Skip to content

Download the original MD document

Page atlas — all 302 pages

Publisher PDF. Printed/PDF page numbers coincide. Each page was read, including body and source notes. This index routes to substantive wave notes; it is not a claim that every source assertion was independently verified.

PagesSectionWhat to find
1–3Front matterAction, legal identity, publication placeholders and comment process
4–7ContentsComplete source navigation
8–14Purpose and backgroundWhy CAT exists and how event/customer linkage works
15–23Necessity debateCompeting positions, existing use and retired alternatives
24–30Current governance and fundingCAT LLC, FINRA CAT, committee votes and 2026 model
31–40Implementation stepsTwo rule changes plus distinct plan, asset, contract, funding and consultation actions
41–48Service and funding choicesPerformance obligations, timing, appropriations and SRO access costs
49–54Consultation and rescissionStakeholder input, voting, full Rule 613 repeal and alternatives
55–61Rule overview and permitted useContinuity and regulatory-only access/purpose
62–88Definitions43 terms, identifier design, trading-day boundaries and omitted terms
89–93Security/actor perimeterEligible securities, tokenized venues and Q21–23
94–101Clock synchronizationActor tolerances, daily controls, logging, certification and Q24–27
102–106TimestampsPrecision, manual events, permanent nanosecond truncation and Q28–30
107–109Connectivity and agentsEncrypted connections, contracts and primary reporter responsibility
110–112Reporting timing and symbologyT+1 clocks, early reporting and shared symbols
113–120SRO reportsEvent fields, daily identifiers and options quotes
121–134Member reportsCore/ATS fields, received data, FINRA joins and Q40–44
135–138Error correctionT+3, policies, thresholds and annual review
139–150Reference data and privacyIdentity/linkage architecture, historical changes, objections and SEC position
151–154Reference updates and questionsDaily/periodic changes, correction and Q47–50
155–160Floor/manual and RFQ exceptionsScope, surviving reports and removed time limit
161–168Linkage, port and reject exceptionsActor/system-specific relief and surviving duties
169–171Reporter retentionSubmission files versus underlying books
172–176Economic frameRetention questions, public-good rationale and baseline
177–186Evidence/processing baselineRetention, linkage, clocks, timetable and late repairs
187–200Funding/governance/security baselineMoney allocation, decisions, quality, SCI/security and affected parties
201–210Effects and benefitsForegone future evidence, quality, fee incidence and governance
211–222Costs and implementation risksPolicies, records, appropriations, contracting, input and security
223–231Monetized economicsGross old/new costs, initial versus recurring, PV and annualized totals
232–237Efficiency and competitionControl over future changes, fixed burdens, fees and capital formation
238–242AlternativesAbolition or permanent funding while retaining plan governance
243–247Economic questionsQ61–82, transition evidence and governance alternatives
248–251PRA purpose and collectionsOMB control, confidentiality and collection objects
252–259PRA tables and assumptionsHistoric/current populations, hours, costing and external costs
260–267PRA clock, IRFA, CRA and authorityDistinct comment clocks, small entities, legal bases and OMB review
268–269Proposed preamble and definition startAuthorized regulatory access and first definition
270–278Proposed definitions and scopeAll definitions and (b) scope
279–283Proposed clocks, submission and symbols(c)–(g), reporter obligations
284–287Proposed SRO reporting(h) fields and start of member reports
288–297Proposed member reporting(i) ATS and member fields, received joins and quotes
298–301Proposed corrections, reference, exceptions and records(j)–(m)
302–302Rule 613 reserved and signaturePart 242 amendatory action

Sources

Document details and formats

Saved research reading. Its original dates and claim limits control; the export date does not refresh the evidence.