Remaining government corporations and GSEs
Window: exclusive after 2026-09-11 16:01:37 EDT through frozen cutoff 2026-09-16 19:10:34 EDT
Inclusive replay: 2026-09-11 date-only publishers, then dedupe against Weekly Delta 2026-09-11 (especially WAVE_3B EXIM CesiumAstro / Sep 10 Board, DFC Honduras, MCC Kiribati payload, Ginnie APM 26-08, FHLB Sep 9–10 Global, RMA Sep 8–11 product notices)
Discovery rule: official roots, newsrooms, and financials/libraries/minutes/APMs/information statements if present. Federal Register is not discovery. FR backbone has EXIM PRA 2026-19014, MCC EAC meeting 2026-18955, Neighborhood Reinvestment Sunshine 2026-18803, AmeriCorps PRA (3A).
Lane: remaining government corporations and GSEs. Not a 392-node census.
Skip (already opened 1A–2E): Fannie Mae (LL-2026-07 named; PDF unread is a hole, not a recensus), Freddie Mac, FHFA 404, USPS, Amtrak/STB.
Skip: FDIC-as-corp — 1B/2B already walked FDIC press/FIL (exam-cycle IFR, TPRM, no FIL after 58-2026).
Skip: twelve Reserve Bank public sites through 2026-09-08 19:18 EDT (fed-clearing-treasury).
NCUA as credit-union regulator is WAVE_3D; this slice owns the Central Liquidity Facility and the Share Insurance Fund (user-named).
Sallie Mae / SLM Corporation is walked once: privatized; not a GSE.
Inspect broadly. Empty hunts are coverage. Promote narrowly. Award ≠ obligation ≠ disbursement ≠ delivery. Agenda ≠ decision. Comment-period close ≠ financing. Signing ≠ first draw. Staff briefing ≠ a rule.
Most of these publishers expose calendar dates, not intraday timestamps. September 11 objects are date-bounded and are not asserted to precede 16:01:37 EDT.
Mutation: Workbench only. No vault, Catalog, Registry, watches, entity chart, app, or Git. promotion_review is a hunt disposition, not vault authority.
09-11 continuation clocks this slice was required to verify
- EXIM Sep 10 Board (09-11: meeting
Completed; no Summary of Minutes /Board Decision:). Unchanged. Live page still agenda +Completed. Minutes index still lists Sep 10 as agenda, not summary. Three items remain Decision Required: Approval. - EXIM CesiumAstro $280M MMIA signed Sep 9. No first-draw clock retrieved.
- DFC MiCrédito Honduras $10M (approval Sep 8 / release Sep 9). No disbursement / first sub-loan retrieved. Fold the Sep 9 release.
- MCC Kiribati Amendment 1 (Sep 1 instrument; 09-11 payload fill). Still the latest Kiribati document. No later EIF-by-last-signature notice.
- MCC Philippines Energy Threshold 9/10 listing (09-11
unresolvedas signing). Now sourced: $60 million grant signed Sep 10. Hole-fill, not a new-window atomic. - Ginnie APM 26-08 (Aug 13) was 09-11 “latest.” Superseded as latest: APM 26-09 (Sep 11) and 26-10 (Sep 14).
- PBGC calendar-year premium due 2026-10-15. Unchanged. News latest still Aug 10.
- FFB September monthly activity report. Still unposted; 2026 list through August.
- FCSIC next premium review. No in-window Board premium action.
- CLF next monthly FS. No in-window advance or later-than-July FS retrieved.
Promotion-review objects
1. DFC Board approved more than $8 billion in new investments (Sep 16)
Actor: U.S. International Development Finance Corporation Board of Directors; CEO Ben Black
Clocks: Board approved 2026-09-16 (date-only; FOR IMMEDIATE RELEASE). No disbursement, commitment-as-drawn, or congressional-notification clock in the release. Additional transactions “remain confidential” and “may be subject to further steps before commitment and closing, including congressional notification.”
URL: DFC release
Disposition: promotion_review
Named approved deals (dollar amounts per deal unpublished; package characterized as more than $8 billion and DFC’s “largest digital investment to date”):
| Deal | What the release says |
|---|---|
| IFC Global Trade Finance Program counter-guaranty | DFC shares risk with IFC on trade-finance guaranties exclusively for U.S. exports; “billions of dollars in international transactions” is DFC’s characterization, not a measured volume. |
| Vodafone Ukraine / NEQSOL | Financing to modernize telecom / 5G around “trusted technology” during the war. Amount unpublished. |
| DTEK + Fluence BESS, Ukraine | 200 MW / 400 MWh battery storage across six sites; agency claim “enough power for 600,000 homes for two hours.” Amount unpublished. |
| Jordan National Carrier Project | Loan to National Carrier Project Company + political risk insurance for equity investors Meridiam and Suez — seawater desalination plant and conveyance. Amount unpublished. |
| WIOCC Group equity, Sub-Saharan Africa | Equity to a carrier-neutral wholesale connectivity / data-center platform spanning 30 African countries; partners Vision International Investment Company and Africa Finance Corporation. Amount unpublished. |
| West Africa critical minerals | “DFC is also supporting a critical minerals project in West Africa.” No name, amount, or country in the release. |
| Other | Confidential; may need congressional notification before commitment/closing. |
Same-day newsroom also posted a General Counsel Robert Stebbins thanks-for-service note and Head of Investment Conor Coleman House Appropriations FY27 opening remarks. Personnel / testimony ≠ the Board package.
Claim limit: Board approval is not commitment-as-disbursed, not first export financed under the IFC counter-guaranty, not a battery in service, not a cubic meter of Jordanian desalinated water, not a WIOCC fiber-km lit, and not a minerals offtake. “More than $8 billion” is DFC’s package characterization; individual principal amounts are unpublished. Confidential items may still fail commitment/CN. Honduras $10M Sep 9 remains 09-11.
2. Ginnie Mae issued APM 26-09 (Sep 11) and APM 26-10 (Sep 14) — MBS Guide pooling eligibility
Actor: Ginnie Mae (HUD government corporation)
Clocks: APM 26-09 dated 2026-09-11 (inclusive replay; 09-11 WAVE_3B’s latest APM was 26-08 Aug 13). APM 26-10 dated 2026-09-14, “effective immediately.” Letter bodies / Guide redlines not line-read (JS APM library; index blurbs retrieved).
URL: APM index
Disposition: promotion_review / hold_for_source on the unread PDFs
Index blurbs:
- 26-09: existing guidance did not specifically address a loan modified to a term greater than 30 years, later bought out of a Ginnie Mae MBS due to redefault, now re-performing on modified terms — eligibility for re-securitization in C ET pools. Ginnie “is revising its guidance to confirm” such Re-Performing Modified Loans… (blurb truncates).
- 26-10: pooling eligibility for different types of single-family construction-to-permanent and rehabilitation loans, and the conditions under which they are eligible for pooling. Effective immediately.
Claim limit: APM ≠ first C-to-P or C ET pool issued under the new text, ≠ a Ginnie outstanding-balance change, ≠ an FHA/VA/RD insurance-rule rewrite, ≠ FHFA/Fannie/Freddie Guide. Blurbs are not the operative Guide language. Sep 11 26-09 is date-bounded inclusive replay, not asserted before 16:01:37 EDT.
3. MCC Philippines Energy Threshold Program signed $60 million (Sep 10) — 09-11 hole-fill
Actor: Millennium Challenge Corporation; Republic of the Philippines (Secretary of Finance Frederick Go); U.S. Ambassador Lee Lipton; MCC Acting Chief of Staff Dan Petrie; MCC Acting VP Policy and Evaluation Martha Bowen
Clocks: signed 2026-09-10 at the Luzon Economic Corridor Investment Forum, Manila. Board approval 2026-06-24 (pre-window; 09-11 owned the approval). Exclusive start is after 2026-09-11 16:01:37 EDT; this instrument is Sep 10. 09-11 WAVE_3B left the 9/10 ceremony listing unresolved as to whether a signing occurred. This sitting retrieves the press release.
URL: MCC release · homepage card
Disposition: hold_for_source cleared / fold as the 09-11 object. Do not recensus as a new in-window action.
Program (agency description): $60 million threshold grant to modernize the Energy Regulatory Commission (streamlining/digitalization), strengthen electric-cooperative governance, and pilot smart-grid technologies; “unlock domestic capital for infrastructure investments.” MCC “will also coordinate with” DFC on targeted TA / catalytic funding — coordination language, not a DFC Board approval (DFC’s Sep 16 package does not name the Philippines Energy Threshold).
Claim limit: Signing is not entry into force, not first disbursement, not ERC process change delivered, not a compact, and not a U.S. private-sector offtake. $60 million is the grant ceiling in the release, not dollars drawn. Agreement PDF was not retrieved from the resources library this sitting (documents index still shows Kiribati Amendment 1 Sep 1 / Solomon Islands KPI Sep 2 as latest posted docs).
4. EXIM Sep 10 Board meeting remains Completed with no public decision (continuation)
Actor: EXIM Board of Directors
Clocks: meeting 2026-09-10 9:30 a.m. ET. Through freeze, live minutes URL still titled as agenda; wrapper prints Completed; no Summary of Minutes / Board Decision: block. Minutes index newest row is still Sep 10 Agenda, not Summary. Newsroom newest dated release still Sep 10 roundtable.
URL: Sep 10 page · minutes index
Disposition: verify_later — 09-11 gate did not move.
Open items still awaiting a published Board Decision:
- Open / OGC: EXIM Military Policy — Addition of Satellites to the Small Craft Exclusion. Decision required: Approval.
- Closed / Transportation AP300196XX: Turk Hava Yollari / Boeing / PEFCO — pre-delivery payment financing for commercial aircraft.
- Closed / Transportation AP300140XX: Grupo Ferroviario Mexicano / Ferrocarril Mexicano / J.P. Morgan Chase / Progress Rail — refurbished locomotives.
Claim limit: Completed on an agenda page is not a vote, not a commitment, not a disbursement, and not a military-policy text change. CesiumAstro first draw still unpublished.
Admit-lower-rank / grouped
5. RMA/FCIC in-window product notice — organic cranberry and stonefruit units (Sep 15)
Actor: USDA Risk Management Agency administering FCIC
Clocks: announced 2026-09-15. Effective 2027 crop year. Sep 8–11 lemon/shellfish/oyster/grapevine/NY-apple notices remain 09-11 WAVE_3B object 5. PM-26-047 (Aug 26, pre-window) already listed cranberry/stonefruit EU/OU-by-organic among 2027 crop-year policy changes; Sep 15 is the in-window producer-facing announcement.
URL: RMA news · Sep 15 story
Disposition: admit_lower_rank as an FCIC/RMA product-term change. Do not promote as a new FCIC organic act.
Beginning 2027, producers may select Enterprise Units and Optional Units by organic practice for cranberries and stonefruit. Agency claim: “same unit structure available to conventional producers.”
Claim limit: Product-term change is not an indemnity paid, not a 2026 crop-year rewrite, and not a new FCIC organic act. Underlying Aug 26 bulletin is pre-window.
6. Neighborhood Reinvestment Corporation (NeighborWorks) noticed a Sep 17 annual Board meeting (FR 2026-18803)
Actor: Neighborhood Reinvestment Corporation
Clocks: FR published 2026-09-15; meeting 2026-09-17 2:00 p.m. via Zoom — after frozen cutoff. PI of this notice was 09-11 11:15 a.m. Agenda includes: temporary Board Chair; election of corporate officers; bylaws (Art. II meeting timing/frequency; Art. III Audit Advisory Committee; Art. IX reduced requirements to change bylaws); amended Audit Committee charter; new Audit Advisory Committee charter; Delegation of Authority revision authorizing the President & CEO to approve and execute Master Investment Agreements; internal-audit acceptances; FY27 preliminary spend plan.
URL: FR 2026-18803
Disposition: admit_lower_rank / verify_later. 1B already grouped the FR row routine. This sitting records the bylaws / CEO-MIA-authority agenda lines so Wave 10 can pick them up if minutes post. Agenda ≠ adopted bylaw.
Claim limit: Sunshine notice is not a vote. Sep 17 is outside this freeze. Do not infer bylaws changed.
Material enrichments, not new action clocks
- MCC FR 2026-18955 (published Sep 16; dated Sep 11): Economic Advisory Council open meeting Sep 25, 10:00 a.m.–12:30 p.m. EDT, 1099 14th St NW + WebEx; agenda includes MCC work in upper middle-income countries. Notice ≠ compact. Public-name RSVP due Sep 18.
- EXIM FR 2026-19014 (Sep 16): PRA on EIB form —
routine. - DFC Sep 16 Stebbins GC departure and Coleman FY27 appropriations remarks — personnel/testimony.
- FHLBanks Office of Finance: Sep 9 announce / Sep 10 price $1B 2-year Global 3130BC4W0 remains 09-11. No later Global retrieved through freeze (news index newest still Sep 10).
- Farm Credit Funding Corporation: latest System information statement still Q2 2026; press index newest in-window-adjacent is Sep 3 $2.030 billion Systemwide bond redemption (date-only replay / exclusive-start boundary — ordinary funding, not a Farm Bill or FCA rule). Q2 print not a new weekly atomic.
- PBGC news latest Aug 10 (Coverage Assessment Program). Premium-page CMS stamps Sep 14–16. Calendar-year plans’ normal due date remains 2026-10-15. Stamp ≠ rate change.
- FCA public newsroom HTML still lists through June 11 2026 (NR-26-08); 09-11 sitting reached NR 26-13 Sep 10 informational meeting. No later-than-Sep-10 FCA news release retrieved this sitting. Do not treat the stale HTML list as a finding that Sep 10 never happened.
- TVA press-releases URL 403 this sitting. No in-window rate/board/generation object retrieved via search. Sep 9 Sequoyah exercise remains 09-11.
- Ginnie daily/monthly disclosure files not independently recensus’d; APM 26-09/26-10 are the Guide clocks.
Coverage receipt — every named publisher
| Publisher | Root / surfaces | Status | In-window material | Claim limit |
|---|---|---|---|---|
| TVA | tva.com newsroom/press-releases 403; plant/preparedness pages reached via search | newsroom blocked; bounded empty via search | none retrieved after Sep 9 exercise (09-11) | 403 ≠ inactivity |
| EXIM | exim.gov news + minutes library | reached | Sep 10 Board still Completed without published decision; news still Sep 10. PRA 2026-19014 routine | Completed ≠ vote; CesiumAstro ≠ draw |
| DFC | dfc.gov newsroom + $8B release | reached | Sep 16 Board >$8B package; Sep 9 Honduras fold | Approval ≠ disbursement; per-deal amounts unpublished |
| MCC | mcc.gov home, documents, Philippines signing release | reached | Philippines $60M signed Sep 10 (09-11 hole-fill). Kiribati Amd. 1 still Sep 1. EAC meeting notice Sep 25 | Signing ≠ EIF/draw; notice ≠ compact |
| PBGC | pbgc.gov news + premium library | reached / empty_hunt for new instruments | News latest 2026-08-10. CMS stamps Sep 14–16 | Stamp ≠ rate change. Oct 15 due date unchanged |
| Ginnie Mae | ginniemae.gov APM index via search (HTML JS-thin) | reached (index) / JS-thin on HTML | APM 26-09 Sep 11; APM 26-10 Sep 14. PDFs unread | APM ≠ first pool under new text |
| Federal Financing Bank | ffb.treasury.gov monthly-activity-reports | reached / empty_hunt | 2026 monthly list through August; no September report | Listing of August is not a new lending program |
| FHLBanks (Council) | fhlbanks.com | reached / empty_hunt | No dated Council press in window | Council marketing ≠ OF issuance |
| FHLB Office of Finance | fhlb-of.com news | reached | Sep 9–10 $1B 2-year Global fold 09-11; no later Global | Global is ordinary funding, not a policy |
| FHLB New York / Atlanta | not independently recensus’d this sitting (09-11 empty / research-note) | unresolved this sitting | — | Do not invent silence |
| Farm Credit System | farmcredit.com; farmcreditfunding.com information statements + press | reached | Latest combined statement still Q2 2026. Sep 3 $2.03B redemption (replay/ordinary) | Redemption ≠ FCS legal change |
| Farm Credit Administration | fca.gov newsroom | reached (HTML list stale through June 11; 09-11 had NR 26-13 Sep 10) | empty_hunt for later-than-Sep-10 NR | Stale HTML ≠ Sep 10 never happened |
| Farmer Mac | no standalone newsroom hunted; FCA May 14 Farmer Mac report is pre-window | empty_hunt via FCA parent | none | Not an FHFA object |
| FCSIC | fcsic.gov home | reached / empty_hunt | No in-window premium action | Silence ≠ premium change |
| NCUA Central Liquidity Facility | ncua.gov/support-services/central-liquidity-facility | reached / empty_hunt | No in-window advance or later monthly FS | Monthly FS ≠ an advance |
| NCUA Share Insurance Fund | ncua.gov/support-services/share-insurance-fund + June 24 Board briefing | reached / empty_hunt | Last public SIF briefing June 24 ($24.5B assets Q1). 2B already empty of standalone NCUA CU closures | Briefing ≠ premium/NOL change |
| Power Marketing (DOE hub) | energy.gov/power-marketing-administrations | not independently recensus’d beyond 2C | not_applicable to steal 2C’s Centralia §202(c) / Duane Arnold | Do not steal 2C |
| Bonneville | bpa.gov /about/newsroom | reached / empty_hunt | No dated in-window ROD/rate extracted | — |
| WAPA | wapa.gov/newsroom | reached / empty_hunt | No dated in-window Administrator rate order extracted | — |
| SEPA / SWPA | energy.gov/sepa · energy.gov/swpa | unresolved this sitting (09-11 empty hub pages) | none independently re-proven | Hub pages only |
| CCC | USDA CCC explainer | unresolved this sitting (09-11 blocked 403) | FSA objects are 1C | 403 ≠ CCC inactivity |
| FCIC | rma.usda.gov/about-rma/fcic + RMA news | reached | Sep 15 organic cranberry/stonefruit EU/OU (2027). Sep 8–11 fold | Product terms ≠ organic-act change |
| UNICOR | unicor.gov | unresolved this sitting (09-11 blocked 403) | not re-proven | 403 ≠ inactivity |
| Presidio Trust | presidio.gov/about/press | reached / empty_hunt | Latest dated press still Aug 2026 park/lease events | Event ≠ charter/lease |
| St. Lawrence Seaway / GLS | seaway.dot.gov/latest-news | blocked 403 | not independently re-indexed this sitting (09-11 index empty after Jul 31) | 403 ≠ lock closure |
| Neighborhood Reinvestment (NeighborWorks) | FR 2026-18803 (1B locator); nw.org not independently walked | FR reached | Sep 17 annual Board agenda (after freeze) | Agenda ≠ bylaw |
| Sallie Mae / SLM Corp. | salliemae.com investor disclosures | not_applicable | SLM’s own 10-K: “Neither SLM Corporation nor any of its subsidiaries is a government-sponsored enterprise or an instrumentality of the United States.” Private-education lender. No in-window federal instrument | Do not treat as a GSE |
| FDIC-as-corp | fdic.gov press/FIL | skipped: covered by 1B–2B | exam-cycle IFR / TPRM / no FIL after 58-2026 | Not recensus’d as DIF |
FR census (not discovery): EXIM 2026-19014 PRA; MCC 2026-18955 EAC meeting; Neighborhood Reinvestment 2026-18803 Sunshine. 1B already grouped EXIM PRA and NeighborWorks Sunshine routine.
Surfaces (reached / empty_hunt / blocked / unresolved)
| Surface | Result |
|---|---|
| tva.com/newsroom/press-releases | blocked 403 |
| exim.gov/news | reached; newest Sep 10 |
| exim.gov/news/meeting-minutes + Sep 10 URL | reached; agenda/Completed; no decision block |
| dfc.gov/media/newsroom + $8B release | reached |
| mcc.gov + Philippines signing release | reached; Sep 10 hole-fill |
| pbgc.gov/news | reached; latest Aug 10 |
| ginniemae.gov APM HTML | JS shell; index reached via search |
| ffb.treasury.gov monthly-activity-reports | reached; through August 2026 |
| fhlbanks.com | reached / empty |
| fhlb-of.com/news | reached; newest Sep 10 Global (09-11) |
| farmcreditfunding.com information statements + press | reached |
| fca.gov/newsroom/news | reached (list stale); no later-than-Sep-10 NR found |
| fcsic.gov | reached / empty |
| ncua.gov CLF | reached / empty |
| ncua.gov Share Insurance Fund | reached / empty in-window |
| bpa.gov/about/newsroom | reached / empty |
| wapa.gov/newsroom | reached / empty |
| rma.usda.gov/news-events | reached; Sep 15 organic cranberry/stonefruit |
| unicor.gov | unresolved this sitting |
| presidio.gov/about/press | reached / empty |
| seaway.dot.gov/latest-news | blocked 403 |
A 403, JS shell, or empty fetch is a tool-path failure, not a finding that the publisher was silent — except where a second path (search index, alternate URL, PDF) actually enumerated the surface, which then may be empty_hunt.
Skips honored
Fannie / Freddie / FHFA / USPS / Amtrak / STB (1A–2E). FDIC-as-corp (1B/2B). Twelve Reserve Banks through 2026-09-08 19:18 EDT. NCUA-as-regulator except CLF and SIF (3D). Genesis, SR 26-6, SWIFT, COMEX recensus.
Lane closed?
Yes for the named 3B publishers through the frozen cutoff, with the open gates below. Every named publisher has a status. Open gates, not incompleteness theater:
- DFC Sep 16 >$8B package: per-deal amounts, commitment/closing, congressional notification, first disbursement / first IFC U.S.-export guaranty / first BESS MW / Jordan water / WIOCC equity close / West Africa minerals name
- DFC MiCrédito Honduras disbursement / first sub-loan (09-11)
- EXIM Sep 10 Board decisions unpublished (satellites Small-Craft Exclusion; THY/Boeing PDP; Ferromex locomotives)
- EXIM CesiumAstro first draw
- MCC Philippines Energy Threshold EIF / first disbursement; agreement PDF unread
- MCC Kiribati Amendment 1 EIF-by-last-signature if a later-dated Kiribati counterpart signature appears
- Ginnie APM 26-09 / 26-10 PDFs unread; next APM after 26-10
- NeighborWorks Sep 17 Board minutes / adopted bylaws / CEO-MIA delegation (meeting after freeze)
- PBGC calendar-year premium 2026-10-15
- FCSIC next premium review
- CLF next monthly FS
- FFB September monthly activity report
- FCIC/RMA 2027 crop-year effective date on the Sep 15 cranberry/stonefruit units
- MCC EAC meeting Sep 25
- TVA, CCC, UNICOR, seaway.dot.gov live roots still blocked / unresolved
- FHLB NY/Atlanta, SEPA/SWPA not independently recensus’d this sitting
Empty-hunt count (first-class): PBGC new instrument, FFB September report, FHLBanks Council, FCA later-than-Sep-10 NR, Farmer Mac, FCSIC premium, CLF advance/FS, NCUSIF in-window action, BPA, WAPA, Presidio charter — 11 named empty hunts. EXIM is reached-but-no-new-decision (continuation), not empty.
No vault write. No Catalog/Registry mutation. No entity-chart write.
Sources
Full saved reading
View cited sources (9)
These are the sources cited by this reading. Each source keeps its own date and scope.
Document details and formats
About the dates and filing language
- Evidence date
- When this document or named claim was checked. A newer collection, export or website date does not update it.
- Current, private, Workbench or promotion
- These can describe the saved document’s original filing or custody. This public reading preserves that history; publication does not turn its findings into government approval, binding law or newly verified evidence.
- Master data and projection
- The maintained factual record and a page generated from it. Repeated views are not additional independent evidence.
- Provenance and source join
- Where a record came from, and the exact reference connecting a claim to its source.
- Gate, receipt and operating evidence
- A required decision or condition, its documentary record, and evidence that the named activity actually occurred. Permission, delivery and operation stay separate.
Saved research reading. Its original dates and claim limits control; the export date does not refresh the evidence.
Saved source details
---
title: Wave 3B — remaining government corporations and GSEs
status: closed
artifact_role: research-wave-ledger
opened: 2026-09-16
depends_on: WAVE_3_ENTITY_CHART_INSPECTION.md
---
Original title: Wave 3B — remaining government corporations and GSEs