Skip to content

EOP, money bureaus, labs, legislative support

Window: strictly after 2026-09-03 20:09:34 EDT through 2026-09-11 16:01:37 EDT.
Inclusive replay: 2026-09-03 date-only publishers, then DEDUPE against this package’s 1A–2E and against already-owned packages.
Mode: inspect-broadly / promote-narrowly. Empty hunt is coverage. Official roots.
Mutation: Workbench only. promotion_review is a hunt disposition, not vault authority.

Treasury/OFAC/SEC/CFTC/IRS were already hunted as department/regulator sites. This slice opens the named money bureaus as their own publishers. Twelve Reserve Banks remain skipped through 2026-09-08 19:18 EDT. SWIFT/COMEX/DTCC recensus skipped. Genesis through 2026-09-09 15:40 EDT is fold. USTR forced-labor TRQ standing watch fires only on establishment notices.

Most agency pages expose calendar dates, not intraday timestamps. September 11 objects are date-bounded and are not asserted to precede 16:01:37 EDT.

Look / keep / promote

LOOK     official root + newsroom/releases + library/FOIA/publications if present
KEEP     in-window object that hits the house interest test
PROMOTE  only if established-story fit + material state movement

Record each assigned publisher as reached / empty_hunt / blocked / not_applicable / unresolved. A skip is a row.

Highest-value objects

1. NNSA CD-1 for LANSCE Modernization (LAMP) — 2026-09-09

NNSA approved Critical Decision-1 for the Los Alamos Neutron Science Center Modernization Project. CD-1 is DOE Order 413.3B “Approve Alternate Selection and Cost Range”: the project definition / conceptual-design gate. It authorizes design-phase work to replace the 50-year-old LANSCE front end (ion sources and beam-forming components). Administrator Williams called it a national-security investment in unique proton-radiography, materials, neutron-scattering, and nuclear-data capabilities used for weapons-component qualification. LANL Deputy Lab Director for Weapons Nakhleh noted CD-1 came 18 months after CD-0.

CD-1 is not CD-2 (performance baseline), not CD-3 (start of construction), not CD-4 (operations). Not a first beam, not a stockpile FPU, not an appropriation. Distinct from the NIF Enhanced Fusion Yield Capability CD-1, which FY2027 Weapons Activities documents date to 2026-03-27 — outside this window; the LLNL Sep 11 EYC article is a restatement, not a new CD.

URL: https://www.energy.gov/nnsa/articles/nnsa-approves-critical-modernization-milestone-los-alamos-national-laboratorys-1

2. Commerce CHIPS R&D award finalizations posted on NIST — 2026-09-08

Two same-day NIST “updates” record signed CHIPS R&D awards:

Signing of a final award is more than a selection presser. It is still not obligation drawn, not a foundry IOC, not a PQC FIPS clock, and not a CHIPS manufacturing (Title) construction start. Brookhaven’s Sep 2 PsiQuantum *Construct* software partnership is a separate, 09-03-adjacent lab locator.

3. USTR forced-labor TRQ / UFLPA establishment watch — still none

USTR press index reached (web_fetch of the dated path 404’d; search index recovered the list). In-window items:

Zero USTR rows in the frozen 513 FR census. Forced-labor Section 301 action remains the July 23 object. Standing watch unfired.

promotion_review units

PR-3F-01 — LAMP CD-1 (LANSCE front-end modernization)

PR-3F-02 — CHIPS R&D final awards: GlobalFoundries $375M + PsiQuantum $100M

EOP / trade / science

OSTP (whitehouse.gov/ostp/ + /ostp/news/): empty_hunt. Latest dated item is the Sep 2 G20 Innovation Ministerial consensus statement — 09-03 owned / exclusive-start boundary. No in-window NSTC, PCAST, or OSTP instrument.

ONCD (whitehouse.gov/oncd/ + /oncd/news/): reached; empty_hunt. Public page exists. News index latest is the Mar 6, 2026 Cyber Strategy unveil; Cairncross confirmation is Aug 2025. A Sep 10 Billington-summit speech on the Texas “Project Watershed 250” water-cyber pilot (announced late August) is a trade-press locator, not an ONCD instrument. No in-window strategy, EO, or program IOC.

CEQ (whitehouse.gov/ceq/news/): empty_hunt. Latest CEQ-tagged release Jul 9 (Permitting Innovators Expo selections).

ONDCP (whitehouse.gov/ondcp/news/): empty_hunt. Latest Aug 28 (DFC / MLB partnership). No in-window strategy, HIDTA, or budget instrument.

CEA (whitehouse.gov/cea/news/ + 2026 ERP page): empty_hunt. Latest research note Jul 15 (balance-of-payments deficits). No in-window ERP supplement or data revision.

USTR (ustr.gov press): reached via search index (dated path 404 on live fetch). In-window: Sep 8 Canada-retaliation statement (fold to 1A proclamations); Sep 9 SME Dialogue + podcast. No TRQ / UFLPA / forced-labor establishment notice. FR agency empty (1B already). Standing watch remains none through freeze.

OIRA / reginfo.gov: blocked. reginfo.gov/public/do/eoDashboard returned “temporarily experiencing technical difficulties.” No in-window completed-review extract. Not an inactivity finding.

Money bureaus

Bureau of the Fiscal Service (fiscal.treasury.gov/news/): empty_hunt on the news index (latest Aug 19 OpenCorporates-into-Do Not Pay; Aug 14 historic fiscal-data release). Named sub-surfaces:

U.S. Mint (usmint.gov/news/press-releases): reached. Latest press Sep 1 (2026 Palladium Eagle on-sale Sep 3) is 09-03-adjacent. In-window operating noise: Long Beach Expo booth Sep 9–11; Enduring Liberty 9/11 privy-mark half-dollar pre-order window Sep 10–Sep 25 15:00 ET, ship Dec 3 — collector product, not a circulating-specie or bullion-program rewrite. Cumulative sales report through week ending Sep 8 is statistical. No AFR, circulating-mix, or bullion-allocation instrument.

BEP (bep.gov/news): empty_hunt. News index latest dated press is 2024-08-12 (Series 2021 $5 uncut sheets). Office-of-the-Director page lastmod 2026-08-31 (Acting Director Michael Brown) — personnel page, not an in-window appointment instrument. No in-window monthly production report, Catalyst $10 tactile-feature production start, or facility CD located. Currency-reader / *American Council of the Blind* status reports remain March 2026 objects.

TTB (ttb.gov newsletter archives): reached. Sep 4 newsletter: September three-period excise-return reminder (standing 27 CFR 25.164a); one Offer in Compromise; Labor Day; USTR Notorious Markets comment request (USTR process, not a TTB rule); FDA/CBP locators. No AVA final, tax-rate, COLA-system, or CBMA instrument. Routine group.

CDFI Fund (cdfifund.gov/news): empty_hunt. Latest Aug 25 (Director Chris Miller). FY2026 BEA round closed Jul 31; announcement date still TBD. Geographic-based NMTC ACS files show Updated Sep 9 — data-file refresh, not an allocation or award. CY2026 NMTC $5B round “opening soon” remains Aug 12 pre-notice.

OFR (financialresearch.gov): reached. Blog latest Aug 25 (deep-learning forecasts); Aug 20 Treasury-repo central-clearing plateau; Aug 19 hedge-fund cash Treasuries $2T. In-window: MMF / STFM monitors are dynamic_bounded statistical (updated daily/monthly). No new collection rule, annual report, or FSOC-directed product. Staff views ≠ OFR/Treasury position.

FSOC (Treasury FSOC page): reached; empty_hunt (JS-thin, same as 2B). No dated in-window designation, meeting readout, or annual-report drop extracted.

CFIUS (cfius.gov, redirected from the Treasury CFIUS URL): reached. Dedicated site live (Treasury launched it Jul 29). Recent Actions latest Aug 7 (2025 annual report). No in-window determination, mitigation, annual report, or Known-Investor-Program expansion.

Outbound Investment Security Program (home.treasury.gov/policy-issues/international/outbound-investment-program): reached. Final rule still the Oct 28, 2024 instrument effective Jan 2, 2025. COINS Act (NDAA FY2026, enacted Dec 18, 2025) still directs regs within 450 days; current 31 CFR 850 remains in force until those regs issue. No in-window FAQ, prohibition add, or notification-system change. Notification templates lastmod Aug 19 is a form file, not a rule.

Legislative support

CBO (cbo.gov): reached via search index; blocked on this host (geo captcha / “enable JS”). In-window harvest is cost estimates and a Sep 8 presentation:

GAO (homepage recovered; reports-testimonies index still 403 as in 1A/2A): reached. No new product 1A missed inside the window.

ProductPublished / public1A/2A statusThis slice
GAO-26-108127 chemical-facility vettingSep 8 / Sep 81A retain_current_atomicfold
GAO-26-107894 FEMA NRISep 10 / Sep 101A watch_onlyfold
GAO-26-108229 NNSA strategic partnership projectsSep 10 / Sep 102A watch_only unread PDFstill unread; not re-opened
GAO-26-106756 agricultural diseasesSep 2 / Sep 101A fold publicationfold
GAO-26-108092 DOD IGSASep 3 / Sep 91A foldfold
GAO-26-109086 State PORSep 1 / Sep 81A watch_onlyfold
GAO-26-109100 state-administered-program fraudJul 23 (reissued Aug 7)not 1Ahomepage feature only; not in-window
Bid protests B-424508.2 etc.Sep 8–11—routine bid-protest denials/sustains

Debt / improper-payment / open-recommendation press on the homepage are older (Jun 11 debt; May 22 MedPAC). No new Comptroller General instrument.

GPO (gpo.gov news): empty_hunt. Latest Aug 4 (GovInfo annual-reports collection). In-window events are paid InDesign/Illustrator training Sep 14–15 (after freeze). No in-window *Congressional Record* production change, FR/GPO authentication change, or Public Law slip beyond 1A’s recovered presidential texts.

Library of Congress / CRS: reached via Congress.gov CRS-products index (loc.gov events JS/Cloudflare). In-window CRS products (analysis, not law):

CRS updates are congressional-support analysis. They do not move CFIUS, SEC, or 340B legal state. Record as reached; do not promote. LOC public events (Sep 11 DNA time-capsule display; Declaration’s Promise exhibit) are ceremonial.

Architect of the Capitol (aoc.gov/news-notices): reached. In-window: Sep 8 Capitol Visitor Center fall-season public notice (Guide Service / Constitution Day programs). Not a construction CD, occupancy, or security-perimeter change. Routine.

Labs (non-Genesis) + NIST PQC

Genesis objects through Sep 9 15:40 remain folded (GridFM, OPAL, SBIR pitch, lab Genesis Phase I/II selections including BNL GridFM Sep 1, Fermilab accelerator-AI, INL Prometheus, Argonne/Sandia/LLNL Genesis awards). Keep only federal operating / award / IOC objects.

LabNews indexIn-window keepNotes
LANLoperations/news + NNSALAMP CD-1 (PR-3F-01)CINT Fall Call Sep 1–30 is a user-facility proposal window, not an award. Air-quality dashboard is operational telemetry, not an IOC.
Sandianewsreleases.sandia.govnoneSep 9 analog-memory research; Sep 10 quantum-sensing fieldability — science, not award/IOC. Aug 31 sounding-rocket is pre-window. Genesis Jul 22 fold.
LLNLllnl.gov articlesnone newSep 11 EYC article restates Mar 27, 2026 CD-1 (FY2027 WA). W80-4 CSA FPU article is a 2025-09-22 stamp restated; not this window. Nightwatch digital-product stamp lastmod Sep 2 — 09-03. Aires Tide is Genesis-adjacent / May drop-test. CASC newsletter Sep 4 is internal. NIF Discovery Science full proposals due Sep 16 (after freeze).
Argonneanl.gov / ALCF / APSnoneAPS user-access/ESAF page updates Sep 3–4 are facility admin. ALCF inference-service copy is Genesis-tied. No in-window INCITE/ALCC award drop located.
Brookhavenbnl.gov/newsroomnone (research)Sep 11 NSLS-II four-technique nuclear-materials imaging setup commissioned with NSUF — research instrument, not a reactor IOC or award. Sep 2 PsiQuantum Construct partnership is 09-03. Sep 1 GridFM $14.2M Genesis Phase II fold. EIC crystal procurement complete is Aug 21.
Fermilabfnal.govnoneHomepage Genesis accelerator-AI selection fold. URA honorary awards / directorate-reorg copy are personnel/org, not a PIP-II CD. Saturday Morning Physics Sep 12 is after freeze.
PNNLpnnl.gov newsnoneNo in-window award/IOC located.
INLinl.gov / gain.inl.govnonePrometheus Genesis Phase II is Jul 22 fold. MALAMUTE docs rebuilt Sep 11 is software, not an IOC.
SRNLsrnl.doe.govempty_hunt (no in-window hit)Grouped.
NRELnrel.govempty_hunt (no in-window hit)Grouped.
ORNLornl.gov newsnoneUS ITER CS stacking complete is Jun 29. SIPRC construction contract is older. SAMPE award story is 2025.
JPLjpl.nasa.gov/newsnoneSep 9 Sentinel-6 El Niño science feature. Prime-contract competition clock remains Sep 30, 2028 (May 22 announcement). NIAC awards are Jul 29. No in-window NASA operating/award/IOC.

NNSA adjacent (not a named lab, harvested because LANL/LLNL indexes pointed here):

NIST (nist.gov/news-events/news + CSRC PQC): reached.

Routine / bounded negatives / folds

ClusterResultDisposition
OSTP G20 ministerial Sep 209-03fold
USTR Sep 8 Canada statementlocator for 1A §338 proclamationsfold
USTR SME Dialogue / podcastmeetingsroutine
Forced-labor TRQ / UFLPA establishmentnonestanding watch unfired
Genesis lab awards / GridFM / Prometheus / ALCF inferencethrough Sep 9 15:40fold
NIF EYC CD-1Mar 27, 2026fold (LLNL Sep 11 restatement)
W80-4 CSA FPUSep 22, 2025reject (stale LLNL page)
B61-13 final CSA stampSep 1; NNSA release Sep 10fold stamp; publication provenance only
Nightwatch digital productlastmod Sep 209-03 fold
Mint palladium on-sale / 9/11 privy pre-ordercollectorroutine
TTB Sep 4 OIC + September 3-period reminderstanding tax calendarroutine
CBO bill cost estimates Sep 4–11scoringroutine
GAO bid protests Sep 8–11bid protestroutine
AOC Visitor Center fall noticetoursroutine
LOC exhibits / DNA time capsuleceremonialroutine
CRS Sep 10 product dropanalysisreached, not promote
OFR/STFM/MMF monitor printsstatisticalroutine / dynamic_bounded
FiscalData ESF interest / DTS / auctionsstatisticalroutine
CDFI geographic file Sep 9data refreshroutine
Sandia/BNL/NIST research paperssciencereject from promotion

Coverage receipt

Publisher familyStatusNew material / clockEnrichmentRoutine / reject / fold
OSTPempty_hunt00Sep 2 G20 fold
ONCDreached; empty_hunt0Watershed-250 speech locatorMar 6 strategy stands
CEQempty_hunt00Jul 9 last
ONDCPempty_hunt00Aug 28 last
CEAempty_hunt00Jul 15 last
USTRreached0 establishmentCanada statement → 1ASME/podcast routine; TRQ watch unfired
OIRA / reginfoblocked——not countable
Fiscal Service (DNP / USAspending / ESF)reached; empty_hunt0ASAP Sep 16 after freezeAug 19 DNP dataset fold
U.S. Mintreached0 operating9/11 privy pre-orderSep 1 palladium 09-03
BEPempty_hunt0Acting Director page Aug 31news stale
TTBreached0Sep 4 newsletterOIC / 3-period routine
CDFI Fundempty_hunt0Sep 9 geo fileAug 25 director last
OFRreached; empty_hunt on instruments0monitors dynamicAug 25 blog last
FSOCreached; empty_hunt00JS-thin as 2B
CFIUSreached; empty_hunt0cfius.gov live since Jul 29Aug 7 annual report last
Outbound Investmentreached; empty_hunt0COINS 450-day clock unchanged31 CFR 850 still operative
CBOmixed: search reached; site blocked0 baselineSep 8 Medicare presentation; bill scorescost estimates routine
GAOreached0 new vs 1A108229 PDF still unreadprotests routine; 109100 not in-window
GPOempty_hunt00Aug 4 last
LOC / CRSCRS index reached; loc.gov events JS-thin0 legalSep 10 CRS product dropanalysis not promote
Architect of the Capitolreached0Sep 8 CVC noticetours routine
NIST (incl. PQC)reached0 PQC clock; 2 CHIPS awards (watch)IR 8536 Sep 9; TES paper Sep 10PQC unchanged
Labs (grouped)indexes reached1 (LAMP CD-1)B61-13 Sep 10 provenanceGenesis fold; research reject

Surfaces

SurfaceResult
whitehouse.gov/ostp/ and /ostp/news/empty_hunt
whitehouse.gov/oncd/ and /oncd/news/reached; empty_hunt
whitehouse.gov/ceq/news/empty_hunt
whitehouse.gov/ondcp/news/empty_hunt
whitehouse.gov/cea/news/empty_hunt
ustr.gov press indexreached (dated path 404; search recovered Sep 8–9 list)
reginfo.gov EO dashboardblocked (technical difficulties)
fiscal.treasury.gov/news/empty_hunt
fiscal.treasury.gov Do Not Pay / ASAPreached; no in-window instrument
fiscaldata.treasury.gov ESF/FIP / DTSreached; statistical
usmint.gov/news/press-releasesreached; latest Sep 1
bep.gov/newsempty_hunt (stale)
ttb.gov newsletter archivesreached
cdfifund.gov/newsempty_hunt
financialresearch.gov blog + monitorsreached; empty on instruments
home.treasury.gov FSOCreached; empty / JS-thin
cfius.govreached; empty in window
treasury outbound-investment-programreached; empty in window
cbo.govblocked this host; reached via search index
gao.gov homepage / productsreached; reports-testimonies index still 403
gpo.gov newsempty_hunt
congress.gov/crs-productsreached
loc.gov eventsunresolved (Cloudflare)
aoc.gov/news-noticesreached
nist.gov/news-events/news + csrc PQC pubsreached
energy.gov/nnsa LAMP CD-1reached
lanl.gov / sandia.gov / llnl.gov / anl.gov / bnl.gov / fnal.gov / pnnl.gov / inl.gov / ornl.gov / jpl.nasa.gov news indexesreached (SRNL/NREL empty_hunt)

A 403, JS shell, captcha, or empty fetch is a tool-path failure, not a finding that the publisher was silent.

Lane closed?

Yes for the named core publishers (EOP offices, USTR, Fiscal Service, Mint, BEP, TTB, CDFI, OFR, FSOC, CFIUS, Outbound, CBO, GAO-delta, GPO, LOC/CRS, AOC, NIST) through the frozen cutoff. Labs are grouped: one keep (LAMP CD-1); the rest empty or research-only.

Open gates rather than incompleteness theater:

Skips honored: twelve Reserve Banks through Sep 8 19:18 EDT; SWIFT; COMEX/DTCC recensus; Genesis through Sep 9 15:40; Treasury/OFAC/SEC/CFTC/IRS department hunts not recensus’d.

No vault write. No Catalog/Registry mutation. No entity-chart write. No Git.

Sources

Full saved reading

View cited sources (3)

These are the sources cited by this reading. Each source keeps its own date and scope.

Document details and formats
Optional file downloads
For AI readers: complete text and record details
About the dates and filing language
Evidence date
When this document or named claim was checked. A newer collection, export or website date does not update it.
Current, private, Workbench or promotion
These can describe the saved document’s original filing or custody. This public reading preserves that history; publication does not turn its findings into government approval, binding law or newly verified evidence.
Master data and projection
The maintained factual record and a page generated from it. Repeated views are not additional independent evidence.
Provenance and source join
Where a record came from, and the exact reference connecting a claim to its source.
Gate, receipt and operating evidence
A required decision or condition, its documentary record, and evidence that the named activity actually occurred. Permission, delivery and operation stay separate.

Saved research reading. Its original dates and claim limits control; the export date does not refresh the evidence.

Original title: Wave 3F — EOP, money bureaus, labs, legislative support