  "id": "doe-reactor-pilot",
  "title": "DOE Reactor Pilot Program (Executive Order 14301, section 5) and its criticality demonstrations",
  "one_line": "Under EO 14301 the Department of Energy opened an outside-laboratory test-reactor pilot, selected eleven projects and reported five criticality demonstrations between June 4 and August 5, 2026; the NRC's rule letting applicants use prior DOE or War authorizations takes effect November 25, 2026.",
  "system": "civilian-nuclear-licensing-and-fuel",
  "second_system": null,
  "how_it_entered": {
    "earliest_thread_file": {
      "date": "2026-07-25",
      "file": "Federal Government Website Sweep 2026-07-25/Domestic Systems Wave 7/DOMESTIC_SYSTEMS_WAVE_7_PRIMARY_OBJECT_LEDGER.md",
      "note": "The July 25 website sweep records the Unity and Aalo-X criticality releases."
    },
    "requests": [
      {
        "id": "K02-020",
        "when": "2026-07-25",
        "her_words": "I want this to be comprehensive FULL sweep, not a blanket of forced brevity.",
        "why_quote": "We haven't done a real 'government website sweep' in a bit - I'm thinking we should!!",
        "package": "Federal Government Website Sweep 2026-07-25"
      },
      {
        "id": "K03-012",
        "when": "2026-08-08",
        "her_words": "I'm thinking we should plan another government wide sweep to see what took place this past week.",
        "package": "Federal Government Weekly Delta 2026-08-08",
        "note": "The weekly delta recorded the Groves criticality."
      },
      {
        "id": "K07-072",
        "when": "2026-09-23 18:25 UTC",
        "her_words": "I think the government is building a quantum resistant financial rail (or outsourcing the building of the actual technology) based on the science & technology strategy documents and the GENESIS mission",
        "files": [
          "Economic Institution Legitimacy Crisis 2025-2026/WAVE_3_SCIENCE_TECHNOLOGY_MISSION_TO_MACHINE_EVIDENCE_LEDGER_2026-09-24.md"
        ]
      }
    ],
    "request_source": "Obsidian vault: 00 - Index/Operation Inch by Inch/Katie's Words 2026-11-13/ORIGINS_BY_PACKAGE.json"
  },
  "actors": [
    {
      "body": "The President",
      "role": "Signed Executive Order 14301 on May 23, 2025; section 5(a) directs the pilot."
    },
    {
      "body": "Secretary of Energy; U.S. Department of Energy, Office of Nuclear Energy",
      "role": "Runs the pilot: opened applications, selected projects, authorizes the test reactors and publishes the results."
    },
    {
      "body": "Idaho National Laboratory",
      "role": "Site of the Mark-0, Unity and Aalo-X demonstrations."
    },
    {
      "body": "Antares Nuclear; Deployable Energy; Aalo Atomics; Oklo",
      "role": "Operators of Mark-0, Unity, Aalo-X and the Groves Isotope Test Reactor, as named in DOE releases. The files do not name the operator of Ward 250 or give the companies' legal entity forms."
    },
    {
      "body": "U.S. Nuclear Regulatory Commission",
      "role": "Licenses commercial reactors; proposed (April 2, 2026) and finalized (October 26, 2026) the rule on prior DOE or War authorizations."
    }
  ],
  "strands": [
    {
      "strand": "Direction",
      "steps": [
        1
      ]
    },
    {
      "strand": "Selection",
      "steps": [
        2,
        3
      ]
    },
    {
      "strand": "Demonstrations",
      "steps": [
        5,
        6,
        7,
        8,
        9
      ]
    },
    {
      "strand": "Commercial licensing",
      "steps": [
        4,
        10
      ]
    }
  ],
  "steps": [
    {
      "n": 1,
      "date": "2025-05-23",
      "date_exactness": "day given; filed May 28 and published May 29, 2025",
      "body": "The President (Donald J. Trump)",
      "what": "Under EO 14301 §5(a), the President directed the Secretary of Energy to create a pilot outside national laboratories and approve at least three test reactors with a goal of criticality by July 4, 2026.",
      "stage": "signed",
      "status_word": "signed; published May 29, 2025 at 90 FR 22591-22593",
      "path": "presidential-instrument",
      "rests_on": "official record, linked (Compilation of Presidential Documents; Federal Register)",
      "primary_source": "https://www.govinfo.gov/content/pkg/DCPD-202500634/html/DCPD-202500634.htm",
      "quote": {
        "file": "Federal Science Operating System/FEDERAL_SCIENCE_OPERATING_SYSTEM_FACTUAL_SPINE_2025-2026.md",
        "text": "Under EO 14301 §5(a), the President directed the Secretary of Energy to create a pilot outside national laboratories and approve at least three test reactors with a goal of criticality by July 4, 2026."
      },
      "files": [
        "Federal Science Operating System/FEDERAL_SCIENCE_OPERATING_SYSTEM_FACTUAL_SPINE_2025-2026.md"
      ],
      "from_register": false,
      "strand": "Direction",
      "weight": "turning point",
      "thesis_words": [],
      "where_in_the_system": [
        {
          "foundation": "Foundations 2026-11-14/how-a-federal-action-moves-from-agenda-to-effect.md",
          "stage": "(d) Presidential instrument: executive order, memorandum, proclamation, determination; what it directs, to whom, by when; publication; how agencies carry it out or do not"
        },
        {
          "foundation": "Systems Map 2026-11-14/join/out/CANONICAL_SYSTEMS.json (civilian-nuclear-licensing-and-fuel; no foundation piece)",
          "stage": "DOE authorizes test reactors"
        }
      ],
      "manager_weight": "turning point",
      "what_moves": "Duty: the Secretary of Energy is directed to set up an outside-laboratory pilot and approve at least three test reactors.",
      "publication": {
        "quote": "Signed 2025-05-23; filed 2025-05-28 08:45; published 2025-05-29, 90 FR 22591–22593.",
        "file": "Federal Science Operating System/FEDERAL_SCIENCE_OPERATING_SYSTEM_FACTUAL_SPINE_2025-2026.md"
      },
      "disagreement": "none recorded",
      "source_check": "none",
      "movement_type": "Decided"
    },
    {
      "n": 2,
      "date": "2025-06-18",
      "date_exactness": "calendar day",
      "body": "U.S. Department of Energy, Office of Nuclear Energy",
      "what": "DOE opened applications for construction and operation of qualified test reactors outside the national laboratories. The initial window ran through July 21, with later applications on a rolling basis.",
      "stage": "request for information or comment",
      "status_word": "applications invited (initial window to July 21, 2025; rolling after)",
      "path": "agency-operation-or-program",
      "rests_on": "the body's own statement, linked",
      "primary_source": "https://www.energy.gov/ne/us-department-energy-reactor-pilot-program",
      "quote": {
        "file": "Federal Science Operating System/FEDERAL_SCIENCE_OPERATING_SYSTEM_FACTUAL_SPINE_2025-2026.md",
        "text": "DOE opened applications for construction and operation of qualified test reactors outside the national laboratories. The initial window ran through July 21, with later applications on a rolling basis."
      },
      "files": [
        "Federal Science Operating System/FEDERAL_SCIENCE_OPERATING_SYSTEM_FACTUAL_SPINE_2025-2026.md"
      ],
      "from_register": false,
      "strand": "Selection",
      "weight": "step",
      "thesis_words": [],
      "where_in_the_system": [
        {
          "foundation": "Systems Map 2026-11-14/join/out/CANONICAL_SYSTEMS.json (civilian-nuclear-licensing-and-fuel; no foundation piece)",
          "stage": "DOE authorizes test reactors"
        }
      ],
      "md_stage": "applications invited",
      "manager_weight": "step",
      "what_moves": "Program: application window opened.",
      "disagreement": "none recorded",
      "source_check": "none",
      "movement_type": "Asked for input or applications"
    },
    {
      "n": 3,
      "date": "2025-08-12",
      "date_exactness": "calendar day",
      "body": "U.S. Department of Energy",
      "what": "DOE announced eleven initial projects across ten companies, including two Oklo projects, for work through its authorization process; the companies bear project costs. The announcement set July 4, 2026 as the criticality goal.",
      "stage": "approved or adopted",
      "status_word": "initial selections announced (selection is not authorization)",
      "path": "agency-operation-or-program",
      "rests_on": "the body's own statement, linked",
      "primary_source": "https://www.energy.gov/articles/department-energy-announces-initial-selections-new-reactor-pilot-program",
      "quote": {
        "file": "Federal Science Operating System/FEDERAL_SCIENCE_OPERATING_SYSTEM_FACTUAL_SPINE_2025-2026.md",
        "text": "DOE announced eleven initial projects across ten companies, including two Oklo projects, for work through its authorization process."
      },
      "files": [
        "Federal Science Operating System/FEDERAL_SCIENCE_OPERATING_SYSTEM_FACTUAL_SPINE_2025-2026.md",
        "Economic Institution Legitimacy Crisis 2025-2026/WAVE_3_SCIENCE_TECHNOLOGY_MISSION_TO_MACHINE_EVIDENCE_LEDGER_2026-09-24.md"
      ],
      "from_register": false,
      "strand": "Selection",
      "weight": "turning point",
      "thesis_words": [],
      "where_in_the_system": [
        {
          "foundation": "Systems Map 2026-11-14/join/out/CANONICAL_SYSTEMS.json (civilian-nuclear-licensing-and-fuel; no foundation piece)",
          "stage": "DOE authorizes test reactors"
        }
      ],
      "md_stage": "selected",
      "manager_weight": "step",
      "what_moves": "Program: projects selected; no reactor authorized by this step.",
      "disagreement": "none recorded",
      "source_check": "none",
      "movement_type": "Selected or offered, not final"
    },
    {
      "n": 4,
      "date": "2026-04-02",
      "date_exactness": "dated March 31, filed April 1 and published April 2, 2026",
      "body": "U.S. Nuclear Regulatory Commission",
      "stage": "proposed",
      "status_word": "proposed rule published (91 FR 16584-16588); comments due May 4, 2026",
      "path": "agency-rule",
      "weight": "step",
      "manager_weight": "step",
      "what": "The NRC proposed letting its reviews of reactor designs previously authorized by DOE or the Department of War reuse the tested safety evidence, mapped to NRC requirements and changed conditions. Comments were due May 4, 2026.",
      "quote": {
        "file": "Federal Science Operating System/FEDERAL_SCIENCE_OPERATING_SYSTEM_FACTUAL_SPINE_2025-2026.md",
        "text": "Dated 2026-03-31; filed 2026-04-01 08:45; published 2026-04-02, 91 FR 16584–16588. Comments due 2026-05-04."
      },
      "files": [
        "Federal Science Operating System/FEDERAL_SCIENCE_OPERATING_SYSTEM_FACTUAL_SPINE_2025-2026.md"
      ],
      "rests_on": "official record, linked (Federal Register)",
      "strand": "Commercial licensing",
      "what_moves": "Rules: proposed.",
      "where_in_the_system": [
        {
          "foundation": "Foundations 2026-11-14/how-a-federal-action-moves-from-agenda-to-effect.md",
          "stage": "(b) Agency rule: from agenda and request for information through proposal, comment, OIRA review, final rule, publication and effective date"
        },
        {
          "foundation": "Systems Map 2026-11-14/join/out/CANONICAL_SYSTEMS.json (civilian-nuclear-licensing-and-fuel; no foundation piece)",
          "stage": "NRC licenses reactors"
        }
      ],
      "added_2026-11-16": true,
      "disagreement": "none recorded",
      "source_check": "none",
      "thesis_words": [],
      "from_register": false,
      "movement_type": "Proposed or filed"
    },
    {
      "n": 5,
      "date": "2026-06-04",
      "date_exactness": "calendar day",
      "body": "Antares Nuclear (operator; the files do not give the legal entity form); U.S. Department of Energy (authorizer and publisher)",
      "what": "DOE reported that Antares Nuclear’s Mark-0 completed a zero-power fueled criticality demonstration at Idaho National Laboratory.",
      "stage": "first use",
      "status_word": "zero-power fueled criticality reported by DOE",
      "path": "agency-operation-or-program",
      "rests_on": "the body's own statement, linked",
      "primary_source": "https://www.energy.gov/articles/department-energy-celebrates-first-advanced-reactor-criticality",
      "quote": {
        "file": "Federal Science Operating System/FEDERAL_SCIENCE_OPERATING_SYSTEM_FACTUAL_SPINE_2025-2026.md",
        "text": "DOE reported that Antares Nuclear’s Mark-0 completed a zero-power fueled criticality demonstration at Idaho National Laboratory."
      },
      "files": [
        "Federal Science Operating System/FEDERAL_SCIENCE_OPERATING_SYSTEM_FACTUAL_SPINE_2025-2026.md"
      ],
      "from_register": false,
      "strand": "Demonstrations",
      "weight": "turning point",
      "thesis_words": [],
      "where_in_the_system": [
        {
          "foundation": "Systems Map 2026-11-14/join/out/CANONICAL_SYSTEMS.json (civilian-nuclear-licensing-and-fuel; no foundation piece)",
          "stage": "DOE authorizes test reactors"
        }
      ],
      "manager_weight": "turning point",
      "manager_weight_note": "First criticality reported under the pilot.",
      "what_moves": "Systems: first test reactor critical under the pilot.",
      "disagreement": "none recorded",
      "source_check": "none",
      "movement_type": "Physical milestone"
    },
    {
      "n": 6,
      "date": "2026-06-18",
      "date_exactness": "calendar day",
      "body": "U.S. Department of Energy (the files do not name the Ward 250 operator)",
      "what": "DOE reported that Ward 250 completed its zero-power fueled criticality demonstration at the Utah San Rafael Energy Lab in Emery County. DOE described it as the first DOE-authorized reactor built outside a national laboratory.",
      "stage": "in operation",
      "status_word": "zero-power fueled criticality reported by DOE",
      "path": "agency-operation-or-program",
      "rests_on": "the body's own statement, linked",
      "primary_source": "https://www.energy.gov/articles/department-energy-celebrates-second-advanced-reactor-achieving-criticality",
      "quote": {
        "file": "Federal Science Operating System/FEDERAL_SCIENCE_OPERATING_SYSTEM_FACTUAL_SPINE_2025-2026.md",
        "text": "DOE reported that Ward 250 completed its zero-power fueled criticality demonstration at the Utah San Rafael Energy Lab in Emery County. DOE described it as the first DOE-authorized reactor built outside a national laboratory."
      },
      "files": [
        "Federal Science Operating System/FEDERAL_SCIENCE_OPERATING_SYSTEM_FACTUAL_SPINE_2025-2026.md"
      ],
      "from_register": false,
      "strand": "Demonstrations",
      "weight": "step",
      "thesis_words": [],
      "where_in_the_system": [
        {
          "foundation": "Systems Map 2026-11-14/join/out/CANONICAL_SYSTEMS.json (civilian-nuclear-licensing-and-fuel; no foundation piece)",
          "stage": "DOE authorizes test reactors"
        }
      ],
      "corrected_2026-11-16": [
        {
          "field": "body",
          "was": "Valar Atomics Inc. and U.S. Department of Energy",
          "now": "U.S. Department of Energy (the files do not name the Ward 250 operator)",
          "file": "Federal Science Operating System/FEDERAL_SCIENCE_OPERATING_SYSTEM_FACTUAL_SPINE_2025-2026.md",
          "quote": "DOE reported that Ward 250 completed its zero-power fueled criticality demonstration at the Utah San Rafael Energy Lab in Emery County.",
          "reason": "No research file names Valar Atomics; the batch 9 name is not supported by the library."
        }
      ],
      "manager_weight": "step",
      "what_moves": "Systems: second test reactor critical; first outside a national laboratory per DOE.",
      "disagreement": "none recorded",
      "source_check": "none",
      "movement_type": "Physical milestone"
    },
    {
      "n": 7,
      "date": "2026-06-30",
      "date_exactness": "calendar day",
      "body": "Deployable Energy (operator); U.S. Department of Energy",
      "what": "Deployable Energy’s Unity reached zero-power fueled criticality at Idaho National Laboratory. DOE announced it July 1 and counted it as the third demonstration.",
      "stage": "in operation",
      "status_word": "zero-power fueled criticality; DOE release July 1",
      "path": "agency-operation-or-program",
      "rests_on": "the body's own statement, linked",
      "primary_source": "https://www.energy.gov/articles/us-department-energy-meets-president-trumps-goal-delivers-third-advanced-reactor",
      "quote": {
        "file": "Federal Science Operating System/FEDERAL_SCIENCE_OPERATING_SYSTEM_FACTUAL_SPINE_2025-2026.md",
        "text": "Deployable Energy’s Unity reached zero-power fueled criticality at Idaho National Laboratory. DOE announced it July 1 and counted it as the third demonstration."
      },
      "files": [
        "Federal Science Operating System/FEDERAL_SCIENCE_OPERATING_SYSTEM_FACTUAL_SPINE_2025-2026.md",
        "Federal Government Website Sweep 2026-07-25/Domestic Systems Wave 7/DOMESTIC_SYSTEMS_WAVE_7_PRIMARY_OBJECT_LEDGER.md"
      ],
      "from_register": false,
      "strand": "Demonstrations",
      "weight": "step",
      "thesis_words": [],
      "where_in_the_system": [
        {
          "foundation": "Systems Map 2026-11-14/join/out/CANONICAL_SYSTEMS.json (civilian-nuclear-licensing-and-fuel; no foundation piece)",
          "stage": "DOE authorizes test reactors"
        }
      ],
      "manager_weight": "step",
      "what_moves": "Systems: third test reactor critical.",
      "disagreement": "none recorded",
      "source_check": "none",
      "movement_type": "Physical milestone"
    },
    {
      "n": 8,
      "date": "2026-07-04",
      "date_exactness": "calendar day",
      "body": "Aalo Atomics (operator); U.S. Department of Energy",
      "what": "Aalo-X completed a zero-power fueled criticality demonstration at Idaho National Laboratory. DOE announced it July 6 and counted it as the fourth DOE-authorized advanced reactor to reach criticality.",
      "stage": "in operation",
      "status_word": "zero-power fueled criticality; DOE release July 6",
      "path": "agency-operation-or-program",
      "rests_on": "the body's own statement, linked",
      "primary_source": "https://www.energy.gov/articles/department-energy-celebrates-fourth-criticality-ahead-july-4th-goal",
      "quote": {
        "file": "Federal Science Operating System/FEDERAL_SCIENCE_OPERATING_SYSTEM_FACTUAL_SPINE_2025-2026.md",
        "text": "Aalo-X completed a zero-power fueled criticality demonstration at Idaho National Laboratory. DOE announced it July 6 and counted it as the fourth DOE-authorized advanced reactor to reach criticality."
      },
      "files": [
        "Federal Science Operating System/FEDERAL_SCIENCE_OPERATING_SYSTEM_FACTUAL_SPINE_2025-2026.md",
        "Federal Government Website Sweep 2026-07-25/Domestic Systems Wave 7/DOMESTIC_SYSTEMS_WAVE_7_PRIMARY_OBJECT_LEDGER.md"
      ],
      "from_register": false,
      "strand": "Demonstrations",
      "weight": "step",
      "thesis_words": [],
      "where_in_the_system": [
        {
          "foundation": "Systems Map 2026-11-14/join/out/CANONICAL_SYSTEMS.json (civilian-nuclear-licensing-and-fuel; no foundation piece)",
          "stage": "DOE authorizes test reactors"
        }
      ],
      "disagreement": "Not a disagreement between files. DOE counts Mark-0, Unity and Aalo-X (Idaho National Laboratory) and Ward 250 (Utah) in its four-by-July-4 total; EO 14301 section 5(a) calls for a pilot outside the national laboratories.",
      "manager_weight": "step",
      "what_moves": "Systems: fourth test reactor critical.",
      "md_disagree": false,
      "source_check": "none",
      "movement_type": "Physical milestone"
    },
    {
      "n": 9,
      "date": "2026-08-05",
      "date_exactness": "August 5 is inferred from DOE's August 6 release (\"the previous night\"); the exact time is not stated",
      "body": "Oklo (operator; the files do not give the legal entity form); U.S. Department of Energy, Office of Nuclear Energy (authorizer and publisher)",
      "what": "The Groves Isotope Test Reactor reached criticality in Lockhart, Texas. DOE reported the result the next day and identified it as the fifth DOE-authorized advanced reactor to reach criticality that summer.",
      "stage": "in operation",
      "status_word": "criticality reported by DOE August 6",
      "path": "agency-operation-or-program",
      "rests_on": "the body's own statement, linked",
      "primary_source": "https://www.energy.gov/ne/articles/office-nuclear-energy-celebrates-fifth-advanced-reactor-criticality",
      "quote": {
        "file": "Federal Science Operating System/FEDERAL_SCIENCE_OPERATING_SYSTEM_FACTUAL_SPINE_2025-2026.md",
        "text": "The Groves Isotope Test Reactor reached criticality in Lockhart, Texas. DOE reported the result the next day and identified it as the fifth DOE-authorized advanced reactor to reach criticality that summer."
      },
      "files": [
        "Federal Science Operating System/FEDERAL_SCIENCE_OPERATING_SYSTEM_FACTUAL_SPINE_2025-2026.md",
        "Federal Government Weekly Delta 2026-08-08/waves/WAVE_4_PHYSICAL_PRODUCTION.md",
        "Economic Institution Legitimacy Crisis 2025-2026/WAVE_3_SCIENCE_TECHNOLOGY_MISSION_TO_MACHINE_EVIDENCE_LEDGER_2026-09-24.md"
      ],
      "from_register": false,
      "strand": "Demonstrations",
      "weight": "step",
      "thesis_words": [],
      "where_in_the_system": [
        {
          "foundation": "Systems Map 2026-11-14/join/out/CANONICAL_SYSTEMS.json (civilian-nuclear-licensing-and-fuel; no foundation piece)",
          "stage": "DOE authorizes test reactors"
        }
      ],
      "manager_weight": "step",
      "what_moves": "Systems: fifth test reactor critical.",
      "disagreement": "none recorded",
      "source_check": "none",
      "movement_type": "Physical milestone"
    },
    {
      "n": 10,
      "date": "2026-10-26",
      "date_exactness": "publication date",
      "body": "U.S. Nuclear Regulatory Commission",
      "what": "The NRC published a final rule adding to 10 CFR Parts 50 and 53 a route for applicants to use a prior Department of Energy or Department of War authorization to show specified safety functions. The applicant must identify how the earlier authorization meets NRC requirements; a commercial licence still needs NRC review and decision. Effective November 25, 2026.",
      "stage": "published",
      "status_word": "final rule published (91 FR 67195); effective November 25, 2026",
      "path": "agency-rule",
      "rests_on": "official record, linked (Federal Register)",
      "primary_source": "https://www.govinfo.gov/content/pkg/FR-2026-10-26/html/2026-21801.htm",
      "quote": {
        "file": "Federal Science Operating System/FEDERAL_SCIENCE_OPERATING_SYSTEM_FACTUAL_SPINE_2025-2026.md",
        "text": "The applicant must identify how the earlier authorization satisfies applicable NRC requirements."
      },
      "files": [
        "Federal Science Operating System/FEDERAL_SCIENCE_OPERATING_SYSTEM_FACTUAL_SPINE_2025-2026.md"
      ],
      "from_register": false,
      "strand": "Commercial licensing",
      "weight": "turning point",
      "thesis_words": [],
      "where_in_the_system": [
        {
          "foundation": "Foundations 2026-11-14/how-a-federal-action-moves-from-agenda-to-effect.md",
          "stage": "(b) Agency rule: from agenda and request for information through proposal, comment, OIRA review, final rule, publication and effective date"
        },
        {
          "foundation": "Systems Map 2026-11-14/join/out/CANONICAL_SYSTEMS.json (civilian-nuclear-licensing-and-fuel; no foundation piece)",
          "stage": "NRC licenses reactors"
        }
      ],
      "manager_weight": "turning point",
      "what_moves": "Rules: a licensing route for designs previously authorized by DOE or War.",
      "disagreement": "none recorded",
      "source_check": "none",
      "movement_type": "Published"
    }
  ],
  "where_in_the_system": [
    {
      "foundation": "Foundations 2026-11-14/how-a-federal-action-moves-from-agenda-to-effect.md",
      "stage": "(d) Presidential instrument: executive order, memorandum, proclamation, determination; what it directs, to whom, by when; publication; how agencies carry it out or do not",
      "steps": [
        1
      ]
    },
    {
      "foundation": "Systems Map 2026-11-14/join/out/CANONICAL_SYSTEMS.json (civilian-nuclear-licensing-and-fuel; no foundation piece)",
      "stage": "DOE authorizes test reactors",
      "steps": [
        1,
        2,
        3,
        5,
        6,
        7,
        8,
        9
      ]
    },
    {
      "foundation": "Foundations 2026-11-14/how-a-federal-action-moves-from-agenda-to-effect.md",
      "stage": "(b) Agency rule: from agenda and request for information through proposal, comment, OIRA review, final rule, publication and effective date",
      "steps": [
        4,
        10
      ]
    },
    {
      "foundation": "Systems Map 2026-11-14/join/out/CANONICAL_SYSTEMS.json (civilian-nuclear-licensing-and-fuel; no foundation piece)",
      "stage": "NRC licenses reactors",
      "steps": [
        4,
        10
      ]
    }
  ],
  "same_days": {
    "2025-05-23": [
      {
        "date": "2025-05-23",
        "body": "President Donald J. Trump",
        "line": "The President signed the separate NRC reform order, EO 14300, that day.",
        "file": "Federal Science Operating System/FEDERAL_SCIENCE_OPERATING_SYSTEM_FACTUAL_SPINE_2025-2026.md"
      }
    ],
    "2026-06-04 (step 5)": [
      {
        "date": "2026-06-05",
        "body": "Senate",
        "line": "The Senate rejected the motion to proceed to the House message on S. 1318, 47 to 52. The October 25 file records no later reauthorization action.",
        "story": "fisa-702",
        "story_file": "Stories 2026-11-14/batch 8/fisa-702.json",
        "file": "Congressional Committee Control Plane/MILITARY_INTELLIGENCE_COMMITTEE_DELTA_2026-10-25.md"
      },
      {
        "date": "2026-06-03",
        "body": "The President (Donald Trump), Executive Order 14410, with its Appendix",
        "line": "The President signed Executive Order 14410, 'Implementing Schedule Policy/Career in the Excepted Service'. Section 5 determined that the positions in its Appendix are of a confidential, policy-determining, policy-making or policy-advocating character and placed them in Schedule Policy/Career; the Appendix has 4,862 rows (4,861 position-description listing rows plus one NIH class row, 4,811 distinc",
        "story": "schedule-policy-career",
        "story_file": "Stories 2026-11-14/batch 4/schedule-policy-career.json",
        "file": "Executive Order Source Library/Source Text Editions/eo-9a4746d7faeabbcd7abc.md"
      },
      {
        "date": "2026-06-04",
        "body": "House Committee on Armed Services",
        "line": "The House Committee on Armed Services calendar lists a meeting on H.R. 8800, the National Defense Authorization Act for Fiscal Year 2027.",
        "story": "ndaa-sasc",
        "story_file": "Stories 2026-11-14/batch 8/ndaa-sasc.json",
        "file": "Congressional Committee Control Plane/house_repository_daily_discovery_119th.json"
      },
      {
        "date": "2026-06-04",
        "body": "U.S. Department of Energy; Japan's Ministry of Education, Culture, Sports, Science and Technology (MEXT) and Ministry of Economy, Trade and Industry (METI)",
        "line": "DOE and the two Japanese ministries announced a planned five-year Genesis partnership of a combined $1 billion, split equally and subject to future appropriations, with eleven joint teams linking twelve DOE national laboratories, one Office of Science user facility and twelve Japanese institutions.",
        "story": "genesis-mission-awards",
        "story_file": "Stories 2026-11-14/batch 4/genesis-mission-awards.json",
        "file": "Federal Science Operating System/FEDERAL_SCIENCE_OPERATING_SYSTEM_FACTUAL_SPINE_2025-2026.md"
      },
      {
        "date": "2026-06-04",
        "body": "Ohio Secretary of State and the DOJ National Fraud Enforcement Division",
        "line": "Ohio's Secretary of State published a signed six-page memorandum of understanding with the Division to share public business-entity data for fraud analysis and prosecution; it transfers and obligates no funds, leaves schedules and file formats to a later technical annex, excludes Computer Matching Act programs unless exempt, and requires DOJ to validate records before acting.",
        "story": "fraud-task-force",
        "story_file": "Stories 2026-11-14/batch 3/fraud-task-force.json",
        "file": "Fraud and Payment Integrity/FEDERAL_AND_FLORIDA_FRAUD_AGREEMENTS_AI_OVERSIGHT_INTERLOCK_2026-09-14.md"
      }
    ],
    "2026-10-26 (step 10)": [
      {
        "date": "2026-10-26",
        "body": "Department of the Treasury (Federal Register agency line: Investment Security Office)",
        "line": "Treasury proposed 31 CFR part 851 under the COINS Act (Title VIII of the Defense Production Act). It would cover semiconductors and microelectronics, artificial intelligence, quantum, high-performance computing and supercomputing, and hypersonics; would add biotechnology; and would prohibit covered investment in developing a 'super intelligence system'. Part 850 stays in force until a final part 8",
        "story": "outbound-investment-rules",
        "story_file": "Stories 2026-11-14/batch 5/outbound-investment-rules.json",
        "file": "July 2024 Protection and Financial Control Window/COINS_PART_851_PROPOSAL_DELTA_2026-10-25.md"
      },
      {
        "date": "2026-10-26",
        "body": "Nuclear Regulatory Commission",
        "line": "The NRC published a final rule amending 10 CFR 50.43 and 53.440. Applicants using an Energy or War authorization must identify how it satisfies the relevant NRC requirements for specified safety functions. NRC retains the licensing decision. The rule is effective November 25. The NRC received 136 unique comment submissions on the proposal.",
        "story": "nrc-licensing-overhaul",
        "story_file": "Stories 2026-11-14/batch 4/nrc-licensing-overhaul.json",
        "file": "Federal Government Refresh 2026-10-30/Source Documents/2026-21801.txt"
      },
      {
        "date": "2026-10-26",
        "body": "Office of the Comptroller of the Currency",
        "line": "The OCC CAS record for filing 2025-Charter-342347 records Ripple National Trust Bank, charter 25364, as Consummated/Effective on October 26, 2026. The notes do not record the final letter, the date of first customer activity, any RLUSD issuer transfer, any reserve move or any Federal Reserve access as of November 13, 2026.",
        "story": "occ-trust-charters",
        "story_file": "Stories 2026-11-14/batch 3/occ-trust-charters.json",
        "file": "Fintech and Private Rails/RIPPLE_TREASURY_AVIVA_AND_OCC_NEWS_2026-10-26.md"
      },
      {
        "date": "2026-10-27",
        "body": "Department of Health and Human Services (HHS) and Centers for Medicare & Medicaid Services (CMS)",
        "line": "HHS and CMS published proposed rule CMS-9873-P, 'Exchange Pre-Eligibility Verification', with comments due November 27, 2026. A new applicant would generally wait for verification of income and family size, citizenship or immigration status, other coverage and residence before getting financial help; the applicant could enroll at full price while waiting or pick a plan that starts once verified; C",
        "story": "aca-ptc-verification",
        "story_file": "Stories 2026-11-14/batch 5/aca-ptc-verification.json",
        "file": "Insurance and Reinsurance/MARKETPLACE_2027_NONCITIZEN_ELIGIBILITY_AND_2028_VERIFICATION_2026-11-11.md"
      },
      {
        "date": "2026-10-28",
        "body": "The Depository Trust Company, a subsidiary of The Depository Trust & Clearing Corporation; the service is named the DTCC Tokenization Service (DTS)",
        "line": "DTC launched the DTCC Tokenization Service: twenty DTC Participants had signed access agreements, the service was integrated with the Canton Network and DTCC's private Besu network with additional networks to be added in 2027, and the service page listed 34 securities available to tokenize.",
        "story": "dtc-tokenization-service",
        "story_file": "Stories 2026-11-14/upgraded (batches 1-2 and pilot)/dtc-tokenization-service.json",
        "file": "Fintech and Private Rails/Major Bank Digital Transition 2026-09-26/MORGAN_STANLEY_DTC_TOKENIZATION_FIRST_USE_2026-11-04.md"
      }
    ]
  },
  "where_it_stands": "As of 15 November 2026: DOE has reported five advanced-reactor criticality demonstrations under its Reactor Pilot Program, the fourth on July 4, 2026 and the fifth (Oklo's Groves Isotope Test Reactor, Lockhart, Texas) on August 5, 2026. Three of the four counted by July 4 were at Idaho National Laboratory and one (Ward 250) at the Utah San Rafael Energy Lab. The NRC's final rule on designs previously authorized by DOE or the Department of War was published October 26, 2026 (91 FR 67195) and takes effect November 25, 2026. The notes record no commercial NRC application relying on a pilot authorization as of 15 November 2026.",
  "next_dated": [
    {
      "when": "2026-11-23",
      "label": "23 November 2026",
      "what": "The NRC identifies November 23, 2026 as the EO 14300 section 5 deadline to complete its revision of rules and guidance (nrc-licensing-overhaul story).",
      "stage": "deadline",
      "files": [
        "Federal Science Operating System/FEDERAL_SCIENCE_OPERATING_SYSTEM_FACTUAL_SPINE_2025-2026.md"
      ],
      "primary_source": null
    },
    {
      "when": "2026-11-25",
      "label": "25 November 2026",
      "what": "The NRC rule on prior DOE or War authorizations takes effect.",
      "stage": "scheduled effective date",
      "files": [
        "Federal Science Operating System/FEDERAL_SCIENCE_OPERATING_SYSTEM_FACTUAL_SPINE_2025-2026.md"
      ],
      "primary_source": "https://www.govinfo.gov/content/pkg/FR-2026-10-26/html/2026-21801.htm"
    },
    {
      "when": "no date",
      "label": "Not dated",
      "what": "A commercial NRC application that relies on a pilot authorization.",
      "stage": "no date recorded in the notes",
      "files": [
        "Federal Science Operating System/FEDERAL_SCIENCE_OPERATING_SYSTEM_FACTUAL_SPINE_2025-2026.md"
      ],
      "primary_source": null
    }
  ],
  "not_shown": [
    "The notes do not record the DOE authorization instrument for each demonstration.",
    "The notes do not name the operator of Ward 250.",
    "The notes do not record how DOE applied the outside-laboratory terms of section 5(a) to the three Idaho National Laboratory demonstrations.",
    "The notes do not record any criticality under the pilot after August 5, 2026, as of 2026-11-15.",
    "The notes do not record a commercial NRC application relying on a pilot authorization as of 2026-11-15.",
    "The notes do not record the number of comments on the April 2, 2026 NRC proposal."
  ],
  "where_the_files_stop_top5": [
    "DOE authorization instruments for each demonstration.",
    "Operator of Ward 250.",
    "Any criticality after August 5, 2026.",
    "A commercial NRC application relying on a pilot authorization.",
    "Comments on the April 2, 2026 proposal."
  ],
  "touches": [
    {
      "thread": "nrc-licensing-overhaul",
      "at_step": [
        1,
        4,
        10
      ],
      "how": "EO 14300, signed the same day as EO 14301, is that story's step 1; the April 2, 2026 proposal and the October 26, 2026 final rule are its steps 8 and 32.",
      "story_file": "Stories 2026-11-14/batch 4/nrc-licensing-overhaul.json"
    }
  ],
  "foundation": [
    {
      "file": "Obsidian vault: 00 - Index/Operation Inch by Inch/Systems Map 2026-11-14/join/out/CANONICAL_SYSTEMS.md",
      "system": "civilian-nuclear-licensing-and-fuel",
      "why": "The system has no foundation piece; its definition names DOE test-reactor authorizations and NRC licensing."
    },
    {
      "file": "Obsidian vault: 00 - Index/Operation Inch by Inch/Foundations 2026-11-14/how-a-federal-action-moves-from-agenda-to-effect.md",
      "why": "Paths (b) agency rule and (d) presidential instrument."
    },
    {
      "file": "Research Packages/Federal Science Operating System/FEDERAL_SCIENCE_OPERATING_SYSTEM_FACTUAL_SPINE_2025-2026.md",
      "why": "Dated list of the pilot steps, each with its DOE or Federal Register link."
    }
  ],
  "open_points": [
    {
      "kind": "missing fact",
      "what": "The notes do not record the DOE authorization instrument for each demonstration.",
      "where": "Federal Science Operating System/FEDERAL_SCIENCE_OPERATING_SYSTEM_FACTUAL_SPINE_2025-2026.md",
      "settled": "no",
      "fix": ""
    },
    {
      "kind": "missing fact",
      "what": "No research file names the operator of Ward 250; the batch 9 story named Valar Atomics Inc.",
      "where": "Federal Science Operating System/FEDERAL_SCIENCE_OPERATING_SYSTEM_FACTUAL_SPINE_2025-2026.md",
      "settled": "no",
      "fix": "U.S. Department of Energy (the files do not name the Ward 250 operator)."
    },
    {
      "kind": "missing fact",
      "what": "The files give company names without legal entity forms (the batch 9 story added \"Inc.\" to four of them).",
      "where": "Federal Science Operating System/FEDERAL_SCIENCE_OPERATING_SYSTEM_FACTUAL_SPINE_2025-2026.md",
      "settled": "no",
      "fix": ""
    },
    {
      "kind": "missing fact",
      "what": "The notes do not record how DOE applied the outside-laboratory terms of section 5(a) to the Idaho National Laboratory demonstrations.",
      "where": "Federal Science Operating System/FEDERAL_SCIENCE_OPERATING_SYSTEM_FACTUAL_SPINE_2025-2026.md",
      "settled": "no",
      "fix": ""
    },
    {
      "kind": "missing fact",
      "what": "The notes do not record a commercial NRC application relying on a pilot authorization.",
      "where": "Federal Science Operating System/FEDERAL_SCIENCE_OPERATING_SYSTEM_FACTUAL_SPINE_2025-2026.md",
      "settled": "no",
      "fix": ""
    }
  ],
  "files_used": {
    "thread_files": [
      "Economic Institution Legitimacy Crisis 2025-2026/WAVE_3_SCIENCE_TECHNOLOGY_MISSION_TO_MACHINE_EVIDENCE_LEDGER_2026-09-24.md",
      "Federal Government Website Sweep 2026-07-25/Domestic Systems Wave 7/DOMESTIC_SYSTEMS_WAVE_7_PRIMARY_OBJECT_LEDGER.md",
      "Federal Government Weekly Delta 2026-08-08/waves/WAVE_4_PHYSICAL_PRODUCTION.md"
    ],
    "related_files": [
      "Federal Science Operating System/FEDERAL_SCIENCE_OPERATING_SYSTEM_FACTUAL_SPINE_2025-2026.md"
    ]
  },
  "counts": {
    "thread_files": 3,
    "steps": 10,
    "turning_points": 3,
    "open_points": 5,
    "steps_before_2026-11-16": 9,
    "turning_points_before_2026-11-16": 4,
    "detail_by_federal_scope": 0,
    "steps_added_2026-11-16": 1,
    "steps_with_disagreement": 1
  },
  "renumbered_2026-11-16": {
    "1": 1,
    "2": 2,
    "3": 3,
    "4": 5,
    "5": 6,
    "6": 7,
    "7": 8,
    "8": 9,
    "9": 10
  },
  "interpretation": [
    {
      "claim": "Codex's view of the Groves criticality",
      "quote": {
        "text": "The Groves criticality receipt matters because it crosses a physical threshold",
        "file": "Economic Institution Legitimacy Crisis 2025-2026/WAVE_3_SCIENCE_TECHNOLOGY_MISSION_TO_MACHINE_EVIDENCE_LEDGER_2026-09-24.md"
      }
    }
  ],
  "quiet_stretch": [
    {
      "from": "2025-08-12",
      "to": "2026-04-02",
      "what": "The notes record no pilot step between the initial selections and the NRC proposal; pending: DOE authorizations and the first criticality."
    },
    {
      "from": "2026-08-05",
      "to": "2026-10-26",
      "what": "The notes record no further criticality after Groves; pending: the NRC final rule."
    }
  ],
  "left_out": [
    "Kairos Hermes construction permit: an NRC construction permit outside the pilot.",
    "EO 14301 publication (May 29, 2025): one document, recorded inside step 1.",
    "DOE fact sheet on the four-by-July-4 tally: restates steps 5 to 8."
  ],
  "builder_notes": "G03, 16 November 2026: brought to the story standard. All steps are federal or federally authorized. One step added (NRC proposal of April 2, 2026). Turning points re-weighted to three: the order (step 1), the first criticality (step 5) and the NRC final rule (step 10). The old body 'Valar Atomics Inc.' for Ward 250 is not supported by any file and was replaced (corrected_2026-11-16 on step 6); 'Inc.' was dropped from the other company names because no file gives it. FEDERAL_SCIENCE_OPERATING_SYSTEM_FACTUAL_SPINE_2025-2026.md was modified on 15 November 2026 at 23:39; every quote still matches and the pilot dates are unchanged. The handoff file's nrc-licensing-overhaul entry (October 26 final rule) is already step 10 here.",
  "set_aside_2026-11-16": [
    {
      "field": "steps[old 1].body",
      "text": "President Donald J. Trump"
    },
    {
      "field": "steps[old 1].status_word",
      "text": "signed"
    },
    {
      "field": "steps[old 1].rests_on",
      "text": "official record, linked"
    },
    {
      "field": "steps[old 1].date_exactness",
      "text": "calendar day"
    },
    {
      "field": "steps[old 1].where_in_the_system",
      "text": "Executive order and DOE mandate"
    },
    {
      "field": "steps[old 2].body",
      "text": "U.S. Department of Energy"
    },
    {
      "field": "steps[old 2].stage",
      "text": "applications invited"
    },
    {
      "field": "steps[old 2].status_word",
      "text": "applications invited"
    },
    {
      "field": "steps[old 2].rests_on",
      "text": "official record, linked"
    },
    {
      "field": "steps[old 2].where_in_the_system",
      "text": "DOE test-reactor applications and selection"
    },
    {
      "field": "steps[old 3].stage",
      "text": "selected"
    },
    {
      "field": "steps[old 3].status_word",
      "text": "selected"
    },
    {
      "field": "steps[old 3].rests_on",
      "text": "official record, linked"
    },
    {
      "field": "steps[old 3].what",
      "text": "DOE announced eleven initial projects across ten companies, including two Oklo projects, for work through its authorization process."
    },
    {
      "field": "steps[old 3].where_in_the_system",
      "text": "DOE test-reactor applications and selection"
    },
    {
      "field": "steps[old 4].body",
      "text": "Antares Nuclear Inc. and U.S. Department of Energy"
    },
    {
      "field": "steps[old 4].stage",
      "text": "test completed"
    },
    {
      "field": "steps[old 4].status_word",
      "text": "test completed"
    },
    {
      "field": "steps[old 4].rests_on",
      "text": "official record, linked"
    },
    {
      "field": "steps[old 4].where_in_the_system",
      "text": "DOE-authorized physical testing"
    },
    {
      "field": "steps[old 5].body",
      "text": "Valar Atomics Inc. and U.S. Department of Energy"
    },
    {
      "field": "steps[old 5].stage",
      "text": "test completed"
    },
    {
      "field": "steps[old 5].status_word",
      "text": "test completed"
    },
    {
      "field": "steps[old 5].rests_on",
      "text": "official record, linked"
    },
    {
      "field": "steps[old 5].where_in_the_system",
      "text": "DOE-authorized physical testing"
    },
    {
      "field": "steps[old 6].body",
      "text": "Deployable Energy and U.S. Department of Energy"
    },
    {
      "field": "steps[old 6].stage",
      "text": "test completed"
    },
    {
      "field": "steps[old 6].status_word",
      "text": "test completed"
    },
    {
      "field": "steps[old 6].rests_on",
      "text": "official record, linked"
    },
    {
      "field": "steps[old 6].where_in_the_system",
      "text": "DOE-authorized physical testing"
    },
    {
      "field": "steps[old 7].body",
      "text": "Aalo Atomics Inc. and U.S. Department of Energy"
    },
    {
      "field": "steps[old 7].stage",
      "text": "test completed"
    },
    {
      "field": "steps[old 7].status_word",
      "text": "test completed"
    },
    {
      "field": "steps[old 7].rests_on",
      "text": "official record, linked"
    },
    {
      "field": "steps[old 7].where_in_the_system",
      "text": "DOE-authorized physical testing"
    },
    {
      "field": "steps[old 7].disagreement",
      "text": "DOE includes three Idaho National Laboratory demonstrations in its four-by-July-4 tally. Section 5(a) describes an outside-laboratory pilot."
    },
    {
      "field": "steps[old 8].body",
      "text": "Oklo Inc. and U.S. Department of Energy"
    },
    {
      "field": "steps[old 8].stage",
      "text": "test completed"
    },
    {
      "field": "steps[old 8].status_word",
      "text": "test completed"
    },
    {
      "field": "steps[old 8].rests_on",
      "text": "official record, linked"
    },
    {
      "field": "steps[old 8].date_exactness",
      "text": "date confirmed by DOE presentation and August 6 release"
    },
    {
      "field": "steps[old 8].where_in_the_system",
      "text": "DOE-authorized physical testing"
    },
    {
      "field": "steps[old 9].stage",
      "text": "final rule published"
    },
    {
      "field": "steps[old 9].status_word",
      "text": "final rule published"
    },
    {
      "field": "steps[old 9].rests_on",
      "text": "official record, linked"
    },
    {
      "field": "steps[old 9].what",
      "text": "The NRC published the final rule allowing applicants under Parts 50 and 53 to use prior DOE or War authorizations in addressing specified safety functions. NRC remains the commercial licensing authority."
    },
    {
      "field": "steps[old 9].where_in_the_system",
      "text": "NRC rule and commercial licensing decision"
    },
    {
      "field": "where_in_the_system (story level, before 2026-11-16)",
      "text": [
        {
          "stage": "Executive order and DOE mandate",
          "steps": [
            1
          ]
        },
        {
          "stage": "DOE test-reactor applications and selection",
          "steps": [
            2,
            3
          ]
        },
        {
          "stage": "DOE-authorized physical testing",
          "steps": [
            5,
            6,
            7,
            8,
            9
          ]
        },
        {
          "stage": "NRC rule and commercial licensing decision",
          "steps": [
            10
          ]
        },
        {
          "stage": "Commercial licensing",
          "steps": [
            4
          ]
        }
      ]
    },
    {
      "field": "title",
      "text": "DOE Reactor Pilot Program and its criticality demonstrations"
    },
    {
      "field": "one_line",
      "text": "DOE’s test-reactor selections and dated criticality demonstrations under Executive Order 14301."
    },
    {
      "field": "where_it_stands",
      "text": "DOE reported five advanced-reactor criticality demonstrations under its Reactor Pilot Program through August 6, 2026. Four were in its tally by July 4, including three at Idaho National Laboratory. The executive order directs an outside-laboratory pilot. DOE’s published tally distinguishes the sites. The NRC’s prior-authorization rule takes effect November 25 and gives commercial applicants a way to use prior DOE or War authorizations in licensing reviews."
    },
    {
      "field": "actors",
      "text": [
        {
          "body": "Secretary of Energy",
          "role": "Approves qualified test reactors through DOE’s authorization process."
        },
        {
          "body": "Office of Nuclear Energy, U.S. Department of Energy",
          "role": "Reports the tests, sites and milestones."
        },
        {
          "body": "Idaho National Laboratory",
          "role": "Hosted the Mark-0, Unity and Aalo-X demonstrations."
        },
        {
          "body": "U.S. Nuclear Regulatory Commission",
          "role": "Decides commercial licensing applications and issued the prior-authorization rule."
        }
      ]
    },
    {
      "field": "next_dated",
      "text": [
        {
          "when": "2026-11-25",
          "label": "25 November 2026",
          "what": "The NRC rule takes effect. An applicant can identify the earlier authorization and supply the record for the safety functions it wants the NRC to credit.",
          "stage": "scheduled effective date",
          "files": [
            "Federal Science Operating System/FEDERAL_SCIENCE_OPERATING_SYSTEM_FACTUAL_SPINE_2025-2026.md"
          ],
          "primary_source": "https://www.govinfo.gov/content/pkg/FR-2026-10-26/html/2026-21801.htm"
        },
        {
          "when": "no date",
          "label": "Next project records",
          "what": "Named DOE authorization instruments, follow-on test results and dates for sustained operation or output from the demonstrated designs.",
          "stage": "pending",
          "files": [
            "Federal Science Operating System/FEDERAL_SCIENCE_OPERATING_SYSTEM_FACTUAL_SPINE_2025-2026.md"
          ],
          "primary_source": "https://www.energy.gov/ne/us-department-energy-reactor-pilot-program"
        },
        {
          "when": "no date",
          "label": "First commercial application",
          "what": "An NRC docket identifying a DOE pilot authorization and the NRC finding for a specified safety function.",
          "stage": "pending",
          "files": [
            "Federal Science Operating System/FEDERAL_SCIENCE_OPERATING_SYSTEM_FACTUAL_SPINE_2025-2026.md"
          ],
          "primary_source": "https://www.govinfo.gov/content/pkg/FR-2026-10-26/html/2026-21801.htm"
        }
      ]
    },
    {
      "field": "not_shown",
      "text": [
        "The notes do not record how DOE counted sites against the outside-laboratory terms of §5(a).",
        "The notes do not record all authorization instruments for the individual demonstrations.",
        "The notes do not record a first commercial NRC finding under the new rule or commercial output for the pilot tests."
      ]
    },
    {
      "field": "where_the_files_stop_top5",
      "text": [
        "The notes do not record how DOE counted sites against the outside-laboratory terms of §5(a).",
        "The notes do not record all authorization instruments for the individual demonstrations.",
        "The notes do not record a first commercial NRC finding under the new rule or commercial output for the pilot tests."
      ]
    },
    {
      "field": "open_points",
      "text": [
        {
          "kind": "missing fact",
          "what": "The notes do not record how DOE counted sites against the outside-laboratory terms of §5(a).",
          "where": "Federal Science Operating System/FEDERAL_SCIENCE_OPERATING_SYSTEM_FACTUAL_SPINE_2025-2026.md",
          "settled": "no",
          "fix": ""
        },
        {
          "kind": "missing fact",
          "what": "The notes do not record all authorization instruments for the individual demonstrations.",
          "where": "Federal Science Operating System/FEDERAL_SCIENCE_OPERATING_SYSTEM_FACTUAL_SPINE_2025-2026.md",
          "settled": "no",
          "fix": ""
        },
        {
          "kind": "missing fact",
          "what": "The notes do not record a first commercial NRC finding under the new rule or commercial output for the pilot tests.",
          "where": "Federal Science Operating System/FEDERAL_SCIENCE_OPERATING_SYSTEM_FACTUAL_SPINE_2025-2026.md",
          "settled": "no",
          "fix": ""
        }
      ]
    },
    {
      "field": "touches",
      "text": [
        {
          "thread": "nrc-licensing-overhaul",
          "at_step": [
            1,
            9
          ],
          "how": "The October 26 NRC rule supplies a path to use earlier DOE and War authorizations in a commercial licensing application.",
          "story_file": "Stories 2026-11-14/batch 4/nrc-licensing-overhaul.json"
        }
      ]
    },
    {
      "field": "foundation",
      "text": [
        {
          "file": "Obsidian vault: 00 - Index/Operation Inch by Inch/Systems Map 2026-11-14/join/out/CANONICAL_SYSTEMS.md",
          "system": "civilian-nuclear-licensing-and-fuel"
        }
      ]
    },
    {
      "field": "how_it_entered",
      "text": {
        "earliest_thread_file": {
          "date": "2026-07-25",
          "file": "Federal Government Website Sweep 2026-07-25/Domestic Systems Wave 7/DOMESTIC_SYSTEMS_WAVE_7_PRIMARY_OBJECT_LEDGER.md"
        },
        "requests": []
      }
    }
  ],
  "verification_2026-11-16": {
    "date": "2026-11-16",
    "by": "G03",
    "quotes_checked": 11,
    "quotes_not_found": [],
    "steps_in_date_order": true,
    "numbered": true,
    "original_steps_present": 9,
    "original_steps_changed": [
      {
        "old_n": 9,
        "new_n": 10,
        "date": "2026-10-26",
        "why": "same date; what reworded; earlier wording in set_aside_2026-11-16"
      }
    ],
    "bad_touch_pointers": [],
    "method": "Each quote, with markdown links, bold and line breaks removed and whitespace collapsed, found as a substring of its file (same method as story_check3.py)."
  },
  "pointer_corrections": [
    {
      "date": "2026-11-19",
      "prior_touches": [
        {
          "thread": "nrc-licensing-overhaul",
          "at_step": [
            1,
            4,
            10
          ],
          "how": "EO 14300, signed the same day as EO 14301, is that story's step 1; the April 2, 2026 proposal and the October 26, 2026 final rule are its steps 8 and 33.",
          "story_file": "Stories 2026-11-14/batch 4/nrc-licensing-overhaul.json"
        }
      ],
      "basis": "Current NRC story: April 2 proposal is step 8 and October 26 final rule is step 32; the added November steps do not shift step 32."
    }
  ],
  "changes": [
    {
      "date": "2026-11-19",
      "by": "Codex",
      "what": "Repaired the current cross-story pointer to the NRC October 26 final-rule step; preserved earlier pointer."
    }
  ],
  "movement_types_added_2026-11-24": {
    "by": "Claude, with Katie",
    "what": "Added movement_type to every step. No other field was changed.",
    "vocabulary": "00 - Index/Operation Inch by Inch/Stories 2026-11-14/MOVEMENT TYPES — for any system.md",
    "how": "Each step was read. The type follows the step's own stage wording and what it records."
  }
}