Military / homeland retry
Window: exclusive after 2026-09-11 16:01:37 EDT through frozen cutoff 2026-09-16 19:10:34 EDT
Mode: inspect-broadly / promote-narrowly on libraries, procurement dumps, PEO later clocks, CISA directives/ICS/KEV, FEMA declaration data. Not a recensus of Wave 2D press objects or Wave 3E IR 8587.
Discovery rule: official dedicated pages, print/search/mirrors, OpenFEMA, CISA feeds. Federal Register is not discovery.
Mutation: Workbench only. No vault, Catalog, Registry, watches, entity chart, app, or Git.
Award ≠ obligation ≠ payment ≠ delivery ≠ fielding. A 403/JS shell is a tool-path failure, not inactivity. 09-11 leftover holes recovered here stay 09-11-owned; they are not this-window atomics.
BLUF
Recovered contract-day objects (09-11 hole closed as official HTML): dedicated War.gov pages for Sept. 3, 4, and 8 are now reached. Article IDs: 4590748 / 4591558 / 4592905. Largest unread-until-now awards on those dumps: CIRCM FRP IDIQ $4.838B (Sep 8); M1156 PGK IDIQ $862.8M (Sep 3); CVN 82 LLTM UCA $336.112M (Sep 4, official HTML now matches the company/secondary text); MDA IRBM/ICBM targets $508.5M (Sep 4; only $8.79M obligated); NASCM fire-control support $194.1M (Sep 3); DLA Pentaq fitness-gear add $763.1M ceiling (Sep 4, shared SPE1C1-25-R-0130 vehicle). Do not promote as this-window atomics. Disposition historical_repair into Weekly Delta 2026-09-11.
This window: no new Stafford major disaster after DR-4944. OpenFEMA recovered one in-window FMAG: FM-5676-AR Bunker Fire, declared 2026-09-15, incident began Sep 14. PA designated; IA not; no funding obligations displayed as of last refresh 2026-09-16. Wave 3E press walk missed it. Admit lower-rank. No new BOD/ED. KEV catalog refresh 2026-09-16 18:47 UTC (in-window) is routine under BOD 26-04 — fold to 3E. No Pantex B61-13 assembly-complete or War-acceptance clock. No War DPA Title I/III instrument. Feinberg memo / Elmet IBAS remain 2D; no new OSC/CAS Board implementing text retrieved (Feinberg PDF still Akamai 403).
Still blocked / unread: Sept. 16 contracts dump — dedicated slug not found; GlobalSecurity 16 Sep daily Defense Industry section empty (lists only Sept. 15). Treat as unread / not confirmed posted before freeze, not empty. Feinberg appendix PDF body still 403. Some PEO/DLA flagship URLs 403 from this host; newsrooms reached via search.
Scope and required surfaces
| Surface class | Result |
|---|---|
| 1. library / publications / FOIA / archive | CISA directives library reached; ICS advisory library reached; FEMA OpenFEMA datasets reached; NNSA/Pantex news reached (people/9-11 features) |
| 2. manuals / transmittals / bulletins / policy memos | CISA BOD/ED reached; no new directive. Feinberg implementing appendix blocked (PDF 403) |
| 3. budget / AFR / procurement / grants | War dedicated contract pages Sep 3/4/8 reached; Sep 16 unread. PEO later clocks reached (thin) — award headlines only, no delivery |
| 4. operational dashboards / datasets / APIs | OpenFEMA FemaWebDisasterDeclarations reached; CISA KEV JSON reached (catalogVersion 2026.09.16, dateReleased 2026-09-16T18:47:50Z) |
| 5. organization / leadership / delegation | not this slice’s hunt except PAE/SSC newsroom locators |
| 6. OIG / GAO / court companion | not in-scope for 4D |
| 7. newsroom as locator only | used to find article IDs and PEO wrapping; 2D/3E press objects not rewritten |
Inspection log
| Hunt | Path | Result |
|---|---|---|
| War contracts Sep 3 | GS daily index 09-03_index.htm → dod-contracts_4590748.htm; official war.gov 4590748 | reached official HTML |
| War contracts Sep 4 | GS dod-contracts_4591558.htm; official war.gov 4591558 (also GlobeNewswire tracker redirect of same slug) | reached official HTML. Air Force block after NAVY not independently line-read (truncation on both hosts). Not treated as empty. |
| War contracts Sep 8 | GS dod-contracts_4592905.htm; official war.gov 4592905 | reached official HTML through Air Force / small-business footnote |
| War contracts Sep 16 | guessed slugs 404; GS 09-16_index.htm Defense Industry blank; GS daily briefing lists only “Contracts for Sept. 15, 2026” | unread / not confirmed posted |
| War contracts index | JS shell (“simulated response” / Load More) | dynamic_bounded — not a finding of silence |
| Army ACC / USAASC | PrSM wrapping Sep 3 is 09-11-window; no in-window delivery/obligation later clock on named Sep 14 awards | reached; empty later-clock |
| NAVAIR / PAE(A) | MQ-25 Lot 1 and Blackbeard production stories are 2D award headlines; deliveries still 2029 / lot-not-accepted | reached; empty later-clock |
| SSC / AFPEO / AFLCMC | Sentinel Pathfinder is 2D; SSC newsroom locator shows FireSat-S CDR Sep 14 and SCAR CSO Sep 16 (2D already has SCAR strategy). Individual SSC story HTML 403 this host | reached via index/search; story bodies mixed |
| DLA | newsroom reached via search; Sep 16 Distributed Production Wargame is pre-window event wrapping (2D fold). Commodity lines on recovered Sep 3/4/8 pages are 09-11 | reached; no distinct in-window production/finance object |
| NNSA / Pantex | Y-12 B61-13 CSA remains 09-10/09-11. Pantex homepage/press: people and 9/11 features; newest dated press remains 2025. No assembly-complete or War-acceptance receipt | reached; empty_hunt for later clock |
| CISA BOD/ED library | /news-events/directives/all newest still BOD 26-04 Jun 10; ED 26-03 Mar 11 (V1). BOD 26-04 implementation guidance last Updated: August 25, 2026 | reached; empty_hunt for new directive |
| CISA ICS-CERT | ICS Advisories index: Sep 15 batch (CareCam CM2507, Siemens, Schneider, mySCADA, Wärtsilä, Digital Watchdog) already 3E. No Sep 16 ICS batch | reached; fold 3E |
| CISA KEV | JSON feed known_exploited_vulnerabilities.json | reached; in-window dateAdded grouped (see below) |
| FEMA declarations data | OpenFEMA FemaWebDisasterDeclarations filter declarationDate ge 2026-09-11; disaster page /disaster/5676 | reached. One FMAG. No new DR after 4944; no new EM after 3653 |
| Feinberg PDF / OSC-CAS | media.defense.gov PDF | blocked Akamai 403 this sitting. 2D already has release HTML + appendix bullets. No CAS Board proposal text, no OSC loan instrument |
Recovered 09-11 contract-day objects (historical_repair — not this window)
These sat in the 09-11 unread hole. Official HTML now certifies them. They are not this-window promotions. Award ≠ delivery.
A. Sept. 3 dump — Contracts for Sept. 3, 2026
Material (not each a new atomic even for 09-11):
- Northrop Grumman Minneapolis — M1156 Precision Guidance Kits $862,848,000 FFP IDIQ; manufacture/inspect/test/package/deliver PGK and variants; ECD 2031-09-03; one bid; ACC Newark
W15QKN-26-D-A072. Ceiling ≠ kits in inventory. - Research Innovations Inc. — Dragonfly $99,529,577 FFP IDIQ; procurement/delivery/sustainment; 95 bids; ECD 2031-09-02; ACC APG
W56KGY-26-D-A002. 09-11 CPE-ISW wrapping cited $96.9M; official dump is $99,529,577. Face-value difference unresolved except that the dedicated page is the obligation instrument. Same REWSI family already 09-11. - GD Mission Systems Pittsfield — NASCM fire-control subsystem $194,139,485 CPFF modification PZ0002 to unpriced letter contract
N0003026C7000(optional CLINs included); Nuclear-Armed Sea-Launched Cruise Missile Program; FY25 reconciliation RDT&E Navy $135,303,302 obligated; ECD 2028-09-30; SSP. Support contract ≠ missile in inventory ≠ first SLCM-N round. 10 U.S.C. 3204(a)(1). - IS4S — EMRF production $47,768,691 FFP SBIR Phase III; five outfitted expeditionary maintenance/repair facilities (90 EMRC prototype units + four variants) as data-collection platforms to validate the concept; ECD Sep 2027; MARMC
N5005426C0002. Prototype/validation ≠ fleet facility fielded. - Dynetics — MRADR production-representative models $40,776,966 hybrid OTA modification; 14 medium-range air-defense radar PRMs + retrofit of four prototypes and four MELRPS; 10 U.S.C. 4022 follow-on to
M67854-23-9-0023; MARCORSYSCOMM67854-25-9-0122. PRM ≠ IOC. - USTRANSCOM SSA Atlantic $72,742,360 FFP IDIQ stevedoring (Charleston/Savannah/Wilmington/Morehead City); cumulative face $90,927,949; ECD 2031-09-30. Civil/terminal, grouped.
- Sierra Nevada — SAOC $30,967,151 CPFF/CR modification P00037 to
FA2834-24-C-B002; cumulative face $13,113,048,798 from $13,082,081,647. Survivable Airborne Operations Center sustainment increment, not a new aircraft. - NAVFAC Southwest roofing MAC $200M combined; P-8A sustainment option $31.5M; ordnance-handling MAC $31M; Slewing Arm Davits $23.8M; Aegis FES $17.8M; AN/BLQ-10 spares $14.6M; Aegis SI&T $9.5M — grouped sustainment. MK 48 MOD 7 options and SONAR spares that 09-11 already took from later-page annotations are not recensus’d.
B. Sept. 4 dump — Contracts for Sept. 4, 2026
Material:
- **HII Newport News — CVN 82 (USS *William J. Clinton*) long-lead materials $336,112,000 cost-only UCA;
N00024-26-C-2182; FY26 SCN $336,112,000 obligated; ECD March 2039; 10 U.S.C. 3204(a)(1). Official HTML now certifies the object 2D could only quote from secondary/company text. Advance procurement ≠ keel ≠ construction start. HII’s own release is 2026-09-11** (company wrapping of this dump). - MDA / Northrop Grumman Chandler — IRBM/ICBM target flight-test support $508,490,719 hybrid CPFF/CR/FPI follow-on
HQ0855-26-C-E001; performance Sep 2026–Aug 2035; Chandler AZ / Corinne UT / Elkton MD; only $8,786,477 FY26 RDT&E obligated. One offer. Ceiling ≠ targets flown. - DLA Troop Support — Pentaq Manufacturing maximum $763,082,470 FFP IDIQ physical fitness gear;
SPE1C1-26-D-0079; solicitationSPE1C1-25-R-0130(shared ceiling; other awardees already on this vehicle from Apr/May); five-year base + five-year option; ordering period end Sept. 3, 2031; six responses. Ceiling ≠ gear delivered. Commodity. - Boeing — F/A-18E/F and EA-18G flight-control-surface repair ceiling $241,340,000 DO
N00383-26-F-YY2B; $60,335,000 (25%) obligated; remainder committed. Repair DO ≠ aircraft delivered. - NASSCO — USS *Pinckney* (DDG 91) FY26 Depot Modernization Period $149,599,723 FPIF
N0002426C4401; options to $149,921,701; ECD Sep 2028. Availability ≠ ship back in fleet as a counted object. - L3Harris — low-profile photonics masts $139,012,362 modification to
N00024-20-C-6249; new-construction and in-service SSN. Production mod ≠ mast installed. - NG Marine Systems — Virginia-class SSTG maintenance IDIQ $111,354,038 (options to $253,293,127)
N00024-26-D-4314; no funds at award. Sustainment vehicle. - LM Space — Trident II Life Extension 2 SSP Alteration Advanced Design $90,229,306 CPFF P00030 to
N0003024C0100; FY26 WPN fully obligated; ECD 2030-09-30; PAE SSP. Design/development ≠ LE2 fielded. - Griffon Outlaw $17.5M appears on this dump; Sep 10 page already corrected actual award date to Sep 8. 09-11 owns the correction. Do not double-count.
- Army HAZMAT repair Fort Benning $37.85M; American Ordnance shutdown equitable adjustment $12.6M; Allsteel furniture $10.4M; NAVFAC Hawaii A-E $75M; MK 41 VLS electronics $40.1M; Portsmouth Dry Dock #1 schedule mod $16.8M (cumulative face $1.960B) — grouped. Air Force remainder of this dump unread.
C. Sept. 8 dump — Contracts for Sept. 8, 2026
Material:
- Northrop Grumman Rolling Meadows — Common Infrared Countermeasure full-rate production $4,838,487,318 FFP IDIQ; one bid; ECD 2035-09-30; ACC Redstone
W58RGZ-26-D-0056. Work locations and funding with each order. Largest object on the unread 09-11 dumps. FRP vehicle ≠ CIRCM kits delivered ≠ aircraft fitted. - Conti Federal — B-21 RF/measurements hangar, Whiteman AFB $74,787,155 FFP (cumulative $74,978,377); one B-21 aircraft position, back shops, storage, admin; ECD 2029-09-25; FY26 MILCON defense-wide obligated; USACE Kansas City
W912DQ-26-C-A048. Construction award ≠ hangar in service ≠ B-21 based. - AFLCMC Eglin — large penetrator warhead case assembly cumulative max ceiling $149,000,000 FFP/cost IDIQ to Superior Forge, Ellwood National Forge, Faxon Machining, Grand Valley Manufacturing (
FA8681-26-D-B003…-B006); full and subscale variants; ECD 2033-09-07 if option executed; $10,000 FY26 RDT&E obligated at award. Ceiling ≠ cases produced. - NAWCAD — Aviation Systems Engineering Co. $288,823,141 hybrid IDIQ
N0042126D1004for naval-air platform engineering/sustainment through Mar 2032; no funds at award. Services vehicle. - DLA Troop Support — Creation Gardens / What Chefs Want max $496,849,673 FFP-EPA IDIQ fresh fruit/vegetables; Illinois; ordering through 2031-09-07; Army/AF/USDA. Commodity.
- MK-59 floating decoy option $14.7M; LPD 18 common-rail upgrade material $13.0M (awarded Sep 2, annotated); P-8A OFT projection upgrades $10.1M; MV *Independence* O&M $65.0M; RSAF Mountain Home FMS training mod $25.2M; Beale construction-security IDIQ $25.0M; P&W FMS engineering IDIQ $19.3M; Peckham cold-weather caps $11.6M; F/A-18 spares DO $10.1M; F-16 horizontal stabilizers $9.3M; Dominion Humphreys electrical privatization mod $27.0M — grouped. Stantec Albeni Falls fish-passage A-E $12.6M awarded Sep 5 (Labor Day weekend annotation).
Labor Day 2026 was Sep 7; no dedicated Sep 7 dump located (expected).
This-window objects (narrow)
1. FEMA FM-5676-AR — Bunker Fire (Fire Management Assistance)
Actor: FEMA Region 6; Arkansas Division of Emergency Management
Clocks: incident began 2026-09-14; declaration 2026-09-15; OpenFEMA entryDate/updateDate 2026-09-15; disaster page last updated 2026-09-16. Incident end date null.
URLs: OpenFEMA · disaster page
Disposition: admit_lower_rank as a data-recovered FMAG. Not a Stafford major disaster. Wave 3E press walk recorded 0 new declaration.
PA designated (paProgramDeclared true); IA/IH/HM false. Funding-obligations block on the disaster page: “If and when financial assistance is approved for this disaster, it will be displayed here.” Empty as of the Sep 16 refresh. Declaration ≠ obligated dollar ≠ fire contained.
Claim limit: FMAG ≠ major DR. Not DR-4945. Not a successor to DR-4944 Colorado.
No other OpenFEMA declaration with declarationDate on or after 2026-09-11 through the freeze. Last major remains DR-4944-CO (declarationDate in the API 2026-09-01; 09-11 3E owned the Sep 4 press). Last emergency remains EM-3653-NV Hawk Fire (Sep 1).
2. CISA KEV catalog refresh 2026-09-16 (fold to 3E)
JSON catalogVersion 2026.09.16, dateReleased 2026-09-16T18:47:50.6796Z (~14:47 EDT, before freeze). In-window dateAdded rows actually in the feed:
| dateAdded | CVE | Product |
|---|---|---|
| 2026-09-11 | CVE-2026-84869 | ConnectWise ScreenConnect |
| 2026-09-11 | CVE-2026-42016 / CVE-2026-42018 | JFrog Artifactory |
| 2026-09-11 | CVE-2026-85706 | GitLab CE/EE |
| 2026-09-14 | CVE-2026-76461 | Cisco Secure Email Gateway |
| 2026-09-16 | CVE-2026-58704 | Google Pixel modem |
| 2026-09-16 | CVE-2026-76460 | Cisco ISE / ISE-PIC |
| 2026-09-16 | CVE-2026-87886 | Acronis Backup |
Sep 11 adds sit on the exclusive-start calendar day; 3E already grouped Sep 14 and Sep 16 (Pixel / Acronis / Cisco ISE). Sep 11 KEV is 09-11-adjacent. Routine catalog under BOD 26-04. Do not promote. Due dates in the catalog (e.g. Acronis due 2026-09-19) are BOD 26-04 clocks, not new directives.
PEO later clocks on named in-window awards (2D objects — do not recensus headlines)
| 2D object | PEO/acquisition surface this sitting | Later clock? |
|---|---|---|
| PrSM Increment 2 EOC IDIQ (Sep 14, $1.211B) | USAASC Sep 3 wrapping is 09-11-window program narrative (MTA-RF pathway talk). No ACC Redstone delivery/order clock after the War dump | No. IDIQ ≠ first Increment 2 missile |
| MQ-25A Lot 1 LRIP (Sep 14 UCA $552.053M / news $562M) | NAVAIR/PAE(A) Sep 14–15 stories restated Lot 1 = three air vehicles, Lot 2 long-lead, initial deliveries 2029. Same clocks as 2D | No delivery. Face-value $552M vs $562M still unresolved; contracts page remains the obligation instrument |
| Blackbeard first production lot (Sep 14 $43.65M order / Navy wrap to $200M) | Navy press 2026-09-15 is the 2D wrapping. No accepted-AUR clock | No. 444 AURs still a lot size, not inventory |
| AMPV production mod (Sep 14 $818M) | No ACC Detroit later obligation/delivery page retrieved | No |
| Olin small-caliber IDIQ (Sep 11 $788M) | No ACC-RI later order clock | No |
| Sentinel Pathfinder inert stack (Sep 14) | AFNS/AFNWC reprints of the same 2D milestone. Flight test still 2027; IOC still early 2030s | No later flight/silo clock |
| Feinberg *Fostering One Strong Industrial Base* (Sep 15) | PDF still 403. No CAS Board proposal docket, no OSC loan term sheet, no first commercial determination under the 15-day clock | Memo only, as 2D |
| Elmet IBAS $450M (Sep 14) | No OSC implementing instrument on War/OSC pages. Company 8-K (locator only) is not official War text and is not recensus’d | Announcement only, as 2D |
SSC newsroom locator (index reached 2026-09-16): FireSat-S Critical Design Review Sep 14 (System Delta 810). CDR ≠ satellite on orbit. SCAR CSO strategy Sep 16 already 2D. DARC Site 3 Lake Kickapoo preferred location is 09-11. Individual SSC article HTML 403 this host.
Fold-only / do not recensus
| Object | Owner | This retry |
|---|---|---|
| War contracts Sep 11 / 14 / 15 dumps | 2D | Fold. Not re-listed. |
| Feinberg memo; Elmet IBAS preferred equity | 2D | Fold. No implementing OSC/CAS text. Elmet is IBAS, not DPA Title III. |
| PrSM Inc 2; MQ-25 LRIP; Blackbeard lot; AMPV mod; Olin ammo | 2D | Fold headlines. Later-clock hunt empty. |
| NNSA Y-12 B61-13 CSA complete (stamp 2026-09-01; announced 2026-09-10) | 09-11 / 2C / 2D fold | Still no Pantex assembly-complete or War-acceptance receipt. CSA ≠ assembled bomb ≠ fielded B61-13. |
| EO 14427 DPA energy; EO 14426 Veterans | 1A / 1C | No War DPA Title I/III instrument on recovered dumps or War releases. Last retrieved War DPA Title III on war.gov remains out of window (BAE RH45 July 7). |
| CISA IR 8587 final | 3E | Fold. Not a BOD/ED. |
| CISA AA26-251A; LRA M-26-14 (Aug 20); BOD 26-04 (Jun 10); ED 26-03 (Mar 11) | 09-11 / 3E / standing | Did not fire. Agency Logging Plan still Nov 18. |
| CISA ICS Sep 15 batch; cyber-decoy Sep 16; TIC 3.0 minor | 3E | Fold. Vendor ICS ≠ BOD. |
| FEMA DR-4944; EAS test scheduled Nov 17; PA/HMGP obligation pressers | 3E / 09-11 | Fold. FM-5676 is a different instrument (FMAG). |
| DLA Distributed Production Wargame Sep 1–3 / Sep 16 story; Industry Collider Day Sep 9 | 2D | Fold as pre-window wrapping. |
| Griffon Outlaw Sep 4 announce / Sep 8 actual award | 09-11 | Fold the correction. |
| Crane MMR; JASSM/LRASM P00020; Nitradyn; NGEAU FRP; MK 48 options; DARC Site 3 | 09-11 2D | Fold. |
Empty hunts (first-class)
- No new Binding Operational Directive or Emergency Directive in the exclusive window. Directives index newest remains BOD 26-04 (Jun 10) and ED 26-03 (Mar 11). BOD 26-04 implementation-guidance page still “Updated: August 25, 2026.”
- No new Stafford major disaster or emergency declaration after exclusive start. OpenFEMA unique hit is FM-5676 only.
- No Pantex B61-13 later clock. Homepage 2026-09-14 features are people/9-11. Press-release index newest dated item remains 2025.
- No War DPA Title I rated order, Title III award, or allocation on recovered dumps or War releases.
- No delivery/acceptance/fielding clock on PrSM Inc 2, MQ-25 Lot 1, Blackbeard AURs, AMPV, CIRCM, PGK, or CVN 82. Sentinel remains inert Pathfinder / 2027 flight-test / early-2030s IOC.
- No in-window DLA production/finance object distinct from 09-11 commodity lines and 2D wrapping.
- DIU / DARPA not re-walked as a census; 2D already empty-dated DIU news and D2 prize announcement.
Blocked / still unread
| Surface | Status | Note |
|---|---|---|
| war.gov Contracts Sept. 16 | unread / not confirmed posted | Dedicated article 404 on guessed slugs. GS 16 Sep daily Defense Industry section empty. Standing 5 p.m. dump, if posted, would sit before freeze (19:10:34 EDT) — still not retrieved. Not empty. |
| war.gov Contracts index | dynamic_bounded JS shell | Article URLs work when the ID is known. |
| Feinberg memo PDF (media.defense.gov) | blocked 403 | Release HTML in 2D. Appendix not line-read. |
| Sept. 4 Air Force block | unread (truncated) | NAVY through small-business footnote reached; AF section not independently hashed. |
| SSC individual story HTML | blocked 403 this host | Index/search reached (FireSat-S CDR locator; SCAR already 2D). |
| dla.mil / af.mil flagship | mixed; curl 403 on some paths | Reached via search this sitting (same 2D pattern). 403 ≠ inactivity. |
| SAM.gov / FPDS / USAspending | not recensus’d | Bounded. |
| Classified / nonpublic ops | classified_nonpublic | Not inactivity. |
Coverage receipt
| Publisher family | Status | Recovered / new | Fold / empty | Still blocked |
|---|---|---|---|---|
| War dedicated contract dumps | Sep 3/4/8 reached; Sep 16 unread | 09-11 hole closed as official HTML (CIRCM, PGK, CVN 82, MDA targets, NASCM, Pentaq, B-21 hangar, large-penetrator cases) | Sep 11/14/15 already 2D | Sep 16 dump |
| Service PEO (ACC, NAVAIR/PAE(A), SSC, AFPEO/AFLCMC) | reached via search/index | 0 delivery later clocks | award headlines 2D | some story HTML 403 |
| DLA | reached via search | 0 in-window production object | wargame wrapping 2D; Sep 4/8 commodity on recovered dumps | some flagship 403 |
| NNSA / Pantex | reached | 0 later clock | CSA fold | — |
| CISA directives / ICS / KEV | reached | 0 new BOD/ED; KEV refresh hashed | IR 8587 / ICS / KEV 3E | — |
| FEMA declaration data | reached | 1 FMAG (FM-5676) | DR-4944 / EAS / PA press 3E | — |
Lane closed? Yes for the named 4D must-retrieves that can be closed from public HTML: Sept. 3/4/8 dedicated contract pages are now official-page-reached; CISA directive library empty of new BOD/ED; FEMA OpenFEMA has one in-window FMAG and no new major DR; Pantex later-clock empty; PEO later-clock empty on named 2D awards. No for a complete business-day contracts series — Sept. 16 dump still unread. Feinberg appendix PDF still blocked.
This is public-surface research, not a census of every PEO, SAM award, classified OTA, or Stafford worksheet.
Sources
Full saved reading
View cited sources (6)
These are the sources cited by this reading. Each source keeps its own date and scope.
Document details and formats
About the dates and filing language
- Evidence date
- When this document or named claim was checked. A newer collection, export or website date does not update it.
- Current, private, Workbench or promotion
- These can describe the saved document’s original filing or custody. This public reading preserves that history; publication does not turn its findings into government approval, binding law or newly verified evidence.
- Master data and projection
- The maintained factual record and a page generated from it. Repeated views are not additional independent evidence.
- Provenance and source join
- Where a record came from, and the exact reference connecting a claim to its source.
- Gate, receipt and operating evidence
- A required decision or condition, its documentary record, and evidence that the named activity actually occurred. Permission, delivery and operation stay separate.
Saved research reading. Its original dates and claim limits control; the export date does not refresh the evidence.
Original title: Wave 4D — military / homeland retry