Korea stress transmission — evidence-gap index
Status: completed workbench evidence-gap index; not vault authority or a vault watch
Original observation cutoff: 2026-07-29 after the Seoul close
Later dated material: July 31 regional-control note; August 27 source/access check
Consolidated reading route: Korea transmission lead
Current use of the saved evidence
The August 27 scheduled check completed. It did not recover the exact KOFIA
July 29 leverage observation or a joined July 30–31 KRX/KSD/BOK record proving
member obligations, DvP, fails and cash finality. These two objects remain
ledger-governed source/access holds, NR. This index creates no new watch or
schedule. Other rows below carry forward the saved research criteria; the
August 27 receipt does not say every listed field was freshly checked.
Read the dated return receipt
for the completed check. The associated controlled-asset-break interpretation is a dated hypothesis, separate from evidence. At the original July 29 cutoff, crash-trade settlement was not yet due; at the later check, exact completion records were not recovered. Neither state means settlement failed or succeeded.
Consolidated source questions
Criteria below combine the retained transmission board with the
historical market-stress board.
They specify evidence that could change a reading; they do not report new September observations or activate the proposed steps.
| Question / source gap | Evidence and limiting test | Detailed owner / authority route |
|---|---|---|
| Semiconductor trigger and concentration | Timed issuer guidance/memory/AI-demand evidence and KRX index-point contributions; test Korean residual against common chip exposure, prior return, valuation, weights, breadth and foreign/institutional/retail flows. Synchronized losses alone do not allocate cause. | Regional control; Samsung/SK hynix filings, KRX, official US/JP/TW tape |
| Daily-reset hedge amplification | Manager/LP spot/futures hedge orders at predicted time and size, relative to liquidity and basis; small/dispersed/offset hedges weaken material amplification. | Leverage reconstruction; managers, LPs, KRX, KCMI |
| Broker/derivative forced sales | Exact KOFIA July 29 credit, derivatives deposits, unpaid receivables, actual forced-sale amount/ratio, plus CCP variation margin and broker records. Reporting date must identify observation date; product credit restrictions do not eliminate broader portfolio leverage. | Leverage reconstruction; KOFIA FreeSIS, KRX clearing, FSS, brokers; exact July 29 object remains on access hold |
| Short-selling and exchange controls | Stock-level short turnover, borrowing and net positions must lead price at material scale; halt/trigger/pause/reopen and audit logs test rule breach or erroneous controls. Five-minute and final-closing tape are distinct. | KRX Data Marketplace, event/audit logs and FSS; regional control |
| Won/foreign capital exit and sovereign stress | Joint foreign bond/deposit/FX exits, spot/NDF/basis, bid-ask spreads, auction coverage and haircuts; equity selling alone is not flight from all Korean assets. Post-reported-intervention windows require separate treatment. | Cross-asset authority map; BOK, MOFE, KRX/KOFIA/KSD, FSS |
| FX intervention and reported coordination | Attributable authority confirmation and net transaction disclosures; an aggregate does not by itself establish event timing, counterparties or a jointly executed trade. Keep reported rate check separate from executed US trade. | Currency-defense overlap; BOK/MOFE, Japan MOF, US Treasury/New York Fed |
| Repo causality and extraordinary support | Reserve forecast/other maturity offsets, borrower/class, legal authority, amount, rate, collateral and start/exit clocks. July 16 KRW30tn maturity offsets July 28 KRW28tn replacement on those two operations; total-system net liquidity and crash purpose remain unproved. | Funding evidence; BOK Monetary Markets Department, MPB, facility/balance-sheet records |
| Collateral mobilization, bank/deposit run and D-SIFI action | Actual dated facility draw on eligible receivables; abnormal deposits, funding bids, LCR/NSFR, recovery trigger or FSC/KDIC resolution. Pre-positioned collateral/plans do not prove use or non-use. | Authority map; BOK, FSS, FSC/KDIC, covered entities |
| Secured/unsecured funding and credit access | KOFR/repo/CD/CP levels, volume, dispersion, flags, haircuts, bank/KSFC/intraday credit; primary issuance/rollover, concessions, dealer depth and rating curves. Keep SBS 71.6 bp separate from KOFIA 70.9/71.2 bp closes; quoted yield/NAV changes do not establish freeze or redemptions. | Funding evidence; KSD KOFR, BOK, KOFIA/KSD, FSS/policy vehicles |
| Securities delivery, cash finality and operations | Joined KRX obligation/margin/default-resource record, KSD DvP count/value/time/fails, bank cash completion, BOK-Wire+ queues/volume/hours/intraday use; KFTC retail rejects/latency remain separate. No notice is not measured zero. | Settlement audit; KRX/KSD/BOK, settlement banks, KSFC, KFTC; exact crash-trade joined record remains on access hold |
| Equity-to-crypto or DeFi migration | Net KRW VASP funding traced to brokerage-sale proceeds and beneficial owner; Korean-attributed stablecoin/self-custody/bridge/protocol inflows and account/lender liquidation records. Turnover, TVL and global flows cannot supply the missing bridge. | Crypto flow test; VASPs, FIU/partner banks, issuers, chain analytics with disclosed method |
| Digital-policy or rail acceleration | Compare operative law, decree, issuer/reserve/custody/redemption, first issuance, venue/KSD registry/cash leg and named real-value KRW finality with pre-crash Hangang, securities-token, stablecoin, Agorá and KB-Kinexys clocks. Require a documented event-linked change/use; announcements, prototypes and pre-existing launch schedules are insufficient. | Digital bridge evidence; BOK, FSC, National Assembly, KSD/KRX, BIS, KB/J.P. Morgan |
| New rail absorbed conventional settlement stress | Event-specific traffic, participants and finality showing a material shift due to conventional failure/stress; conventional continuity and no shift weaken that mechanism. | Digital bridge evidence; BOK/KSD/KRX and banks |
Clock and source limitations
- KOFR is normally published by 11:00 for the previous business day: the July 28 observation belongs to July 29 publication; July 29 belongs to July 30. The saved funding review recovered no usable event value.
- The KRX member/CCP settlement deadline is 16:00 on T+2: July 28 trades were due July 30 and July 29 trades due July 31. The table below records the original expected acquisition windows, not future appointments or verified release times.
- The August 27 receipt addresses two exact objects only. Other carried gaps are unrefreshed, and elapsed calendar time is not evidence of availability.
- Keep July 28/29 untreated regional comparisons separate from the July 31 source-reported intervention/AI-reversal context. The dated regional note below has no attached primary-source citation; use the dedicated currency- defense overlap for its source chain. No official execution is inferred here.
- Original gate states such as
PENDINGandNOT-READABLEbelow retain their July 31 context. They do not certify the state of later releases today.
Preserved dated transmission-board history
The following original body preserves the human return decision, August27 receipt, release expectations, source requests, stop rules and July31 regional note. Use the consolidated source questions above as the maintained index.
Human return decision
Saved 2026-07-29 EDT: re-open this package when the KOFIA July 29 leverage observation and the July 30–31 KRX/KSD settlement record are available. These are the agreed adjudication points for the delayed-leverage and controlled-asset-break readings.
2026-08-27 check receipt
The bounded official-source return did not recover the exact KOFIA July 29
leverage observation or a joined July 30–31 KRX/KSD/BOK record adjudicating
member obligations, DvP, fails and cash finality. Both items are
ledger-governed source/access holds. The scheduled check is complete, but
the fields remain NR; no public incident notice cannot be converted into a
measured zero or proof of normal settlement. Re-open on the exact official
series, completion record or incident/default-resource object.
Release clock
| Due / expected | Release | Question answered | Promotion trigger | Falsifier |
|---|---|---|---|---|
| Jul 30 | KOFIA Jul 29 account series | Did second-day losses trigger broker forced sales? | Forced-sale amount/ratio rises abnormally and is large relative to turnover | Flat/falling realized forced sales |
| Jul 30 after 16:00 | Jul 28 KRX/KSD settlement | Did first crash-day trades complete? | Late/fail/default-resource or liquidity-support evidence | Timely DvP with no material fail |
| Jul 30 by normal KOFR clock | Jul 29 KOFR | Did secured funding reprice? | Abnormal rate, volume, dispersion, fallback or calculation flag | Ordinary rate/volume |
| Jul 31 after 16:00 | Jul 29 KRX/KSD settlement | Did second-day trades complete? | Same as above | Same as above |
| Following weekly releases | KRX short, lending, program and investor data | Which trading channel amplified the move? | Concentrated pre-price selling or hedge reset | Selling follows rather than leads price |
| Following issuance windows | CP / corporate-bond placement and rollover | Did spread warning become funding impairment? | Failed/delayed issuance or sharply higher concession | Normal placement and rollover |
Leverage and forced sales
Retrieve:
- KOFIA investor deposits, derivatives deposits, unpaid receivables, actual forced sales and credit financing for Jul 29-31;
- KRX short-turnover and securities-lending balances;
- derivatives variation-margin totals; and
- product-manager/LP hedge tape.
Do not substitute media estimates of “margin calls” for the KOFIA field and its observation date.
Funding and collateral
Retrieve:
- KOFR level, volume, trimmed distribution and publication flags;
- GC/special repo rates, collateral composition and haircuts;
- call, CD, CP and bank-funding series;
- KSFC and BOK intraday/liquidity-facility usage; and
- primary corporate-bond and CP issuance outcomes.
Escalate only if price, quantity and facility evidence agree.
Clearing and finality
Retrieve for Jul 30-31:
- KRX obligation and margin completion;
- KSD DvP count, value and fails;
- settlement-bank cash completion;
- BOK-Wire+ queues, volume, hours, intraday credit and incidents; and
- any KRX default-watch, payment-suspension or waterfall action.
No public incident is not the same as a measured zero.
Crypto and DeFi
Retrieve:
- VASP KRW net deposits/withdrawals;
- source-of-funds cohort data;
- stablecoin purchase/withdrawal/mint/redemption;
- Korean-attributed bridge and protocol flows; and
- liquidation records tied to Korean accounts or lenders.
Turnover, TVL and global liquidations remain non-attributable unless the beneficial-owner and money-object bridge is shown.
Regional control
Retrieve:
- final JPX/Nikkei Jul 29 close and market data;
- date-matched constituent weights and index-point contributions;
- foreign/institutional/retail flows in Taiwan and Japan;
- matched issuer, futures and ETF performance; and
- 5-minute halt/reopen data.
The test is whether Korea's residual survives controls for chip exposure, prior return, valuation, flow and exchange design.
Stop rules
Stop and retain NR when:
- the release did not yet exist at the observation cutoff;
- only turnover is available for a net-flow claim;
- a global crypto or fund series has no Korean attribution;
- a facility is merely authorized or pre-positioned;
- a T+2 trade has not reached its settlement deadline; or
- a source reports a different quote snapshot without enough metadata to reconcile it.
Post-cutoff regional-control update — July 31
The July 28–29 Korea–Taiwan–Japan semiconductor comparison remains the controlling untreated panel for the original crash. Do not splice July 31 returns into it:
- Japan became a policy-treated FX/carry control after the source-reported July 30 yen-buying operation and reported U.S. rate check.
- Taiwan remains the cleaner regional semiconductor comparator.
- The U.S. AI tape and Microsoft earnings are a common-factor control.
- Korea's reported dollar-selling operation makes post-operation KRW direction an intervention-confounded signal.
- The early July 31 KOSPI surge is not a final close and does not establish successful KRX/KSD/BOK-Wire+ settlement.
Add these release gates:
| Gate | Exact question | State |
|---|---|---|
| Japan official intervention amount | Does the Aug. 28 MOF total for Jul. 30–Aug. 26 contain a nonzero aggregate? | PENDING |
| Korea official intervention total | Does the later 2026Q3 net USD transaction record contain official sales? | EXPECTED—DATE-NOT-YET-SCHEDULED |
| U.S. authority record | Was the reported rate check a Treasury-directed New York Fed fiscal-agent action, and was any trade executed? | PENDING |
| Jul. 31 regional final tape | Do final closes, breadth and flows preserve the early AI/chip reversal? | PENDING |
| Jul. 28–29 T+2 finality | Do KRX/KSD/member records show completion, fails, margin support or default-resource use? | NOT-READABLE |
Sources
Full saved reading
View the saved source references. This record has no direct external citation in its source-link list.
Document details and formats
About the dates and filing language
- Evidence date
- When this document or named claim was checked. A newer collection, export or website date does not update it.
- Current, private, Workbench or promotion
- These can describe the saved document’s original filing or custody. This public reading preserves that history; publication does not turn its findings into government approval, binding law or newly verified evidence.
- Master data and projection
- The maintained factual record and a page generated from it. Repeated views are not additional independent evidence.
- Provenance and source join
- Where a record came from, and the exact reference connecting a claim to its source.
- Gate, receipt and operating evidence
- A required decision or condition, its documentary record, and evidence that the named activity actually occurred. Permission, delivery and operation stay separate.
Saved research reading. Its original dates and claim limits control; the export date does not refresh the evidence.