Skip to content

Strict re-audit — central institutions

This isolated overlay re-audits the exact 19 prior Wave 3 D rows belonging to fg-107, fg-114, and fg-227, in their closed relevance-ledger order. It does not revise the official-site census, evidence objects, clocks, novelty, or any file under ../../../waves/wave_3_defense/.

Exact result

Controlling classRows
A — routine_or_duplicate_reject0
B — completeness_census_only5
C — plotline_support_only9
D — promotion_review5
Total19

Only D enters D_REVIEW_QUEUE.csv; the queue has 5 rows and 5 unique retained-D units. There are no shared retained-D units. The other 14 rows cannot create standalone Observatory notes.

Retained D non-routine tests

UnitObjectTitleExact established plotline joinWhy this is not routine
W3-CI-PRU-001W3-DS-OBJ-017Department of War Publishes Fifth Release of Unidentified Anomalous Phenomena Files on WAR.GOV/UFO["Disclosure"]Retain D — not routine: public release of the fifth declassified UAP tranche is itself the tracked disclosure/provenance transition on the established UAP storyline, changing public-record availability from four releases to five without validating the files' historical claims.
W3-CI-PRU-002W3-DS-OBJ-009Department of War Launches the Golden Dome for America Hub To Accelerate Industry Engagement, Revolutionize Homeland Missile Defense PartnershipsTechnology/AI; MilitaryRetain D — not routine: the Department actually launched a named Golden Dome industry-engagement interface on the already established Golden Dome/defense-tech storyline. The review is limited to that operating acquisition interface and does not claim a solicitation, award, fielded shield, interception, or demonstrated capability.
W3-CI-PRU-003W3-DS-OBJ-004U.S.-Jamaica Joint Statement on Status of Forces Agreement["Foreign Policy","Military"]Retain D — not routine: the governments announced a signed SOFA, creating the governing legal instrument for temporary U.S.-force presence and mutually agreed activity in Jamaica on the established Western Hemisphere defense/Monroe storyline. No instrument text, entry-into-force clock, base, deployment, force count, or operation is inferred.
W3-CI-PRU-004W3-DI-OBJ-029DOE Information Reviews [2026-100-039]["Energy"]Retain D — not routine audit/recommendation publication: the Board-signed letter records DOE staff's cessation of the prior CUI/public-release review pathway, materially updating the already established DOE–DNFSB access and technical-report availability watch. The letter requests restoration and proves neither DOE acceptance nor resolution.
W3-CI-PRU-005W3-DI-OBJ-030Acting Chairman Summers Concludes Tenure at DNFSB["Politics","Energy"]Retain D — not routine personnel: Summers's tenure end left the charted DNFSB with one serving member and without full-Board quorum, materially changing statutory Board-action capacity on the established administrative-state/nuclear-oversight spine while delegated staff functions continued.

The fifth UAP tranche survives because public provenance is the exact Disclosure storyline, not because it was recent. Golden Dome survives because its named acquisition interface actually launched on an already tracked project, not because the Department issued a press release. The Jamaica SOFA survives as a signed governing instrument on the established Western Hemisphere/Monroe storyline, not as generic Military adjacency. The DNFSB letter survives because it records a change in the clearance pathway on the already established DOE–DNFSB access watch, not merely a recommendation. The DNFSB tenure object survives because loss of full-Board quorum changes statutory action capacity, not because a leader departed.

Deliberate downgrades

- SM-3 frameworks and the three industrial-finance families remain C: no

framework signature/award/output state or final financing/production state is proved. Niron's pending workbench inventory is not a live Observatory object and cannot elevate a conditional commitment.

- PFAS and Pacific-infrastructure OIG objects remain C; the GAO blast-health

report remains B. Audit, advisory, and recommendation publication alone is not implementation or effect.

- Four ordinary contract actions remain B. Amounts, FMS funding, shared

ceilings, option periods, and award language do not prove delivery or an operating transition.

- DLA Okinawa and the twenty-four-site WMS go-live remain C. Both are real

operating evidence, but neither joins a specific established Observatory storyline tightly enough for a standalone note; generic Military, Energy, or technology adjacency fails D.

Determinism and preservation

build_reaudit.py derives the exact population and order from the closed Wave 3 ledgers and emits only this directory. validate_reaudit.py runs the builder twice, proves byte-idempotence, validates controlled plotline/subplot labels and class semantics, and fingerprints the entire closed Wave 3 tree before and after.

Frozen source proof used by this overlay:

- closed Wave 3 files: 120

- closed Wave 3 tree SHA-256: b8ffb27fb6b78b1b40f7881a97bb7745ae829e36f89959138dc21c38e1be28c7

- source primary ledger SHA-256: eccd241f5d2dbbd8d4a3aa38db7d90c668b5188a7e08b516955fefd1f422ee1d

- source relevance ledger SHA-256: ebbe5dc586b440301cb172331f3d7026735b42a8a4be9fad8d5995dc043122e4

This overlay is a review gate only. It grants no keep, vault promotion, chart construction, canon change, new plotline, or implementation authority.

Sources

Full saved reading

View the saved source references. This record has no direct external citation in its source-link list.

Document details and formats
Optional file downloads
For AI readers: complete text and record details

Saved research reading. Its original dates and claim limits control; the export date does not refresh the evidence.

Saved source details

---

title: Wave 3 Strict Re-audit — Central Institutions

status: validated-overlay

artifact_role: controlling-promotion-gate-only

audited_at: 2026-08-23

closed_wave_mutation: false

vault_chart_canon_mutation: false

---

Original title: Wave 3 strict re-audit — central institutions