard design approvals; more flexibility in licensing control-room staff; an updated process for setting new or revised requirements for existing facilities; clearer defect, noncompliance and nonemergency-event reporting; financial qualification aligned with Part 53; less routine reporting and recordkeeping; and clarified decommissioning, including use of decommissioning trusts. It applies to existing plants and new applicants. Comments were to run 30 days from Federal Register publication on docket NRC-2025-1138, with a virtual public meeting during that period.",
      "stage": "announced",
      "status_word": "proposed rule announced (news release); not yet in the Federal Register",
      "path": "agency-rule",
      "rests_on": "the body's own statement, linked (NRC news release 26-077 and the NRC 2026 news index)",
      "quote": {
        "text": "NRC proposed an EO 14300 overhaul of reactor licensing and oversight",
        "file": "Federal Government Weekly Delta 2026-09-11/waves/WAVE_3D_INDEPENDENTS_SCIENCE_SAFETY_ECON.md"
      },
      "files": [
        "Federal Government Weekly Delta 2026-09-11/waves/WAVE_3D_INDEPENDENTS_SCIENCE_SAFETY_ECON.md",
        "Federal Government Weekly Delta 2026-09-11/waves/WAVE_3_MERGE.md",
        "Federal Government Weekly Delta 2026-09-16/waves/WAVE_1C_OPERATIONS_INDUSTRY_DELIVERY.md",
        "Federal Government Weekly Delta 2026-09-16/waves/WAVE_2C_DIRECT_SITES_OPERATIONS_SECURITY.md",
        "Federal Government Weekly Delta 2026-09-16/waves/WAVE_3D_INDEPENDENTS_SCIENCE_SAFETY_ECON.md",
        "Federal Government Weekly Delta 2026-09-16/waves/WAVE_4C_OPERATIONS_LIBRARIES.md"
      ],
      "register_records": [
        "sep11-nrc-nprm"
      ],
      "disagreement": "Timing: the 11 September merge lists 26-077 as a find of the 11 September sweep (checked through 16:01:37 EDT); the 16 September Wave 1C says the release was stamped 21:25 EDT, after that sweep's cutoff, and treats it as new. Access: the 11 September Wave 3D marks the 26-077 PDF 'reached'; the 16 September files say the story page and PDF returned 403/500 errors.",
      "source_check": "none: no Source Check 2026-11-14 result concerns this step",
      "from_register": false,
      "weight": "step",
      "where_in_the_system": "(b) Agency rule, stage 4 (proposed): Commission approval announced before publication",
      "thesis_words": [],
      "what_moves": "",
      "happening_ids": [
        "F1-00",
        "F2-00",
        "F3-11",
        "F4-08",
        "D0916_4C-15"
      ],
      "note": "",
      "movement_type": "Said or announced"
    },
    {
      "n": 27,
      "strand": "The broad reactor-licensing proposal (26-077)",
      "date": "2026-09-24",
      "date_exactness": "Federal Register publication date (document 2026-19568)",
      "body": "Nuclear Regulatory Commission; published by the Office of the Federal Register",
      "what": "The proposed rule 'Regulatory Enhancements for Reactor Licensing, Decommissioning, and Operational Oversight' appeared in the Federal Register as document 2026-19568 at 91 FR 60702 (docket NRC-2025-1138, RIN 3150-AL45), opening the comment period. The 25 September file records it as a proposal.",
      "stage": "published",
      "status_word": "proposed rule published for comment",
      "path": "agency-rule",
      "rests_on": "official record, linked (Federal Register document 2026-19568)",
      "quote": {
        "text": "NRC published a proposed rule for comment.",
        "file": "Federal Government Weekly Delta 2026-09-25/PRIMARY_OBJECT_LEDGER.csv"
      },
      "files": [
        "Federal Government Weekly Delta 2026-09-25/PRIMARY_OBJECT_LEDGER.csv",
        "Federal Government Weekly Delta 2026-09-25/waves/WAVE_7_COMMERCE_SCIENCE_COMMUNICATIONS.md",
        "Federal Science Operating System/FEDERAL_SCIENCE_OPERATING_SYSTEM_FACTUAL_SPINE_2025-2026.md"
      ],
      "register_records": [
        "weekly-2026-09-25-nrc-reactor-proposal"
      ],
      "disagreement": "The 16 September files report that NRC staff expected publication on about 25 September (citing the American Nuclear Society); the 25 September ledger and Federal Register link give 24 September. The Federal Register document settles it as 24 September.",
      "source_check": "none: no Source Check 2026-11-14 result concerns this step",
      "from_register": false,
      "weight": "turning point",
      "where_in_the_system": "(b) Agency rule, stages 4-5 (proposed; comment period opens)",
      "thesis_words": [],
      "what_moves": "proposed: what NRC rules say on seismic design, design-approval expiry, staffing, reporting, records and decommissioning trusts",
      "happening_ids": [
        "F6-03"
      ],
      "note": "",
      "thesis_words_set_aside_2026-11-14": [
        {
          "term": "records",
          "sense": "C",
          "bears": "bears on it (proposed only)",
          "why": "My reading: 'reduce routine reporting/recordkeeping' would mean some records stop being made or kept by licensees; nothing is in force."
        }
      ],
      "primary_source": "https://www.govinfo.gov/content/pkg/FR-2026-09-24/html/2026-19568.htm",
      "manager_weight": "step",
      "step_note_2026-11-16": "Codex added the November 9 comment-deadline sentence and the spine's deadline quote to this step on 15 November 2026; the deadline is its own step (November 9), so the sentence moved there and the original quote was restored. 91 FR 60702, the docket and the RIN are added from the spine.",
      "cite_quote_2026-11-16": {
        "text": "The NRC published its broader proposed rule on reactor licensing, decommissioning and operational oversight on **September 24**, at **91 FR 60702** (NRC-2025-1138, RIN 3150-AL45).",
        "file": "Federal Science Operating System/FEDERAL_SCIENCE_OPERATING_SYSTEM_FACTUAL_SPINE_2025-2026.md"
      },
      "movement_type": "Proposed or filed"
    },
    {
      "n": 28,
      "strand": "Clinch River (first use of the modernized hearing)",
      "date": "2026-09-29",
      "date_exactness": "date only, from the 30 September ledger (TVA release date); the files do not give the NRC's own issue date",
      "body": "Nuclear Regulatory Commission (issued the permit); Tennessee Valley Authority (confirmed it)",
      "what": "TVA confirmed that the NRC issued a construction permit for Clinch River Unit 1, a BWRX-300 reactor. The files do not say how long the review took.",
      "stage": "approved or adopted",
      "status_word": "construction permit issued",
      "path": "agency-order-or-decision",
      "rests_on": "the body's own statement, linked (TVA news release); the NRC permit itself is not cited",
      "quote": {
        "text": "TVA separately confirmed an NRC construction permit for Clinch River Unit 1",
        "file": "Federal Government Weekly Delta 2026-09-30/waves/WAVE_6_ADJACENT_INSTITUTIONS.md"
      },
      "files": [
        "Federal Government Weekly Delta 2026-09-30/waves/WAVE_6_ADJACENT_INSTITUTIONS.md",
        "Federal Government Weekly Delta 2026-09-30/PRIMARY_OBJECT_LEDGER.csv",
        "Federal Government Weekly Delta 2026-09-30/ADJACENT_ENTITY_OBJECT_LEDGER.csv"
      ],
      "register_records": [
        "FYC-038",
        "FYC-ADJ-018"
      ],
      "disagreement": "The reader record dates it '2026-09 (date not given)'; both 30 September ledgers give 2026-09-29 (date only).",
      "source_check": "none: no Source Check 2026-11-14 result concerns this step",
      "from_register": false,
      "weight": "step",
      "where_in_the_system": "Licensing action: construction permit issued",
      "thesis_words": [],
      "what_moves": "final decision authority exercised by the NRC (a permit to build)",
      "happening_ids": [
        "D0930_6-13"
      ],
      "note": "",
      "movement_type": "Decided"
    },
    {
      "n": 29,
      "strand": "Procedural modernization",
      "date": "2026-09-30",
      "date_exactness": "Federal Register publication 2026-09-30 (document 2026-19963); public-inspection stamp 2026-09-29 08:45",
      "body": "Nuclear Regulatory Commission",
      "what": "The NRC confirmed the effective date of 26 October for its direct final rule on rulemaking procedure, advisory-committee alignment, access and security. The notes record no later step on the rule as of 15 November 2026.",
      "stage": "took effect",
      "status_word": "direct final rule confirmation; effective 2026-10-26",
      "path": "agency-rule",
      "rests_on": "official record, linked (Federal Register document 2026-19963)",
      "quote": {
        "text": "FACA procedure alignment effective 2026-10-26",
        "file": "Federal Government Weekly Delta 2026-09-30/COMMITTEE_OBJECT_LEDGER.csv"
      },
      "files": [
        "Federal Government Weekly Delta 2026-09-30/COMMITTEE_OBJECT_LEDGER.csv"
      ],
      "register_records": [
        "FYC-COM-017"
      ],
      "disagreement": "none recorded",
      "source_check": "none: no Source Check 2026-11-14 result concerns this step",
      "from_register": true,
      "weight": "detail",
      "where_in_the_system": "(b) Agency rule, stage 10 then 7 (direct final rule confirmed)",
      "thesis_words": [],
      "what_moves": "",
      "happening_ids": [],
      "note": "",
      "movement_type": "Decided"
    },
    {
      "n": 30,
      "strand": "ACRS",
      "date": "2026-09-30",
      "date_exactness": "date shown on the NRC ACRS web page as read in the browser",
      "body": "Nuclear Regulatory Commission (ACRS description page)",
      "what": "The NRC's description of ACRS, dated 30 September 2026, says ACRS is implementing Executive Order 14300. The file does not record how many positions were cut, any change in licensing time or any safety outcome. ACRS meetings ran February through September 2026 with transcripts and minutes posted.",
      "stage": "stated by the body",
      "status_word": "implementing (agency page)",
      "path": "advisory-committee",
      "rests_on": "the body's own statement, linked (NRC ACRS page)",
      "quote": {
        "text": "read in the rendered browser and dated September 30, 2026, says it is implementing Executive Order 14300.",
        "file": "Government Hidden Control Surfaces 2026/NRC_COMMITTEE_MEETINGS_SCOPE_AND_RECORD_GAPS_2026-10-31.md"
      },
      "files": [
        "Government Hidden Control Surfaces 2026/NRC_COMMITTEE_MEETINGS_SCOPE_AND_RECORD_GAPS_2026-10-31.md"
      ],
      "register_records": [
        "U3-NRC-REMIT"
      ],
      "disagreement": "none recorded",
      "source_check": "none: no Source Check 2026-11-14 result concerns this step",
      "from_register": false,
      "weight": "step",
      "where_in_the_system": "(a) Advisory committee: the sponsoring agency changes its scope",
      "thesis_words": [],
      "what_moves": "stated: ACRS staff and functions being reduced; legal existence unchanged; no figures in the files",
      "happening_ids": [
        "F8-01",
        "F8-02"
      ],
      "note": "",
      "thesis_words_set_aside_2026-11-14": [
        {
          "term": "legal shell",
          "sense": "",
          "bears": "supports (stated, not measured)",
          "why": "My reading: the committee stays in existence by statute while the agency says it is cutting it to the statutory minimum."
        },
        {
          "term": "staff",
          "sense": "",
          "bears": "not shown",
          "why": "No file gives a number of ACRS positions before or after."
        }
      ],
      "movement_type": "Said or announced"
    },
    {
      "n": 31,
      "strand": "Fees",
      "date": "2026-10-01",
      "date_exactness": "start date set in the fee rule",
      "body": "Nuclear Regulatory Commission",
      "what": "By the terms of the fiscal 2026 fee rule, fixed fee caps began on 1 October. The notes record no cap applied to an application as of 15 November 2026.",
      "stage": "took effect",
      "status_word": "fixed caps start (by the rule's terms)",
      "path": "agency-rule",
      "rests_on": "official record, linked (Federal Register document 2026-12067)",
      "quote": {
        "text": "fixed caps start 2026-10-01",
        "file": "Federal Science Operating System/FEDERAL_SCIENCE_OPERATING_SYSTEM_FACTUAL_SPINE_2025-2026.md"
      },
      "files": [
        "Federal Science Operating System/FEDERAL_SCIENCE_OPERATING_SYSTEM_FACTUAL_SPINE_2025-2026.md"
      ],
      "register_records": [],
      "disagreement": "none recorded",
      "source_check": "none: no Source Check 2026-11-14 result concerns this step",
      "from_register": false,
      "weight": "detail",
      "where_in_the_system": "(b) Agency rule, stage 7 (compliance or later effective date)",
      "thesis_words": [],
      "what_moves": "",
      "happening_ids": [],
      "note": "",
      "movement_type": "Took effect"
    },
    {
      "n": 32,
      "strand": "DOE/War prior-authorization rule",
      "date": "2026-10-26",
      "date_exactness": "published 2026-10-26 (91 FR 67195-67200); effective 2026-11-25",
      "body": "Nuclear Regulatory Commission",
      "what": "The NRC published its final rule 'NRC Reviews of Reactor Designs Previously Authorized by U.S. Department of Energy or Department of War' (91 FR 67195-67200, docket NRC-2025-1503, RIN 3150-AL60), amending 10 CFR 50.43 and 53.440 so applicable commercial reactor applications can rely on DOE or Department of War authorization, testing and demonstrated safe functioning for specified safety functions. The rule says it addresses section 5(d) of Executive Order 14300. The applicant must identify how the earlier authorization satisfies applicable NRC requirements, and the NRC still makes the licensing findings. The NRC received 136 unique comment submissions on the proposal. Effective 25 November 2026.",
      "stage": "published",
      "status_word": "final rule; effective 2026-11-25",
      "path": "agency-rule",
      "rests_on": "official record, linked (Federal Register document 2026-21801); its text settles the order section and the comment count",
      "quote": {
        "text": "This rulemaking addresses section 5(d), which contemplates an expedited pathway to approve reactor designs that the U.S. Department of Energy (DOE) or the Department of War (DOW) have tested and that have demonstrated the ability to function safely.",
        "file": "Federal Government Refresh 2026-10-30/Source Documents/2026-21801.txt"
      },
      "files": [
        "Federal Government Refresh 2026-10-30/Source Documents/2026-21801.txt",
        "Contested Logistics/ENERGY_REACTOR_GRAZING_AND_INDUSTRY_DELTA_2026-10-30.md",
        "Federal Government Refresh 2026-10-30/WAVE_10_MERGE.md",
        "Federal Science Operating System/FEDERAL_SCIENCE_OPERATING_SYSTEM_FACTUAL_SPINE_2025-2026.md"
      ],
      "register_records": [
        "g30-nrc",
        "FR 2026-21801",
        "fgm-g30-nrc"
      ],
      "disagreement": "none recorded",
      "source_check": "matches: Source Check S13 tested 'The final rule takes effect November 25.' (Federal Government Refresh 2026-10-30/WAVE_10_MERGE.md) against the Federal Register text ('DATES: This final rule is effective on November 25, 2026.')",
      "from_register": false,
      "weight": "turning point",
      "where_in_the_system": "(b) Agency rule, stages 6-7 (final; published; effective date set)",
      "thesis_words": [],
      "what_moves": "records (use of DOE and Department of War safety evidence in NRC review, in force from 2026-11-25); final decision authority stays with the NRC",
      "happening_ids": [
        "CL-01",
        "R1030-02"
      ],
      "note": "",
      "thesis_words_set_aside_2026-11-14": [
        {
          "term": "records",
          "sense": "B",
          "bears": "supports",
          "why": "My reading: the DOE and Department of War test and authorization records stay with those departments, while their use moves into NRC licensing review."
        },
        {
          "term": "reassigned",
          "sense": "",
          "bears": "cuts against (for decision authority)",
          "why": "The file says the NRC still makes the required licensing findings; final decision authority does not move to DOE or the Department of War."
        }
      ],
      "primary_source": "https://www.govinfo.gov/content/pkg/FR-2026-10-26/html/2026-21801.htm",
      "step_note_2026-11-16": "Codex shortened 'what' and changed the quote on 15 November 2026; the rule's title, citation, section 5(d) wording and quote are restored from the rule text, and Codex's sentence on what the applicant must identify is kept (spine wording).",
      "cite_quote_2026-11-16": {
        "text": "The applicant must identify how the earlier authorization satisfies applicable NRC requirements.",
        "file": "Federal Science Operating System/FEDERAL_SCIENCE_OPERATING_SYSTEM_FACTUAL_SPINE_2025-2026.md"
      },
      "movement_type": "Published"
    },
    {
      "n": 33,
      "date": "2026-11-03",
      "date_exactness": "Exact date stated in the owning return and original source",
      "body": "Nuclear Regulatory Commission",
      "what": "NRC published the final contested-adjudications rule, docket NRC-2025-1501/RIN 3150-AL58, at 91 FR 69446–69490, with December 3 effectiveness for proceedings noticed on or after that date. The final rule did not adopt proposed section 2.309(k).",
      "stage": "final rule published",
      "status_word": "final rule published",
      "path": "agency-rule",
      "rests_on": "Original primary source linked and read in the owning research return",
      "quote": {
        "text": "On November 3, 2026, NRC published the final rule **Streamlining Contested Adjudications in Licensing Proceedings**, docket NRC-2025-1501, RIN 3150-AL58, 91 FR 69446–69490.",
        "file": "Federal Science Operating System/NUCLEAR_FLEET_FINANCE_AND_LICENSING_RETURN_2026-11-19.md"
      },
      "files": [
        "Federal Science Operating System/NUCLEAR_FLEET_FINANCE_AND_LICENSING_RETURN_2026-11-19.md"
      ],
      "weight": "detail",
      "strand": "Contested adjudications",
      "thesis_words": [],
      "from_register": false,
      "source_check": "November 19 bounded original-source reading",
      "movement_type": "Published"
    },
    {
      "n": 34,
      "strand": "The broad reactor-licensing proposal (26-077)",
      "date": "2026-11-09",
      "date_exactness": "date set by the Federal Register notice",
      "body": "Nuclear Regulatory Commission (docket NRC-2025-1138)",
      "what": "The comment period on the broader proposal (docket NRC-2025-1138, RIN 3150-AL45) and its draft regulatory guides closed at 11:59 p.m. ET, the deadline set by the printed September 24 Federal Register notice. The notes record no comment count, extension or result of the virtual public meeting as of 15 November 2026.",
      "stage": "comment period closing date",
      "status_word": "comment period closing date",
      "path": "agency-rule",
      "rests_on": "the body's own statement, linked (NRC release 26-077, for the 30-day rule)",
      "quote": {
        "file": "Federal Science Operating System/FEDERAL_SCIENCE_OPERATING_SYSTEM_FACTUAL_SPINE_2025-2026.md",
        "text": "The final printed notice set **November 9, 2026 at 11:59 p.m. ET** as the comment deadline."
      },
      "files": [
        "Federal Government Weekly Delta 2026-09-16/waves/WAVE_3D_INDEPENDENTS_SCIENCE_SAFETY_ECON.md",
        "Federal Government Weekly Delta 2026-09-11/waves/WAVE_3D_INDEPENDENTS_SCIENCE_SAFETY_ECON.md",
        "Federal Science Operating System/FEDERAL_SCIENCE_OPERATING_SYSTEM_FACTUAL_SPINE_2025-2026.md"
      ],
      "register_records": [],
      "disagreement": "Release 26-077 (11 September) said comments would run 30 days from Federal Register publication, which counts to 24 October; the printed Federal Register notice sets November 9.",
      "source_check": "none: no Source Check 2026-11-14 result concerns this step",
      "from_register": false,
      "weight": "detail",
      "where_in_the_system": "(b) Agency rule, stage 5 (comment period closed)",
      "thesis_words": [],
      "what_moves": "",
      "happening_ids": [],
      "note": "",
      "primary_source": "https://www.govinfo.gov/content/pkg/FR-2026-09-24/html/2026-19568.htm",
      "corrected_2026-11-16": [
        {
          "field": "date",
          "was": "2026-10-24 (worked out by counting 30 days from the 24 September publication; no file stated it)",
          "now": "2026-11-09",
          "file": "Federal Science Operating System/FEDERAL_SCIENCE_OPERATING_SYSTEM_FACTUAL_SPINE_2025-2026.md",
          "quote": "The final printed notice set **November 9, 2026 at 11:59 p.m. ET** as the comment deadline."
        },
        {
          "field": "what",
          "was": "NRC release 26-077 set the comment period on the proposal at 30 days from Federal Register publication (24 September). No file states the closing date. The notes record no closing date, extension, number of comments or virtual public meeting as of 31 October 2026.",
          "now": "The comment period on the broader proposal (docket NRC-2025-1138, RIN 3150-AL45) and its draft regulatory guides closed at 11:59 p.m. ET, the deadline set by the printed September 24 Federal Register notice. The notes record no comment count, extension or result of the virtual public meeting as of 15 November 2026.",
          "file": "Federal Science Operating System/FEDERAL_SCIENCE_OPERATING_SYSTEM_FACTUAL_SPINE_2025-2026.md",
          "quote": "The final printed notice set **November 9, 2026 at 11:59 p.m. ET** as the comment deadline."
        }
      ],
      "step_note_2026-11-16": "Codex changed this step's date and text on 15 November 2026; checked against the spine. Release 26-077's 30-day wording stays in 'disagreement'.",
      "movement_type": "Clock date"
    },
    {
      "n": 35,
      "date": "2026-11-17",
      "date_exactness": "Exact date stated in the owning return and original source",
      "body": "Nuclear Regulatory Commission",
      "what": "NRC published the ACRS functions direct final rule, docket NRC-2025-0974/RIN 3150-AL43, at 91 FR 73647. It narrows reviews and changes membership/functions, with February 1, 2027 effectiveness subject to the significant-adverse-comment process; comments are due December 17, 2026.",
      "stage": "direct final rule published",
      "status_word": "direct final rule published",
      "path": "agency-rule",
      "rests_on": "Original primary source linked and read in the owning research return",
      "quote": {
        "text": "On November 17, 2026, NRC published **Advisory Committee on Reactor Safeguards Functions**, docket NRC-2025-0974, RIN 3150-AL43, as a direct final rule at 91 FR 73647, accompanied by a proposed rule.",
        "file": "Federal Science Operating System/NUCLEAR_FLEET_FINANCE_AND_LICENSING_RETURN_2026-11-19.md"
      },
      "files": [
        "Federal Science Operating System/NUCLEAR_FLEET_FINANCE_AND_LICENSING_RETURN_2026-11-19.md"
      ],
      "weight": "detail",
      "strand": "ACRS",
      "thesis_words": [],
      "from_register": false,
      "source_check": "November 19 bounded original-source reading",
      "movement_type": "Published"
    }
  ],
  "where_in_the_system": [
    {
      "stage": "(d) Presidential instrument: what it directs, to whom, by when",
      "steps": [
        1
      ]
    },
    {
      "stage": "(g) What oversight bodies add: congressional hearings",
      "steps": [
        2,
        10,
        15
      ]
    },
    {
      "stage": "(e)/(g) Senate nomination hearing (who leads the deciding body)",
      "steps": [
        3
      ]
    },
    {
      "stage": "(b) Agency rule, stage 4 (proposed): the order's clock for it",
      "steps": [
        4
      ]
    },
    {
      "stage": "(b) Agency rule, stages 4-5 (proposed; comment period)",
      "steps": [
        5,
        8,
        13
      ]
    },
    {
      "stage": "(a) Advisory committee: advice transmitted",
      "steps": [
        6,
        12
      ]
    },
    {
      "stage": "(b) Agency rule, stage 7 (published; took effect 2026-04-29)",
      "steps": [
        7
      ]
    },
    {
      "stage": "(a) Advisory committee: meeting",
      "steps": [
        9
      ]
    },
    {
      "stage": "(b) Agency rule, stage 10 (faster route: direct final rule)",
      "steps": [
        11,
        23
      ]
    },
    {
      "stage": "Licensing action: application received and docketed",
      "steps": [
        14
      ]
    },
    {
      "stage": "(a) Advisory committee: advice transmitted on a proposed rule",
      "steps": [
        16
      ]
    },
    {
      "stage": "(b) Agency rule, stage 10 then 7 (direct final rule confirmed; took effect)",
      "steps": [
        17
      ]
    },
    {
      "stage": "(b) Agency rule, stages 6-7 (final; published; effective date)",
      "steps": [
        18
      ]
    },
    {
      "stage": "(a) Advisory committee: statutory safety review of a construction permit",
      "steps": [
        19
      ]
    },
    {
      "stage": "(a) Advisory committee: advice on a draft rule before proposal",
      "steps": [
        20
      ]
    },
    {
      "stage": "(b) Agency rule, stage 1 (agenda item or stated direction) before proposal",
      "steps": [
        21
      ]
    },
    {
      "stage": "Licensing action: mandatory hearing (process changed)",
      "steps": [
        22
      ]
    },
    {
      "stage": "Licensing action: mandatory hearing",
      "steps": [
        24
      ]
    },
    {
      "stage": "Backfit review (advice to the Executive Director for Operations)",
      "steps": [
        25
      ]
    },
    {
      "stage": "(b) Agency rule, stage 4 (proposed): Commission approval announced before publication",
      "steps": [
        26
      ]
    },
    {
      "stage": "(b) Agency rule, stages 4-5 (proposed; comment period opens)",
      "steps": [
        27
      ]
    },
    {
      "stage": "Licensing action: construction permit issued",
      "steps": [
        28
      ]
    },
    {
      "stage": "(b) Agency rule, stage 10 then 7 (direct final rule confirmed)",
      "steps": [
        29
      ]
    },
    {
      "stage": "(a) Advisory committee: the sponsoring agency changes its scope",
      "steps": [
        30
      ]
    },
    {
      "stage": "(b) Agency rule, stage 7 (compliance or later effective date)",
      "steps": [
        31
      ]
    },
    {
      "stage": "(b) Agency rule, stage 5 (comment period closed)",
      "steps": [
        34
      ]
    },
    {
      "stage": "(b) Agency rule, stages 6-7 (final; published; effective date set)",
      "steps": [
        32
      ]
    },
    {
      "stage": "(b) Agency rule, stage 3 (OIRA review)",
      "steps": [],
      "note": "The notes record no OMB or OIRA review of any of these rules. The order names OMB."
    },
    {
      "stage": "(b) Agency rule, stage 8 (congressional review)",
      "steps": [],
      "note": "No file records a Congressional Review Act action."
    },
    {
      "stage": "(f) Courts",
      "steps": [],
      "note": "The notes record no court filing on any of these rules."
    }
  ],
  "quiet_stretch": [
    {
      "from": "2025-05-29",
      "to": "2026-03-03",
      "what": "The notes record no NRC rule step on the order between publication and the first proposal (contested adjudications); two Senate hearings on the NRC (September and October 2025) are the dated steps. The nine-month proposal deadline, 23 February 2026, falls inside this stretch."
    },
    {
      "from": "2026-07-24",
      "to": "2026-09-11",
      "what": "Between the ACRS letter on licensing/oversight/siting modernization and the 26-077 release, only the 3-6 August NRC meetings are recorded on the broad proposal."
    },
    {
      "from": "2026-09-24",
      "to": "2026-11-15",
      "what": "The 26-077 comment period ran to November 9; the notes record no comment count, public meeting result or later step on the proposal as of 15 November 2026. The October 26 final rule on DOE/War prior authorizations falls inside this stretch."
    }
  ],
  "same_days": {
    "2025-05-23 (Executive Order 14300 signed)": [
      {
        "date": "2025-05-23",
        "body": "The President (Executive Orders 14299, 14301, 14302)",
        "line": "Three other nuclear orders signed the same day: national-security reactors, DOE reactor testing, the nuclear industrial base.",
        "file": "Federal Science Operating System/FEDERAL_SCIENCE_OPERATING_SYSTEM_FACTUAL_SPINE_2025-2026.md"
      },
      {
        "date": "2025-05-23",
        "body": "The President (Executive Order 14299); Department of the Army",
        "line": "Army made executive agent for a domestic-installation reactor by 30 September 2028.",
        "file": "FORTRESS America and Military Installation Energy Independence 2026-09-30/IMPLEMENTATION_TRANSITION_TIMELINE.md"
      },
      {
        "date": "2025-05-22",
        "body": "Supreme Court of the United States",
        "line": "Stay order in the Wilcox/Harris removal cases allowed removals of independent-agency members pending appeal.",
        "file": "Judicial Money/JUDICIAL_MONEY_MAP.md"
      }
    ],
    "2026-09-24 (26-077 published in the Federal Register)": [
      {
        "date": "2026-09-23",
        "body": "Senate Committee on Environment and Public Works",
        "line": "Nuclear-waste hearing on a proposed Nuclear Lifecycle Innovation Campus model and six state memoranda of understanding.",
        "file": "Congressional Committee Control Plane/COMMERCE_SCIENCE_COMMUNICATIONS_COMMITTEE_DELTA_2026-10-25.md"
      },
      {
        "date": "2026-09-24",
        "body": "Department of Energy",
        "line": "Announced intent to help fund 31 grid projects ('Speed to Power'): selection stage, $1.9 billion federal.",
        "file": "Federal Government Weekly Delta 2026-09-25/CORRECTIVE_DIRECT_SITE_REVIEW_2026-09-26.md"
      },
      {
        "date": "2026-09-25",
        "body": "FERC staff",
        "line": "Final environmental impact statement for Sabine Pass Stage 5; authorization still to come.",
        "file": "Federal Government Weekly Delta 2026-09-25/CORRECTIVE_DIRECT_SITE_REVIEW_2026-09-26.md"
      },
      {
        "date": "2026-09-25",
        "body": "United States Postal Service",
        "line": "Interim final rule partly rescinding its NEPA procedures after the Council on Environmental Quality's government-wide change.",
        "file": "Federal Government Weekly Delta 2026-09-25/waves/WAVE_7_COMMERCE_SCIENCE_COMMUNICATIONS.md"
      }
    ],
    "2026-10-26 (DOE/War prior-authorization final rule published)": [
      {
        "date": "2026-10-26",
        "body": "Nuclear Regulatory Commission (ADAMS)",
        "line": "ACRS September meeting minutes (ML26289A171) changed to public.",
        "file": "Government Hidden Control Surfaces 2026/NRC_COMMITTEE_MEETINGS_SCOPE_AND_RECORD_GAPS_2026-10-31.md"
      },
      {
        "date": "2026-10-27",
        "body": "Department of Energy",
        "line": "Conditional loan commitment of up to $5 billion for Constellation nuclear uprates in Illinois, Maryland and Pennsylvania.",
        "file": "Contested Logistics/ENERGY_REACTOR_GRAZING_AND_INDUSTRY_DELTA_2026-10-30.md"
      },
      {
        "date": "2026-10-28",
        "body": "Department of Energy",
        "line": "Financial close on a $5.1 billion Alliant Energy loan package.",
        "file": "Contested Logistics/ENERGY_REACTOR_GRAZING_AND_INDUSTRY_DELTA_2026-10-30.md"
      },
      {
        "date": "2026-10-28",
        "body": "Nuclear Regulatory Commission",
        "line": "Final environmental impact statement for the Global Laser Enrichment Paducah facility published (register record FR 2026-21996).",
        "file": "Federal Government Refresh 2026-10-30/Source Documents/fr-week.txt"
      },
      {
        "date": "2026-10-26",
        "body": "U.S. Trade and Development Agency",
        "line": "Agreement with TÜPRAŞ to fund an assessment of small modular reactors for a Turkish refinery.",
        "file": "Contested Logistics/ENERGY_REACTOR_GRAZING_AND_INDUSTRY_DELTA_2026-10-30.md"
      }
    ]
  },
  "where_it_stands": "As of the November 19 bounded research return, the contested-hearing rule has been published final with December 3 effectiveness. The ACRS direct final rule sets December 17 comments and conditional February 1, 2027 effectiveness. The broader licensing proposal and Part 57 retain their separately dated earlier records; this return is not a complete rule-finality census.",
  "next_dated": [
    {
      "when": "2026-11-23",
      "what": "Executive Order 14300 deadline for the NRC's final rules and guidance concluding the wholesale revision (18 months from signing). The NRC identifies November 23, 2026 as that deadline.",
      "stage": "scheduled (deadline in the order)",
      "files": [
        "Executive Order Source Library/Source Text Editions/eo-5aa6d3a7df9569a3b22c.md",
        "Federal Science Operating System/FEDERAL_SCIENCE_OPERATING_SYSTEM_FACTUAL_SPINE_2025-2026.md"
      ]
    },
    {
      "when": "2026-11-25",
      "what": "DOE/Department of War prior-authorization final rule takes effect.",
      "stage": "scheduled (effective date in the rule)",
      "files": [
        "Federal Government Refresh 2026-10-30/Source Documents/2026-21801.txt",
        "Contested Logistics/ENERGY_REACTOR_GRAZING_AND_INDUSTRY_DELTA_2026-10-30.md",
        "Federal Government Refresh 2026-10-30/WAVE_10_MERGE.md"
      ]
    },
    {
      "when": "after 2026-11-25",
      "what": "The first commercial application relying on the rule and the resulting NRC licensing finding.",
      "stage": "pending",
      "files": [
        "Federal Science Operating System/FEDERAL_SCIENCE_OPERATING_SYSTEM_FACTUAL_SPINE_2025-2026.md"
      ],
      "primary_source": "https://www.govinfo.gov/content/pkg/FR-2026-10-26/html/2026-21801.htm"
    },
    {
      "when": "2026-12-02 to 2026-12-04",
      "what": "ACRS full-committee meeting 741.",
      "stage": "scheduled",
      "files": [
        "Government Hidden Control Surfaces 2026/Meeting Umbrella Catchup 2026-10-31/NRC_MEETING_AND_REPORT_LOCATORS_2026-10-31.json",
        "Government Hidden Control Surfaces 2026/NRC_COMMITTEE_MEETINGS_SCOPE_AND_RECORD_GAPS_2026-10-31.md"
      ]
    },
    {
      "when": "no date in the files",
      "what": "Final rules on 26-077, Part 57 and contested adjudications; the NRC's response to the comments on 26-077.",
      "stage": "pending",
      "files": [
        "Federal Science Operating System/FEDERAL_SCIENCE_OPERATING_SYSTEM_FACTUAL_SPINE_2025-2026.md",
        "Federal Government Weekly Delta 2026-09-25/PRIMARY_OBJECT_LEDGER.csv"
      ]
    }
  ],
  "not_shown": [
    "Any NRC reorganization or reduction in force under section 4(a), or the 20-person drafting team the order calls for.",
    "How many ACRS positions or functions were cut; the ACRS page says that ACRS is implementing the order.",
    "The notes do not record whether the 13 August Clinch River mandatory hearing was held, or what it decided.",
    "The notes do not record the NRC’s response to comments or the result of the planned public meeting on the broader proposal.",
    "Any Commission vote on these proposals or final rules, or any OMB review of them.",
    "Fixed licensing deadlines of 18 months for new reactors and 1 year for continued operation (section 5(a)): the fee rule defers decision deadlines.",
    "Any rule on the linear no-threshold radiation model, NEPA procedures, the Reactor Oversight Process or renewed-licence terms (sections 5(b), 5(c), 5(g), 5(i)), except as far as the 26-077 proposal touches oversight.",
    "Whether RIN 3150-AL44 (the ACRS letter's rulemaking) and docket NRC-2025-1138 (the 26-077 proposal) are the same rulemaking.",
    "Any court challenge to any of these rules.",
    "Any fee cap applied to an actual application after 1 October."
  ],
  "where_the_files_stop_top5": [
    "Whether the 26-077 comment period (closed 9 November 2026) was extended, and how many comments were filed (docket NRC-2025-1138).",
    "Whether the NRC issues final rules and guidance by the order's 23 November 2026 deadline, and which.",
    "What the ACRS letter on RIN 3150-AL44 said, and whether RIN 3150-AL44 is the 26-077 rulemaking.",
    "Whether the 13 August Clinch River mandatory hearing was held, and the NRC's own date for the construction permit.",
    "Any NRC reorganization or reduction in force, and ACRS staffing figures, after the order."
  ],
  "touches": [
    {
      "thread": "nrc-fusion-rule",
      "at_step": "step 4 (nine-month deadline)",
      "how": "The NRC's fusion-machine proposal (published 26 February 2026, comments closed 27 May) sits in the same spine table but rests on the 2019 NEIMA deadline of 31 December 2027, not on Executive Order 14300. Not folded in."
    },
    {
      "thread": "doe-reactor-pilot",
      "at_step": "steps 1 and 32",
      "how": "The October 26 NRC rule supplies a path to use earlier DOE and War authorizations in a commercial licensing application.",
      "story_file": "Stories 2026-11-14/batch 9/doe-reactor-pilot.json"
    },
    {
      "thread": "military-microreactors",
      "at_step": "steps 1 and 32",
      "how": "Executive Order 14299, signed the same day, directs Army reactors; the 26 October NRC rule lets commercial applicants rely on Department of War authorization."
    },
    {
      "thread": "nrc-licensing-actions",
      "at_step": "between steps 25 and 26",
      "how": "Other NRC licensing actions in the same weeks (Pioneer pre-limited-work-authorization exemption 28 August, Global Laser Enrichment Paducah order 26 August, NextEra-Dominion transfer notice 27 August) are individual licensing steps, not rule changes."
    },
    {
      "thread": "duane-arnold-restart",
      "at_step": "step 26",
      "how": "The 16 September files that report 26-077 say the Duane Arnold restart is still pending NRC licensing (staff target 29 January 2028) and that 26-077 is not a Duane Arnold action."
    },
    {
      "thread": "tva-clinch-river-smr",
      "at_step": "steps 9, 14, 19, 22, 24, 28",
      "how": "Folded in: the Clinch River permit review was the first use of the modernized mandatory hearing."
    },
    {
      "thread": "acrs-construction-permit-reviews",
      "at_step": "steps 9 and 19",
      "how": "Partly folded in: the Clinch River ACRS letter and subcommittee meeting. The Long Mott letter (16 October) and hearing advisory (14 September) are left out."
    }
  ],
  "foundation": [
    {
      "file": "Operation Inch by Inch/Foundations 2026-11-14/how-a-federal-action-moves-from-agenda-to-effect.md",
      "why": "No foundation piece exists for civilian nuclear licensing (the systems map marks it as needed). Section (b), agency rule, gives the stages used here: agenda, proposal, comment, final, publication, effective date, direct final rule."
    },
    {
      "file": "Federal Science Operating System/FEDERAL_SCIENCE_OPERATING_SYSTEM_FACTUAL_SPINE_2025-2026.md",
      "why": "Its two reconciliation tables (7 September 2026) give the exact dates and stage of the order and of six NRC rules (Part 53, Part 57, DOE/War evidence, adjudications, fees, foreign ownership), each with its Federal Register link."
    },
    {
      "file": "Government Hidden Control Surfaces 2026/NRC_COMMITTEE_MEETINGS_SCOPE_AND_RECORD_GAPS_2026-10-31.md",
      "why": "Short: what the order says about ACRS, what the ACRS and CRGR records show and where they stop."
    }
  ],
  "interpretation": [
    {
      "claim": "Codex reads the order as an attempt to change how the regulator operates while staying inside the existing statute.",
      "quote": "A direct attempt to change the regulator's operating model inside the Atomic Energy Act; no completed RIF, final rule, license, or 400-GW result.",
      "file": "Economic Institution Legitimacy Crisis 2025-2026/WAVE_2_EXECUTIVE_ORDER_PROCEDURAL_ENGINE_EVIDENCE_LEDGER_2026-09-24.md",
      "note": "Dated 24 September 2026. By then the Part 53, foreign-ownership and fee final rules had been published (the files differ on whether those count as rules under the order)."
    },
    {
      "claim": "Codex ties the NRC rules to Katie's thesis.",
      "quote": "Keeping these questions together makes the nuclear-revival thesis testable against particular legal changes and eventual project results.",
      "file": "Federal Science Operating System/FEDERAL_SCIENCE_OPERATING_SYSTEM_FACTUAL_SPINE_2025-2026.md",
      "note": "The thesis is written into the factual spine here."
    },
    {
      "claim": "Codex places Part 53 outside the overhaul.",
      "quote": "Fusion has a separate rulemaking; this is distinct from the broader EO 14300 overhaul.",
      "file": "Federal Science Operating System/FEDERAL_SCIENCE_OPERATING_SYSTEM_FACTUAL_SPINE_2025-2026.md"
    },
    {
      "claim": "Codex calls the 26-077 release the first proposal of a rewrite.",
      "quote": "as the first in-window **proposal** of a reactor-regulation rewrite",
      "file": "Federal Government Weekly Delta 2026-09-11/waves/WAVE_3D_INDEPENDENTS_SCIENCE_SAFETY_ECON.md",
      "note": "'First in-window' means first in that week's sweep, not first under the order."
    },
    {
      "claim": "Codex frames the 26 October rule as creating a route.",
      "quote": "NRC creates a route to reuse earlier government reactor safety work",
      "file": "Contested Logistics/ENERGY_REACTOR_GRAZING_AND_INDUSTRY_DELTA_2026-10-30.md"
    }
  ],
  "left_out": [
    "Long Mott construction-permit items: hearing advisory 26-029-A (14 September), ACRS subcommittee meetings (5 May, 1-2 and 15 September) and ACRS letter (16 October). These are another applicant's review; the files do not say the modernized hearing applied.",
    "Other ACRS subcommittee meetings (Framatome 17 February, Westinghouse cladding 26 June) and full-committee meeting dates February-September, which the files list without content.",
    "ACRS September minutes made public on 26 October (publication detail, listed under same_days).",
    "Fusion-machine proposed rule and Tennessee Agreement State fusion rules (thread nrc-fusion-rule).",
    "DOE Reactor Pilot criticalities, the eVinci test, the Dewey-Burdock licence renewal, Project IKE, North Anna, Belews Creek, Palo Verde and Duke transfers, Duane Arnold: separate licensing or DOE actions.",
    "The NRC in-situ recovery proposal (26-076; Federal Register 2026-18504): no file ties it to the order (kept as a lead in open_points).",
    "Weekly carry-lines repeating that 26-077 was still a proposal (16 September Wave 3D, 2C, 4C, Wave 4 merge, campaign stop receipt), merged into steps 26-27."
  ],
  "open_points": [
    {
      "kind": "register error",
      "what": "The thread register lists FERC as a main body of this thread; FERC takes no step in it (its CIP-014-4 item only sat in the same weekly files).",
      "where": "THREAD_REGISTER_whole_workbench.json, nrc-licensing-overhaul, main_bodies",
      "settled": "yes: every NRC passage in the thread files",
      "fix": "main_bodies: NRC; ACRS; (TVA as applicant)."
    },
    {
      "kind": "register error",
      "what": "The register and the Executive Order Map describe 'a September 24 proposal' as if it were a second NRC proposal; it is the Federal Register publication of the same 26-077 proposal.",
      "where": "THREAD_REGISTER government_mentions (WAVE_7 09-25, 'The September 24 proposal held at proposal stage'); ALL_ORDERS.json 14300 threads.records_output",
      "settled": "yes: Federal Government Weekly Delta 2026-09-25/PRIMARY_OBJECT_LEDGER.csv gives the same title, 'Regulatory Enhancements for Reactor Licensing, Decommissioning, and Operational Oversight', as the 16 September Wave 1C account of release 26-077",
      "fix": "NRC release 26-077 (11 September 2026) announced the proposal; it was published in the Federal Register on 24 September 2026 as document 2026-19568."
    },
    {
      "kind": "disagreement",
      "what": "26-077 timing: the 11 September merge counts it as a find of that sweep; the 16 September Wave 1C says it was released at 21:25 EDT, after the sweep's cutoff.",
      "where": "Federal Government Weekly Delta 2026-09-11/waves/WAVE_3_MERGE.md vs Federal Government Weekly Delta 2026-09-16/waves/WAVE_1C_OPERATIONS_INDUSTRY_DELIVERY.md",
      "settled": "no",
      "fix": ""
    },
    {
      "kind": "disagreement",
      "what": "Expected publication date: 16 September files say about 25 September (per the American Nuclear Society); the 25 September file and Federal Register link give 24 September.",
      "where": "Federal Government Weekly Delta 2026-09-16/waves/WAVE_1C_OPERATIONS_INDUSTRY_DELIVERY.md; Federal Government Weekly Delta 2026-09-16/waves/WAVE_4C_OPERATIONS_LIBRARIES.md; Federal Government Weekly Delta 2026-09-25/PRIMARY_OBJECT_LEDGER.csv",
      "settled": "yes: Federal Register document 2026-19568 is dated 24 September",
      "fix": "Published 2026-09-24."
    },
    {
      "kind": "stale text",
      "what": "The 24 September Wave 2 ledger says the order has 'no completed RIF, final rule, license'; by then Part 53, the foreign-ownership direct final rule and the fiscal 2026 fee rule were final (whether they count under the order is not settled in the files), and TVA's permit followed on 29 September.",
      "where": "Economic Institution Legitimacy Crisis 2025-2026/WAVE_2_EXECUTIVE_ORDER_PROCEDURAL_ENGINE_EVIDENCE_LEDGER_2026-09-24.md, EO 14300 row",
      "settled": "no",
      "fix": ""
    },
    {
      "kind": "passed deadline",
      "what": "The order's nine-month deadline for proposed rules was 23 February 2026; the first proposals on the order's listed subjects in the files are dated after it.",
      "where": "Executive Order Source Library/Source Text Editions/eo-5aa6d3a7df9569a3b22c.md; Federal Science Operating System/FEDERAL_SCIENCE_OPERATING_SYSTEM_FACTUAL_SPINE_2025-2026.md",
      "settled": "no",
      "fix": ""
    },
    {
      "kind": "passed deadline",
      "what": "The notes record no closing date for the 26-077 comment period, no extension and no comment count as of 31 October 2026.",
      "where": "https://www.govinfo.gov/content/pkg/FR-2026-09-24/html/2026-19568.htm",
      "settled": "yes",
      "fix": "The September 24 Federal Register notice for NRC-2025-1138, RIN 3150-AL45, set November 9 at 11:59 p.m. ET as the deadline for comments on the broader proposal and draft regulatory guides."
    },
    {
      "kind": "passed deadline",
      "what": "The notes record no result for the 13 August Clinch River mandatory hearing (first use of the modernized framework) as of 31 October 2026.",
      "where": "Federal Government Weekly Delta 2026-08-08/waves/WAVE_4_PHYSICAL_PRODUCTION.md, watch table",
      "settled": "no",
      "fix": ""
    },
    {
      "kind": "missing fact",
      "what": "The files do not say whether RIN 3150-AL44 (ACRS letter, 24 July) and docket NRC-2025-1138 (26-077) are the same rulemaking, or whether the 3-6 August 'licensing, oversight and siting modernization' meetings concern it.",
      "where": "Government Hidden Control Surfaces 2026/Meeting Umbrella Catchup 2026-10-31/NRC_MEETING_AND_REPORT_LOCATORS_2026-10-31.json; Federal Government Whole-Site Recertification 2026-08-01/Physical Production Systems Full-Surface Wave 2026-08-04/PHYSICAL_PRODUCTION_SYSTEMS_FULL_SURFACE_WAVE_2026-08-04.md",
      "settled": "no",
      "fix": ""
    },
    {
      "kind": "missing fact",
      "what": "No file gives the NRC's own issue date for the Clinch River construction permit; only TVA's release date (29 September, date only).",
      "where": "Federal Government Weekly Delta 2026-09-30/PRIMARY_OBJECT_LEDGER.csv",
      "settled": "no",
      "fix": ""
    },
    {
      "kind": "missing fact",
      "what": "No file records any reorganization, reduction in force or drafting team under section 4(a), or ACRS staffing numbers under 4(b).",
      "where": "Government Hidden Control Surfaces 2026/NRC_COMMITTEE_MEETINGS_SCOPE_AND_RECORD_GAPS_2026-10-31.md; ALL_ORDERS.json 14300 outputs_located",
      "settled": "no",
      "fix": ""
    },
    {
      "kind": "disagreement",
      "what": "Access to the 26-077 PDF: the 11 September Wave 3D marks it 'reached'; the 16 September files say it returned 403/500.",
      "where": "Federal Government Weekly Delta 2026-09-11/waves/WAVE_3D_INDEPENDENTS_SCIENCE_SAFETY_ECON.md vs Federal Government Weekly Delta 2026-09-16/waves/WAVE_4C_OPERATIONS_LIBRARIES.md",
      "settled": "no",
      "fix": ""
    },
    {
      "kind": "lead",
      "what": "The NRC's in-situ recovery groundwater and decommissioning-timeliness proposal (news 26-076, 1 September; Federal Register 2026-18504, 10 September) is never tied to the order in the files.",
      "where": "Federal Government Weekly Delta 2026-09-03/waves/WAVE_2C_DIRECT_SITES_OPERATIONS_SECURITY.md; Federal Government Weekly Delta 2026-09-11/waves/WAVE_3D_INDEPENDENTS_SCIENCE_SAFETY_ECON.md",
      "settled": "no",
      "fix": ""
    },
    {
      "kind": "lead",
      "what": "The ACRS letters' Response cells are blank and the notes do not record the letter bodies, including the one on licensing/oversight/siting modernization (ML26205A160).",
      "where": "Government Hidden Control Surfaces 2026/Meeting Umbrella Catchup 2026-10-31/NRC_MEETING_AND_REPORT_LOCATORS_2026-10-31.json",
      "settled": "no",
      "fix": ""
    },
    {
      "kind": "wrong wording",
      "what": "A reader record dates the Clinch River permit '2026-09 (date not given)'; the same package's ledgers give 2026-09-29.",
      "where": "Government Read record for Federal Government Weekly Delta 2026-09-30/waves/WAVE_6_ADJACENT_INSTITUTIONS.md",
      "settled": "yes: Federal Government Weekly Delta 2026-09-30/PRIMARY_OBJECT_LEDGER.csv, row FYC-038",
      "fix": "2026-09-29 (date only, TVA release)."
    }
  ],
  "files_used": {
    "thread_files": [
      "Federal Government Weekly Delta 2026-08-08/waves/WAVE_4_PHYSICAL_PRODUCTION.md",
      "Federal Government Weekly Delta 2026-09-11/waves/WAVE_3D_INDEPENDENTS_SCIENCE_SAFETY_ECON.md",
      "Federal Government Weekly Delta 2026-09-11/waves/WAVE_3_MERGE.md",
      "Federal Government Weekly Delta 2026-09-16/waves/WAVE_1C_OPERATIONS_INDUSTRY_DELIVERY.md",
      "Federal Government Weekly Delta 2026-09-16/waves/WAVE_2C_DIRECT_SITES_OPERATIONS_SECURITY.md",
      "Federal Government Weekly Delta 2026-09-16/waves/WAVE_3D_INDEPENDENTS_SCIENCE_SAFETY_ECON.md",
      "Federal Government Weekly Delta 2026-09-25/waves/WAVE_7_COMMERCE_SCIENCE_COMMUNICATIONS.md",
      "Federal Science Operating System/FEDERAL_SCIENCE_OPERATING_SYSTEM_FACTUAL_SPINE_2025-2026.md",
      "Government Hidden Control Surfaces 2026/NRC_COMMITTEE_MEETINGS_SCOPE_AND_RECORD_GAPS_2026-10-31.md"
    ],
    "related_files": [
      "Congressional Committee Control Plane/HOUSE_REPOSITORY_EVENT_DETAIL_MANIFEST_119TH.json",
      "Congressional Committee Control Plane/senate_committee_archive_discovery_119th.json",
      "Contested Logistics/ENERGY_REACTOR_GRAZING_AND_INDUSTRY_DELTA_2026-10-30.md",
      "Economic Institution Legitimacy Crisis 2025-2026/WAVE_2_EXECUTIVE_ORDER_PROCEDURAL_ENGINE_EVIDENCE_LEDGER_2026-09-24.md",
      "Economic Institution Legitimacy Crisis 2025-2026/WAVE_3_SCIENCE_TECHNOLOGY_MISSION_TO_MACHINE_EVIDENCE_LEDGER_2026-09-24.md",
      "Executive Order Source Library/Source Text Editions/eo-5aa6d3a7df9569a3b22c.md",
      "Federal Government Catch-up 2026-10-22/Phase 2/GOVINFO_WINDOW_ITEMS.json",
      "Federal Government Refresh 2026-10-30/Source Documents/2026-21801.txt",
      "Federal Government Refresh 2026-10-30/WAVE_10_MERGE.md",
      "Federal Government Weekly Delta 2026-08-13/waves/WAVE_4_PHYSICAL_PRODUCTION.md",
      "Federal Government Weekly Delta 2026-09-16/waves/WAVE_4C_OPERATIONS_LIBRARIES.md",
      "Federal Government Weekly Delta 2026-09-25/PRIMARY_OBJECT_LEDGER.csv",
      "Federal Government Weekly Delta 2026-09-30/ADJACENT_ENTITY_OBJECT_LEDGER.csv",
      "Federal Government Weekly Delta 2026-09-30/COMMITTEE_OBJECT_LEDGER.csv",
      "Federal Government Weekly Delta 2026-09-30/PRIMARY_OBJECT_LEDGER.csv",
      "Federal Government Weekly Delta 2026-09-30/waves/WAVE_6_ADJACENT_INSTITUTIONS.md",
      "Federal Government Whole-Site Recertification 2026-08-01/Physical Production Systems Full-Surface Wave 2026-08-04/PHYSICAL_PRODUCTION_SYSTEMS_FULL_SURFACE_WAVE_2026-08-04.md",
      "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_WAVE_2_ENERGY_MANUFACTURING_CRITICAL_MATERIALS_REGISTRY_2026-08-18.json",
      "Government Hidden Control Surfaces 2026/Meeting Umbrella Catchup 2026-10-31/NRC_MEETING_AND_REPORT_LOCATORS_2026-10-31.json"
    ],
    "nuclear_return_files": [
      "Federal Science Operating System/NUCLEAR_FLEET_FINANCE_AND_LICENSING_RETURN_2026-11-19.md"
    ]
  },
  "register_records_used": [
    "CHRG-119shrg63177",
    "FR 2026-21801",
    "FYC-038",
    "FYC-ADJ-018",
    "FYC-COM-017",
    "U3-NRC-EO14300",
    "U3-NRC-REMIT",
    "acrs-letter-0",
    "acrs-letter-1",
    "acrs-letter-2",
    "acrs-letter-3",
    "acrs-letter-4",
    "acrs-sub-2",
    "crgr",
    "fgm-g30-nrc",
    "g30-nrc",
    "house-repository:119186",
    "senate.archive.ssev.23def933c2f93f36",
    "senate.archive.ssev.28fede9b4ae7633e",
    "senate.archive.ssev.c6b0882fa2a8e3c7",
    "sep11-nrc-nprm",
    "w2-src-tva",
    "weekly-2026-09-25-nrc-reactor-proposal"
  ],
  "counts": {
    "thread_files": 9,
    "raw_happenings_in_thread_files": 172,
    "happenings_kept_from_thread_files": 18,
    "happenings_kept_from_related_files": 9,
    "happenings_kept": 27,
    "related_files_added": 19,
    "steps": 35,
    "turning_points": 2,
    "steps_weight_step": 17,
    "steps_weight_detail": 14,
    "steps_with_disagreement": 3,
    "steps_with_saved_original": 1,
    "steps_with_saved_original_note": "Step on the 26 October final rule: the saved Federal Register text (Federal Government Refresh 2026-10-30/Source Documents/2026-21801.txt) was used to settle that it addresses section 5(d) of the order and the count of 136 comment submissions.",
    "steps_from_register_only": 7,
    "register_records_used": 23,
    "quotes_checked": 38,
    "quotes_failed": 0,
    "counted_with_manager_weight_2026-11-16": true
  },
  "builder_notes": [
    "Quote check: 38 quotes (steps and interpretation) checked as whitespace-normalised substrings of their files with markdown marks removed; 38 found, 0 not found. Problems: none. Every step lists at least one file.",
    "Scope. The register lists 9 thread files with 172 reader happenings; most are about other subjects (weekly government-wide sweeps). 18 thread happenings were kept. A search of all research files for the order number, the 26-077 release, the Federal Register numbers of the six NRC rules, Clinch River, Part 57 and ACRS found the related files listed in files_used.related_files; 9 of their reader happenings were kept, and register records (ACRS locators, hearing listings, ledgers) supplied 7 steps found only there.",
    "Threads folded in: nrc-doe-military-authorization-rule (its own story is steps on 2 April and 26 October), tva-clinch-river-smr (Clinch River strand), acrs-construction-permit-reviews (Clinch River letter and subcommittee only), nrc-crgr-backfit (one detail step). Not folded: nrc-fusion-rule (NEIMA, not the order), doe-reactor-pilot (DOE under Executive Order 14301), nrc-licensing-actions (individual licences). The register's ties_to, part_of, has_parts, merged_from and linked_to are empty for this thread; possible_same_as named the three checked.",
    "Hard part: deciding which NRC rules belong to 'the overhaul'. Only two documents in the files say they carry out Executive Order 14300 (release 26-077 and the 26 October final rule, which names section 5(d)); the ACRS page says ACRS is implementing it. Part 53, foreign ownership, fees, Part 57, adjudications and the procedural direct final rule are kept as their own strands because the spine groups them with the order and they match its section 5 subjects; each step says where the files do not make the link. Codex itself says Part 53 is distinct from the overhaul.",
    "No foundation piece exists for the civilian-nuclear-licensing-and-fuel system; where_in_the_system uses the agenda-to-effect piece's stage names plus plain licensing stages (application docketed, mandatory hearing, construction permit).",
    "Dates computed by me and labelled: 23 February 2026 (nine months after signing; the Executive Order Map gives the same date) and about 24 October 2026 (30 days after publication). No other arithmetic was used.",
    "Happening ids: F<n>-<i> are thread files in register order (F0 = 8 August Wave 4 ... F8 = NRC committee file) with the reader's happening index; other ids are short file labels plus the reader's index.",
    "Thesis-word readings are mine, as the instructions require.",
    "16 November 2026 update (worker G01): the last two steps put in date order (Codex had left n=33 before n=32); Codex's November 9 sentence moved off the September 24 step; the October 26 final rule's fuller text and quote restored; the September 24 proposal weighted as a step in manager_weight; 'as of' dates moved to 15 November 2026. Quotes checked 16 November 2026: all found."
  ],
  "set_aside_2026-11-14": [
    {
      "field": "actors[1].role",
      "text": "the files do not show any Commission vote on these rules."
    },
    {
      "field": "actors[5].role",
      "text": "No file shows it acting."
    },
    {
      "field": "actors[6].role",
      "text": "No file shows OMB or its Office of Information and Regulatory Affairs reviewing any of these rules."
    },
    {
      "field": "actors[7].role",
      "text": "Publishing is not acting."
    },
    {
      "field": "steps[0].what_moves",
      "text": "directed only:"
    },
    {
      "field": "steps[0].note",
      "text": "The NRC committee file adds: 'It does not repeal the statutory committee.'"
    },
    {
      "field": "steps[1].what",
      "text": "they do not show what was said or whether Executive Order 14300 was discussed."
    },
    {
      "field": "steps[2].what",
      "text": "the files do not show his confirmation date or his designation as Chairman."
    },
    {
      "field": "steps[3].what",
      "text": "The order's nine-month deadline for the NRC to issue notice(s) of proposed rulemaking for the wholesale revision passed."
    },
    {
      "field": "steps[3].what_moves",
      "text": "it marks where the order's first clock ran out"
    },
    {
      "field": "steps[4].what",
      "text": "The files do not show a final rule."
    },
    {
      "field": "steps[5].what",
      "text": "The letter itself is unread in the files; the index's Response cell is blank."
    },
    {
      "field": "steps[6].note",
      "text": "It is kept here because the register thread names Part 53 and the 26-077 proposal aligns financial qualification with it."
    },
    {
      "field": "steps[8].what",
      "text": "(transcript linked, unread in the files)"
    },
    {
      "field": "steps[9].what",
      "text": "The files do not establish that it occurred or what was said."
    },
    {
      "field": "steps[10].what_moves",
      "text": "no investment or ownership approval shown"
    },
    {
      "field": "steps[11].what",
      "text": "(letter unread; Response cell blank)"
    },
    {
      "field": "steps[12].what",
      "text": "a 15 May correction did not finalize it."
    },
    {
      "field": "steps[13].what",
      "text": "Docketing starts review; it is not a permit."
    },
    {
      "field": "steps[14].what",
      "text": "The files do not establish what was said."
    },
    {
      "field": "steps[15].what",
      "text": "(letter unread; Response cell blank)"
    },
    {
      "field": "steps[16].what",
      "text": "Eligibility is not evidence of any completed investment or approved ownership structure."
    },
    {
      "field": "steps[17].what",
      "text": "The order (section 5(a)) called for fixed licensing deadlines enforced by caps on hourly fee recovery; this rule sets caps but not the deadlines."
    },
    {
      "field": "steps[17].what_moves",
      "text": "the decision deadlines the order linked to the caps did not move"
    },
    {
      "field": "steps[18].what",
      "text": "(letter unread; Response cell blank)"
    },
    {
      "field": "steps[19].what",
      "text": "(letter unread; Response cell blank)"
    },
    {
      "field": "steps[20].what",
      "text": "The file records them as process events only; it does not say"
    },
    {
      "field": "steps[23].what",
      "text": "The scheduled date of the first modernized mandatory hearing passed. No file records that the hearing was held or what it decided; the 8 August file lists it only as a date to watch."
    },
    {
      "field": "steps[24].what",
      "text": "Its period, cases and conclusions are unread in the files"
    },
    {
      "field": "steps[24].what",
      "text": "the subject of the 26-077 proposal's change to how the NRC sets new requirements for existing plants"
    },
    {
      "field": "steps[25].disagreement",
      "text": "Neither point changes the release date."
    },
    {
      "field": "steps[26].what",
      "text": "The 25 September file holds it as a proposal only: no final requirement, licence amendment, decommissioning action or operating decision follows from it."
    },
    {
      "field": "steps[26].what_moves",
      "text": "proposed only:"
    },
    {
      "field": "steps[27].what",
      "text": "A permit is not construction start, financing, an operating licence or generation."
    },
    {
      "field": "steps[27].what",
      "text": "against the 18-month target"
    },
    {
      "field": "steps[27].what_moves",
      "text": "nothing about construction"
    },
    {
      "field": "steps[28].what",
      "text": "The files do not show the rule operating after that date."
    },
    {
      "field": "steps[29].what",
      "text": "The file does not establish how many positions were cut, how licensing time changed or any safety outcome."
    },
    {
      "field": "steps[30].what",
      "text": "No file records any cap applied to an application."
    },
    {
      "field": "steps[31].what",
      "text": "By the 30-day count from Federal Register publication, the comment period on the 26-077 proposal would close on or about 24 October. No file records the closing date, an extension, the number of comments or the virtual public meeting."
    },
    {
      "field": "steps[32].rests_on",
      "text": "saved copy used to settle the order section and the comment count"
    },
    {
      "field": "steps[32].source_check",
      "text": "against the saved Federal Register text"
    },
    {
      "field": "where_in_the_system[27].note",
      "text": "No file shows OMB or OIRA review of any of these rules, though the order names OMB."
    },
    {
      "field": "where_in_the_system[29].note",
      "text": "No court filing on any of these rules appears in the files."
    },
    {
      "field": "quiet_stretch[0].what",
      "text": "No NRC rule step on the order appears in the files between publication and the first proposal (contested adjudications); two Senate hearings on the NRC (September and October 2025) are the only dated steps. The nine-month proposal deadline passed on 23 February 2026 inside this stretch."
    },
    {
      "field": "where_it_stands",
      "text": "The files show no reorganization or reduction in force under section 4(a)."
    },
    {
      "field": "not_shown[1]",
      "text": "the ACRS page says only that"
    },
    {
      "field": "not_shown[2]",
      "text": "That the 13 August Clinch River mandatory hearing was held, and what it decided."
    },
    {
      "field": "where_the_files_stop_top5[0]",
      "text": "Whether the 26-077 comment period closed on about 24 October, was extended"
    },
    {
      "field": "open_points[2].settled",
      "text": "(does not change the release date)"
    },
    {
      "field": "open_points[5].what",
      "text": "The order's nine-month deadline for proposed rules (23 February 2026) passed"
    },
    {
      "field": "open_points[6].what",
      "text": "The 26-077 comment period closed about 24 October by the 30-day count; no file records it, an extension or the comment count."
    },
    {
      "field": "open_points[7].what",
      "text": "The 13 August Clinch River mandatory hearing (first use of the modernized framework) is never recorded as held."
    },
    {
      "field": "open_points[11].settled",
      "text": "(not material)"
    },
    {
      "field": "open_points[12].what",
      "text": "it may belong beside 26-077's decommissioning changes"
    },
    {
      "field": "open_points[13].what",
      "text": "and the letter bodies unread"
    },
    {
      "field": "steps[n=4].stage",
      "text": "other (deadline passed)",
      "by": "manager"
    },
    {
      "field": "steps[n=24].status_word",
      "text": "scheduled date passed; outcome not recorded",
      "by": "manager"
    },
    {
      "field": "steps[2].status_word",
      "text": "held (GovInfo heldDate); the Senate archive listing alone is graded 'occurrence not verified'",
      "by": "manager, second sweep"
    },
    {
      "field": "steps[3].status_word",
      "text": "scheduled (archive listing date); occurrence not verified",
      "by": "manager, second sweep"
    },
    {
      "field": "steps[4].status_word",
      "text": "deadline 2026-02-23 passed",
      "by": "manager, second sweep"
    },
    {
      "field": "steps[6].status_word",
      "text": "letter report listed; response cell blank; body unread",
      "by": "manager, second sweep"
    },
    {
      "field": "steps[9].status_word",
      "text": "subcommittee meeting held per calendar; transcript unread",
      "by": "manager, second sweep"
    },
    {
      "field": "steps[10].status_word",
      "text": "scheduled (repository listing); occurrence not established",
      "by": "manager, second sweep"
    },
    {
      "field": "steps[15].status_word",
      "text": "scheduled (archive listing); occurrence not verified",
      "by": "manager, second sweep"
    },
    {
      "field": "steps[25].status_word",
      "text": "issued; released 2026-09-02; body unread",
      "by": "manager, second sweep"
    },
    {
      "field": "steps[32].status_word",
      "text": "by count only; not recorded",
      "by": "manager, second sweep"
    }
  ],
  "checks_applied_2026-11-14": [
    {
      "where": "steps[n=8].quote.text",
      "why": "Check 1: the quote's last part is the file's own remark about the record; kept the words that state what happened.",
      "evidence_file": "Federal Science Operating System/FEDERAL_SCIENCE_OPERATING_SYSTEM_FACTUAL_SPINE_2025-2026.md"
    },
    {
      "where": "steps[n=13].quote.text",
      "why": "Check 1: the quote's last part is the file's own remark about the record; kept the words that state what happened.",
      "evidence_file": "Federal Science Operating System/FEDERAL_SCIENCE_OPERATING_SYSTEM_FACTUAL_SPINE_2025-2026.md"
    },
    {
      "where": "steps[n=21].quote.text",
      "why": "Check 1: the quote's last part is the file's own remark about the record; kept the words that state what happened. The file has no other words on these meetings.",
      "evidence_file": "Federal Government Whole-Site Recertification 2026-08-01/Physical Production Systems Full-Surface Wave 2026-08-04/PHYSICAL_PRODUCTION_SYSTEMS_FULL_SURFACE_WAVE_2026-08-04.md"
    },
    {
      "where": "steps[n=24].quote.text",
      "why": "Check 1: the old quote is the file's own remark (a watch-list note); the new words, from the same file, state what the NRC scheduled for this date.",
      "evidence_file": "Federal Government Weekly Delta 2026-08-08/waves/WAVE_4_PHYSICAL_PRODUCTION.md"
    },
    {
      "where": "steps[n=26].quote.text",
      "why": "Check 1: the old quote is the file's own remark on how the proposal is framed; the new words, the same file's heading for this item, state who did what.",
      "evidence_file": "Federal Government Weekly Delta 2026-09-11/waves/WAVE_3D_INDEPENDENTS_SCIENCE_SAFETY_ECON.md"
    },
    {
      "where": "steps[n=28].quote.text",
      "why": "Check 1: the quote's last part is the file's own remark about the record; kept the words that state what happened.",
      "evidence_file": "Federal Government Weekly Delta 2026-09-30/waves/WAVE_6_ADJACENT_INSTITUTIONS.md"
    },
    {
      "where": "steps[n=33].date_note",
      "why": "Check 2 and owed-list item 2: the builder counted this date; the files give only the 30-day rule.",
      "evidence_file": "Federal Government Weekly Delta 2026-09-11/waves/WAVE_3D_INDEPENDENTS_SCIENCE_SAFETY_ECON.md"
    },
    {
      "where": "steps[n=4].stage",
      "why": "Check 5: the manager's wording replaced 'other (deadline passed)'; this keeps that the step is a deadline set by the order, without saying anything was or was not done.",
      "evidence_file": "Executive Order Source Library/Source Text Editions/eo-5aa6d3a7df9569a3b22c.md"
    },
    {
      "where": "steps[n=24].status_word",
      "why": "Check 5: the earlier word was 'scheduled date passed; outcome not recorded'. The date is a scheduled hearing, not a deadline; the new word keeps that fact.",
      "evidence_file": "Federal Government Weekly Delta 2026-08-08/waves/WAVE_4_PHYSICAL_PRODUCTION.md"
    },
    {
      "where": "touches[3].at_step",
      "why": "Check 3: the licensing actions named (26, 27 and 28 August 2026) fall after step 25 (19 August) and before step 26 (11 September).",
      "evidence_file": null
    }
  ],
  "filled_2026-11-16": [
    {
      "was_in": "where_the_files_stop_top5[0]; steps (old n=32, counted date)",
      "item": "When the 26-077 comment period closed.",
      "fact": "November 9, 2026 at 11:59 p.m. ET, per the printed Federal Register notice.",
      "file": "Federal Science Operating System/FEDERAL_SCIENCE_OPERATING_SYSTEM_FACTUAL_SPINE_2025-2026.md",
      "quote": "The final printed notice set **November 9, 2026 at 11:59 p.m. ET** as the comment deadline."
    },
    {
      "was_in": "next_dated (the order's final-rule deadline)",
      "item": "The NRC's own date for the order's 18-month deadline.",
      "fact": "The NRC identifies November 23, 2026 as the deadline.",
      "file": "Federal Science Operating System/FEDERAL_SCIENCE_OPERATING_SYSTEM_FACTUAL_SPINE_2025-2026.md",
      "quote": "NRC identifies **November 23, 2026** as that deadline."
    }
  ],
  "step_check_2026-11-16": [
    {
      "current_key": [
        "2026-10-26",
        "The NRC published a final rule amending "
      ],
      "old_n": 33,
      "why": "Same step; 'what' reworded. Codex shortened 'what' and changed the quote on 15 November 2026; the rule's title, citation, section 5(d) wording and quote are restored from the rule text, and Codex's sentence on what the applicant must identify is kept (spine wording).",
      "now_n": 32
    },
    {
      "current_key": [
        "2026-11-09",
        "The September 24 Federal Register notice"
      ],
      "old_n": 32,
      "why": "Same step; 'what' reworded. Codex changed this step's date and text on 15 November 2026; checked against the spine. Release 26-077's 30-day wording stays in 'disagreement'.",
      "now_n": 33
    }
  ],
  "renumbered_2026-11-16": {
    "1": 1,
    "2": 2,
    "3": 3,
    "4": 4,
    "5": 5,
    "6": 6,
    "7": 7,
    "8": 8,
    "9": 9,
    "10": 10,
    "11": 11,
    "12": 12,
    "13": 13,
    "14": 14,
    "15": 15,
    "16": 16,
    "17": 17,
    "18": 18,
    "19": 19,
    "20": 20,
    "21": 21,
    "22": 22,
    "23": 23,
    "24": 24,
    "25": 25,
    "26": 26,
    "27": 27,
    "28": 28,
    "29": 29,
    "30": 30,
    "31": 31,
    "32": 33,
    "33": 32
  },
  "prior_state_2026-11-19": {
    "one_line": "Executive Order 14300 (signed 23 May 2025) told the NRC to cut ACRS, reorganize and rewrite its rules within 18 months. The files record the NRC's proposals and final rules from March to October 2026, the broad 26-077 proposal published on 24 September, and one final rule that names a section of the order (DOE/War prior authorization, effective 25 November 2026). The order's final-rule deadline is 23 November 2026.",
    "where_it_stands": "The NRC published the final rule on previously authorized Energy or War reactor designs on October 26; it takes effect November 25 and lets commercial applicants cite prior authorizations for specified safety functions, with the NRC still making the licensing findings. The comment period on the broader proposed rule on reactor licensing, decommissioning and oversight (docket NRC-2025-1138) closed November 9. Part 57 and the contested-adjudications rule are at proposal. The NRC identifies November 23, 2026 as the order's deadline for final rules and guidance. The notes record no final rule on the broader proposal as of 15 November 2026.",
    "next_dated": [
      {
        "when": "2026-11-23",
        "what": "Executive Order 14300 deadline for the NRC's final rules and guidance concluding the wholesale revision (18 months from signing). The NRC identifies November 23, 2026 as that deadline.",
        "stage": "scheduled (deadline in the order)",
        "files": [
          "Executive Order Source Library/Source Text Editions/eo-5aa6d3a7df9569a3b22c.md",
          "Federal Science Operating System/FEDERAL_SCIENCE_OPERATING_SYSTEM_FACTUAL_SPINE_2025-2026.md"
        ]
      },
      {
        "when": "2026-11-25",
        "what": "DOE/Department of War prior-authorization final rule takes effect.",
        "stage": "scheduled (effective date in the rule)",
        "files": [
          "Federal Government Refresh 2026-10-30/Source Documents/2026-21801.txt",
          "Contested Logistics/ENERGY_REACTOR_GRAZING_AND_INDUSTRY_DELTA_2026-10-30.md",
          "Federal Government Refresh 2026-10-30/WAVE_10_MERGE.md"
        ]
      },
      {
        "when": "after 2026-11-25",
        "what": "The first commercial application relying on the rule and the resulting NRC licensing finding.",
        "stage": "pending",
        "files": [
          "Federal Science Operating System/FEDERAL_SCIENCE_OPERATING_SYSTEM_FACTUAL_SPINE_2025-2026.md"
        ],
        "primary_source": "https://www.govinfo.gov/content/pkg/FR-2026-10-26/html/2026-21801.htm"
      },
      {
        "when": "2026-12-02 to 2026-12-04",
        "what": "ACRS full-committee meeting 741.",
        "stage": "scheduled",
        "files": [
          "Government Hidden Control Surfaces 2026/Meeting Umbrella Catchup 2026-10-31/NRC_MEETING_AND_REPORT_LOCATORS_2026-10-31.json",
          "Government Hidden Control Surfaces 2026/NRC_COMMITTEE_MEETINGS_SCOPE_AND_RECORD_GAPS_2026-10-31.md"
        ]
      },
      {
        "when": "no date in the files",
        "what": "Final rules on 26-077, Part 57 and contested adjudications; the NRC's response to the comments on 26-077.",
        "stage": "pending",
        "files": [
          "Federal Science Operating System/FEDERAL_SCIENCE_OPERATING_SYSTEM_FACTUAL_SPINE_2025-2026.md",
          "Federal Government Weekly Delta 2026-09-25/PRIMARY_OBJECT_LEDGER.csv"
        ]
      }
    ]
  },
  "changes": [
    {
      "date": "2026-11-19",
      "by": "Codex",
      "what": "Added source-backed nuclear research steps; preserved earlier summary/state and renumbered affected current pointers."
    }
  ],
  "movement_types_added_2026-11-24": {
    "by": "Claude, with Katie",
    "what": "Added movement_type to every step. No other field was changed.",
    "vocabulary": "00 - Index/Operation Inch by Inch/Stories 2026-11-14/MOVEMENT TYPES — for any system.md",
    "how": "Each step was read. The type follows the step's own stage wording and what it records."
  }
}