Initial Evidence Ledger — Investment Claim to Funding Stack
Macro controls
| Object | What the source supports | What it does not support |
|---|---|---|
| BEA new FDI, 2025 | $232.2B actual expenditures to acquire, establish or expand U.S. businesses; $218.4B acquisitions; $13.8B greenfield establishment/expansion; $284.5B planned future expenditure attached to those transactions. | A claim that all announced investments are actual FDI or new physical construction. |
| BEA inward direct-investment position, end-2025 | Foreign direct-investment position in the United States was $5.86T, up $266.0B in 2025; position is cumulative ownership/intercompany-finance stock, not annual project capex. | Construction spend, a new-commitment ledger or a debt-funding total. |
| Fed Z.1, 2026 Q1 | Nonfinancial-business debt outstanding was $22.6T; nonfinancial corporate debt $14.5T. Corporate bonds, depository loans, mortgages, commercial paper and other loans are distinct instruments. | A project-level identification of lenders or the claim that banks alone fund industrial investment. |
| U.S. financial account, 2025 | Net U.S. borrowing from foreign residents was $1.21T. | That these flows funded the named investment projects or were FDI. |
Administration aggregate: object mismatch
The White House Investment Accelerator fact sheet said in March 2025 that more than $3T in private investment had been secured, without a project-by-project funding ledger or methodology. The White House investment list also includes a $1.2T Qatar “economic exchange,” a $1.4T UAE ten-year investment framework and corporate announcements. These are not interchangeable construction financings and must not be summed as a single debt pipeline.
First project sample
| Project / headline | Physical or economic object | Funding evidence located | State and next proof |
|---|---|---|---|
| Apple — $500B / four years | Apple says the figure includes suppliers, direct employment, data centers, facilities and Apple TV+ productions, not solely new construction. | FY2025 10-K: $132.4B cash/cash equivalents/marketable securities; $12.7B PP&E purchases in FY2025; $91.3B term-debt principal. | A rolling corporate-spend commitment. Need named-site capex and dedicated financing only if a particular asset is researched. |
| TSMC Arizona — $165B planned U.S. investment | Multiple fabs and related facilities over years; disclosed operating/construction chronology. | TSMC 2025 Form 20-F reports up to $6.6B CHIPS direct funding, up to $5B federal loans, and $8B TSMC Arizona notes outstanding at end-2025, parent-guaranteed. | Concrete layered stack, but not all $165B is closed/drawn. Continue with award milestones, notes, parent contribution and each fab’s construction/COD. |
| Stargate — $500B / four years | Future AI-infrastructure target. | Announcement names SoftBank, OpenAI, Oracle and MGX as initial equity funders; says $100B would begin deployment. No signed $500B debt package is disclosed in the announcement. | Announcement/equity-intent level. Split by site, SPV, power, customer contract and financing document. |
| CoreWeave Pennsylvania — $6B commitment | AI data-center build; 100MW initial capacity with potential 300MW expansion. | 2025 SEC materials describe a $2.6B delayed-draw term loan for the development. Company reported $10.3B investments, $9.3B net financing raised and $21.6B debt in 2025. | A real debt/equity/customer-contract/OEM-finance mix. Trace first draw, collateral, power/interconnection and construction spend. |
| Venture Global Louisiana — $18B claim | LNG infrastructure; project stack exists separately from any White House list. | 2025 10-K reports $23.7B project-level debt and $34.8B total debt; Plaquemines issued $2.5B secured notes in April 2025. | Classic asset-backed/project-finance reference case. Trace offtake contracts, lenders/noteholders, draw/use and operating cash flow. |
| Hyundai — $21B, 2025–28 | $9B auto capacity, $6B parts/logistics/steel, $6B future industry/energy; includes but is not limited to a Louisiana EAF mill. | Sponsor release does not identify a project debt facility or full capital stack. | Aggregate group allocation, not evidence of $21B bank lending. Begin at individual legal entities/sites. |
Sources
- BEA — New Foreign Direct Investment in the United States, 2025
- BEA — Direct Investment by Country and Industry, 2025
- Federal Reserve — Financial Accounts, 2026 Q1
- BEA — U.S. International Transactions and Investment Position, 2025
- White House — Investment Accelerator fact sheet
- White House — investment list
- Apple — $500B announcement; Apple FY2025 10-K
- TSMC 2025 Form 20-F
- OpenAI — Stargate announcement
- CoreWeave 2025 10-K
- Venture Global 2025 10-K
- Hyundai — $21B announcement
Sources
Full saved reading
View cited sources (13)
These are the sources cited by this reading. Each source keeps its own date and scope.
- BEA — New Foreign Direct Investment in the United States, 2025
- BEA — Direct Investment by Country and Industry, 2025
- Federal Reserve — Financial Accounts, 2026 Q1
- BEA — U.S. International Transactions and Investment Position, 2025
- White House — Investment Accelerator fact sheet
- White House — investment list
- Apple — $500B announcement
- Apple FY2025 10-K
- TSMC 2025 Form 20-F
- OpenAI — Stargate announcement
- CoreWeave 2025 10-K
- Venture Global 2025 10-K
- Hyundai — $21B announcement
Document details and formats
Saved research reading. Its original dates and claim limits control; the export date does not refresh the evidence.
Saved source details
---
title: "Initial Evidence Ledger — Investment Claim to Funding Stack"
status: current
artifact_role: source-bearing initial ledger
evidence_cutoff: 2026-07-31
---