title: Wave 1A — Legal, Regulatory, and Instrument Delta — August 21, 2026 status: complete-for-wave-merge artifact_role: source-family-wave lane: legal-regulatory-instruments exclusive_research_start: 2026-08-20 12:19:33 EDT frozen_retrieval_cutoff: 2026-08-21 15:00:00 EDT final_retrieval_receipt: 2026-08-21 15:01:17–15:01:22 EDT baseline: Federal Government Weekly Delta 2026-08-20 vault_landings: []

---

Wave 1A — legal, regulatory, and instrument delta

Controlling ruling

The strongest genuinely new legal instrument in this window is **National Security Presidential Memorandum 17 (NSPM-17), the National Space Transportation Policy**. The White House posted it at 4:54:58 p.m. EDT on August 20, after the prior package's cutoff. It immediately replaces the 2013 National Space Transportation Policy, supplies a federal coordination overlay through the Assistant to the President for Science and Technology, and opens

90-, 120-, 180-, and 240-day implementation clocks. It does not itself

prove an appropriation, site selection, infrastructure project, launch, procurement, export-license result, or progress toward the stated 2030 capacity goal.

The Federal Register backbone mostly moved publication and comment clocks. August 21 publication resolved the three financial proposals that the August 20 merge held at Public Inspection, but none became final: SEC Regulation Crypto Assets, the CFTC compute-derivatives request for comment, and the CFTC CPO/CTA proposal. A DOL/OFCCP final-rule trilogy and an EOIR fee rule created future effective dates. A NOAA temporary rule filed after the prior cutoff will close the northern-zone Atlantic Spanish mackerel commercial fishery beginning August 25. Two BIS Public Inspection rules removed one named party and two addresses from the Entity List effective August 21. The remainder is a mixed set of proposals, applications, approval/publication layers, procedural notices, corrections, and routine administrative objects; those states are not collapsed into implementation or effect.

This wave controls only the legal/instrument source family strictly after

August 20, 2026, 12:19:33 EDT through the frozen cutoff of **August 21,

2026, 15:00:00 EDT**. It is a workbench input to the parent merge and authorizes no registry, CSV, vault, watch, event, entity-chart, or generated-surface edit.

Coverage manifest

SurfaceReached state before cutoffCoverage and clock boundaryResult
Federal Register API, publication dates Aug. 20–21Official day-level metadata replay224 documents: 108 dated Aug. 20 and 116 dated Aug. 21. The API supplies publication dates, not a time proving which Aug. 20 objects appeared after 12:19:33 EDT.All 108 Aug. 20 objects were replayed and deduplicated against the Aug. 20 governed package. All 116 Aug. 21 objects were screened; 17 were rules, 6 proposed rules, and 93 notices. Controlling text was read for admission candidates and exact-clock objects.
Current Public Inspection APISnapshot frozen before 15:00 EDT86 objects. The snapshot reports 82 regular filings at Aug. 21 08:45 EDT, one special filing at Aug. 21 11:15 EDT, one Aug. 20 16:15 EDT filing, and two current special-list objects with no filed_at value. Regular-list update: 08:45; special-list update: 11:15.All 86 were screened. Public Inspection is a filing/publication-pipeline state, not final publication, legal effect, or implementation unless the controlling text independently states an effective clock.
White House presidential actions and fact sheetsOfficial White House pages and underlying NSPM-17 textNSPM-17 page metadata: Aug. 20 16:54:58 EDT; fact sheet: Aug. 20 16:58:25 EDT. Both are inside this wave.One controlling presidential memorandum admitted. The earlier negative from the White House index is superseded by direct-object recovery; the fact sheet is supporting description, not the controlling instrument.
OMB memoranda indexOfficial reached indexLatest reached numbered memorandum remained M-26-17, Aug. 10.No post-start OMB memorandum was located on the reached index. This is a bounded index result, not proof that OMB took no action.
Federal Register / White House cross-check for presidential objectsOfficial publication and direct-object surfacesProc. 11056 was signed Aug. 18, appeared in current Public Inspection Aug. 21 at 11:15 EDT, and was scheduled for Aug. 24 publication.Duplicate of the Aug. 20 baseline's Canada-duty displacement; only its Public Inspection/publication provenance advanced.

Final cutoff-edge retrieval receipt

The waiting gate closed at 15:00:19 EDT. This lane then re-retrieved the official Federal Register August 20 and August 21 day queries, the current Public Inspection API, the White House Presidential Actions index, and the White House Presidential Memoranda index from 15:01:17 through 15:01:22 EDT. The post-cutoff retrieval is a receipt for the already-frozen universe: an object first posted after 15:00:00 EDT would be outside scope even if visible in this fetch.

Final official surfaceFinal resultSHA-256 of retrieved responseCutoff ruling
Federal Register Aug. 20 day query108 documentsbc5a0233d3a2989d92b5ac3ea60f3b40589c13bf0518b3380000470d80cfc599Count unchanged; complete day remains replay/dedup only.
Federal Register Aug. 21 day query116 documents1fd19be065127bcc5ceb0ebe693abb50876dd7430531387d27b78ccc5cd7b258Byte-identical to the 14:26 pre-cutoff receipt; no cutoff-edge publication-list change.
Current Public Inspection query86 objects2d0068c0aca307ece23a3501b056e0a7c06299f308bd6b1d263837dacc022f6cByte-identical to the 14:26 pre-cutoff receipt. Distribution remained one Aug. 20 16:15 filing, 82 Aug. 21 08:45 filings, one Aug. 21 11:15 filing, and two missing filed_at values. Regular/special update clocks remained 08:45/11:15 EDT.
White House Presidential Actions indexNSPM-17 at top, dated/posted Aug. 20 16:54:58 EDT; Proc. 11056 next83825cdb54a5711a101b107824793dc03f46cac45880d64e0e23953265b7664fByte-identical to the 14:26 pre-cutoff receipt; no new indexed presidential action at the edge.
White House Presidential Memoranda indexNSPM-17 at top, dated/posted Aug. 20 16:54:58 EDTa3ea4ea0d8a67010b096e3682279715e9c237309663f553a64fa6ad717c31fb2Byte-identical to the 14:26 pre-cutoff receipt; no new indexed memorandum at the edge.

Final receipt ruling: the frozen backbone remains **108 August 20 Federal

Register documents, 116 August 21 Federal Register documents, and 86 current Public Inspection objects**. The White House indexes confirm NSPM-17 as the newest reached presidential memorandum. No object first posted after 15:00 EDT is admitted.

Replay and dedup ruling

- The 108 August 20 Federal Register publications are retained as a complete

day-level replay and rejected as novel deltas because they are already inside the August 20 package. No sub-day publication time is invented.

- The 86-object current Public Inspection snapshot is not treated as a

complete August 20 historical list. It is the current list reached before the frozen cutoff. Its one surviving August 20 filed object, FR Doc. 2026-17228, was separately examined because its 16:15 EDT filing time is demonstrably after the prior cutoff.

- Commission releases and Public Inspection states already captured on August

20 are merged into their August 21 Federal Register publication clocks rather than counted as new instruments.

Admission ledger

admit means the object crosses this wave's materiality bar. It does not mean automatic vault promotion. merge-clock means the prior package already owns the substantive candidate and this wave resolves a later clock.

Object / actorState reached inside windowExact clocksState not reached / claim limitWave disposition
NSPM-17, National Space Transportation Policy — President / White HouseNew controlling presidential policy; PPD-26 of Nov. 21, 2013 revoked; inconsistent prior presidential memoranda or space-policy directives displaced; APST coordinates interagency implementationMemorandum dated Aug. 20; official web posting Aug. 20 16:54:58 EDT; fact sheet 16:58:25 EDT. Source clocks: 90, 120, 180 and 240 days from memorandum date, plus recurring two-year clocks and a 60-day clock triggered by complete foreign-vehicle request information.No exact signature time stated. No appropriation, selected site, completed strategy/report, changed export control, launch, contract, construction, or capacity result proven. The 1,000-launch/reentry figure is a 2030 range-capacity goal.admit — primary presidential instrument and clock spine
Atlantic Spanish mackerel northern-zone commercial closure, 2026-17228 — NMFS/NOAATemporary rule closes northern zone commercial harvest after projected attainment of revised quota; sale/purchase restrictions attach during closure, subject to stated cold-storage exceptionFiled Aug. 20 16:15 EDT; scheduled publication Aug. 24; effective Aug. 25, 2026 through Feb. 28, 2027Not closed at cutoff; no excess harvest, enforcement, landing, sale, ecological, or revenue result proven.admit — post-baseline filing and future operating-effect clock
OFCCP EO 11246 implementing regulations rescission, 2026-17114 — DOLFinal rule publishedPublished Aug. 21; effective Oct. 26, 2026No pre-effective contractor behavior or statutory repeal proven.admit — future final-rule effect
Section 503 modifications, 2026-17115 — DOLFinal rule removes mandatory disability self-identification invitations, related collection, utilization-goal and analysis provisions while retaining statutory nondiscrimination and affirmative-action obligationsPublished Aug. 21; general effect Sep. 21, 2026; 41 CFR part 60-30 amendment Dec. 21, 2026Statutory obligations do not disappear; no contractor implementation or enforcement result proven.admit — split effective clocks
VEVRAA modifications, 2026-17116 — DOLFinal rule removes EO 11246 cross-references and updates covered-contract threshold from $150,000 to $200,000Published Aug. 21; rule effective Sep. 21, 2026; underlying statutory threshold identified by the rule as effective Oct. 1, 2025Veterans' nondiscrimination and affirmative-action duties remain; no new award, compliance or enforcement result proven.admit — legal-text correction with effect clock
EOIR OBBBA fee inflation adjustment, 2026-17146 — DOJ/EOIRFinal FY2027 immigration-related fee adjustment publishedPublished Aug. 21; effective Oct. 1, 2026No fee collection, filing, waiver, adjudication, or migration effect proven at cutoff.admit — future fee authority
BIS removal from Entity List, 2026-17230 — Commerce/BISFinal rule removes Atempo Proje Danismanlik Bilgisayar Yazilim Insaat Taahhut ve Dis Ticaret Limited Sirketi, Istanbul, from the Entity ListFiled Aug. 21 08:45 EDT; effective Aug. 21; scheduled publication Aug. 24No shipment, license, sale, payment, or transaction proven. Removal is not a general lifting of controls on other parties or items.admit — named legal-scope relaxation
BIS revision to Arrow Electronics (Hong Kong) entry, 2026-17231 — Commerce/BISFinal rule removes two addresses from the existing entry; it does not remove the listed person itselfFiled Aug. 21 08:45 EDT; effective Aug. 21; scheduled publication Aug. 24No license or transaction outcome; do not report this as removal of Arrow Electronics from the Entity List.admit — address-scope correction
Timber salvage harvest categorical exclusion, 2026-17251 — InteriorDepartmental NEPA categorical exclusion establishedFiled Aug. 21 08:45 EDT; scheduled publication/effect Aug. 24Does not authorize a project; extraordinary-circumstances review and other applicable law remain.admit — future procedural authority, no project
Forest and woodland density management categorical exclusion, 2026-17252 — InteriorDepartmental NEPA categorical exclusion establishedFiled Aug. 21 08:45 EDT; scheduled publication/effect Aug. 24Does not authorize thinning, construction or land treatment; project-level review boundary remains.admit — future procedural authority, no project
Regulation Crypto Assets, 2026-17183, S7-2026-27 — SECProposed rule reached publication; proposes conditional offering exemptions and safe harborPublished Aug. 21; comments due Oct. 20, 2026No final exemption, lawful offering regime, sale, issuance or compliance determination. The API's effective_on value must not be read as proposal effectiveness.merge-clock — Aug. 20 Public Inspection candidate
Compute derivatives RFC, 2026-17163, RIN 3038-AF77 — CFTCRequest for comment reached publicationPublished Aug. 21; comments due Oct. 20, 2026No listed or approved compute contract, accepted underlier, benchmark, surveillance method, trade or settlement.merge-clock — Aug. 20 Commission/PI candidate
CPO/CTA duplicative-regulation proposal, 2026-17079 — CFTCProposed RIA-CPO/CTA exemptions and small-pool threshold change reached publicationPublished Aug. 21; comments due Oct. 5, 2026No operative exemption, no supersession of no-action relief, and no reporting or registration change unless a final rule later acts.merge-clock — Aug. 20 Commission/PI candidate
Trump Account eligible investments, 2026-17123 — Treasury/IRSProposed guidance on eligible investments before the beneficiary turns 18Published Aug. 21; comments and hearing requests due Oct. 20, 2026No final investment restriction, account opening, contribution, allocation, balance or return.admit — proposal/watch clock
LCH SA Liquidity Plan, 2026-17061, SR-LCH SA-2026-004 — SECOrder approving proposed rule change reached Federal Register publication; formal Liquidity Plan approval is realOrder dated Aug. 18; publication Aug. 21The decision clock predates this wave. Publication does not prove funded resources, a default, facility draw, repo, stress breach, or operational exercise.admit as provenance correction / do not date decision Aug. 21
Amah Mutsun Tribal Band documented petition, 2026-17054 — InteriorNotice of receipt of a documented federal-acknowledgment petitionPublished Aug. 21; comments and evidence due Dec. 21, 2026Receipt is not federal acknowledgment, tribal status, benefit eligibility, land status or final determination.admit — petition clock only
Silicon metal antidumping and countervailing-duty orders, 2026-17050 and 2026-17049 — CommerceTrade-remedy orders for Australia and Norway became applicablePublished/applicable Aug. 21No entry, customs collection, import-volume, price, production or retaliation effect proven.admit — legal trade-remedy authority
IRS DIFSLA matching-program notice, 2026-17133 — Treasury/IRSLouisiana Department of Health programs change; Louisiana Department of Children and Family Services exits the matching agreementPublished Aug. 21; comments due 30 days after publication. Notice also states a Sep. 1 re-establishment condition and a minimum 30-day post-publication condition.The two stated timing formulations do not reconcile on their face. No match, denial, payment block, false positive or correction may be inferred.admit with unresolved internal clock ambiguity

Public Inspection candidate dispositions

These are filed-object states as of the snapshot. Future publication dates do not turn a proposal into a final rule, an application into an approval, or an approval into consummated control.

FR Doc.ObjectFiled / scheduled clockCandidate disposition and boundary
2026-17193FCC request for comment on continued import/marketing of certain covered UAS and components, PS Docket 26-184 / DA 26-832Filed Aug. 21 08:45; publication scheduled Aug. 24; comments 30 days after publicationcandidate. Proposed prohibition only. Existing use/operation of already-purchased equipment is outside the proposal as described; no final ban, seizure, deauthorization, import refusal or marketing cessation at cutoff.
2026-17219U.S. Coast Guard Academy Board of VisitorsFiled Aug. 21 08:45; publication scheduled Aug. 24entity/overlay candidate. Statutory FACA advisory board establishment/reconstitution, indefinite duration; advisory review and reporting do not create command authority over the Academy.
2026-17239Education Department General Administrative RegulationsFiled Aug. 21 08:45; publication scheduled Aug. 24; comments due 30 days after publicationcandidate. NPRM proposes Grants.gov/application-notice publication routing and continuation/termination, merit and evidence-framework changes. No final provenance or grant-termination authority change at cutoff.
2026-17242DOJ application to restore federal firearms rightsFiled Aug. 21 08:45; publication scheduled Aug. 24; 30-day PRA comment clockmerge/watch. Implements form plumbing after the Aug. 20 final rule; no submitted or approved restoration application.
2026-17244NRC Palo Verde indirect license-transfer orderFiled Aug. 21 08:45; publication scheduled Aug. 24candidate/provenance. Order issued/effective Aug. 18 approves an indirect transfer linked to a merger; no physical operating change or consummated merger. Approval lapses after one year if not completed absent extension. Do not create an Aug. 21 approval clock.
2026-17250HHS RFI on vaccine-recommendation categories and shared clinical decision-makingFiled Aug. 21 08:45; publication scheduled Aug. 24; comments Sep. 20candidate. Input to an implementation plan; no recommendation, immunization schedule, benefit, coverage, mandate or clinical standard changed.
2026-17235Tonto Apache Tribe of Arizona Liquor Control CodeFiled Aug. 21 08:45; publication scheduled Aug. 24candidate legal-code publication. Preserve tribal actor and code identity; do not infer a license, vendor, sale, revenue or enforcement event.
2026-17243Natural Gas Pipeline Co. of America / Horizon Pipeline application and intervention deadlineFiled Aug. 21 08:45; publication scheduled Aug. 24cross-lane handoff to 1B plus legal docket watch. Application/intervention state only; no certificate, construction, service or gas-flow result.
2026-17194; 2026-17207EXIM applications above $100 millionFiled Aug. 21 08:45; publication scheduled Aug. 24cross-lane handoff to 1B. Application notices are not authorizations, commitments, disbursements, exports or repayment.
2026-17294Proc. 11056 Canada additional-duty suspensionSpecial filing Aug. 21 11:15; publication scheduled Aug. 24duplicate / merge provenance. Signed Aug. 18 and captured by Aug. 20 package. The scheduled duties remain displaced to Aug. 22 12:01 a.m. EDT unless a later controlling instrument acts.
2026-17159FCC data-breach/VRS/incarcerated-communications objectCurrent special-list object; API supplies no filed_at or publication datewithdrawn duplicate. August 20 baseline already records the agency-requested withdrawal. Nonoperative absent a valid successor.
2026-17227Indiana Harbor Canal safety-zone objectCurrent special-list object; API supplies no filed_at or publication dateunresolved special-list clock / reject for this fixed window. Current membership alone cannot establish an in-window filing, effective time, or operating event.

Exact implementation clock map

For NSPM-17, the source's controlling language is “within” the stated number of days. Calendar dates below are arithmetic watch dates calculated from August 20, 2026; they are not separately stated by the source and should be checked against any later agency interpretation or publication.

Trigger / nominal dateRequired next objectActor(s)Claim limit
NSPM-17 +90 days / Nov. 18, 2026Identify federal lands for an additional designated federal-land reentry siteInterior with War, Transportation and relevant agenciesIdentification is not site operation, environmental clearance, construction or reentry.
NSPM-17 +120 days / Dec. 18, 2026Update export policies/programs and export controls as appropriateState and Commerce, coordinated actors specified by the memorandumDirection does not itself alter a control classification or issue a license.
NSPM-17 +180 days / Feb. 16, 2027Range-scheduling criteria; launch-location findings and airspace/ATC plan; spectrum report; infrastructure-security reports; responsive-access barrier evaluation; reentry-safety criteria; industrial-base strategyWar, NASA, Transportation, Commerce, FCC, DHS, APST and other named actorsEach deliverable must be verified separately; the common deadline does not prove coordinated completion.
NSPM-17 +240 days / Apr. 17, 2027Development plan for the designated federal-land reentry siteCommerce with relevant agenciesPlan is not funding, procurement, permitting, construction or operation.
NSPM-17 recurring two yearsSpectrum approach report; industrial-base strategy review/update; export-policy/control updatesNamed actors in §§2–4Recurrence begins only from the controlling trigger specified in each subsection.
Foreign launch/reentry request + complete information +60 daysRecommendation to PresidentAPST and APNSAEvent-relative; no calendar date exists without a documented complete-information receipt.
Aug. 22, 2026 12:01 a.m. EDTCanada duty suspension expires / displaced duties potentially beginPresident / Customs implementationVerify controlling instrument and customs collection separately.
Aug. 25, 2026 through Feb. 28, 2027Atlantic Spanish mackerel northern-zone commercial closureNMFSFiled rule proves authority and scheduled effect, not harvest or enforcement outcome.
Sep. 21, 2026Section 503 and VEVRAA final rules take general effectDOL/OFCCPDo not collapse with contractor implementation.
Oct. 1, 2026EOIR FY2027 OBBBA fee adjustment takes effectEOIRDo not book collection before an actual filing/payment.
Oct. 5, 2026CFTC CPO/CTA comments closeCFTCDocket close, not adoption.
Oct. 20, 2026SEC crypto, CFTC compute and IRS Trump Account proposal comments closeSEC, CFTC, Treasury/IRSThree distinct dockets; no final regime follows automatically.
Oct. 26, 2026EO 11246 implementing-regulation rescission takes effectDOL/OFCCPDoes not repeal a statute or prove contractor conduct.
Dec. 21, 2026Section 503 part 60-30 amendment effect; Amah Mutsun petition comments/evidence dueDOL/OFCCP; InteriorUnrelated clocks; neither proves implementation or acknowledgment.

Reject and duplicate ledger

Federal Register publications

Disposition classCoverageRuling
August 20 replay108 documentsduplicate against governed Aug. 20 baseline. Retained only to satisfy complete day replay; no post-12:19 publication time inferred.
August 21 rules/proposed rules23 documentsAll screened. Material objects appear in the admission/candidate ledgers. Remaining routine corrections, localized safety/technical amendments, and narrow program rules were rejected for the whole-government materiality bar without implying legal invalidity or agency inactivity.
August 21 notices93 documentsAll screened at official metadata; admission candidates received controlling-text review. Routine meetings, information collections, licensing/application notices, narrow investigations, property/resource actions, combined filings and corrections were rejected or routed to the owning lane.
Corrections with no independent new policy stateincludes 2026-17145, 2026-17154 and PI correction objects C1-2026-16331, C1-2026-16314, C1-2026-04516merge to corrected parent object; do not create a new policy/action clock solely from a correction notice.
NRC Duke Energy license-transfer application, 2026-17147one noticecandidate/reject from promotion. NRC is considering a direct transfer; comments Sep. 21 and hearing requests Sep. 10. Application is not approval, consummated transfer or operating change.
DHS genealogy-program proposal, 2026-17119one proposed rulereject from promotion / docket watch only. Proposed clarification of record-request rules; no record release, access denial or final standard.

Current Public Inspection snapshot

Disposition classCountRuling
NAGPRA inventory/repatriation/intended-disposition notices20Screened and rejected from this federal-control-plane merge as object-specific notices. This is not a judgment on their legal or cultural significance and not an absence claim about transfer completion.
Agency information-collection notices13Twelve routine PRA objects rejected; 2026-17242 retained as firearms-rule implementation plumbing. No respondent, approval, restoration or program outcome inferred.
Meetings/nominations notices7Rejected as scheduling/participation objects absent a new authority, recommendation, decision or completed proceeding.
Exchange SRO proposed-rule notices6Docket/publication states only; rejected from the whole-government ranked set absent a material clearing, custody, capital, market-structure or implementation change.
Remaining rules, notices, applications, orders, guidances, safety/resource objects and corrections40Every row screened. Material/legal candidates are itemized above. The rest are rejected as narrow, routine, correction-only, application-only, meeting/combined-filing, safety-zone, resource-management, guidance, investigation or procedural objects; no generalized inactivity claim follows.

Access gaps and bounded negatives

1. August 20 Federal Register time boundary. Day-level publication records

do not prove whether an object was published before or after 12:19:33 EDT. The full day was replayed and deduplicated; only independently timestamped post-start objects are admitted as novel.

2. Current Public Inspection is not a historical feed. The 86-object result

is the current snapshot reached before 15:00, not proof that it contains every object displayed earlier on August 20 or every special filing later on August 21. No object filed or recovered after 15:00 is admitted.

3. Missing PI timestamps. FR Docs. 2026-17159 and 2026-17227 lacked

filed_at and publication-date values in the reached API. Current-list

membership cannot manufacture a fixed-window filing clock.

4. White House index lag. The reached category index initially displayed

August 13 as its newest presidential action, but direct official pages later resolved NSPM-17 and its fact sheet. Therefore the earlier negative is withdrawn. Direct-object recovery shows why index negatives remain bounded.

5. OMB. No post-start memorandum was found on the reached official OMB

memoranda index. Nonpublic review, interagency clearance, budget work or an unindexed object was not censused.

6. Docket depth. This wave read controlling text for material admissions

but did not claim exhaustive review of every attachment, comment, exhibit, service list, confidential submission or external docket mirror across 224 publications and 86 current Public Inspection objects.

7. Clock ambiguity. The DIFSLA notice's Sep. 1 language and its minimum

30-day post-publication condition do not reconcile on their face. Preserve both source statements until IRS supplies a correction or controlling interpretation.

8. Proposal API anomaly. The Federal Register API exposes an effective_on

value for SEC Regulation Crypto Assets even though the controlling object is a proposed rule. The legal object type and text control; no proposal effectiveness is asserted.

No bounded negative is evidence of classified or nonpublic inactivity, unannounced adjudication, contract performance, payment or settlement, shipment, customs collection, physical construction, field enforcement, operational implementation, or economic effect.

Candidate disposition rows for parent merge

CandidateRecommended parent dispositionDurable landing, if later authorizedRequired falsifier / next evidence
NSPM-17promote as primary instrument plus multi-agency implementation watchPresidential-instrument factual note; space-transportation authority/coordination cross-cut; date-specific watchesFederal Register publication; agency 90/120/180/240-day deliverables; appropriation/procurement/site/project evidence; range schedules and measurable launch/reentry capacity
NMFS Spanish mackerel closureselective atomic/watchLegal/effect-clock event, not central entity-chart nodeAug. 25 legal effect; later reopening/extension; actual landings or enforcement only from separate sources
OFCCP final-rule trilogypromote as one legal package with three non-collapsed clocksLabor/contracting rule timelineSep. 21, Oct. 26 and Dec. 21 effects; implementing guidance, enforcement or contractor evidence
SEC crypto + CFTC compute + CFTC CPO/CTAclock-only update to Aug. 20 regulatory-perimeter packageExisting financial cross-cut/watchDocket close, final rules, approved products or actual reporting/registration changes
BIS 2026-17230 / 17231promote narrow scope correction if export-control layer is in mergeExport-control atomicPublished final text; license/transaction evidence; subsequent relisting or address change
LCH SA orderprovenance correction, not new decision dateClearing-house transition chronology if this approval is material thereEffective plan text, implementation evidence, facility use, default/stress exercise
Interior categorical exclusionsone paired procedural-authority candidateNEPA/permitting cross-cutProject-specific invocation plus extraordinary-circumstances determination, permit, award or construction
Coast Guard Academy Board of Visitorsentity/overlay adjudicationAdvisory-overlay registry only if formal chart rules admit itCharter/statutory source, appointment roster, first meeting and report; no parent/command edge
FCC UAS proposalwatch, no ban claimExisting UAS authority/tariff package as a proposed domestic-marketing layerAug. 24 publication, comments, final FCC action, covered-list scope and implementation
EDGAR proposal / HHS vaccine RFIproposal/RFI watch onlyRespective education and health packages if parent ranks themFinal rule or implemented recommendation/coverage/program change
Palo Verde order / Duke applicationpreserve approval-versus-application splitNuclear-license timeline only if parent admitsMerger consummation and indirect transfer for Palo Verde; NRC final order for Duke; physical operations separately
Amah Mutsun petition / Tonto Apache liquor codepreserve named tribal actor and exact legal objectTribal-law/recognition atomics if within parent scopeAcknowledgment determination for petition; publication/effect and implementation for code
EXIM and FERC applicationsroute to Wave 1B; retain legal docket clocks hereFunding/physical-operating lanesBoard authorization, financing commitment/disbursement; FERC certificate/construction/service

Primary official sources

- White House — NSPM-17, The National Space Transportation Policy

- White House — Golden Age of Space Transportation fact sheet

- Federal Register API — documents published Aug. 20, 2026

- Federal Register API — documents published Aug. 21, 2026

- Federal Register API — current Public Inspection documents

- Public Inspection — NMFS Atlantic Spanish mackerel closure, 2026-17228

- Federal Register — SEC Regulation Crypto Assets, 2026-17183

- Federal Register — CFTC compute-derivatives RFC, 2026-17163

- Federal Register — CFTC CPO/CTA proposal, 2026-17079

- Federal Register — OFCCP EO 11246 implementing-regulations rescission, 2026-17114

- Federal Register — OFCCP Section 503 modifications, 2026-17115

- Federal Register — OFCCP VEVRAA modifications, 2026-17116

- Federal Register — IRS Trump Account eligible-investments proposal, 2026-17123

- Federal Register — LCH SA Liquidity Plan approval, 2026-17061

- Federal Register — Amah Mutsun documented petition receipt, 2026-17054

- Federal Register — IRS DIFSLA matching program, 2026-17133

- Public Inspection — FCC covered-UAS request for comment, 2026-17193

- Public Inspection — BIS Entity List removal, 2026-17230

- Public Inspection — BIS Entity List revision, 2026-17231

- Public Inspection — Education Department General Administrative Regulations, 2026-17239

- Public Inspection — Palo Verde indirect license transfer, 2026-17244

- Public Inspection — HHS vaccine-recommendation RFI, 2026-17250

- Public Inspection — timber salvage categorical exclusion, 2026-17251

- Public Inspection — forest and woodland density-management categorical exclusion, 2026-17252

Completion statement

Wave 1A completed its fixed-window official-source replay, deduplication, legal-object classification, exact-clock separation, admission adjudication, reject ledger, access-gap record and parent-disposition handoff. The frozen cutoff remains August 21, 2026, 15:00:00 EDT; no later-retrieved object is admitted. All conclusions remain pending parent merge and human review.

Sources

Document details and formats

Saved research reading. Its original dates and claim limits control; the export date does not refresh the evidence.