Skip to content

Korea stress transmission — evidence-gap index

Status: completed workbench evidence-gap index; not vault authority or a vault watch

Original observation cutoff: 2026-07-29 after the Seoul close

Later dated material: July 31 regional-control note; August 27 source/access check

Consolidated reading route: Korea transmission lead

Current use of the saved evidence

The August 27 scheduled check completed. It did not recover the exact KOFIA July 29 leverage observation or a joined July 30–31 KRX/KSD/BOK record proving member obligations, DvP, fails and cash finality. These two objects remain ledger-governed source/access holds, NR. This index creates no new watch or schedule. Other rows below carry forward the saved research criteria; the August 27 receipt does not say every listed field was freshly checked.

Read the dated return receipt

for the completed check. The associated controlled-asset-break interpretation is a dated hypothesis, separate from evidence. At the original July 29 cutoff, crash-trade settlement was not yet due; at the later check, exact completion records were not recovered. Neither state means settlement failed or succeeded.

Consolidated source questions

Criteria below combine the retained transmission board with the

historical market-stress board.

They specify evidence that could change a reading; they do not report new September observations or activate the proposed steps.

Question / source gapEvidence and limiting testDetailed owner / authority route
Semiconductor trigger and concentrationTimed issuer guidance/memory/AI-demand evidence and KRX index-point contributions; test Korean residual against common chip exposure, prior return, valuation, weights, breadth and foreign/institutional/retail flows. Synchronized losses alone do not allocate cause.Regional control; Samsung/SK hynix filings, KRX, official US/JP/TW tape
Daily-reset hedge amplificationManager/LP spot/futures hedge orders at predicted time and size, relative to liquidity and basis; small/dispersed/offset hedges weaken material amplification.Leverage reconstruction; managers, LPs, KRX, KCMI
Broker/derivative forced salesExact KOFIA July 29 credit, derivatives deposits, unpaid receivables, actual forced-sale amount/ratio, plus CCP variation margin and broker records. Reporting date must identify observation date; product credit restrictions do not eliminate broader portfolio leverage.Leverage reconstruction; KOFIA FreeSIS, KRX clearing, FSS, brokers; exact July 29 object remains on access hold
Short-selling and exchange controlsStock-level short turnover, borrowing and net positions must lead price at material scale; halt/trigger/pause/reopen and audit logs test rule breach or erroneous controls. Five-minute and final-closing tape are distinct.KRX Data Marketplace, event/audit logs and FSS; regional control
Won/foreign capital exit and sovereign stressJoint foreign bond/deposit/FX exits, spot/NDF/basis, bid-ask spreads, auction coverage and haircuts; equity selling alone is not flight from all Korean assets. Post-reported-intervention windows require separate treatment.Cross-asset authority map; BOK, MOFE, KRX/KOFIA/KSD, FSS
FX intervention and reported coordinationAttributable authority confirmation and net transaction disclosures; an aggregate does not by itself establish event timing, counterparties or a jointly executed trade. Keep reported rate check separate from executed US trade.Currency-defense overlap; BOK/MOFE, Japan MOF, US Treasury/New York Fed
Repo causality and extraordinary supportReserve forecast/other maturity offsets, borrower/class, legal authority, amount, rate, collateral and start/exit clocks. July 16 KRW30tn maturity offsets July 28 KRW28tn replacement on those two operations; total-system net liquidity and crash purpose remain unproved.Funding evidence; BOK Monetary Markets Department, MPB, facility/balance-sheet records
Collateral mobilization, bank/deposit run and D-SIFI actionActual dated facility draw on eligible receivables; abnormal deposits, funding bids, LCR/NSFR, recovery trigger or FSC/KDIC resolution. Pre-positioned collateral/plans do not prove use or non-use.Authority map; BOK, FSS, FSC/KDIC, covered entities
Secured/unsecured funding and credit accessKOFR/repo/CD/CP levels, volume, dispersion, flags, haircuts, bank/KSFC/intraday credit; primary issuance/rollover, concessions, dealer depth and rating curves. Keep SBS 71.6 bp separate from KOFIA 70.9/71.2 bp closes; quoted yield/NAV changes do not establish freeze or redemptions.Funding evidence; KSD KOFR, BOK, KOFIA/KSD, FSS/policy vehicles
Securities delivery, cash finality and operationsJoined KRX obligation/margin/default-resource record, KSD DvP count/value/time/fails, bank cash completion, BOK-Wire+ queues/volume/hours/intraday use; KFTC retail rejects/latency remain separate. No notice is not measured zero.Settlement audit; KRX/KSD/BOK, settlement banks, KSFC, KFTC; exact crash-trade joined record remains on access hold
Equity-to-crypto or DeFi migrationNet KRW VASP funding traced to brokerage-sale proceeds and beneficial owner; Korean-attributed stablecoin/self-custody/bridge/protocol inflows and account/lender liquidation records. Turnover, TVL and global flows cannot supply the missing bridge.Crypto flow test; VASPs, FIU/partner banks, issuers, chain analytics with disclosed method
Digital-policy or rail accelerationCompare operative law, decree, issuer/reserve/custody/redemption, first issuance, venue/KSD registry/cash leg and named real-value KRW finality with pre-crash Hangang, securities-token, stablecoin, Agorá and KB-Kinexys clocks. Require a documented event-linked change/use; announcements, prototypes and pre-existing launch schedules are insufficient.Digital bridge evidence; BOK, FSC, National Assembly, KSD/KRX, BIS, KB/J.P. Morgan
New rail absorbed conventional settlement stressEvent-specific traffic, participants and finality showing a material shift due to conventional failure/stress; conventional continuity and no shift weaken that mechanism.Digital bridge evidence; BOK/KSD/KRX and banks

Clock and source limitations

Preserved dated transmission-board history

The following original body preserves the human return decision, August27 receipt, release expectations, source requests, stop rules and July31 regional note. Use the consolidated source questions above as the maintained index.

Human return decision

Saved 2026-07-29 EDT: re-open this package when the KOFIA July 29 leverage observation and the July 30–31 KRX/KSD settlement record are available. These are the agreed adjudication points for the delayed-leverage and controlled-asset-break readings.

2026-08-27 check receipt

The bounded official-source return did not recover the exact KOFIA July 29 leverage observation or a joined July 30–31 KRX/KSD/BOK record adjudicating member obligations, DvP, fails and cash finality. Both items are ledger-governed source/access holds. The scheduled check is complete, but the fields remain NR; no public incident notice cannot be converted into a measured zero or proof of normal settlement. Re-open on the exact official series, completion record or incident/default-resource object.

Release clock

Due / expectedReleaseQuestion answeredPromotion triggerFalsifier
Jul 30KOFIA Jul 29 account seriesDid second-day losses trigger broker forced sales?Forced-sale amount/ratio rises abnormally and is large relative to turnoverFlat/falling realized forced sales
Jul 30 after 16:00Jul 28 KRX/KSD settlementDid first crash-day trades complete?Late/fail/default-resource or liquidity-support evidenceTimely DvP with no material fail
Jul 30 by normal KOFR clockJul 29 KOFRDid secured funding reprice?Abnormal rate, volume, dispersion, fallback or calculation flagOrdinary rate/volume
Jul 31 after 16:00Jul 29 KRX/KSD settlementDid second-day trades complete?Same as aboveSame as above
Following weekly releasesKRX short, lending, program and investor dataWhich trading channel amplified the move?Concentrated pre-price selling or hedge resetSelling follows rather than leads price
Following issuance windowsCP / corporate-bond placement and rolloverDid spread warning become funding impairment?Failed/delayed issuance or sharply higher concessionNormal placement and rollover

Leverage and forced sales

Retrieve:

Do not substitute media estimates of “margin calls” for the KOFIA field and its observation date.

Funding and collateral

Retrieve:

Escalate only if price, quantity and facility evidence agree.

Clearing and finality

Retrieve for Jul 30-31:

No public incident is not the same as a measured zero.

Crypto and DeFi

Retrieve:

Turnover, TVL and global liquidations remain non-attributable unless the beneficial-owner and money-object bridge is shown.

Regional control

Retrieve:

The test is whether Korea's residual survives controls for chip exposure, prior return, valuation, flow and exchange design.

Stop rules

Stop and retain NR when:

Post-cutoff regional-control update — July 31

The July 28–29 Korea–Taiwan–Japan semiconductor comparison remains the controlling untreated panel for the original crash. Do not splice July 31 returns into it:

Add these release gates:

GateExact questionState
Japan official intervention amountDoes the Aug. 28 MOF total for Jul. 30–Aug. 26 contain a nonzero aggregate?PENDING
Korea official intervention totalDoes the later 2026Q3 net USD transaction record contain official sales?EXPECTED—DATE-NOT-YET-SCHEDULED
U.S. authority recordWas the reported rate check a Treasury-directed New York Fed fiscal-agent action, and was any trade executed?PENDING
Jul. 31 regional final tapeDo final closes, breadth and flows preserve the early AI/chip reversal?PENDING
Jul. 28–29 T+2 finalityDo KRX/KSD/member records show completion, fails, margin support or default-resource use?NOT-READABLE

Sources

Full saved reading

View the saved source references. This record has no direct external citation in its source-link list.

Document details and formats
Optional file downloads
For AI readers: complete text and record details
About the dates and filing language
Evidence date
When this document or named claim was checked. A newer collection, export or website date does not update it.
Current, private, Workbench or promotion
These can describe the saved document’s original filing or custody. This public reading preserves that history; publication does not turn its findings into government approval, binding law or newly verified evidence.
Master data and projection
The maintained factual record and a page generated from it. Repeated views are not additional independent evidence.
Provenance and source join
Where a record came from, and the exact reference connecting a claim to its source.
Gate, receipt and operating evidence
A required decision or condition, its documentary record, and evidence that the named activity actually occurred. Permission, delivery and operation stay separate.

Saved research reading. Its original dates and claim limits control; the export date does not refresh the evidence.