{
  "id": "federal-pqc-migration",
  "title": "Federal post-quantum cryptography migration under Executive Order 14412 and OMB M-26-15",
  "one_line": "The federal government's dated instruction to move its own information systems to post-quantum cryptography: EO 14412 (signed June 22, 2026) and OMB M-26-15 (June 24, 2026) on top of NIST's 2024 algorithm standards and the earlier EO 14144/14306 layer, with the GSA identity working group, NIST's validation route and final IR 8547, GAO's preparation audit, NSA's EO-linked hub for national security systems, and one observed post-quantum connection at Login.gov and CISA.",
  "system": "federal-it-systems-and-ai (second system: critical-infrastructure-cyber-risk)",
  "how_this_machinery_works": {
    "line": "The President sets the policy and clocks by executive order; OMB turns the civilian part into a memorandum binding executive agencies; each agency's CIO and PQC migration lead inventories and plans; NIST supplies the algorithms (FIPS 203/204/205), guidance (IR 8547) and the module-validation route (CMVP, with NVLAP-accredited laboratories); GSA runs the shared identity work; each agency's authorizing official accepts a migrated system; national security systems follow CNSS Policy 15 and NSA instead; GAO audits. Stages are those of the foundation piece on federal information systems (stages 1, 5, 8, 10, 16).",
    "files": [
      "Obsidian vault: 00 - Index/Operation Inch by Inch/Foundations 2026-11-14/how-federal-information-systems-and-ai-are-built-authorized-and-secured.md",
      "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_QUANTUM_CRYPTOGRAPHIC_ACCEPTANCE_MAP_2026-08-19.md"
    ]
  },
  "how_it_entered": {
    "earliest_file_on_subject": {
      "date": "2026-07-08",
      "file": "Saved Research History/Factual Editions/473b5218be11746a0880.md",
      "note": "The July 8 government-site deep dive (window June 17 to July 8) records EO 14412 and EO 14413 being added, both published June 25. This edition predates Katie's first recorded request (July 10)."
    },
    "earliest_thread_package_file": {
      "date": "2026-08-11",
      "file": "Fintech and Private Rails/Federal Cryptographic Trust Stack 2026-08-11/FEDERAL_CRYPTOGRAPHIC_TRUST_STACK_2026-08-11.md",
      "note": "The Federal Cryptographic Trust Stack study; its section 10 on post-quantum migration was reconciled on September 7, 2026."
    },
    "requests": [
      {
        "id": "K03-033",
        "when": "2026-08-11 23:32 UTC",
        "subject": "Government use of blockchain and cryptography (the trust stack)",
        "her_words": "want to get yourself up to speed on the research we have on governmental use of blockchain?",
        "why": "Her crypto and blockchain theory, which she sees following from the SSA work.",
        "why_quote": "And leads us right into my next 'theory' of crypto and blockchain",
        "package": "Fintech and Private Rails"
      },
      {
        "id": "K03-034",
        "when": "2026-08-12 00:01 UTC",
        "subject": "Post-quantum report, the 2026 strategy report and the 2026 science innovation report",
        "her_words": "let's dig into the 2026 strategy report and I think we should look at the 2026 science innovation report as well - I think these have lots of overlap",
        "why": "not stated",
        "package": "Fintech and Private Rails"
      },
      {
        "id": "K03-052",
        "when": "2026-08-20 00:28 UTC",
        "subject": "Cryptography and quantum layers, then one structural map",
        "her_words": "Can we dig into the cryptography and quantum layers a bit?",
        "why": "not stated",
        "package": "Federal Science Operating System"
      },
      {
        "id": "K08-060",
        "when": "2026-10-01 22:40 UTC",
        "subject": "NSA post-quantum cryptography resource hub",
        "her_words": "NSA just released their post-quantum cryptography resource hub - let's check that out!!",
        "why": "not stated",
        "package": "Fintech and Private Rails"
      }
    ],
    "note": "Katie's August 26 request about the Treasury Quantum Readiness Task Force (K04-040, 'Can we dig into Treasury announcement of the Quantum Readiness Task Force!!') has no research file; see open points."
  },
  "actors": [
    {
      "name": "The President (Donald Trump)",
      "role": "Signed EO 14306 (June 6, 2025) and EO 14412 (June 22, 2026)."
    },
    {
      "name": "The President (Joseph Biden)",
      "role": "Signed EO 14144 (January 16, 2025), whose post-quantum and TLS section EO 14306 replaced."
    },
    {
      "name": "Office of Management and Budget (OMB), Executive Office of the President",
      "role": "Co-leads coordination under EO 14412 Sec. 3(a); issued M-26-15; receives agency leads and plans."
    },
    {
      "name": "Office of the National Cyber Director (ONCD)",
      "role": "Co-leads coordination with OMB; receives agency leads and plans. The files describe no ONCD-issued record."
    },
    {
      "name": "Each agency head, CIO and PQC migration lead",
      "role": "Names a lead (due July 22), inventories high value assets and high impact systems, files a plan (due October 22), migrates (2030/2031). No agency-specific record appears in the files."
    },
    {
      "name": "National Institute of Standards and Technology (NIST), Department of Commerce",
      "role": "Issued FIPS 203/204/205 (2024) and IR 8547 (draft 2024, final October 27, 2026); owes ongoing guidance, a pilot on its own systems and a CMVP process revision (both due December 19, 2026)."
    },
    {
      "name": "NIST Cryptographic Module Validation Program (CMVP) and NIST National Voluntary Laboratory Accreditation Program (NVLAP)",
      "role": "CMVP validates cryptographic modules; NVLAP accredits the testing laboratories. Files write 'NIST' or 'CMVP' for the laboratory-application pause, which the register assigns to NVLAP."
    },
    {
      "name": "General Services Administration (GSA)",
      "role": "Convenes the FICAM/PQC interagency working group under M-26-15; operates Login.gov; named in EO 14412 Sec. 6(a) on cost savings."
    },
    {
      "name": "Cybersecurity and Infrastructure Security Agency (CISA), Department of Homeland Security",
      "role": "Consulted on OMB guidance; owes minimum cryptographic-bill-of-materials guidance (March 19, 2027); operator of www.cisa.gov, observed using hybrid post-quantum TLS on November 11."
    },
    {
      "name": "Federal Acquisition Regulatory Council (FAR Council)",
      "role": "Owes a proposed contractor FIPS/PQC rule (December 19, 2026) and a proposed vulnerability-disclosure rule (March 19, 2027)."
    },
    {
      "name": "National Security Agency (NSA), Department of War; Committee on National Security Systems (CNSS)",
      "role": "NSA's Director, as National Manager for National Security Systems, owes a report through CNSS (December 19, 2026); NSA launched the October 1 hub tying its work to EO 14412. CNSS Policy 15 is the national-security-system rule (thread nsa-cnsa2). Files often write 'NSA' for CNSS policy."
    },
    {
      "name": "Government Accountability Office (GAO)",
      "role": "Audited agency post-quantum preparation (GAO-27-108740)."
    },
    {
      "name": "Sector Risk Management Agencies; Secretary of State",
      "role": "Owe help to critical-infrastructure owners (Sec. 5(a)) and foreign engagement (Sec. 5(b)); no output in the files."
    }
  ],
  "strands": [
    {
      "strand": "Standards NIST supplies",
      "steps": [
        1,
        2,
        9,
        12,
        22
      ]
    },
    {
      "strand": "Module validation (NIST CMVP and its test laboratories)",
      "steps": [
        3,
        17
      ]
    },
    {
      "strand": "Earlier presidential layer",
      "steps": [
        4,
        5,
        7,
        8
      ]
    },
    {
      "strand": "Oversight",
      "steps": [
        6,
        15,
        19,
        20
      ]
    },
    {
      "strand": "EO 14412 and its clocks",
      "steps": [
        10,
        13
      ]
    },
    {
      "strand": "OMB memorandum and the GSA working group",
      "steps": [
        11,
        14,
        16,
        21
      ]
    },
    {
      "strand": "National security systems (as tied to EO 14412)",
      "steps": [
        18
      ]
    },
    {
      "strand": "Observed use",
      "steps": [
        23
      ]
    }
  ],
  "steps": [
    {
      "disagreement": "none recorded",
      "source_check": "none: no Source Check 2026-11-14 result concerns this step",
      "from_register": false,
      "register_records": [],
      "thesis_words": [],
      "what_moves": "what agencies must migrate to (the approved algorithms); no system moves",
      "files": [
        "Federal Government Weekly Delta 2026-09-11/waves/WAVE_3F_EOP_MONEY_LABS_LEGISLATIVE.md",
        "Federal Government Weekly Delta 2026-09-16/waves/WAVE_3F_EOP_MONEY_LABS_LEGISLATIVE.md",
        "Fintech and Private Rails/Federal Cryptographic Trust Stack 2026-08-11/CRYPTOGRAPHIC_ACCELERATION_AND_THE_BIGGER_STORY_2026-08-17.md",
        "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_QUANTUM_CRYPTOGRAPHIC_ACCEPTANCE_MAP_2026-08-19.md",
        "Federal Science Operating System/Scientific Trust Stack 2026-08-17/SCIENTIFIC_TRUST_STACK_SOURCE_LEDGER_2026-08-17.md"
      ],
      "strand": "Standards NIST supplies",
      "date": "2024-08-13",
      "date_exactness": "exact day (the files give 'Aug 13, 2024' and '2024')",
      "body": "National Institute of Standards and Technology (NIST), Department of Commerce",
      "what": "NIST's first three post-quantum algorithm standards, FIPS 203 (ML-KEM, key establishment), FIPS 204 (ML-DSA, signatures) and FIPS 205 (SLH-DSA, signatures), were final.",
      "stage": "published",
      "status_word": "finals",
      "path": "chamber-or-standard-setter-action",
      "rests_on": "official record, linked (NIST CSRC announcement of the approved FIPS)",
      "quote": {
        "text": "FIPS 203/204/205 remain Aug 13, 2024 finals.",
        "file": "Federal Government Weekly Delta 2026-09-11/waves/WAVE_3F_EOP_MONEY_LABS_LEGISLATIVE.md"
      },
      "weight": "step",
      "where_in_the_system": "16. Standards and guidance are issued for owners: NIST, NSA and CISA",
      "n": 1,
      "movement_type": "Published"
    },
    {
      "disagreement": "none recorded",
      "source_check": "none: no Source Check 2026-11-14 result concerns this step",
      "from_register": false,
      "register_records": [
        "g30-nist (Federal Government Refresh 2026-10-30, PRIMARY_OBJECT_LEDGER.json)"
      ],
      "thesis_words": [],
      "what_moves": "",
      "files": [
        "Fintech and Private Rails/Federal Cryptographic Trust Stack 2026-08-11/NIST_POST_QUANTUM_TRANSITION_FINAL_RETURN_2026-10-30.md"
      ],
      "strand": "Standards NIST supplies",
      "date": "2024-11-12",
      "date_exactness": "exact day of the draft (from the final report's document history)",
      "body": "NIST (Information Technology Laboratory; report NIST IR 8547)",
      "what": "NIST published the draft of IR 8547, its report on the transition to post-quantum cryptography standards.",
      "stage": "proposed (draft for comment)",
      "status_word": "prior draft",
      "path": "staff-position",
      "rests_on": "official record, linked (NIST CSRC document history)",
      "quote": {
        "text": "prior draft: 2024-11-12",
        "file": "Fintech and Private Rails/Federal Cryptographic Trust Stack 2026-08-11/NIST_POST_QUANTUM_TRANSITION_FINAL_RETURN_2026-10-30.md"
      },
      "weight": "detail",
      "where_in_the_system": "16. Standards and guidance are issued for owners: NIST, NSA and CISA",
      "n": 2,
      "movement_type": "Proposed or filed"
    },
    {
      "disagreement": "Date: the markdown files leave the pause undated; the register record gives 'from 2025-01-01' and the bulletin date 2026-03-09. Body: the thread name calls it a CMVP matter; the register names NVLAP, which accredits the laboratories, while CMVP validates modules.",
      "source_check": "none: no Source Check 2026-11-14 result concerns this step",
      "from_register": false,
      "register_records": [
        "nvlap-capacity-pause (Federal Science Operating System, NSSTS_QUANTUM_CRYPTOGRAPHIC_ACCEPTANCE_REGISTRY_2026-08-19.json)"
      ],
      "thesis_words": [],
      "what_moves": "capacity of the validation route (laboratory accreditation) is held where it is; nothing moves",
      "files": [
        "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_QUANTUM_CRYPTOGRAPHIC_ACCEPTANCE_MAP_2026-08-19.md",
        "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_QUANTUM_CRYPTOGRAPHIC_ACCEPTANCE_CLAIM_AUDIT_2026-08-19.md"
      ],
      "strand": "Module validation (NIST CMVP and its test laboratories)",
      "date": "2025-01-01",
      "date_exactness": "start date from the register record only; the markdown files give no date ('before 2026-08-19'); the NVLAP bulletin LB-163-2026 is dated 2026-03-09 in the register",
      "body": "NIST National Voluntary Laboratory Accreditation Program (NVLAP); the markdown files say only 'NIST'",
      "what": "NIST stopped accepting new applications from laboratories wanting accreditation to test cryptographic modules (cryptographic and security testing, CST, laboratories), citing limited resources. The file names eight existing laboratories: Lightship, atsec, Intertek Acumen, Gossamer, Leidos AT&E, AEGISOLVE, Penumbra and Advanced Data Security.",
      "stage": "paused",
      "status_word": "paused",
      "path": "agency-operation-or-program",
      "rests_on": "the body's own statement, linked (NVLAP lab bulletin LB-163-2026, named in the register record)",
      "quote": {
        "text": "NIST paused new applications to the cryptographic/security-testing laboratory program because of resource constraints.",
        "file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_QUANTUM_CRYPTOGRAPHIC_ACCEPTANCE_MAP_2026-08-19.md"
      },
      "weight": "step",
      "where_in_the_system": "5. The agency authorizes its own system to operate (ATO)",
      "note": "Folded in from thread nist-cmvp-capacity. EO 14412 Sec. 6(b) later orders NIST to revise CMVP processes to speed validations; the files do not tie the pause to that order.",
      "n": 3,
      "movement_type": "Ended, expired or refused"
    },
    {
      "disagreement": "none recorded. The PQC content of the original section is described in the register record, not in the markdown file's text, which lists 'routing and encryption'.",
      "source_check": "none: no Source Check 2026-11-14 result concerns this step",
      "from_register": false,
      "register_records": [
        "eo-14144-p04 (Executive Order Source Library, WAVE_8B1_MAP_SOURCE_SNAPSHOT.json)"
      ],
      "thesis_words": [],
      "what_moves": "assigns post-quantum and TLS tasks to Commerce/NIST, CISA, OMB, Defense/NSA and State (per the register record)",
      "files": [
        "Executive Order Source Library/Biden Backfill 2026-10-30/WAVE_8B1_CYBER.md"
      ],
      "strand": "Earlier presidential layer",
      "date": "2025-01-16",
      "date_exactness": "exact day signed; published 2025-01-17",
      "body": "The President (Joseph Biden), Executive Order 14144",
      "what": "President Biden signed Executive Order 14144. Its section 4 included directions on encrypted communications, post-quantum cryptography product categories and TLS (the protocol that encrypts web connections), with a TLS 1.3 outer date of January 2, 2030.",
      "stage": "signed",
      "status_word": "signed",
      "path": "presidential-instrument",
      "rests_on": "official record, linked (Federal Register document 2025-01470)",
      "quote": {
        "text": "EO 14144 was signed January 16, 2025 and published January 17.",
        "file": "Executive Order Source Library/Biden Backfill 2026-10-30/WAVE_8B1_CYBER.md"
      },
      "weight": "step",
      "where_in_the_system": "1. The rules are set: executive orders and OMB memoranda",
      "n": 4,
      "movement_type": "Decided"
    },
    {
      "disagreement": "none recorded",
      "source_check": "none: no Source Check 2026-11-14 result concerns this step",
      "from_register": false,
      "register_records": [
        "fgm-2025-06-06-eo-14144-14306-selective-amendment (Federal Government Movement Atlas, MOVEMENT_REGISTRY.json)"
      ],
      "thesis_words": [],
      "what_moves": "removes the automatic link from the product list to purchasing and the immediate key-migration direction; keeps the 2030 TLS date",
      "files": [
        "Executive Order Source Library/Biden Backfill 2026-10-30/WAVE_8B1_CYBER.md",
        "Federal Government Whole-Site Recertification 2026-08-01/lanes/TRUMP_AI_EXECUTIVE_ORDER_OFFICIAL_INVENTORY_2026-08-01.md"
      ],
      "strand": "Earlier presidential layer",
      "date": "2025-06-06",
      "date_exactness": "exact day signed; published 2025-06-11",
      "body": "The President (Donald Trump), Executive Order 14306",
      "what": "President Trump signed Executive Order 14306, which amended parts of EO 14144 rather than revoking it. It replaced the post-quantum and TLS provision with milestones for a list of product categories and TLS requirements, kept the January 2, 2030 TLS 1.3 outer date, and dropped the original clauses that tied the category list to solicitations, called for immediate key migration and called for foreign engagement.",
      "stage": "amended",
      "status_word": "selectively amends",
      "path": "presidential-instrument",
      "rests_on": "official record, linked (Federal Register document 2025-10804)",
      "quote": {
        "text": "Replaces the provision with category-list and TLS-requirement milestones. The January 2, 2030 TLS 1.3 outer date remains.",
        "file": "Executive Order Source Library/Biden Backfill 2026-10-30/WAVE_8B1_CYBER.md"
      },
      "weight": "step",
      "where_in_the_system": "1. The rules are set: executive orders and OMB memoranda",
      "n": 5,
      "movement_type": "Decided"
    },
    {
      "disagreement": "none recorded",
      "source_check": "none: no Source Check 2026-11-14 result concerns this step",
      "from_register": false,
      "register_records": [],
      "thesis_words": [],
      "what_moves": "nothing; a finding about agency preparation",
      "files": [
        "Fintech and Private Rails/Federal Cryptographic Trust Stack 2026-08-11/FEDERAL_POST_QUANTUM_PUBLIC_EDGE_AND_EXERCISE_USE_2026-11-11.md"
      ],
      "strand": "Oversight",
      "date": "2025-09-11",
      "date_exactness": "exact day the sensitive version was issued; audit work February 2024 to September 2025",
      "body": "Government Accountability Office (GAO)",
      "what": "GAO issued a sensitive (non-public) audit of how the 24 Chief Financial Officers Act agencies were preparing for post-quantum migration: inventories, funding assessments and testing.",
      "stage": "published (to its addressees; not public)",
      "status_word": "issued",
      "path": "oversight",
      "rests_on": "official record, linked (GAO product page for GAO-27-108740)",
      "quote": {
        "text": "GAO-27-108740 is the public version of a sensitive audit issued September 11, 2025.",
        "file": "Fintech and Private Rails/Federal Cryptographic Trust Stack 2026-08-11/FEDERAL_POST_QUANTUM_PUBLIC_EDGE_AND_EXERCISE_USE_2026-11-11.md"
      },
      "weight": "detail",
      "where_in_the_system": "8. The system is secured: CISA directives, logging, identity tokens, post-quantum migration, identity services",
      "n": 6,
      "movement_type": "Published"
    },
    {
      "disagreement": "none recorded",
      "source_check": "none: no Source Check 2026-11-14 result concerns this story",
      "from_register": false,
      "register_records": [],
      "thesis_words": [],
      "what_moves": "",
      "n": 7,
      "strand": "Earlier presidential layer",
      "date": "2025-12-01",
      "date_exactness": "exact day stated in the file (deadline in amended EO 14144 §4(f))",
      "body": "CISA (§4(f)(i) product-category list) and OMB (§4(f)(ii) TLS requirement), under EO 14144 as amended by EO 14306",
      "what": "The December 1, 2025 deadline in amended EO 14144 §4(f) for CISA's list of product categories supporting post-quantum cryptography and for OMB's TLS requirement. CISA issued its list on January 23, 2026; OMB set the TLS 1.3 requirement for systems other than national security systems in M-26-15 of June 24, 2026. The notes record no public OMB issuance by December 1, 2025 as of 2026-11-15.",
      "stage": "deadline; results recorded later in the notes",
      "status_word": "December 1, 2025 deadline",
      "path": "presidential-instrument",
      "rests_on": "official record, linked (EO 14306)",
      "quote": {
        "text": "For §4(f)(i), CISA issued its product-category guidance January 23, 2026, after the December 1, 2025 deadline.",
        "file": "Executive Order Source Library/Biden Backfill 2026-10-30/WAVE_8B1_CYBER.md"
      },
      "files": [
        "Executive Order Source Library/Biden Backfill 2026-10-30/WAVE_8B1_CYBER.md",
        "Fintech and Private Rails/Federal Cryptographic Trust Stack 2026-08-11/FEDERAL_CRYPTOGRAPHIC_TRUST_STACK_2026-08-11.md"
      ],
      "weight": "step",
      "where_in_the_system": "1. The rules are set: executive orders and OMB memoranda",
      "happening_ids": [],
      "note": "",
      "added_2026-11-16": true,
      "movement_type": "Clock date"
    },
    {
      "disagreement": "none recorded",
      "source_check": "none: no Source Check 2026-11-14 result concerns this story",
      "from_register": false,
      "register_records": [],
      "thesis_words": [],
      "what_moves": "",
      "n": 8,
      "strand": "Earlier presidential layer",
      "date": "2026-01-23",
      "date_exactness": "exact day stated in both files",
      "body": "Cybersecurity and Infrastructure Security Agency (CISA), Department of Homeland Security",
      "what": "CISA issued its guidance on product categories for technologies that use post-quantum cryptography standards (EO 14144 §4(f)(i), as amended by EO 14306); its bulletin links the release to EO 14306. Table 2 lists four categories with widely available products supporting some PQC functions: cloud infrastructure and platform services, chat and messaging, browsers and web servers, and endpoint data-at-rest and full-disk encryption; Table 3 lists categories still transitioning. The guidance excludes operational technology and the Internet of Things. M-26-15 §3(C)(4) later cites the list.",
      "stage": "issued (guidance)",
      "status_word": "issued",
      "path": "agency-guidance",
      "rests_on": "the body's own statement, linked (CISA bulletin and product-category page)",
      "tied_to_order": "yes, by number (EO 14306; §4(f)(i))",
      "quote": [
        {
          "text": "CISA issued the §4(f)(i) guidance on January 23, 2026.",
          "file": "Fintech and Private Rails/Federal Cryptographic Trust Stack 2026-08-11/FEDERAL_CRYPTOGRAPHIC_TRUST_STACK_2026-08-11.md"
        },
        {
          "text": "CISA's noon Eastern Standard Time bulletin expressly links the release to EO 14306.",
          "file": "Executive Order Source Library/Biden Backfill 2026-10-30/WAVE_8B1_CYBER.md"
        }
      ],
      "files": [
        "Fintech and Private Rails/Federal Cryptographic Trust Stack 2026-08-11/FEDERAL_CRYPTOGRAPHIC_TRUST_STACK_2026-08-11.md",
        "Executive Order Source Library/Biden Backfill 2026-10-30/WAVE_8B1_CYBER.md"
      ],
      "weight": "step",
      "where_in_the_system": "16. Standards and guidance are issued for owners: NIST, NSA and CISA",
      "happening_ids": [],
      "note": "",
      "added_2026-11-16": true,
      "movement_type": "Published"
    },
    {
      "disagreement": "none recorded",
      "source_check": "none: no Source Check 2026-11-14 result concerns this step",
      "from_register": false,
      "register_records": [],
      "thesis_words": [],
      "what_moves": "",
      "files": [
        "Federal Government Weekly Delta 2026-09-11/waves/WAVE_3F_EOP_MONEY_LABS_LEGISLATIVE.md",
        "Federal Government Weekly Delta 2026-09-16/waves/WAVE_3F_EOP_MONEY_LABS_LEGISLATIVE.md"
      ],
      "strand": "Standards NIST supplies",
      "date": "2026-06-12",
      "date_exactness": "exact day as written ('Jun 12'); the file does not name the document numbers",
      "body": "NIST",
      "what": "NIST had working drafts on post-quantum cryptography for PIV (the Personal Identity Verification cards federal employees carry), dated June 12.",
      "stage": "studied or staff paper (working draft)",
      "status_word": "working drafts",
      "path": "staff-position",
      "rests_on": "official record (NIST CSRC publications, which the file says it reached); the file gives no document link for these drafts",
      "quote": {
        "text": "PIV PQC working drafts remain Jun 12.",
        "file": "Federal Government Weekly Delta 2026-09-11/waves/WAVE_3F_EOP_MONEY_LABS_LEGISLATIVE.md"
      },
      "weight": "detail",
      "where_in_the_system": "16. Standards and guidance are issued for owners: NIST, NSA and CISA",
      "note": "The file states the date as unchanged at September 11; it does not say what the drafts contain.",
      "n": 9,
      "movement_type": "In process"
    },
    {
      "disagreement": "none on the dates. Two files call the 2030/2031 targets 'priority' or 'civilian HVA' targets; the order's text says 'all HVAs and high impact systems', excluding national security systems.",
      "source_check": "none: no Source Check 2026-11-14 result concerns this step",
      "from_register": false,
      "register_records": [
        "https://www.whitehouse.gov/presidential-actions/2026/06/securing-the-nation-against-advanced-cryptographic-attacks (White House Research Hub)"
      ],
      "thesis_words": [],
      "what_moves": "functions: coordination assigned to OMB and the National Cyber Director; staff: each agency must designate a PQC migration lead reporting to its CIO; systems: cryptography of high value assets and high impact systems put on a dated migration; money: none appropriated (subject to availability); legal existence and records: unchanged",
      "files": [
        "Executive Order Source Library/Source Text Editions/eo-06ffd5acc6907caf51d6.md",
        "Fintech and Private Rails/Federal Cryptographic Trust Stack 2026-08-11/FEDERAL_CRYPTOGRAPHIC_TRUST_STACK_2026-08-11.md",
        "Fintech and Private Rails/Federal Cryptographic Trust Stack 2026-08-11/CRYPTOGRAPHIC_ACCELERATION_AND_THE_BIGGER_STORY_2026-08-17.md",
        "Fintech and Private Rails/Federal Cryptographic Trust Stack 2026-08-11/GENESIS_IDENTITY_PROVENANCE_PQC_BRIDGE_2026-08-11.md",
        "Saved Research History/Factual Editions/473b5218be11746a0880.md",
        "Federal Government Whole-Site Recertification 2026-08-01/lanes/TRUMP_AI_CRYPTO_EO_EXISTING_CORPUS_INVENTORY_2026-08-01.md",
        "Federal Government Whole-Site Recertification 2026-08-01/lanes/TRUMP_CRYPTO_DIGITAL_ASSET_EXECUTIVE_ORDER_OFFICIAL_INVENTORY_2026-08-01.md",
        "Federal Government Whole-Site Recertification 2026-08-01/lanes/TRUMP_AI_EXECUTIVE_ORDER_OFFICIAL_INVENTORY_2026-08-01.md",
        "Economic Institution Legitimacy Crisis 2025-2026/WAVE_2_EXECUTIVE_ORDER_PROCEDURAL_ENGINE_EVIDENCE_LEDGER_2026-09-24.md",
        "Economic Institution Legitimacy Crisis 2025-2026/WAVE_3_SCIENCE_TECHNOLOGY_MISSION_TO_MACHINE_EVIDENCE_LEDGER_2026-09-24.md",
        "Federal Science Operating System/Scientific Trust Stack 2026-08-17/SCIENTIFIC_TRUST_STACK_SOURCE_LEDGER_2026-08-17.md",
        "Federal Science Operating System/Scientific Trust Stack 2026-08-17/SCIENTIFIC_TRUST_STACK_AUTHORITY_AND_CONTROL_MATRIX_2026-08-17.md",
        "Federal Science Operating System/Scientific Trust Stack 2026-08-17/SCIENTIFIC_TRUST_STACK_ARCHITECTURE_AND_EVIDENCE_MAP_2026-08-17.md",
        "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_QUANTUM_CRYPTOGRAPHIC_ACCEPTANCE_MAP_2026-08-19.md"
      ],
      "strand": "EO 14412 and its clocks",
      "date": "2026-06-22",
      "date_exactness": "exact day signed; published 2026-06-25 at 91 FR 38483 (Federal Register document 2026-12909)",
      "body": "The President (Donald Trump), Executive Order 14412, 'Securing the Nation Against Advanced Cryptographic Attacks'",
      "what": "President Trump signed Executive Order 14412. It sets a policy of moving federal information systems to NIST post-quantum standards and helping critical-infrastructure owners move; puts the Director of OMB and the National Cyber Director in charge of coordination; and sets clocks: each agency head names a PQC migration lead within 30 days (July 22); OMB issues guidance within 90 days (September 20) requiring high value assets and high impact systems, excluding national security systems, to use PQC for key establishment by December 31, 2030 and for digital signatures by December 31, 2031, with agency plans; within 180 days (December 19) NIST starts a pilot on its own systems (to finish by December 31, 2027) and revises CMVP processes, the NSA Director reports on national security systems through the Committee on National Security Systems, and the FAR Council proposes a contractor rule; within 270 days (March 19, 2027) CISA publishes minimum elements of a cryptographic bill of materials and the FAR Council proposes a vulnerability-disclosure rule. It is to be carried out subject to the availability of appropriations.",
      "stage": "signed (then published June 25)",
      "status_word": "signed; published",
      "path": "presidential-instrument",
      "rests_on": "official record, linked (Federal Register 91 FR 38483; GovInfo PDF); full text in the library's source-text edition",
      "quote": {
        "text": "It is the policy of the United States to safeguard national security and maintain technological leadership by responsibly and effectively executing the transition of Federal information systems to National Institute of Standards and Technology (NIST)-approved Federal Information Processing Standards (FIPS) for Post- Quantum Cryptography (PQC), and to assist critical infrastructure owners and operators with their transitions.",
        "file": "Executive Order Source Library/Source Text Editions/eo-06ffd5acc6907caf51d6.md"
      },
      "weight": "turning point",
      "where_in_the_system": "1. The rules are set: executive orders and OMB memoranda",
      "n": 10,
      "thesis_words_set_aside_2026-11-14": [
        {
          "term": "inside existing institutions",
          "sense": "the change is carried by institutions that already exist",
          "bearing": "supports",
          "why": "My reading: the order creates no body; it gives the work to OMB, the National Cyber Director, NIST, NSA, CISA, the FAR Council and each agency's CIO."
        },
        {
          "term": "absorb new technology and capacity",
          "sense": "taking new capability into an existing institution's rules",
          "bearing": "supports",
          "why": "My reading: the order brings a new class of cryptography into existing federal systems by dated instruction rather than by replacing the systems."
        }
      ],
      "date_note": "The 90-day date given in the text (September 20) was worked out by counting 90 days from June 22, 2026 (EO 14412 signed); no file states this date.",
      "movement_type": "Decided"
    },
    {
      "disagreement": "Date: FEDERAL_CRYPTOGRAPHIC_TRUST_STACK and the register record give June 24; the August 1 executive-order inventory gives no memo date; the thread register says 'June 2026 (June 24 in one file)'. Not settled.",
      "source_check": "none: no Source Check 2026-11-14 result concerns this step",
      "from_register": false,
      "register_records": [
        "omb-m2615-clock (Federal Science Operating System, NSSTS_QUANTUM_CRYPTOGRAPHIC_ACCEPTANCE_REGISTRY_2026-08-19.json)"
      ],
      "thesis_words": [],
      "what_moves": "functions: GSA given the identity-migration working group; agencies given a plan deadline; systems: none yet",
      "files": [
        "Fintech and Private Rails/Federal Cryptographic Trust Stack 2026-08-11/FEDERAL_CRYPTOGRAPHIC_TRUST_STACK_2026-08-11.md",
        "Fintech and Private Rails/Federal Cryptographic Trust Stack 2026-08-11/CRYPTOGRAPHIC_ACCELERATION_AND_THE_BIGGER_STORY_2026-08-17.md",
        "Fintech and Private Rails/Federal Cryptographic Trust Stack 2026-08-11/GENESIS_IDENTITY_PROVENANCE_PQC_BRIDGE_2026-08-11.md",
        "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_QUANTUM_CRYPTOGRAPHIC_ACCEPTANCE_CLAIM_AUDIT_2026-08-19.md",
        "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_QUANTUM_CRYPTOGRAPHIC_ACCEPTANCE_MAP_2026-08-19.md",
        "Federal Science Operating System/Scientific Trust Stack 2026-08-17/SCIENTIFIC_TRUST_STACK_IMPLEMENTATION_WATCHBOARD_2026-08-17.md",
        "Federal Science Operating System/Scientific Trust Stack 2026-08-17/SCIENTIFIC_TRUST_STACK_SOURCE_LEDGER_2026-08-17.md",
        "Federal Science Operating System/Scientific Trust Stack 2026-08-17/SCIENTIFIC_TRUST_STACK_AUTHORITY_AND_CONTROL_MATRIX_2026-08-17.md",
        "Federal Government Whole-Site Recertification 2026-08-01/lanes/TRUMP_CRYPTO_DIGITAL_ASSET_EXECUTIVE_ORDER_OFFICIAL_INVENTORY_2026-08-01.md",
        "Executive Order Source Library/Biden Backfill 2026-10-30/WAVE_8B1_CYBER.md"
      ],
      "strand": "OMB memorandum and the GSA working group",
      "date": "2026-06-24",
      "date_exactness": "exact day in two research files and one register record; one file says the memo date is not given",
      "body": "Office of Management and Budget (OMB), Executive Office of the President, Memorandum M-26-15 'Execution of the Migration to Post-Quantum Cryptography'",
      "what": "OMB issued M-26-15, the guidance EO 14412 Sec. 4(b) called for (due by September 20). Agency PQC migration plans are due to OMB and the Office of the National Cyber Director on October 22 (120 days from the memo date); GSA is to stand up an interagency working group to modernize federal identity, credential and access management (FICAM) for PQC within 60 days; the phases run from priority systems through signatures to the remaining systems through 2035. The memo does not apply to national security systems, and states that a cryptographically relevant quantum computer is not yet known to exist. Appendix A §4 carries forward EO 14306's TLS 1.3 requirement: agencies must support TLS 1.3 or a successor on systems other than national security systems as soon as practicable and by January 2, 2030, and Appendix B requires each initial migration plan to schedule testing and deployment for that date. M-26-15 §3(C)(4) cites CISA's January 23, 2026 product-category list.",
      "stage": "published (issued)",
      "status_word": "issued",
      "path": "program-requirement-without-regulation",
      "rests_on": "official record, linked (OMB PDF on whitehouse.gov); Codex states it read core pages 1-5, not the technical appendices",
      "quote": {
        "text": "OMB issued M-26-15 on June 24: agency plans are due October 22, and its phased approach covers priority migration, signatures and risk-sensitive remaining-system migration through 2035.",
        "file": "Fintech and Private Rails/Federal Cryptographic Trust Stack 2026-08-11/FEDERAL_CRYPTOGRAPHIC_TRUST_STACK_2026-08-11.md"
      },
      "weight": "turning point",
      "where_in_the_system": "1. The rules are set: executive orders and OMB memoranda",
      "n": 11,
      "thesis_words_set_aside_2026-11-14": [
        {
          "term": "inside existing institutions",
          "sense": "the change is carried by institutions that already exist",
          "bearing": "supports",
          "why": "My reading: the operating instruction runs through OMB's existing memorandum power and GSA's existing identity role."
        }
      ],
      "date_note": "The due date given in the text (September 20) was worked out by counting 90 days from June 22, 2026 (EO 14412 signed); no file states this date. The step's own date, June 24, is stated in the files.",
      "corrected_2026-11-16": [
        {
          "field": "what",
          "was": "OMB issued M-26-15, the guidance EO 14412 Sec. 4(b) called for (due by September 20). Agency PQC migration plans are due to OMB and the Office of the National Cyber Director on October 22 (120 days from the memo date); GSA is to stand up an interagency working group to modernize federal identity, credential and access management (FICAM) for PQC within 60 days; the phases run from priority systems through signatures to the remaining systems through 2035. The memo does not apply to national security systems, and states that a cryptographically relevant quantum computer is not yet known to exist.",
          "now": "OMB issued M-26-15, the guidance EO 14412 Sec. 4(b) called for (due by September 20). Agency PQC migration plans are due to OMB and the Office of the National Cyber Director on October 22 (120 days from the memo date); GSA is to stand up an interagency working group to modernize federal identity, credential and access management (FICAM) for PQC within 60 days; the phases run from priority systems through signatures to the remaining systems through 2035. The memo does not apply to national security systems, and states that a cryptographically relevant quantum computer is not yet known to exist. Appendix A §4 carries forward EO 14306's TLS 1.3 requirement: agencies must support TLS 1.3 or a successor on systems other than national security systems as soon as practicable and by January 2, 2030, and Appendix B requires each initial migration plan to schedule testing and deployment for that date. M-26-15 §3(C)(4) cites CISA's January 23, 2026 product-category list.",
          "file": "Fintech and Private Rails/Federal Cryptographic Trust Stack 2026-08-11/FEDERAL_CRYPTOGRAPHIC_TRUST_STACK_2026-08-11.md",
          "quote": "Agencies must support TLS 1.3 or a successor as soon as practicable and by January 2, 2030."
        }
      ],
      "movement_type": "Decided"
    },
    {
      "disagreement": "none recorded",
      "source_check": "none: no Source Check 2026-11-14 result concerns this step",
      "from_register": false,
      "register_records": [],
      "thesis_words": [],
      "what_moves": "",
      "files": [
        "Federal Government Weekly Delta 2026-09-11/waves/WAVE_3F_EOP_MONEY_LABS_LEGISLATIVE.md"
      ],
      "strand": "Standards NIST supplies",
      "date": "2026-06-29",
      "date_exactness": "exact day as written ('Jun 29')",
      "body": "NIST (Cybersecurity White Paper CSWP 39, first update)",
      "what": "NIST's updated white paper on crypto-agility (the ability to swap cryptographic algorithms without rebuilding systems), CSWP 39upd1, is dated June 29.",
      "stage": "published",
      "status_word": "dated Jun 29",
      "path": "staff-position",
      "rests_on": "official record (NIST CSRC, which the file says it reached); no document link in the file",
      "quote": {
        "text": "CSWP 39upd1 crypto-agility is Jun 29.",
        "file": "Federal Government Weekly Delta 2026-09-11/waves/WAVE_3F_EOP_MONEY_LABS_LEGISLATIVE.md"
      },
      "weight": "detail",
      "where_in_the_system": "16. Standards and guidance are issued for owners: NIST, NSA and CISA",
      "n": 12,
      "movement_type": "Published"
    },
    {
      "disagreement": "none recorded",
      "source_check": "none: no Source Check 2026-11-14 result concerns this step",
      "from_register": false,
      "register_records": [],
      "thesis_words": [],
      "what_moves": "staff: a named lead per agency was due; the notes record none as of November 11, 2026",
      "files": [
        "Fintech and Private Rails/Federal Cryptographic Trust Stack 2026-08-11/CRYPTOGRAPHIC_ACCELERATION_AND_THE_BIGGER_STORY_2026-08-17.md",
        "Fintech and Private Rails/Federal Cryptographic Trust Stack 2026-08-11/FEDERAL_CRYPTOGRAPHIC_TRUST_STACK_2026-08-11.md"
      ],
      "strand": "EO 14412 and its clocks",
      "date": "2026-07-22",
      "date_exactness": "deadline (30 days from June 22)",
      "body": "Each agency head (EO 14412 Sec. 4(a)), reporting to the Director of OMB and the National Cyber Director",
      "what": "The deadline for each agency head to name a PQC migration lead and send the name to OMB and the National Cyber Director fell on this day. GAO's October 2026 review does not report these designations. The notes record no designation or receipt under Sec. 4(a) as of November 15, 2026.",
      "stage": "deadline; no result recorded in the notes",
      "status_word": "deadline; no result recorded in the notes",
      "path": "presidential-instrument",
      "rests_on": "official record, linked (EO 14412); the absence is the files' own statement",
      "quote": {
        "text": "2026-07-22 | agency PQC leads due",
        "file": "Fintech and Private Rails/Federal Cryptographic Trust Stack 2026-08-11/CRYPTOGRAPHIC_ACCELERATION_AND_THE_BIGGER_STORY_2026-08-17.md"
      },
      "weight": "step",
      "where_in_the_system": "1. The rules are set: executive orders and OMB memoranda",
      "n": 13,
      "corrected_2026-11-16": [
        {
          "field": "what",
          "was": "The deadline for each agency head to name a PQC migration lead and send the name to OMB and the National Cyber Director fell on this day. The notes record no result as of November 11, 2026.",
          "now": "The deadline for each agency head to name a PQC migration lead and send the name to OMB and the National Cyber Director fell on this day. GAO's October 2026 review does not report these designations. The notes record no designation or receipt under Sec. 4(a) as of November 15, 2026.",
          "file": "Fintech and Private Rails/Federal Cryptographic Trust Stack 2026-08-11/FEDERAL_CRYPTOGRAPHIC_TRUST_STACK_2026-08-11.md",
          "quote": "No public designation or receipt under §4(a) was located through November 15."
        }
      ],
      "movement_type": "Past due, no record"
    },
    {
      "disagreement": "none recorded",
      "source_check": "none: no Source Check 2026-11-14 result concerns this step",
      "from_register": false,
      "register_records": [
        "OBS-001 (Federal Government Nightly Gap Audit 2026-08-29, OBSERVATORY_SAVED_OFFICIAL_SOURCE_CENSUS.csv)"
      ],
      "thesis_words": [],
      "what_moves": "function: the identity-migration work now has a meeting body; the notes record no charter, roster, profile, pilot or procurement as of November 11, 2026",
      "files": [
        "Fintech and Private Rails/Federal Cryptographic Trust Stack 2026-08-11/CRYPTOGRAPHIC_ACCELERATION_AND_THE_BIGGER_STORY_2026-08-17.md",
        "Fintech and Private Rails/Federal Cryptographic Trust Stack 2026-08-11/FEDERAL_CRYPTOGRAPHIC_TRUST_STACK_2026-08-11.md",
        "Federal Science Operating System/Scientific Trust Stack 2026-08-17/SCIENTIFIC_TRUST_STACK_IMPLEMENTATION_WATCHBOARD_2026-08-17.md",
        "Federal Science Operating System/Scientific Trust Stack 2026-08-17/SCIENTIFIC_TRUST_STACK_SOURCE_LEDGER_2026-08-17.md"
      ],
      "strand": "OMB memorandum and the GSA working group",
      "date": "2026-08-12",
      "date_exactness": "exact day of the meeting; GSA reported it on 2026-08-24 (blog post); M-26-15's 60-day deadline would fall on 2026-08-23 if the memo was published June 24 (Codex's calculation)",
      "body": "General Services Administration (GSA), convening the interagency FICAM/PQC working group under OMB M-26-15",
      "what": "The interagency working group on modernizing federal identity, credential and access management for post-quantum cryptography held its first meeting: 40 participants from 17 agencies, with a plan to meet every two weeks and a scope that includes non-human identities and automation. GSA also said its physical-access laboratory is testing quantum-resistant building-access controls and employee identification cards.",
      "stage": "discussed (first meeting held)",
      "status_word": "held (formation)",
      "path": "agency-operation-or-program",
      "rests_on": "the body's own statement, linked (GSA blog, August 24, 2026)",
      "quote": {
        "text": "GSA reported that the FICAM/PQC interagency working group held its first meeting on August 12, with 40 participants from 17 federal agencies.",
        "file": "Fintech and Private Rails/Federal Cryptographic Trust Stack 2026-08-11/CRYPTOGRAPHIC_ACCELERATION_AND_THE_BIGGER_STORY_2026-08-17.md"
      },
      "weight": "step",
      "where_in_the_system": "8. The system is secured: CISA directives, logging, identity tokens, post-quantum migration, identity services",
      "n": 14,
      "movement_type": "In process"
    },
    {
      "disagreement": "none recorded",
      "source_check": "none: no Source Check 2026-11-14 result concerns this story",
      "from_register": false,
      "register_records": [],
      "thesis_words": [],
      "what_moves": "",
      "n": 15,
      "strand": "Oversight",
      "date": "2026-08-24",
      "date_exactness": "exact day stated in the file",
      "body": "Department of the Treasury",
      "what": "Treasury announced a public-private financial-sector Quantum-Readiness Task Force, following EO 14412 and the G7 Cyber Expert Group's January 12 financial-sector roadmap. It lists three workstreams: sector alignment and the post-quantum transition, third-party and vendor readiness, and risk in digital assets and emerging technology. The notes record no membership roster, charter, meeting record or workstream output as of 2026-11-15.",
      "stage": "announced",
      "status_word": "announced",
      "path": "agency-operation-or-program",
      "rests_on": "the body's own statement, linked (Treasury press release sb0615)",
      "tied_to_order": "the file says it followed EO 14412; the file does not tie it to a section of the order",
      "quote": {
        "text": "Treasury announced the public-private task force on August 24, 2026, following EO 14412 and the G7 Cyber Expert Group's January 12 financial-sector roadmap.",
        "file": "Fintech and Private Rails/Federal Cryptographic Trust Stack 2026-08-11/FEDERAL_CRYPTOGRAPHIC_TRUST_STACK_2026-08-11.md"
      },
      "files": [
        "Fintech and Private Rails/Federal Cryptographic Trust Stack 2026-08-11/FEDERAL_CRYPTOGRAPHIC_TRUST_STACK_2026-08-11.md"
      ],
      "weight": "detail",
      "where_in_the_system": "12. Critical infrastructure is designated and sector bodies coordinate",
      "happening_ids": [],
      "note": "",
      "added_2026-11-16": true,
      "movement_type": "Said or announced"
    },
    {
      "disagreement": "none recorded",
      "source_check": "none: no Source Check 2026-11-14 result concerns this step",
      "from_register": false,
      "register_records": [],
      "thesis_words": [],
      "what_moves": "",
      "files": [
        "Federal Science Operating System/Scientific Trust Stack 2026-08-17/SCIENTIFIC_TRUST_STACK_IMPLEMENTATION_WATCHBOARD_2026-08-17.md",
        "Fintech and Private Rails/Federal Cryptographic Trust Stack 2026-08-11/CRYPTOGRAPHIC_ACCELERATION_AND_THE_BIGGER_STORY_2026-08-17.md"
      ],
      "strand": "OMB memorandum and the GSA working group",
      "date": "2026-09-16",
      "date_exactness": "scheduled date",
      "body": "General Services Administration (GSA)",
      "what": "GSA scheduled a Post-Quantum Cryptography Summit for September 16. The notes record no result as of November 11, 2026.",
      "stage": "scheduled",
      "status_word": "GSA event",
      "path": "agency-operation-or-program",
      "rests_on": "the body's own statement (GSA event listing as described in the file); no link given in the file",
      "quote": {
        "text": "GSA Post-Quantum Cryptography Summit | GSA event",
        "file": "Federal Science Operating System/Scientific Trust Stack 2026-08-17/SCIENTIFIC_TRUST_STACK_IMPLEMENTATION_WATCHBOARD_2026-08-17.md"
      },
      "weight": "detail",
      "where_in_the_system": "8. The system is secured: CISA directives, logging, identity tokens, post-quantum migration, identity services",
      "n": 16,
      "movement_type": "Past due, no record"
    },
    {
      "disagreement": "September 21 or 22: the files give both; the register gives 21. Not settled.",
      "source_check": "none: no Source Check 2026-11-14 result concerns this step",
      "from_register": false,
      "register_records": [
        "crypto4a-qasm (Federal Science Operating System, NSSTS_QUANTUM_CRYPTOGRAPHIC_ACCEPTANCE_REGISTRY_2026-08-19.json)"
      ],
      "thesis_words": [],
      "what_moves": "",
      "files": [
        "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_QUANTUM_CRYPTOGRAPHIC_ACCEPTANCE_MAP_2026-08-19.md",
        "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_QUANTUM_CRYPTOGRAPHIC_ACCEPTANCE_CLAIM_AUDIT_2026-08-19.md"
      ],
      "strand": "Module validation (NIST CMVP and its test laboratories)",
      "date": "2026-09-21",
      "date_exactness": "the files write 'September 21/22, 2026'; the register's Crypto4A record gives 2026-09-21",
      "body": "NIST Cryptographic Module Validation Program (CMVP) (the files imply the body; they do not name it for this date)",
      "what": "Modules validated under the older FIPS 140-2 standard were scheduled to move to historical status for use in new-system acquisitions, leaving FIPS 140-3 certificates as the route for new systems. The notes record no result as of November 11, 2026.",
      "stage": "scheduled",
      "status_word": "move to historical status",
      "path": "agency-operation-or-program",
      "rests_on": "official record, linked (NIST CMVP certificate and in-process pages, named in the register)",
      "quote": {
        "text": "FIPS 140-2 modules move to historical status for new-system acquisition use.",
        "file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_QUANTUM_CRYPTOGRAPHIC_ACCEPTANCE_MAP_2026-08-19.md"
      },
      "weight": "detail",
      "where_in_the_system": "5. The agency authorizes its own system to operate (ATO)",
      "note": "Folded in from thread nist-cmvp-capacity.",
      "n": 17,
      "movement_type": "Past due, no record"
    },
    {
      "disagreement": "The hub page reads 'Executive Order XX'; the press release names EO 14412. The press release says 'Trust Now, Exploit Later', the longer article 'Trust Now, Forge Later'.",
      "source_check": "none: no Source Check 2026-11-14 result concerns this step",
      "from_register": false,
      "register_records": [
        "NSA-PQC-HUB-2026-10-01 and NSA-PQC-PRESS-2026-10-01 (Fintech and Private Rails)",
        "w3-nsa-pqc (Federal Government Movement Atlas)"
      ],
      "thesis_words": [],
      "what_moves": "nothing; a public route to existing duties",
      "files": [
        "Sovereign Communications/NSA_NSS_POST_QUANTUM_AND_OPERATIONAL_TECHNOLOGY_CONTROLS_2026-10-21.md",
        "Fintech and Private Rails/Federal Cryptographic Trust Stack 2026-08-11/NSA_POST_QUANTUM_CRYPTOGRAPHY_RESOURCE_HUB_2026-10-01.md",
        "Fintech and Private Rails/Federal Cryptographic Trust Stack 2026-08-11/FEDERAL_CRYPTOGRAPHIC_TRUST_STACK_2026-08-11.md",
        "Fintech and Private Rails/Federal Cryptographic Trust Stack 2026-08-11/README.md"
      ],
      "strand": "National security systems (as tied to EO 14412)",
      "date": "2026-10-01",
      "date_exactness": "exact day",
      "body": "National Security Agency (NSA), Department of War, as National Manager for National Security Systems",
      "what": "NSA launched a public Post-Quantum Cryptography Resource Hub for the Department of War, national security system owners and the Defense Industrial Base, with a press release that restates the CNSS Policy 15 dates (new commercial national security systems must support quantum-resistant algorithms from 2027; legacy systems unable to do so are to be phased out by 2030) and names EO 14412. Its own page said 'Executive Order XX' where the press release named EO 14412.",
      "stage": "announced",
      "status_word": "launched",
      "path": "agency-operation-or-program",
      "rests_on": "the body's own statement, linked (NSA hub page and press release, October 1, 2026)",
      "quote": {
        "text": "NSA links the work to Executive Order 14412 and says it is producing transition resources for the Department of War, NSS owners and the Defense Industrial Base.",
        "file": "Sovereign Communications/NSA_NSS_POST_QUANTUM_AND_OPERATIONAL_TECHNOLOGY_CONTROLS_2026-10-21.md"
      },
      "weight": "step",
      "where_in_the_system": "10. National security systems: the separate lane",
      "note": "Shared with thread nsa-cnsa2, which carries CNSS Policy 15 and the CNSA 2.0 dates in full.",
      "n": 18,
      "movement_type": "Live"
    },
    {
      "disagreement": "none recorded",
      "source_check": "none: no Source Check 2026-11-14 result concerns this step",
      "from_register": false,
      "register_records": [],
      "thesis_words": [],
      "what_moves": "nothing; a public baseline of agency preparation as of September 2025",
      "files": [
        "Fintech and Private Rails/Federal Cryptographic Trust Stack 2026-08-11/FEDERAL_POST_QUANTUM_PUBLIC_EDGE_AND_EXERCISE_USE_2026-11-11.md"
      ],
      "strand": "Oversight",
      "date": "2026-10-06",
      "date_exactness": "exact day of first public release",
      "body": "Government Accountability Office (GAO)",
      "what": "GAO released the public version of its post-quantum preparation audit, GAO-27-108740. None of the 24 CFO Act agencies fully addressed the three practices for inventories, funding assessments and testing in the audited scope; one had identified candidate vendor software through market research; none had done the testing in its own environment that GAO reviewed. The audit uses a framework for systems other than national security systems.",
      "stage": "published",
      "status_word": "released",
      "path": "oversight",
      "rests_on": "official record, linked (GAO product page and full text)",
      "quote": {
        "text": "GAO first released the public version on October 6, 2026 and reissued it on October 14, 2026 to clarify how it coordinated removal of sensitive material.",
        "file": "Fintech and Private Rails/Federal Cryptographic Trust Stack 2026-08-11/FEDERAL_POST_QUANTUM_PUBLIC_EDGE_AND_EXERCISE_USE_2026-11-11.md"
      },
      "weight": "step",
      "where_in_the_system": "8. The system is secured: CISA directives, logging, identity tokens, post-quantum migration, identity services",
      "n": 19,
      "thesis_words_set_aside_2026-11-14": [
        {
          "term": "keeping power answerable",
          "sense": "oversight bodies can examine and report",
          "bearing": "supports",
          "why": "My reading: the legislative branch's auditor publicly measured agency readiness against the migration; it recommends, it does not order."
        }
      ],
      "movement_type": "Published"
    },
    {
      "disagreement": "none recorded",
      "source_check": "none: no Source Check 2026-11-14 result concerns this step",
      "from_register": false,
      "register_records": [],
      "thesis_words": [],
      "what_moves": "",
      "files": [
        "Fintech and Private Rails/Federal Cryptographic Trust Stack 2026-08-11/FEDERAL_POST_QUANTUM_PUBLIC_EDGE_AND_EXERCISE_USE_2026-11-11.md"
      ],
      "strand": "Oversight",
      "date": "2026-10-14",
      "date_exactness": "exact day",
      "body": "Government Accountability Office (GAO)",
      "what": "GAO reissued GAO-27-108740 to clarify how it coordinated the removal of sensitive material.",
      "stage": "amended (reissued)",
      "status_word": "reissued",
      "path": "oversight",
      "rests_on": "official record, linked (GAO product page and errata)",
      "quote": {
        "text": "GAO first released the public version on October 6, 2026 and reissued it on October 14, 2026 to clarify how it coordinated removal of sensitive material.",
        "file": "Fintech and Private Rails/Federal Cryptographic Trust Stack 2026-08-11/FEDERAL_POST_QUANTUM_PUBLIC_EDGE_AND_EXERCISE_USE_2026-11-11.md"
      },
      "weight": "detail",
      "where_in_the_system": "8. The system is secured: CISA directives, logging, identity tokens, post-quantum migration, identity services",
      "n": 20,
      "movement_type": "Amended"
    },
    {
      "disagreement": "none recorded",
      "source_check": "none: no Source Check 2026-11-14 result concerns this step",
      "from_register": false,
      "register_records": [],
      "thesis_words": [],
      "what_moves": "systems: the plans were to name priority systems and phases; the notes record none as of November 11, 2026",
      "files": [
        "Federal Science Operating System/Scientific Trust Stack 2026-08-17/SCIENTIFIC_TRUST_STACK_IMPLEMENTATION_WATCHBOARD_2026-08-17.md",
        "Fintech and Private Rails/Federal Cryptographic Trust Stack 2026-08-11/FEDERAL_CRYPTOGRAPHIC_TRUST_STACK_2026-08-11.md",
        "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_QUANTUM_CRYPTOGRAPHIC_ACCEPTANCE_CLAIM_AUDIT_2026-08-19.md",
        "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_QUANTUM_CRYPTOGRAPHIC_ACCEPTANCE_MAP_2026-08-19.md",
        "Fintech and Private Rails/Federal Cryptographic Trust Stack 2026-08-11/CRYPTOGRAPHIC_ACCELERATION_AND_THE_BIGGER_STORY_2026-08-17.md"
      ],
      "strand": "OMB memorandum and the GSA working group",
      "date": "2026-10-22",
      "date_exactness": "deadline (120 days from the June 24 memo date)",
      "body": "Each agency covered by M-26-15 (plans go to OMB and the Office of the National Cyber Director)",
      "what": "The deadline for agency PQC migration plans fell on this day. The notes record no result as of November 11, 2026.",
      "stage": "deadline; no result recorded in the notes",
      "status_word": "due",
      "path": "program-requirement-without-regulation",
      "rests_on": "official record, linked (OMB M-26-15); the absence is a fact about the files",
      "quote": {
        "text": "agency PQC Migration Plans due to OMB and ONCD",
        "file": "Federal Science Operating System/Scientific Trust Stack 2026-08-17/SCIENTIFIC_TRUST_STACK_IMPLEMENTATION_WATCHBOARD_2026-08-17.md"
      },
      "weight": "step",
      "where_in_the_system": "1. The rules are set: executive orders and OMB memoranda",
      "n": 21,
      "movement_type": "Past due, no record"
    },
    {
      "disagreement": "WAVE_10_MERGE dates it only to the week of October 26-30; the dedicated file and the saved page give October 27.",
      "source_check": "matches (Source Check S13: saved CSRC page reads '10/27/26: IR 8547 (Final)' and lists EO 14412 and OMB M-26-15)",
      "from_register": false,
      "register_records": [
        "g30-nist (Federal Government Refresh 2026-10-30, PRIMARY_OBJECT_LEDGER.json)",
        "fgm-g30-nist (Federal Government Movement Atlas)"
      ],
      "thesis_words": [],
      "what_moves": "guidance agencies use for their plans moves from draft to final; no system moves",
      "files": [
        "Fintech and Private Rails/Federal Cryptographic Trust Stack 2026-08-11/NIST_POST_QUANTUM_TRANSITION_FINAL_RETURN_2026-10-30.md",
        "Federal Government Refresh 2026-10-30/WAVE_10_MERGE.md"
      ],
      "strand": "Standards NIST supplies",
      "date": "2026-10-27",
      "date_exactness": "exact day of final publication (CSRC document history); editorial approval 2026-10-21",
      "body": "NIST (report NIST IR 8547)",
      "what": "NIST published IR 8547 in final form. It identifies quantum-vulnerable algorithms, the replacement standards and transition planning, and NIST says it supports EO 14412 and OMB M-26-15.",
      "stage": "published (final)",
      "status_word": "final",
      "path": "staff-position",
      "rests_on": "official record, linked (NIST news release; CSRC page; report PDF); saved copy used by Source Check",
      "quote": {
        "text": "NIST IR 8547 is now final. CSRC document history fixes October 27, replacing the draft status for this report.",
        "file": "Fintech and Private Rails/Federal Cryptographic Trust Stack 2026-08-11/NIST_POST_QUANTUM_TRANSITION_FINAL_RETURN_2026-10-30.md"
      },
      "weight": "step",
      "where_in_the_system": "16. Standards and guidance are issued for owners: NIST, NSA and CISA",
      "note": "NIST ties this output to EO 14412; the order's Sec. 3(b) calls for ongoing NIST technical guidance.",
      "n": 22,
      "movement_type": "Published"
    },
    {
      "disagreement": "none recorded",
      "source_check": "none: no Source Check 2026-11-14 result concerns this step",
      "from_register": false,
      "register_records": [],
      "thesis_words": [],
      "what_moves": "systems: key establishment on two public federal connections is post-quantum (hybrid) at the observation time; signatures are not",
      "files": [
        "Fintech and Private Rails/Federal Cryptographic Trust Stack 2026-08-11/FEDERAL_POST_QUANTUM_PUBLIC_EDGE_AND_EXERCISE_USE_2026-11-11.md"
      ],
      "strand": "Observed use",
      "date": "2026-11-11",
      "date_exactness": "exact time, 15:09:02 UTC, one request to each site",
      "body": "Login.gov (operated by GSA) and the Cybersecurity and Infrastructure Security Agency (CISA), as operators of the two public sites; the observation was made by the Workbench (Codex), not by either agency",
      "what": "A single test connection to secure.login.gov and to www.cisa.gov negotiated TLS 1.3 with hybrid X25519 plus ML-KEM-768 key agreement, that is, post-quantum key establishment on the public connection, while the handshake signature stayed classical (RSA-PSS). The notes do not record when it was switched on, how much traffic uses it, or whether it reaches behind the public edge.",
      "stage": "in operation (observed once)",
      "status_word": "negotiated",
      "path": "agency-operation-or-program",
      "rests_on": "the Workbench's own observation, record saved beside the file (FEDERAL_PUBLIC_TLS_OBSERVATIONS_2026-11-11.json); no agency statement",
      "quote": {
        "text": "Both public endpoints negotiated TLS 1.3 with X25519MLKEM768, passed certificate and hostname verification, and returned HTTP 200 over the resulting connections.",
        "file": "Fintech and Private Rails/Federal Cryptographic Trust Stack 2026-08-11/FEDERAL_POST_QUANTUM_PUBLIC_EDGE_AND_EXERCISE_USE_2026-11-11.md"
      },
      "weight": "step",
      "where_in_the_system": "8. The system is secured: CISA directives, logging, identity tokens, post-quantum migration, identity services",
      "note": "The file links OMB M-26-15 as the explanation of hybrid TLS; it does not say either agency enabled this under M-26-15.",
      "n": 23,
      "movement_type": "Status check"
    }
  ],
  "where_in_the_system": [
    {
      "stage": "1. The rules are set: executive orders and OMB memoranda",
      "steps": [
        4,
        5,
        7,
        10,
        11,
        13,
        21
      ],
      "note": ""
    },
    {
      "stage": "3. A system or service is bought: vehicles, shared agreements and contract terms",
      "steps": [],
      "note": "No step yet: the FAR proposed rule is due December 19, 2026; the notes record no shared procurement under Sec. 6(a) as of November 11, 2026."
    },
    {
      "stage": "5. The agency authorizes its own system to operate (ATO)",
      "steps": [
        3,
        17
      ],
      "note": "The notes record no agency authorization of a migrated system as of November 11, 2026."
    },
    {
      "stage": "8. The system is secured: CISA directives, logging, identity tokens, post-quantum migration, identity services",
      "steps": [
        6,
        14,
        16,
        19,
        20,
        23
      ],
      "note": ""
    },
    {
      "stage": "10. National security systems: the separate lane",
      "steps": [
        18
      ],
      "note": "The national-security dates themselves sit in thread nsa-cnsa2."
    },
    {
      "stage": "12. Critical infrastructure is designated and sector bodies coordinate",
      "steps": [
        15
      ],
      "note": "The notes record no Sec. 5(a) output as of November 15, 2026; step 15 is Treasury's task force, which the file says followed EO 14412."
    },
    {
      "stage": "16. Standards and guidance are issued for owners: NIST, NSA and CISA",
      "steps": [
        1,
        2,
        8,
        9,
        12,
        22
      ],
      "note": ""
    }
  ],
  "quiet_stretch": [
    {
      "from": "2025-06-11",
      "to": "2026-06-22",
      "what": "Between EO 14306's publication and EO 14412 the files record GAO's sensitive audit (September 2025), the December 1, 2025 deadline in amended EO 14144 §4(f) (step 7), CISA's product-category guidance of January 23, 2026 (step 8) and NIST's June 2026 working drafts."
    },
    {
      "from": "2024-11-12",
      "to": "2026-10-27",
      "what": "IR 8547 was in draft from November 12, 2024 to October 27, 2026; the September 11 and 16 weekly checks report it not yet final."
    },
    {
      "from": "2026-08-24",
      "to": "2026-10-01",
      "what": "After GSA's report of the first working-group meeting, the files record the scheduled September 16 summit and the scheduled FIPS 140-2 date, and nothing from OMB, GSA or the agencies."
    },
    {
      "from": "2026-10-22",
      "to": "2026-11-14",
      "what": "The plan deadline fell on October 22; the later items in the files are IR 8547 final, the GAO reissue and the November 11 connection test."
    }
  ],
  "same_days": {
    "2026-06-22 (EO 14412 signed)": [
      {
        "date": "2026-06-22",
        "body": "The President",
        "line": "EO 14413 signed the same day: a national quantum-development order (the QC-ADDS effort), separate from EO 14412.",
        "file": "Federal Government Whole-Site Recertification 2026-08-01/lanes/TRUMP_AI_CRYPTO_EO_EXISTING_CORPUS_INVENTORY_2026-08-01.md"
      },
      {
        "date": "2026-06-22",
        "body": "U.S. District Court (League of Women Voters v. DHS)",
        "line": "Vacated the 2025 modified SAVE citizenship-screening architecture and the related SSA disclosure.",
        "file": "Census USPS Citizenship and Apportionment 2026/SSA_CITIZENSHIP_IDENTITY_AND_ELIGIBILITY_ARCHITECTURE.md"
      },
      {
        "date": "2026-06-22",
        "body": "FinCEN, OCC, Federal Reserve Board, FDIC and NCUA (joint)",
        "line": "Proposed customer-identification requirements treating permitted stablecoin issuers as covered financial institutions.",
        "file": "Federal Government Whole-Site Recertification 2026-08-01/lanes/DIGITAL_ASSET_FEDERAL_LEGAL_REGULATORY_STATUS_2026-08-01.md"
      },
      {
        "date": "2026-06-25",
        "body": "Chief Digital and Artificial Intelligence Office (Department of War)",
        "line": "Launched Agent Network, AI-enabled battle-management and decision-support infrastructure, with three combatant commands.",
        "file": "Federal Agency AI Plans and Infrastructure 2025-2026/WAVE_4_DEFENSE_AI_ACCELERATION_IMPLEMENTATION_AND_SUPPLIER_DELTA_2026-08-23.md"
      }
    ],
    "2026-06-24 (OMB M-26-15 issued)": [
      {
        "date": "2026-06-24",
        "body": "House Financial Services Committee",
        "line": "Full-committee 'Future of Payments' hearing on the PACE Act and the Fed payment account.",
        "file": "Congressional Monetary Infrastructure/HFSC_MONETARY_INFRASTRUCTURE_HEARING_REGISTRY.md"
      },
      {
        "date": "2026-06-24",
        "body": "Office of the Comptroller of the Currency",
        "line": "Proposed AML/CFT and sanctions-risk program requirements for stablecoin issuers.",
        "file": "Federal Government Whole-Site Recertification 2026-08-01/lanes/DIGITAL_ASSET_FEDERAL_LEGAL_REGULATORY_STATUS_2026-08-01.md"
      },
      {
        "date": "2026-06-22",
        "body": "The President",
        "line": "EO 14413 signed two days earlier; both quantum orders published June 25.",
        "file": "Saved Research History/Factual Editions/473b5218be11746a0880.md"
      }
    ]
  },
  "where_it_stands": "At the latest files (November 11, 2026; November 15, 2026 for the trust-stack and EO 14306 files): EO 14412 is signed and published and OMB M-26-15 is issued; M-26-15 also requires TLS 1.3 or a successor on non-national-security systems by January 2, 2030. CISA issued its post-quantum product-category list under amended EO 14144 on January 23, 2026. The order directs OMB to issue guidance requiring each agency to transition all high value assets and high impact systems to PQC for key establishment by December 31, 2030 and for digital signatures by December 31, 2031; national security systems are excluded. Of the order's dated instructions, the files record the OMB guidance (due September 20) as issued. For the July 22 agency-lead deadline the notes record no result as of November 15, 2026; for the October 22 plan deadline, none as of November 11, 2026. Treasury announced a financial-sector Quantum-Readiness Task Force on August 24, 2026. GSA's identity working group met (August 12); the notes record no output as of November 11, 2026. NIST's IR 8547 is final (October 27). NIST's acceptance of new testing-laboratory applications is paused (since 2025); the notes record no result for the FIPS 140-2 date (September 21/22) as of November 11, 2026. GAO's public audit (October 2026) says no CFO Act agency had fully addressed inventory, funding and testing practices as of September 2025. The files record one post-quantum use on a federal civilian system: hybrid key establishment on the public connections of Login.gov and CISA on November 11; signatures there are classical. The next group of deadlines falls on December 19, 2026.",
  "next_dated": [
    {
      "when": "2026-12-19",
      "what": "NIST to start its PQC migration pilot on NIST systems (EO 14412 Sec. 4(c)).",
      "stage": "scheduled (deadline in the order)",
      "files": [
        "Executive Order Source Library/Source Text Editions/eo-06ffd5acc6907caf51d6.md",
        "Federal Science Operating System/Scientific Trust Stack 2026-08-17/SCIENTIFIC_TRUST_STACK_IMPLEMENTATION_WATCHBOARD_2026-08-17.md",
        "Fintech and Private Rails/Federal Cryptographic Trust Stack 2026-08-11/FEDERAL_CRYPTOGRAPHIC_TRUST_STACK_2026-08-11.md"
      ]
    },
    {
      "when": "2026-12-19",
      "what": "NIST to revise CMVP processes to speed module validations (Sec. 6(b)).",
      "stage": "scheduled (deadline in the order)",
      "files": [
        "Executive Order Source Library/Source Text Editions/eo-06ffd5acc6907caf51d6.md",
        "Federal Science Operating System/Scientific Trust Stack 2026-08-17/SCIENTIFIC_TRUST_STACK_IMPLEMENTATION_WATCHBOARD_2026-08-17.md"
      ]
    },
    {
      "when": "2026-12-19",
      "what": "FAR Council to publish a proposed rule requiring covered contractors to comply with NIST FIPS, including PQC, by December 31, 2030 (Sec. 6(c)).",
      "stage": "scheduled (deadline for a proposal)",
      "files": [
        "Executive Order Source Library/Source Text Editions/eo-06ffd5acc6907caf51d6.md",
        "Fintech and Private Rails/Federal Cryptographic Trust Stack 2026-08-11/FEDERAL_CRYPTOGRAPHIC_TRUST_STACK_2026-08-11.md",
        "Fintech and Private Rails/Federal Cryptographic Trust Stack 2026-08-11/CRYPTOGRAPHIC_ACCELERATION_AND_THE_BIGGER_STORY_2026-08-17.md",
        "Federal Science Operating System/Scientific Trust Stack 2026-08-17/SCIENTIFIC_TRUST_STACK_IMPLEMENTATION_WATCHBOARD_2026-08-17.md"
      ]
    },
    {
      "when": "2026-12-19",
      "what": "NSA Director to report to the President through CNSS on PQC migration of national security systems, then annually (Sec. 5(c)).",
      "stage": "scheduled (deadline in the order)",
      "files": [
        "Executive Order Source Library/Source Text Editions/eo-06ffd5acc6907caf51d6.md"
      ]
    },
    {
      "when": "2027-01-01",
      "what": "CNSA 2.0 required for new national-security-system products, services and acquisitions (CNSS Policy 15; thread nsa-cnsa2).",
      "stage": "scheduled",
      "files": [
        "Fintech and Private Rails/Federal Cryptographic Trust Stack 2026-08-11/NSA_POST_QUANTUM_CRYPTOGRAPHY_RESOURCE_HUB_2026-10-01.md",
        "Sovereign Communications/NSA_NSS_POST_QUANTUM_AND_OPERATIONAL_TECHNOLOGY_CONTROLS_2026-10-21.md"
      ]
    },
    {
      "when": "2027-03-19",
      "what": "CISA, with NIST, to publish minimum elements of a cryptographic bill of materials (Sec. 5(d)); FAR Council to propose the cryptographic vulnerability-disclosure rule (Sec. 6(d)).",
      "stage": "scheduled (deadlines in the order)",
      "files": [
        "Executive Order Source Library/Source Text Editions/eo-06ffd5acc6907caf51d6.md",
        "Federal Science Operating System/Scientific Trust Stack 2026-08-17/SCIENTIFIC_TRUST_STACK_IMPLEMENTATION_WATCHBOARD_2026-08-17.md",
        "Fintech and Private Rails/Federal Cryptographic Trust Stack 2026-08-11/CRYPTOGRAPHIC_ACCELERATION_AND_THE_BIGGER_STORY_2026-08-17.md"
      ]
    },
    {
      "when": "2027-12-31",
      "what": "NIST pilot to be completed.",
      "stage": "scheduled",
      "files": [
        "Executive Order Source Library/Source Text Editions/eo-06ffd5acc6907caf51d6.md",
        "Fintech and Private Rails/Federal Cryptographic Trust Stack 2026-08-11/FEDERAL_CRYPTOGRAPHIC_TRUST_STACK_2026-08-11.md",
        "Federal Science Operating System/Scientific Trust Stack 2026-08-17/SCIENTIFIC_TRUST_STACK_IMPLEMENTATION_WATCHBOARD_2026-08-17.md"
      ]
    },
    {
      "when": "2030-01-02",
      "what": "TLS 1.3 outer date kept by EO 14306.",
      "stage": "scheduled",
      "files": [
        "Executive Order Source Library/Biden Backfill 2026-10-30/WAVE_8B1_CYBER.md"
      ]
    },
    {
      "when": "2030-12-31",
      "what": "High value assets and high impact systems to use PQC for key establishment; covered contractors to comply with FIPS including PQC (as the FAR rule is to propose).",
      "stage": "scheduled (target)",
      "files": [
        "Executive Order Source Library/Source Text Editions/eo-06ffd5acc6907caf51d6.md",
        "Fintech and Private Rails/Federal Cryptographic Trust Stack 2026-08-11/FEDERAL_CRYPTOGRAPHIC_TRUST_STACK_2026-08-11.md"
      ]
    },
    {
      "when": "2031-12-31",
      "what": "High value assets and high impact systems to use PQC for digital signatures.",
      "stage": "scheduled (target)",
      "files": [
        "Executive Order Source Library/Source Text Editions/eo-06ffd5acc6907caf51d6.md",
        "Fintech and Private Rails/Federal Cryptographic Trust Stack 2026-08-11/FEDERAL_CRYPTOGRAPHIC_TRUST_STACK_2026-08-11.md"
      ]
    },
    {
      "when": "through 2035",
      "what": "M-26-15's remaining-system migration phase.",
      "stage": "scheduled (phase)",
      "files": [
        "Fintech and Private Rails/Federal Cryptographic Trust Stack 2026-08-11/FEDERAL_CRYPTOGRAPHIC_TRUST_STACK_2026-08-11.md"
      ]
    }
  ],
  "not_shown": [
    "The notes do not record any agency's named PQC migration lead, or a list of them, as of November 15, 2026.",
    "The notes do not record any agency's PQC migration plan, inventory or list of priority systems, public or obtained.",
    "The notes do not record any agency authorization to operate for a system migrated to PQC, or any completed migration of a federal system. The November 11 test covers key establishment on two public connections.",
    "The notes do not record any money: no funding, budget line or shared procurement under Sec. 6(a). The order runs subject to appropriations.",
    "The notes do not record any output under Sec. 5(a) (help to critical-infrastructure owners) or Sec. 5(b) (foreign engagement).",
    "The notes do not record whether M-26-15 reaches the Federal Reserve Banks that run Fedwire and FedNow (one file reads it as covering the Board but not the Banks; thread fed-pqc-coverage).",
    "The notes do not record whether GSA's working group has a charter, roster, certificate profile, pilot or procurement.",
    "The notes do not record a distinct NSA issuance of the TLS 1.3 requirement for national security systems, as of November 15, 2026."
  ],
  "where_the_files_stop_top5": [
    "Whether agencies filed PQC migration plans by October 22, 2026, and which systems they name (no file after that date checks).",
    "Whether agency heads named PQC migration leads by July 22, 2026 (no roster or receipt in any file as of November 15, 2026).",
    "M-26-15's crypto-inventory and vendor-responsibility clocks the register record mentions (the TLS 1.3 date is now set out in the trust-stack file).",
    "What NIST CMVP did on September 21/22, 2026 for FIPS 140-2 modules, and whether NIST has begun the CMVP process revision due December 19.",
    "What GSA's FICAM/PQC working group has produced since August 24, and whether the September 16 summit was held."
  ],
  "touches": [
    {
      "thread": "nsa-cnsa2",
      "at_step": "NSA hub, October 1, 2026 (step 18)",
      "how": "CNSS Policy 15 (updated March 4, 2025) and CNSA 2.0 set the national-security-system dates (2027 new acquisitions, 2030 phase-out, 2031 use, 2035 objective). M-26-15 excludes these systems; EO 14412 Sec. 5(c) asks NSA to report on them. Only the hub, which names EO 14412, is folded in here."
    },
    {
      "thread": "nist-cmvp-capacity",
      "at_step": "steps 3 and 17",
      "how": "Folded in: the laboratory-application pause and the FIPS 140-2 date. EO 14412 Sec. 6(b) orders NIST to revise CMVP processes to speed validations."
    },
    {
      "thread": "fed-pqc-coverage",
      "at_step": "M-26-15, June 24, 2026 (step 11)",
      "how": "One file reads 'agency' under 44 U.S.C. 3502(1) as including the Board of Governors but not the Reserve Banks."
    },
    {
      "thread": "post-quantum",
      "at_step": "M-26-15 and after",
      "how": "Payment rails: the notes record no PQC object for Treasury SPS, Fedwire, FedNow, FedLine or CHIPS as of November 11, 2026; they record dated plans for SWIFT and some ledgers."
    },
    {
      "thread": "doe-genesis-pqc",
      "at_step": "agency plans due October 22, 2026 (step 21)",
      "how": "The notes record no DOE plan naming Genesis as of November 11, 2026."
    },
    {
      "thread": "eo-14413-qc-adds",
      "at_step": "EO 14412 signed (step 10)",
      "how": "Signed the same day and published together; EO 14413 is a quantum-development order."
    },
    {
      "thread": "login-gov-m-26-18",
      "at_step": "November 11 observation (step 23)",
      "how": "Login.gov is the site observed using hybrid post-quantum key establishment."
    },
    {
      "thread": "(no thread) Department of War PQC Strategy",
      "at_step": "EO 14412 and after",
      "how": "A separate Department of War Chief Information Officer strategy (register gives 2026-04-01 as source date) requires its systems to support PQC by end-2030 and use it by end-2031; national-security lane."
    }
  ],
  "foundation": [
    {
      "file": "Fintech and Private Rails/Federal Cryptographic Trust Stack 2026-08-11/FEDERAL_CRYPTOGRAPHIC_TRUST_STACK_2026-08-11.md (section 10)",
      "why": "The one place that sets EO 14412, M-26-15 and the GSA meeting side by side with every clock and its evidence state."
    },
    {
      "file": "Executive Order Source Library/Source Text Editions/eo-06ffd5acc6907caf51d6.md",
      "why": "The order's own text, section by section, with who must do what by when."
    },
    {
      "file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_QUANTUM_CRYPTOGRAPHIC_ACCEPTANCE_MAP_2026-08-19.md",
      "why": "Explains the algorithm, laboratory, module-validation and authorization chain that any migrated product must pass."
    }
  ],
  "interpretation": [
    {
      "claim": "Codex frames the migration as protecting the records of the 're-founding'; this writes Katie's thesis into a research file.",
      "quote": "If the signatures rot, the re-founding's receipts rot with them.",
      "file": "Fintech and Private Rails/Federal Cryptographic Trust Stack 2026-08-11/CRYPTOGRAPHIC_ACCELERATION_AND_THE_BIGGER_STORY_2026-08-17.md"
    },
    {
      "claim": "Codex says the United States is building a permissioned routing system for science and capital, resting on signed claims.",
      "quote": "The United States is building a permissioned scientific-and-capital routing system.",
      "file": "Fintech and Private Rails/Federal Cryptographic Trust Stack 2026-08-11/CRYPTOGRAPHIC_ACCELERATION_AND_THE_BIGGER_STORY_2026-08-17.md"
    },
    {
      "claim": "Codex calls the acceleration a harvest of public-key trust, not a new coin or chain.",
      "quote": "government-wide harvest of classical public-key trust before that",
      "file": "Fintech and Private Rails/Federal Cryptographic Trust Stack 2026-08-11/CRYPTOGRAPHIC_ACCELERATION_AND_THE_BIGGER_STORY_2026-08-17.md"
    },
    {
      "claim": "Codex reads M-26-15 as covering the Federal Reserve Board but not the Reserve Banks; a legal reading of 44 U.S.C. 3502(1), not a statement by OMB or the Fed.",
      "quote": "Federal Reserve Banks are not in that definition.",
      "file": "Fintech and Private Rails/Federal Cryptographic Trust Stack 2026-08-11/CRYPTOGRAPHIC_ACCELERATION_AND_THE_BIGGER_STORY_2026-08-17.md"
    },
    {
      "claim": "Codex's August 1 inventory rules that tying EO 14412 to money infrastructure is interpretation, not anything the order says.",
      "quote": "The connection to monetary infrastructure is an important analytic join, not an operative proposition in either text.",
      "file": "Federal Government Whole-Site Recertification 2026-08-01/lanes/TRUMP_AI_CRYPTO_EO_EXISTING_CORPUS_INVENTORY_2026-08-01.md"
    },
    {
      "claim": "Katie's own suspicion (K07-072, 2026-09-23) that the government is building a quantum-resistant financial rail; the file built on it found no named production system migrated.",
      "quote": "No named production system was proved migrated.",
      "file": "Economic Institution Legitimacy Crisis 2025-2026/WAVE_3_SCIENCE_TECHNOLOGY_MISSION_TO_MACHINE_EVIDENCE_LEDGER_2026-09-24.md"
    }
  ],
  "left_out": [
    "Federal Bridge Certification Authority G5 plan (posted August 12, 2026; RSA-2048 to RSA-4096, phase 1 August 27): a classical change the file says is not PQC.",
    "National Security Science and Technology Strategy (August 2026) listing PQC as a critical-technology subfield: strategy text that orders no migration; belongs to the science-strategy threads.",
    "NSA's March 2026 Commercial Solutions for Classified package updates and the CNSS Policy 15 dates: national-security lane, thread nsa-cnsa2.",
    "Army Project Convergence Capstone 6 (July 20-29, 2026) and QuSecure's vendor claims (September 2, 2026; July 12, 2022): defense experiments and vendor statements, not civilian-agency migration.",
    "NIST additional-signature round (IR 8610, May 14, 2026) and HAWK withdrawal (July 29, 2026): candidate-algorithm steps that do not change what agencies migrate to now.",
    "Vendor and laboratory entries (Crypto4A, SafeLogic, Entrust, WidePoint and others) in the acceptance map: company states, not federal steps.",
    "GAO's July 2026 Login.gov recommendation update and the NCCoE mobile-licence demonstration: identity work without a post-quantum element.",
    "The September 11 and 16 weekly checks reporting 'no in-window move' for NIST PQC: restatements, used only to support quiet stretches."
  ],
  "open_points": [
    {
      "kind": "register error",
      "what": "The thread register says M-26-15 was issued 'June 2026 (June 24 in one file)'; one research file and one register record give June 24, and one file gives no date.",
      "where": "Thread Register federal-pqc-migration where_it_stands; FEDERAL_CRYPTOGRAPHIC_TRUST_STACK_2026-08-11.md section 10; register record omb-m2615-clock; TRUMP_CRYPTO_DIGITAL_ASSET_EXECUTIVE_ORDER_OFFICIAL_INVENTORY_2026-08-01.md",
      "settled": "no",
      "fix": "OMB M-26-15 is dated June 24, 2026 in the files that read the memo (FEDERAL_CRYPTOGRAPHIC_TRUST_STACK section 10, 'M-26-15 is dated June 24'); the August 1 inventory gives no date."
    },
    {
      "kind": "wrong wording",
      "what": "The register summary calls the 2030/2031 targets targets 'for priority systems'; the order's text says all high value assets and high impact systems, excluding national security systems.",
      "where": "Thread Register federal-pqc-migration where_it_stands; EO 14412 Sec. 4(b) in eo-06ffd5acc6907caf51d6.md",
      "settled": "yes, EO 14412 text (source-text edition)",
      "fix": "Key establishment by December 31, 2030 and signatures by December 31, 2031 for all high value assets and high impact systems, excluding national security systems."
    },
    {
      "kind": "register error",
      "what": "Thread nist-cmvp-capacity describes a 'CST-lab pause' under CMVP; the register record assigns the pause to NVLAP (laboratory accreditation) and dates it from January 1, 2025, which no markdown file states.",
      "where": "Thread Register nist-cmvp-capacity; register record nvlap-capacity-pause; NSSTS_QUANTUM_CRYPTOGRAPHIC_ACCEPTANCE_MAP_2026-08-19.md Wave 4",
      "settled": "no (the bulletin LB-163-2026 is linked, not read here)",
      "fix": "NIST's National Voluntary Laboratory Accreditation Program paused new cryptographic and security testing laboratory applications from January 1, 2025 (bulletin LB-163-2026, March 9, 2026), per the register record."
    },
    {
      "kind": "register error",
      "what": "The Executive Order Map's 'unsure' note says thread nsa-cnsa2 is not tied to EO 14412; the research file states NSA links its October 1 transition resources to EO 14412.",
      "where": "Executive Order Map ALL_ORDERS.json, EO 14412 'unsure'; NSA_NSS_POST_QUANTUM_AND_OPERATIONAL_TECHNOLOGY_CONTROLS_2026-10-21.md",
      "settled": "yes, the research file's statement of the NSA press release",
      "fix": "NSA's October 1, 2026 release names EO 14412 for its national-security transition resources; Sec. 5(c)'s report is still due December 19, 2026."
    },
    {
      "kind": "register error",
      "what": "The Executive Order Map lists Sec. 3(b) (ongoing NIST guidance) as 'not located'; NIST's own page ties final IR 8547 to EO 14412 and M-26-15.",
      "where": "Executive Order Map ALL_ORDERS.json, EO 14412 outputs_located Sec. 3(b); Source Check S13",
      "settled": "yes, Source Check S13 (saved CSRC page lists EO 14412 and OMB M-26-15)",
      "fix": "Sec. 3(b): NIST IR 8547 final October 27, 2026, published by NIST in support of EO 14412 and M-26-15."
    },
    {
      "kind": "passed deadline",
      "what": "EO 14412 Sec. 4(a) agency PQC migration leads were due July 22, 2026; the notes record no lead, roster or receipt as of November 15, 2026.",
      "where": "CRYPTOGRAPHIC_ACCELERATION_AND_THE_BIGGER_STORY_2026-08-17.md table; Fintech and Private Rails/Federal Cryptographic Trust Stack 2026-08-11/FEDERAL_CRYPTOGRAPHIC_TRUST_STACK_2026-08-11.md",
      "settled": "no",
      "fix": ""
    },
    {
      "kind": "passed deadline",
      "what": "M-26-15 agency PQC migration plans were due October 22, 2026; no file after that date says whether any were filed or made public.",
      "where": "SCIENTIFIC_TRUST_STACK_IMPLEMENTATION_WATCHBOARD_2026-08-17.md; FEDERAL_POST_QUANTUM_PUBLIC_EDGE_AND_EXERCISE_USE_2026-11-11.md is silent",
      "settled": "no",
      "fix": ""
    },
    {
      "kind": "passed deadline",
      "what": "The notes record no result for the FIPS 140-2 historical-status date (September 21/22, 2026) as of November 11, 2026.",
      "where": "NSSTS_QUANTUM_CRYPTOGRAPHIC_ACCEPTANCE_MAP_2026-08-19.md 'What to watch next'",
      "settled": "no",
      "fix": ""
    },
    {
      "kind": "disagreement",
      "what": "The FIPS 140-2 date is given as 'September 21/22'; the register's Crypto4A record gives September 21.",
      "where": "NSSTS_QUANTUM_CRYPTOGRAPHIC_ACCEPTANCE_MAP and CLAIM_AUDIT; register record crypto4a-qasm",
      "settled": "no",
      "fix": ""
    },
    {
      "kind": "missing fact",
      "what": "The GSA Post-Quantum Cryptography Summit of September 16, 2026 is listed as scheduled; no file says it was held.",
      "where": "SCIENTIFIC_TRUST_STACK_IMPLEMENTATION_WATCHBOARD_2026-08-17.md; CRYPTOGRAPHIC_ACCELERATION table",
      "settled": "no",
      "fix": ""
    },
    {
      "kind": "missing fact",
      "what": "The register record for M-26-15 mentions TLS 1.3, crypto-inventory and vendor-responsibility clocks; no markdown file sets them out, and Codex says it did not fully review the technical appendices.",
      "where": "register record omb-m2615-clock; FEDERAL_CRYPTOGRAPHIC_TRUST_STACK section 10 evidence limits",
      "settled": "in part, by Fintech and Private Rails/Federal Cryptographic Trust Stack 2026-08-11/FEDERAL_CRYPTOGRAPHIC_TRUST_STACK_2026-08-11.md (TLS 1.3 by January 2, 2030 in Appendix A §4; Appendix B schedule). The crypto-inventory and vendor-responsibility clocks are not set out.",
      "fix": ""
    },
    {
      "kind": "missing fact",
      "what": "The Department of War PQC Strategy is dated only '2026' in the markdown files; the register gives 2026-04-01 as a listed source date.",
      "where": "GENESIS_IDENTITY_PROVENANCE_PQC_BRIDGE_2026-08-11.md; register record w4-src-cyber-pqc-strategy",
      "settled": "no",
      "fix": ""
    },
    {
      "kind": "lead",
      "what": "Treasury's Quantum Readiness Task Force: Katie asked about it on August 26 (K04-040) and no file was made; a member of the House Financial Services Committee asked Secretary Bessent about 'the new quantum readiness task force' at the September 15, 2026 hearing.",
      "where": "Katie's Words ORIGINS_BY_PACKAGE K04-040; Congressional Monetary Infrastructure/HFSC Treasury International Financial System Hearing 2026-09-15/Transcripts/.../TRANSCRIPT.txt at about 00:31:48",
      "settled": "yes, by Fintech and Private Rails/Federal Cryptographic Trust Stack 2026-08-11/FEDERAL_CRYPTOGRAPHIC_TRUST_STACK_2026-08-11.md (announcement of August 24, 2026; step 15)",
      "fix": ""
    },
    {
      "kind": "stale text",
      "what": "NSA's hub page read 'Executive Order XX' at launch; no later file checks whether NSA corrected it.",
      "where": "NSA_POST_QUANTUM_CRYPTOGRAPHY_RESOURCE_HUB_2026-10-01.md, launch-page notes item 1",
      "settled": "no",
      "fix": ""
    },
    {
      "kind": "lead",
      "what": "The November 11 test shows hybrid ML-KEM at Login.gov and CISA but not when it was enabled or whether other federal sites use it.",
      "where": "FEDERAL_POST_QUANTUM_PUBLIC_EDGE_AND_EXERCISE_USE_2026-11-11.md",
      "settled": "no",
      "fix": ""
    },
    {
      "kind": "missing fact",
      "what": "A distinct NSA issuance of the TLS 1.3 requirement for national security systems (EO 14144 §4(f)(ii), as amended): the notes record none as of November 15, 2026.",
      "where": "Fintech and Private Rails/Federal Cryptographic Trust Stack 2026-08-11/FEDERAL_CRYPTOGRAPHIC_TRUST_STACK_2026-08-11.md",
      "settled": "no",
      "fix": ""
    }
  ],
  "threads_folded_in": {
    "folded": [
      "nist-cmvp-capacity (steps 3, 14)"
    ],
    "partly": [
      "nsa-cnsa2 (only the October 1 NSA hub, step 18)"
    ],
    "not_folded": [
      "post-quantum",
      "fed-pqc-coverage",
      "doe-genesis-pqc"
    ]
  },
  "files_used": {
    "thread_files": [
      "Economic Institution Legitimacy Crisis 2025-2026/WAVE_2_EXECUTIVE_ORDER_PROCEDURAL_ENGINE_EVIDENCE_LEDGER_2026-09-24.md",
      "Economic Institution Legitimacy Crisis 2025-2026/WAVE_3_SCIENCE_TECHNOLOGY_MISSION_TO_MACHINE_EVIDENCE_LEDGER_2026-09-24.md",
      "Executive Order Source Library/Biden Backfill 2026-10-30/WAVE_8B1_CYBER.md",
      "Federal Government Refresh 2026-10-30/WAVE_10_MERGE.md",
      "Federal Government Weekly Delta 2026-09-16/waves/WAVE_3F_EOP_MONEY_LABS_LEGISLATIVE.md",
      "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_QUANTUM_CRYPTOGRAPHIC_ACCEPTANCE_CLAIM_AUDIT_2026-08-19.md",
      "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_QUANTUM_CRYPTOGRAPHIC_ACCEPTANCE_MAP_2026-08-19.md",
      "Federal Science Operating System/Scientific Trust Stack 2026-08-17/SCIENTIFIC_TRUST_STACK_ARCHITECTURE_AND_EVIDENCE_MAP_2026-08-17.md",
      "Federal Science Operating System/Scientific Trust Stack 2026-08-17/SCIENTIFIC_TRUST_STACK_AUTHORITY_AND_CONTROL_MATRIX_2026-08-17.md",
      "Federal Science Operating System/Scientific Trust Stack 2026-08-17/SCIENTIFIC_TRUST_STACK_IMPLEMENTATION_WATCHBOARD_2026-08-17.md",
      "Federal Science Operating System/Scientific Trust Stack 2026-08-17/SCIENTIFIC_TRUST_STACK_SOURCE_LEDGER_2026-08-17.md",
      "Fintech and Private Rails/Federal Cryptographic Trust Stack 2026-08-11/CRYPTOGRAPHIC_ACCELERATION_AND_THE_BIGGER_STORY_2026-08-17.md",
      "Fintech and Private Rails/Federal Cryptographic Trust Stack 2026-08-11/FEDERAL_CRYPTOGRAPHIC_TRUST_STACK_2026-08-11.md",
      "Fintech and Private Rails/Federal Cryptographic Trust Stack 2026-08-11/FEDERAL_POST_QUANTUM_PUBLIC_EDGE_AND_EXERCISE_USE_2026-11-11.md",
      "Fintech and Private Rails/Federal Cryptographic Trust Stack 2026-08-11/GENESIS_IDENTITY_PROVENANCE_PQC_BRIDGE_2026-08-11.md",
      "Fintech and Private Rails/Federal Cryptographic Trust Stack 2026-08-11/NIST_POST_QUANTUM_TRANSITION_FINAL_RETURN_2026-10-30.md",
      "Fintech and Private Rails/Federal Cryptographic Trust Stack 2026-08-11/NSA_POST_QUANTUM_CRYPTOGRAPHY_RESOURCE_HUB_2026-10-01.md",
      "Fintech and Private Rails/Federal Cryptographic Trust Stack 2026-08-11/README.md",
      "Saved Research History/Factual Editions/473b5218be11746a0880.md",
      "Sovereign Communications/NSA_NSS_POST_QUANTUM_AND_OPERATIONAL_TECHNOLOGY_CONTROLS_2026-10-21.md"
    ],
    "related_files": [
      "Executive Order Source Library/Source Text Editions/eo-06ffd5acc6907caf51d6.md",
      "Federal Government Weekly Delta 2026-09-11/waves/WAVE_3F_EOP_MONEY_LABS_LEGISLATIVE.md",
      "Federal Government Whole-Site Recertification 2026-08-01/lanes/TRUMP_AI_CRYPTO_EO_EXISTING_CORPUS_INVENTORY_2026-08-01.md",
      "Federal Government Whole-Site Recertification 2026-08-01/lanes/TRUMP_AI_EXECUTIVE_ORDER_OFFICIAL_INVENTORY_2026-08-01.md",
      "Federal Government Whole-Site Recertification 2026-08-01/lanes/TRUMP_CRYPTO_DIGITAL_ASSET_EXECUTIVE_ORDER_OFFICIAL_INVENTORY_2026-08-01.md"
    ]
  },
  "register_records_used": [
    "NSA-PQC-HUB-2026-10-01 and NSA-PQC-PRESS-2026-10-01 (Fintech and Private Rails)",
    "OBS-001 (Federal Government Nightly Gap Audit 2026-08-29, OBSERVATORY_SAVED_OFFICIAL_SOURCE_CENSUS.csv)",
    "crypto4a-qasm (Federal Science Operating System, NSSTS_QUANTUM_CRYPTOGRAPHIC_ACCEPTANCE_REGISTRY_2026-08-19.json)",
    "eo-14144-p04 (Executive Order Source Library, WAVE_8B1_MAP_SOURCE_SNAPSHOT.json)",
    "fgm-2025-06-06-eo-14144-14306-selective-amendment (Federal Government Movement Atlas, MOVEMENT_REGISTRY.json)",
    "fgm-g30-nist (Federal Government Movement Atlas)",
    "g30-nist (Federal Government Refresh 2026-10-30, PRIMARY_OBJECT_LEDGER.json)",
    "https://www.whitehouse.gov/presidential-actions/2026/06/securing-the-nation-against-advanced-cryptographic-attacks (White House Research Hub)",
    "nvlap-capacity-pause (Federal Science Operating System, NSSTS_QUANTUM_CRYPTOGRAPHIC_ACCEPTANCE_REGISTRY_2026-08-19.json)",
    "omb-m2615-clock (Federal Science Operating System, NSSTS_QUANTUM_CRYPTOGRAPHIC_ACCEPTANCE_REGISTRY_2026-08-19.json)",
    "w3-nsa-pqc (Federal Government Movement Atlas)"
  ],
  "counts": {
    "thread_files_federal_pqc_migration": 20,
    "thread_files_including_folded_threads": 21,
    "raw_happenings_in_thread_files": 226,
    "related_files_added": 5,
    "related_files_note": "Related files: the EO 14412 source-text edition, the September 11 weekly delta (NIST PQC dates), the August 1 executive-order inventories (three files), plus files named only under same_days.",
    "happenings_kept_from_thread_files": 37,
    "happenings_kept_note": "Counted by hand against reader records: the happenings that are steps of this story (others in the same files belong to other stories); several are merged into one step.",
    "steps": 23,
    "turning_points": 2,
    "steps_with_disagreement": 5,
    "steps_with_saved_original_used": 2,
    "steps_from_register_only": 0,
    "steps_with_register_records": 10,
    "quotes_checked": 26,
    "quotes_failed": 0
  },
  "builder_notes": "Scope. Thread federal-pqc-migration lists 20 files; nist-cmvp-capacity adds none beyond them, nsa-cnsa2 adds GENESIS_IDENTITY_PROVENANCE_PQC_BRIDGE. Most are broad syntheses, so most of their reader happenings belong to other stories (Genesis, quantum computing awards, payment rails, vendor maps). A search of all research markdown for '14412', 'M-26-15', 'IR 8547' and related terms found the EO source-text edition, the September 11 weekly delta and three August 1 inventories, which were added. The register CSV was searched for PQC terms; 10 records were used for dates or bodies the markdown leaves out (none is the only evidence for a step). Folding. nist-cmvp-capacity is folded in (steps 3 and 17) because EO 14412 Sec. 6(b) orders the CMVP process revised; nsa-cnsa2 is not folded in except NSA's October 1 hub, which names EO 14412; CNSS Policy 15 and CSfC stay in that thread. Hard parts: almost every file is a watch list of future clocks, so the record is mostly instructions and deadlines, with very few completed acts; deadlines that passed (July 22, September 21/22, October 22) are kept as steps. The November 11 TLS observation is the Workbench's own test, not an agency record; it is kept and labelled. Quote check: 26 quotes (steps and interpretation) checked by whitespace-normalised substring with markdown bold, code marks, links and blockquote marks removed; 0 failed: []. 16 November 2026 update (worker G04): the trust-stack file and WAVE_8B1_CYBER were rewritten on 15 November 2026. Added three steps (the December 1, 2025 EO 14144/14306 deadline, CISA's January 23, 2026 product categories, Treasury's August 24, 2026 task force); joined the TLS 1.3 requirement to the M-26-15 step; updated the July 22 lead deadline to November 15. All step quotes re-checked by script.",
  "set_aside_2026-11-14": [
    {
      "field": "steps[0].what",
      "text": "These are what the later orders tell agencies to move to."
    },
    {
      "field": "steps[2].what",
      "text": "Modules reach a CMVP validation certificate only through these laboratories, so the existing eight laboratories are the route every post-quantum module must take."
    },
    {
      "field": "steps[8].disagreement",
      "text": "Not settled by a saved copy of the memo."
    },
    {
      "field": "steps[10].what",
      "text": "The deadline for each agency head to name a PQC migration lead and send the name to OMB and the National Cyber Director passed. The files show no list of leads; no later file returns to it."
    },
    {
      "field": "steps[10].what_moves",
      "text": "the files do not show any"
    },
    {
      "field": "steps[11].what_moves",
      "text": "no charter, roster, profile, pilot or procurement is shown"
    },
    {
      "field": "steps[12].what",
      "text": "The files do not show that it was held or what came of it."
    },
    {
      "field": "steps[13].what",
      "text": "No file after this date reports what happened."
    },
    {
      "field": "steps[13].note",
      "text": "A NIST program clock that predates EO 14412; kept because module validation is the step every migrated product must pass."
    },
    {
      "field": "steps[14].what",
      "text": "The hub creates no new rule;"
    },
    {
      "field": "steps[17].what",
      "text": "The deadline for agency PQC migration plans passed. The files show no plan, public or otherwise, and no file dated after October 22 says whether plans were submitted."
    },
    {
      "field": "steps[17].what_moves",
      "text": "the files do not show any"
    },
    {
      "field": "steps[18].what",
      "text": "It is technical guidance, not a new algorithm standard."
    },
    {
      "field": "steps[18].note",
      "text": "This is the first published output in the files that NIST itself ties to EO 14412 (the order's Sec. 3(b) calls for ongoing NIST technical guidance)."
    },
    {
      "field": "steps[19].what",
      "text": "When it was switched on, how much traffic uses it, and whether it reaches behind the public edge are not shown."
    },
    {
      "field": "where_in_the_system[1].note",
      "text": "no shared procurement from Sec. 6(a) appears."
    },
    {
      "field": "where_in_the_system[2].note",
      "text": "Module validation is evidence for an authorization; no agency authorization of a migrated system appears."
    },
    {
      "field": "where_in_the_system[5].note",
      "text": "No step: Sec. 5(a) assistance has no output in the files."
    },
    {
      "field": "quiet_stretch[0].what",
      "text": "; EO 14306's milestones in between are not reported met or missed."
    },
    {
      "field": "quiet_stretch[1].what",
      "text": "IR 8547 sat in draft for almost two years; the September 11 and 16 weekly checks report it still not final."
    },
    {
      "field": "quiet_stretch[2].what",
      "text": "the files show only the scheduled September 16 summit and the scheduled FIPS 140-2 date; nothing from OMB, GSA or the agencies."
    },
    {
      "field": "quiet_stretch[3].what",
      "text": "The plan deadline passed; the only later items are IR 8547 final, the GAO reissue and the November 11 connection test."
    },
    {
      "field": "where_it_stands",
      "text": "OMB M-26-15 is issued, so the 2030 (key establishment) and 2031 (signatures) targets for high value assets and high impact systems, excluding national security systems, are in force as instructions."
    },
    {
      "field": "where_it_stands",
      "text": "Of the order's dated instructions, only the OMB guidance (due September 20) appears as done. The July 22 agency-lead deadline and the October 22 plan deadline have passed with nothing in the files. GSA's identity working group has met (August 12) but no output is shown."
    },
    {
      "field": "where_it_stands",
      "text": "NIST's module-validation route is constrained (laboratory applications paused since 2025) and its FIPS 140-2 date (September 21/22) passed unrecorded."
    },
    {
      "field": "where_it_stands",
      "text": "The only post-quantum use on a federal civilian system that the files show is hybrid key establishment on the public connections of Login.gov and CISA on November 11; signatures there are still classical. The December 19, 2026 group of deadlines has not yet arrived."
    },
    {
      "field": "not_shown[2]",
      "text": "Any agency authorization to operate for a system migrated to PQC, or any completed migration of a federal system. The November 11 test shows key establishment on two public connections only."
    },
    {
      "field": "not_shown[3]",
      "text": "Any money: the order runs subject to appropriations, and no file shows funding, a budget line or a shared procurement under Sec. 6(a)."
    },
    {
      "field": "touches[1].how",
      "text": "Folded in: the laboratory-application pause and the FIPS 140-2 date are the state of the validation route that EO 14412 Sec. 6(b) orders NIST to speed up."
    },
    {
      "field": "touches[3].how",
      "text": "Payment rails: the files find no PQC object for Treasury SPS, Fedwire, FedNow, FedLine or CHIPS, while SWIFT and some ledgers have dated plans."
    },
    {
      "field": "touches[4].how",
      "text": "The files watch whether DOE's non-national-security plan names Genesis; none is shown."
    },
    {
      "field": "touches[5].how",
      "text": "; a quantum-development order, not a migration order."
    },
    {
      "field": "foundation[2].why",
      "text": ", and why a standard is not a migration."
    },
    {
      "field": "open_points[7].what",
      "text": "The FIPS 140-2 historical-status date (September 21/22, 2026) passed with no file reporting it."
    },
    {
      "field": "steps[n=11].stage",
      "text": "other (deadline passed; nothing published in the files)",
      "by": "manager"
    },
    {
      "field": "steps[n=11].status_word",
      "text": "passed; public roster not located",
      "by": "manager"
    },
    {
      "field": "steps[n=18].stage",
      "text": "other (deadline passed; nothing published in the files)",
      "by": "manager"
    }
  ],
  "checks_applied_2026-11-14": [
    {
      "where": "steps[n=11].quote.text",
      "why": "Check 1: the old quote is the file's status cell ('passed; public roster not located...'), a remark about the record; the first two cells of the same row state the date and what was due.",
      "evidence_file": "Fintech and Private Rails/Federal Cryptographic Trust Stack 2026-08-11/CRYPTOGRAPHIC_ACCELERATION_AND_THE_BIGGER_STORY_2026-08-17.md"
    },
    {
      "where": "steps[n=3].what",
      "why": "Check 4 (owed item 12): the file does not use the word 'eight'; it names the existing laboratories, and they are eight. The sentence now gives the names as the file does.",
      "evidence_file": "Federal Science Operating System/NSSTS Technology-to-Company Map 2026-08-18/NSSTS_QUANTUM_CRYPTOGRAPHIC_ACCEPTANCE_MAP_2026-08-19.md"
    },
    {
      "where": "where_it_stands",
      "why": "Check 4 (owed item 12): the order's own words are that OMB 'shall ... issue guidance requiring each agency to' transition by these dates; the sentence now says that instead of 'they set the targets'.",
      "evidence_file": "Executive Order Source Library/Source Text Editions/eo-06ffd5acc6907caf51d6.md"
    },
    {
      "where": "steps[n=8].date_note",
      "why": "Check 2: the order says 'Within 90 days of the date of this order'; the library's date tables list July 22, October 22, December 19 and March 19 but give no date for the 90-day OMB guidance.",
      "evidence_file": "Executive Order Source Library/Source Text Editions/eo-06ffd5acc6907caf51d6.md"
    },
    {
      "where": "steps[n=9].date_note",
      "why": "Check 2: same counted date as step 8, repeated in this step's text.",
      "evidence_file": "Executive Order Source Library/Source Text Editions/eo-06ffd5acc6907caf51d6.md"
    }
  ],
  "renumbered_2026-11-16": {
    "7": 9,
    "8": 10,
    "9": 11,
    "10": 12,
    "11": 13,
    "12": 14,
    "13": 16,
    "14": 17,
    "15": 18,
    "16": 19,
    "17": 20,
    "18": 21,
    "19": 22,
    "20": 23
  },
  "filled_2026-11-16": [
    {
      "was": "open_points: the register record for M-26-15 mentions TLS 1.3, crypto-inventory and vendor-responsibility clocks; no markdown file sets them out. where_the_files_stop_top5[2] (TLS 1.3 part).",
      "fact": "M-26-15 Appendix A §4 directs support for TLS 1.3 or a successor on non-national-security systems by January 2, 2030; Appendix B requires a testing and deployment schedule in each initial plan.",
      "file": "Fintech and Private Rails/Federal Cryptographic Trust Stack 2026-08-11/FEDERAL_CRYPTOGRAPHIC_TRUST_STACK_2026-08-11.md",
      "quote": "Agencies must support TLS 1.3 or a successor as soon as practicable and by January 2, 2030."
    },
    {
      "was": "quiet_stretch[0]: the notes do not record whether EO 14306's milestones between June 2025 and June 2026 were met.",
      "fact": "CISA issued the §4(f)(i) product-category guidance on January 23, 2026 (deadline December 1, 2025).",
      "file": "Executive Order Source Library/Biden Backfill 2026-10-30/WAVE_8B1_CYBER.md",
      "quote": "For §4(f)(i), CISA issued its product-category guidance January 23, 2026, after the December 1, 2025 deadline."
    },
    {
      "was": "open_points (lead): Treasury's Quantum Readiness Task Force, no file made.",
      "fact": "Treasury announced the task force on August 24, 2026; the notes record no meeting record or workstream output as of November 15.",
      "file": "Fintech and Private Rails/Federal Cryptographic Trust Stack 2026-08-11/FEDERAL_CRYPTOGRAPHIC_TRUST_STACK_2026-08-11.md",
      "quote": "Treasury announced the public-private task force on August 24, 2026, following EO 14412 and the G7 Cyber Expert Group's January 12 financial-sector roadmap."
    }
  ],
  "movement_types_added_2026-11-24": {
    "by": "Claude, with Katie",
    "what": "Added movement_type to every step. No other field was changed.",
    "vocabulary": "00 - Index/Operation Inch by Inch/Stories 2026-11-14/MOVEMENT TYPES — for any system.md",
    "how": "Each step was read. The type follows the step's own stage wording and what it records."
  }
}