Scientific Trust Stack — Implementation Watchboard
Evidence cutoff: 2026-08-27 State: active workbench watch surface
Immediate official clocks
| Date | Required or scheduled object | Authority | Promotion evidence | Boundary |
|---|---|---|---|---|
| 2026-08-20 | CISA Logging Reference Architecture | OMB M-26-14, 90 days from May 22 | public LRA, schema, identity/action/resource/time fields and agency implementation dates | derived deadline; cyber logging, not scientific provenance |
| 2026-08-21 15:00 CDT | Argonne Genesis supercomputing-center sources-sought close | SAM.gov current action e526498e24924e268dfc64c44d243276; same Notice ID AI-Capability-RFI(22-utilities) | amendment, response summary, draft solicitation or successor procurement | August 26 is the superseded original response date; market research is not award |
| 2026-08-21 | Genesis Mission initial operating capability target | EO 14363 | public evidence that at least one challenge reached initial operating capability, with named capability, users and accepted operating result | target date is not proof of IOC |
| 2026-08-12 (announced 2026-08-24) | GSA interagency working group to modernize FICAM for PQC — first meeting held | OMB M-26-15; GSA implementation update | GSA reports 40 participants from 17 agencies, a biweekly aim, and work on non-human identities and automation; still require charter, named roster, identity/certificate profiles, pilots, procurement and minutes | resolved at formation only; a meeting does not prove a profile, system migration or deployment |
| 2026-08-31 | DoW research-security audit reports from 30 unnamed institutions | DoW release | reports, findings, corrective actions and due-process record | audit order is not a finding |
| 2026-09-16 | GSA Post-Quantum Cryptography Summit | GSA event | agency identity case studies, shared procurements and migration receipts | event is not implementation |
| 2026-10-22 | agency PQC Migration Plans due to OMB and ONCD | OMB M-26-15, 120 days | public plan or obtained record naming systems, owners, inventory and phases | submission may remain nonpublic |
| 2026-11-24 | first Genesis annual-report clock | EO 14363 | named identity/provenance/security milestones, standards, procurements and cross-agency connections | report direction does not guarantee public release |
| 2026-12-19 | NIST PQC pilot initiation | EO 14412, 180 days | system, algorithms, vendors, baseline, budget and success measures | initiation is not completion |
| 2026-12-19 | CMVP process revision and FAR PQC proposed rule | EO 14412, 180 days | published revision/rule with covered modules, contractors and dates | proposed rule is not final requirement |
| 2027-03-19 | CISA/NIST minimum CBOM guidance | EO 14412, 270 days | public minimum elements, schema, validation and update rules | guidance is not inventory adoption |
| 2027-03-19 | FAR cryptographic-vulnerability proposed rule | EO 14412, 270 days | published clause and covered-contractor scope | proposed rule is not effective final rule |
| 2027-12-31 | NIST PQC pilot completion | EO 14412 | final report, tested systems, results and migration decision | pilot result is not government-wide deployment |
| 2030-12-31 | civilian HVA/high-impact key-establishment migration target | EO 14412 / M-26-15 | system-level operating evidence and audit | excludes national-security systems |
| 2031-12-31 | civilian HVA/high-impact digital-signature migration target | EO 14412 / M-26-15 | production signature validation and retirement of vulnerable algorithms | same boundary |
| 2035 | remaining civilian-system migration planning horizon | M-26-15 | agency completion and residual-risk reporting | planning horizon, not one statutory deadline |
2026-08-27 elapsed-clock receipts
| Object | Bounded result | Route |
|---|---|---|
| CISA Logging Reference Architecture due under M-26-14 | No qualifying public LRA, schema or agency implementation object was located on the checked official surface through 2026-08-27. Public non-detection does not establish internal nonproduction or noncompliance. | Canonical-watch governed: w-2026-08-20-cisa-logging-reference-architecture. Do not create a duplicate Return Ledger item; return on publication or an attributable official deadline/status change. |
| Argonne Genesis sources-sought close | The History link from original SAM.gov action 7d6092c7a77047bc9ccde87c57a12af8 opens current action e526498e24924e268dfc64c44d243276 for the same Notice ID. The current action gives 2026-08-21 at 3:00 p.m. CDT as the updated response clock; August 26 is the superseded original date. No qualifying public successor procurement or award was located in the bounded check. | Resolved negative at the dated gate; ledger-governed successor. Market research is not award; return on amendment, response summary, successor notice or acquisition instrument. |
| Genesis Mission initial operating capability target | No public object proving initial operating capability for a named challenge, users and accepted operating result was located on checked official surfaces through 2026-08-27. Selections, negotiations and an RFI do not establish IOC. | Canonical-watch governed: w-2026-08-21-genesis-initial-operating-capability. Do not create a duplicate Return Ledger item; return on attributable IOC evidence or an official status/clock change. |
Research-security implementation watches
| Watch | Current state | Required return object |
|---|---|---|
| Government-wide institutional certification collection | OSTP promised added details; NIH later rescinded its implementation notice pending harmonization | system owner, authority, schema, agency coverage, correction and certification status |
| NIST IR 8481 research-institution cybersecurity profile | current official object remains Initial Public Draft | final publication and agency-specific implementation clock |
| NSF TRUST expansion | FY2025 quantum pilot completed; additional portfolios planned | named FY2026/FY2027 portfolios, methodology, verified matches, mitigation, false positives and appeal evidence |
| DOE RTES centralized electronic migration | DOE OIG found incomplete migration in January 2026 | recommendation closure, program-office coverage, controls, training and audit |
| DOE risk-based continuous monitoring | operating policy language | population, triggers, data sources, review frequency, human role, safeguards and outcomes |
| DoW 2026 list import | current decision matrix | list-version changes, entity-resolution practice, waivers, mitigations and proposal outcomes |
| NSF planned FY2027 restricted-entity policy | July 2026 notice describes planned implementation | final guidance, exact effective date, imported lists, exceptions and appeal process |
| SECURE Center | operating five-year award | frameworks, incident taxonomy, reports, training uptake and evidence of agency/institution use |
| Agency nondiscrimination safeguards | GAO found uneven adoption and effectiveness assessment | written criteria, demographic/outcome analysis, independent review and corrective action |
Identity, agent and provenance watches
| Watch | Current state | Required return object |
|---|---|---|
| NIST Software and AI Agent Identity and Authorization | Reviewing Comments | project description, collaborators, reference implementation and final practice guide |
| Human-to-agent delegation | fragmented | standard binding sponsor, agent, task, resource, time, approval and revocation |
| Agent card to runtime proof | unbuilt publicly | card hash, code/model identity, environment measurement, workload key and verification API |
| Science-specific attribute profile | not located | agreed researcher/agent/resource attributes and policy semantics |
| M-26-14 LRA to scientific receipt | cyber architecture pending | extension carrying data/model/instrument versions, method, calibration, uncertainty and correction state |
| Genesis signed outputs | not established | system profile identifying issuer, algorithm, signature coverage, validation and revocation |
| Genesis PQC join | not established | AmSC/Genesis procurement, SSP, CBOM or certificate profile naming FIPS 203/204/205 |
| SBOM/HBOM/CBOM composition | separate objects | crosswalk, identifiers, dependency graph, change propagation and procurement use |
| Scientific correction propagation | fragmented | linked supersession/retraction event reaching repositories, models, decisions and downstream users |
Capital and partner watches
| Watch | Current state | Required return object |
|---|---|---|
| CFIUS Known Investor Program | voluntary pilot operating | full program, criteria, refresh/expiry, portal and transaction-review effect |
| CFIUS Strategic Vendor Program | initiative operating | named participating vendors, referrals, capital instruments and deployed amounts |
| OSC / positive-capital routing | programs operating by instrument | executed loan, guarantee or investment; recipient, amount, conditions and disbursement |
| OISP scope change | operative rule in effect | final rule/guidance changing covered technologies, transactions, countries or exemptions |
| DCSA FOCI status | continuous and entity-specific | changed-condition notice, mitigation amendment, inspection and facility-clearance state |
| FASCSA orders | dynamic and scope-specific | SAM order diff, issuing official, article/source scope, waiver and contract action |
| ICTS Approved Supplier registries | sector-specific | registry entry, validity, monitoring and cross-program reuse—if any |
| CHIPS ten-year guardrails | award-specific clocks | notification, partner approval, foreign-capital change, IP transfer or clawback action |
| Trusted Capital Marketplace | public current status unresolved | current operator, membership, admission/expiry rules and transaction evidence |
Compound signals
Promote the Scientific Trust Stack thesis materially when two or more of these appear in the same named workflow:
- a persistent human, organization and runtime agent identity;
- a typed research-security or ownership eligibility receipt;
- task-scoped delegated access to compute, data or an instrument;
- a complete scientific execution receipt;
- signed or attested provenance with protected authoritative time;
- independent scientific validation and correction machinery;
- PQC or explicit crypto-agility requirements;
- capital routing conditioned on the same eligibility objects.
Failure and downgrade conditions
Downgrade the convergence thesis if:
- agency systems remain incompatible and repeatedly re-create the same profiles;
- automated matches cannot be corrected or produce material discriminatory error;
- agent standards remain descriptive while runtime identity is absent;
- provenance cards are not connected to execution evidence;
- PQC plans omit scientific systems through 2028 pilots;
- CFIUS/vendor/capital routing produces no named transactions or funding;
- list imports lose their native legal context; or
- security controls materially suppress lawful open research without measurable risk reduction.
Capture card
Date/time/timezone: Entity acting: Authority: Instrument: Subject and legal identifier: Scientific object/resource: Decision type: State before: State after: Conditions and expiry: Monitoring owner: Correction/appeal route: Primary source: What remains unproved:
Sources
Full saved reading
View the saved source references. This record has no direct external citation in its source-link list.
Document details and formats
About the dates and filing language
- Evidence date
- When this document or named claim was checked. A newer collection, export or website date does not update it.
- Current, private, Workbench or promotion
- These can describe the saved document’s original filing or custody. This public reading preserves that history; publication does not turn its findings into government approval, binding law or newly verified evidence.
- Master data and projection
- The maintained factual record and a page generated from it. Repeated views are not additional independent evidence.
- Provenance and source join
- Where a record came from, and the exact reference connecting a claim to its source.
- Gate, receipt and operating evidence
- A required decision or condition, its documentary record, and evidence that the named activity actually occurred. Permission, delivery and operation stay separate.
Saved research reading. Its original dates and claim limits control; the export date does not refresh the evidence.