Catch-up reconciliation — August 29, 2026
In plain English
Question: What material federal primary-source changes appeared after August 21, which were or were not captured by Government Ted, and did the saved records satisfy the normal evidence, clock, disposition and documentation method?
Answer: The audit checked 45 possible changes. Later research saved 37, folded one into existing work, repaired one, rejected five and kept one on watch; nothing remained unfinished.
Evidence checked through: 2026-08-29T21:06:00-04:00
The detailed record below keeps the legal wording, source limits and open questions.
Current disposition
The package's 45-row candidate ledger is a retained audit and decision-input snapshot. It is not an open promotion queue.
The later live-vault Government Ted catch-up receipt closed at 21:06 EDT and adjudicated all 45 candidates from the Workbench ledger:
| Final disposition | Count |
|---|---|
| Promoted | 37 |
| Folded into an existing official owner | 1 |
| Historical repair | 1 |
| Rejected | 5 |
| Watch only | 1 |
| Held | 0 |
| Unfinished | 0 |
| Write failed | 0 |
The disposition authority is the exact live-vault JSONL receipt:
`_Grok/Government Ted — run ledger.jsonl`
Use the record with run_id: gov-ted-catchup-2026-08-29. It records the
candidate-level final dispositions, exact vault paths and hashes, validation
results, access limits, next cursor and status: complete.
Authority boundary
- This Workbench package retains the independent control sweep, original candidate reasoning, source reach and 18:55 EDT stop receipt as provenance.
- The live run ledger owns the later candidate dispositions and vault-write
receipts. Where it differs from the original
promotion_reviewproposals, the live ledger wins for what was actually admitted, folded, repaired, rejected or watched. - The catch-up did not retroactively turn the original sweep into proof of exhaustive federal coverage. It resolved the 45-row queue and performed the Phase C fast-surface replay described in the live receipt.
- The live receipt recorded
VAULT CHECK: HEALTHY, but also recorded a nonclean documentation check and unrelated projection/toolchain issues. This reconciliation does not claim that those separate issues were repaired.
Continuation boundary
Do not reopen this package as a current queue. Current federal-delta work begins from the live Government Ted prompt, the live run ledger and the current vault router/scheduled-job state. The original audit remains useful for method, source-reach and claim-boundary provenance only.
The first scheduled full performance gate for the finalized live prompt is the Monday, August 31, 2026 6:00 PM Eastern run. Evaluate that run from its own receipts and close record; do not use this earlier catch-up as a proxy result.
Sources
Full saved reading
View the saved source references. This record has no direct external citation in its source-link list.
Document details and formats
About the dates and filing language
- Evidence date
- When this document or named claim was checked. A newer collection, export or website date does not update it.
- Current, private, Workbench or promotion
- These can describe the saved document’s original filing or custody. This public reading preserves that history; publication does not turn its findings into government approval, binding law or newly verified evidence.
- Master data and projection
- The maintained factual record and a page generated from it. Repeated views are not additional independent evidence.
- Provenance and source join
- Where a record came from, and the exact reference connecting a claim to its source.
- Gate, receipt and operating evidence
- A required decision or condition, its documentary record, and evidence that the named activity actually occurred. Permission, delivery and operation stay separate.
Saved research reading. Its original dates and claim limits control; the export date does not refresh the evidence.
Saved source details
---
title: Federal Government Sweep Control Audit — Catch-up Reconciliation
status: closed-provenance
artifact_role: workflow-record
audit_cutoff: 2026-08-29 18:55:00 EDT
catchup_closed: 2026-08-29 21:06:00 EDT
live_disposition_receipt: _Grok/Government Ted — run ledger.jsonl
---