The science plan's structural map names 48 firm entries (45 different names; a few firms sit in more than one corridor), and 19 kinds of firm, beneath the headline programs in 8 corridors. In AI compute: WWT, SambaNova and the engineers Bridgers & Paxton, Burns & McDonnell and Sargent & Lundy. On the grid: study and test firms such as Qualus, PowerGEM, Doble and Shermco. In quantum and encryption: Bluefors, FormFacto
Across ten federal technology programs, the study finds that awards, production and prototypes still fall short of the government actually accepting a working system. Being near a program is not being in it.
The package traces 18 failure chains; the widest (“A transformer factory delay, failed FITT field test, or unaccepted transformer delivery constrains a major project interconnection”) reaches 5 sectors. 15 of the 18 are rated high immediacy, and 2 are past their re-check date with no newer check.
34 dated decisions across 12 companies run from August 27, 2026 to December 31, 2027; 2 have passed with no recorded outcome, and the next is due October 31, 2026 (BAE Systems Information and Electronic Systems Integration Inc.).
The NSSTS registries name 16 legal entities that recur across sectors: 9 are subsidiaries held by a larger company (for example Amazon Web Services, Inc., owned by Amazon.com, Inc.), 3 are top companies, and for 4 the registries record no owner; 1 acquired company is still listed on its own and is shown here under its owner.
Of the 182 company positions on the NSSTS map, 139 are labelled confirmed, 42 are educated guesses (28 strong inference, 13 supported inference, 1 plausible fit) and 1 is blocked or contradicted; 39 positions cite evidence against themselves, 33 of them still labelled confirmed.
9 of the 182 NSSTS company positions are past their re-check date with no newer check on record and 2 have expired (Hunted Labs LLC; Accenture Federal Services LLC); 112 more fall due by November 8, 2026 and 9 expire by January 23, 2027.
15 shared bottlenecks sit under the NSSTS programs; the widest, OTA and consortium prototype-to-production transition, touches 6 sectors and 19 company positions, and 6 of the 15 are past their check date with no newer check on record.