Federal Government Full Freshness Sweep — August 22, 2026
Lifecycle note (September 8, 2026): closed provenance. Historical pending, review, promotion, completion or incorporation language below records the campaign state at its own cutoff; it is not a current queue and does not change any stated Chronicle landing, incorporation boundary or evidence cutoff.
Terminal scope correction — August 23, 2026: the blanket 392-entity
completeness campaign is stopped and controlled by the materiality closeout. Read
`MATERIALITY_CLOSEOUT_2026-08-23.md`
for the controlling Observatory-relevance result and
`CAMPAIGN_STOP_RECEIPT_2026-08-23.md`
for exact completed, incomplete and intentionally abandoned scope. The
remaining entity assignments are not an open continuation queue.
This package is the governed correction and completion pass after the August 22 Grok entity-library harvest. The Grok package remains intact as provenance. It is an input here, not the controlling result: it intentionally searched from January 20, 2025, omitted planned Waves 3 and 5–9, and did not freshly retrieve many seeded or parent-covered publishers.
The campaign answers two separate questions:
- Publisher freshness: what is the current official publisher/root and can
each required source surface be reached now?
- Substantive freshness: what material primary objects have appeared since
the last trustworthy cutoff for this entity *and this source family*?
A full official-site census is coverage proof, not a command to fill the
Observatory with everything found. Every primary object is separately tested
against established project plotlines. Routine maintenance, completeness-only
rows and supporting context remain inspectable in this Workbench; only the
small promotion_review subset reaches Katie's later human review, and even
that subset has no automatic keep authority.
Every sweepable publisher is observed again during this campaign. Historical search floors vary because the reservoir's last trustworthy coverage varies. An August 21 Federal Register pass, for example, does not certify an entity's FOIA library, OIG reports, operating data or organization pages through that same time.
Authority and mutation boundary
- Live-vault full-government canon remains separate from later pending Workbench research.
- Pending packages may be used as research-dedup cursors, never represented as accepted vault canon.
- This package makes no vault promotion, entity-chart mutation or generated Federal Group edit without Katie's later disposition.
- Adjacent publishers are researched and labeled, but excluded from the 392-node on-tree denominator.
Intended read order
FRESHNESS_CONTRACT.md— evidence, baseline and completion rules.WAVE_CAMPAIGN.md— independently closed Waves 0–10 and their gates.WAVE_PACKAGE_SCHEMA.md— normalized Wave 2–9 files, fields and close-replay rules.WAVE_0_PREFLIGHT.md— topology, source snapshots and the Grok control
audit.
WAVE_0_CLOSEOUT.md— validated publisher, CISA-domain and access-state
denominator.
WAVE_1_CLOSEOUT.md— independently validated financial-system close and
exact continuation cursor.
WAVE_2_CLOSEOUT.md— independently validated Executive Office and
government-wide-instruments close.
WAVE_3_CLOSEOUT.md— independently validated defense/services/intelligence
close and its relevance-filtered review boundary.
relevance_retroaudit/— byte-preserving Wave 1–2 relevance supplements
and the D-only human review queue.
generated/CAMPAIGN_ENTITY_WAVE_ASSIGNMENT.csv— exclusive primary-wave
closure owner for all 392 on-tree identities plus six separately counted adjacent publishers.
generated/ENTITY_FRESHNESS_BASELINE.csv— per-node research start and
authority split.
generated/ENTITY_PUBLISHER_DIRECTORY.csv— corrected current publisher
resolution.
generated/PUBLISHER_COVERAGE_LEDGER.csv— current entity-to-publisher
retrieval join and access bounds.
generated/SURFACE_RECERTIFICATION.csv— dated HTTP/source-surface receipt.waves/— family research lanes and bounded negatives.MATERIALITY_DISPOSITION_LEDGER_2026-08-23.csv— the controlling 55-unit
Observatory-materiality ruling.
MATERIALITY_CLOSEOUT_2026-08-23.md— the controlling result and bounded
13-item human-review queue.
CAMPAIGN_STOP_RECEIPT_2026-08-23.md— the scope-correction receipt and
exact completed, incomplete and intentionally abandoned boundary.
PACKAGE_ARTIFACT_MANIFEST.csv— exact byte-and-hash custody for the
package's frozen-provenance and reproducibility leaves. Root authority
documents and every nested router remain individually registered.
LEGAL_INSTITUTIONAL_RETURN_REFRESH_2026-10-05.md— bounded current return
answers for the Sable signed orders and appeal, FSGB implementation and the
U.S.–Jamaica SOFA instrument; this does not reopen the stopped campaign.
Artifact custody
This terminal package uses one registered, validator-governed delegation manifest. Delegation does not make a leaf generated, disposable, current or vault-canonical. The manifest conservatively retains observations, evidence ledgers, receipts and package-local tools as frozen provenance unless a named producer and rebuild contract prove otherwise. Human authority documents and routers are never delegated.
Completion language
The original 392-entity completion claim is retired. The terminal claim is: 55 deduplicated review units adjudicated to 13 atomic candidates and 42 non-atomic dispositions, with a targeted high-yield gap replay and explicit access/source limits. It does not claim that every entity or source surface was completed, or that any review candidate was accepted into the vault.
Sources
Full saved reading
View the saved source references. This record has no direct external citation in its source-link list.
Document details and formats
About the dates and filing language
- Evidence date
- When this document or named claim was checked. A newer collection, export or website date does not update it.
- Current, private, Workbench or promotion
- These can describe the saved document’s original filing or custody. This public reading preserves that history; publication does not turn its findings into government approval, binding law or newly verified evidence.
- Master data and projection
- The maintained factual record and a page generated from it. Repeated views are not additional independent evidence.
- Provenance and source join
- Where a record came from, and the exact reference connecting a claim to its source.
- Gate, receipt and operating evidence
- A required decision or condition, its documentary record, and evidence that the named activity actually occurred. Permission, delivery and operation stay separate.
Saved research reading. Its original dates and claim limits control; the export date does not refresh the evidence.
Saved source details
---
title: Federal Government Full Freshness Sweep — August 22, 2026
status: closed-provenance
artifact_role: research-package-router
opened: 2026-08-22
topology_denominator: 392 on-tree entities
vault_landings: []
controlled_by: MATERIALITY_CLOSEOUT_2026-08-23.md
---