Global Oil and Gas Movements — Return Trigger and Source-Gap Matrix
October 30 return: the updated globe audit and next waves dispose of the October release and maritime-successor returns and add August U.S. trade/LNG records. The dated September plan below remains the receipt method; its initial observations are history.
Updated: 2026-09-15
Status: current Wave 7 method; no automation or Chronicle watch created
Evidence cutoff: 2026-09-15, America/New_York
Ruling
This project should return on a hybrid cadence:
1. fixed releases for comparable aggregates and forecast revisions;
2. expiry/successor checks for maritime and sanctions permissions;
3. event-driven returns for cargo, field, contract, payment and receipt evidence;
4. monthly reconciliation only after the source object exists.
A new article, price move or AIS trace is not by itself a reason to advance a
route or deal state. Every return asks whether a named public receipt changes a
specific master record projected to ROUTE_EDGE_STARTER.csv or resolves a gap below.
This file is a return method, not a scheduled task, Chronicle watch, publication authorization or promise that a source will publish on time.
Fixed-date returns
| Return date | Source object | What to compare | State-change test | Do not infer |
|---|---|---|---|---|
| 2026-10-04 | OPEC statement after the next seven-country voluntary-adjustment meeting | October/November required production; compensation language; any country-specific schedule | Change target only if the dated official table changes; change production only with a later measured series | A quota or required level is not production, export or compliance |
| 2026-10-06 | EIA October Short-Term Energy Outlook and tables | Middle East export recovery assumption; Gulf production; Russia crude/products; U.S. supply; LNG and prices versus September | Replace the forecast vintage; retain September as superseded history; create a separate current record only when EIA reports an occurred period | A forecast revision is not a cargo or operating receipt |
| 2026-10-14 | IEA October Oil Market Report and Monthly Oil Statistics | Gulf crude/product trade, shut-ins, refinery throughput, Russian products, non-OPEC replacement supply, stocks and demand | Update the dated estimate layer and preserve model/reference-period differences | IEA and EIA estimates are not interchangeable even when both use mb/d |
| 2026-11-10 | EIA November STEO | Same comparison with October; first post-October recovery test | Advance only reported historical periods; keep forecast periods as forecast | Calendar passage does not convert October forecasts into facts |
| 2026-11-13 | IEA November OMR | Same comparison with October | Record revisions explicitly, including any backward revision to September/October | A lower estimate does not prove physical interdiction |
| 2026-12-08 | EIA December STEO | Year-end Middle East, Russia, Americas and LNG outlook | Compare forecast vintage and occurred-period tables | Year-end forecast is not an annual final |
| 2026-12-11 | IEA December OMR | Year-end supply, trade, refining, stocks and demand | Preserve December publication date and underlying data month separately | Publication month is not observation month |
| 2026-12-31 or first business return after | Venezuela “at-cost oil by end of 2026” claim | Executed pricing/offtake instrument, invoice, cargo nomination, bill of lading, payment-account entry or recipient record | Advance VEN-NABEP-ATCOST-YE26 only to the highest evidenced rung | A White House deadline or entity announcement is not performance |
| 2026-12-31 or earlier effective notice | GeoPark Bare CPP | Approvals, authorizations, regulatory and sanctions conditions; transaction closing; approved work program | Advance VEN-GEOPARK-BARE-CPP from described execution to effective/operating only with the relevant notices and field receipts | A stated maximum 120-day condition period is not automatic effectiveness or field investment |
| 2027-01-04 and monthly until resolved | Venezuela “material production to the United States in early 2027” claim | Field/operator production report, terminal loading, customs/import record, refinery receipt, SPR or other named federal receipt | Advance each field/cargo/payment link separately; do not jump directly to sustained | A U.S.-bound destination, U.S. license or U.S. buyer rumor is not discharge or federal receipt |
| 2027-01-04 and through Q1 until resolved | Nabors awarded Venezuela rig | Named customer/field, rig identity, mobilization/import, installation, spud and accepted operating record | Advance VEN-NABORS-RIG-2027 only as each field-service state occurs | A signed multi-year contract and expected start date are not a mobilized or operating rig |
Official schedule sources:
- OPEC's 2026-09-06 statement sets the next participating-country meeting for
2026-10-04: <https://www.opec.org/pr-detail/613-6-september-2026.html>
- EIA's STEO schedule sets 2026 releases for 10-06, 11-10 and 12-08 and states
that unforeseen changes may occur:
<https://www.eia.gov/outlooks/steo/release_schedule.php>
- IEA's OMR schedule sets 2026 releases for 10-14, 11-13 and 12-11 at 10:00
Paris time: <https://www.iea.org/data-and-statistics/data-product/oil-market-report-omr>
Expiry and successor returns
| First return | Object | Current public state at cutoff | Required action | State-change test |
|---|---|---|---|---|
| 2026-09-16 | MARAD 2026-005, Black Sea and Sea of Azov | Listed active with automatic expiry 2026-09-15 | Check the active-advisories index for a successor, extension, cancellation or archival status | Replace the risk-state clock only with the new official advisory; absence of a successor does not prove navigational safety |
| 2026-09-23 | MARAD 2026-006, Red Sea/Bab el-Mandeb/Gulf of Aden | Listed active with expiry 2026-09-22 | Check successor and any changed threat geography or operator guidance | A renewed warning changes the official risk layer, not cargo flow |
| 2026-10-22 | MARAD 2026-007 and 2026-008 | Listed active with expiry 2026-10-21 | Check successor/cancellation and relevance to energy-vessel operations | Global technology/security warnings remain separate from a route disruption |
| 2026-12-22 | MARAD 2026-009, Gulf of Guinea | Listed active with expiry 2026-12-21 | Check successor and geography | Piracy risk is not proof of a missed loading |
| 2027-02-05 | MARAD 2026-010, Gulf of Aden/Arabian Sea/Indian Ocean | Listed active with expiry 2027-02-04 | Check successor | General piracy risk does not replace Red Sea conflict evidence |
| 2027-03-09 | MARAD 2026-011, Persian Gulf/Hormuz/Gulf of Oman | Listed active with expiry 2027-03-08 | Check successor and any change to Iranian-threat description | Advisory status is not passage volume or closure status |
| Event-driven, at every Venezuela OFAC action | Current Venezuela general licenses and FAQs | Several licenses were amended in August–September 2026 | Diff license number, issue/supersession date, covered parties/transactions, payment route, reporting and exclusions | A license authorizes conduct; it does not prove production, lifting, payment or receipt |
| Event-driven, at every Russia/Iran/EU/UK sanctions action | New regulation, general license, designation or price-cap instrument | Live control layer is jurisdiction- and date-specific | Add the legal object and separately test vessel/cargo/party applicability | A list entry or allegation does not establish cargo identity or adjudicated illegality |
Current MARAD index used for the expiry clocks:
<https://www.maritime.dot.gov/msci-advisories>. Current OFAC general-license
index: <https://ofac.treasury.gov/recent-actions/general-licenses>.
Event-driven receipt ladder
Return immediately when one of these objects becomes public. The object opens only the corresponding gate.
| Receipt object | Theatre | Gate it can open | Join key required | Still does not prove |
|---|---|---|---|---|
| Signed binational oil agreement or operative annex | Venezuela | signed_or_granted scope, parties and effective clock | instrument name/date/parties | financing, field work, cargo or payment |
| NABEP/OSC equity, governance or State offtake instrument | Venezuela | legal control, voting, marketing and offtake rights | entity registration/instrument/contract | production, exercised nomination or delivery |
| Field concession, operator agreement or approved development plan | Venezuela | asset/operator/scope and field clock | field/block/instrument | reserves certainty, capex funding or production |
| FID, financing close, rig/service award, rehabilitation contract | Venezuela and balancers | financed or under_construction_or_rehabilitation | project/field/contractor/date | completion or operating output |
| Operator production report with field and period | Any | produced | field/operator/period/unit | export, title, buyer or receipt |
| Terminal nomination or lifting schedule | Any | nominated | terminal/grade/cargo window | loading occurred |
| Bill of lading, quantity certificate or authoritative port loading record | Any | loaded | vessel/IMO, terminal, grade, date, quantity | legal permission, payment or discharge |
| Authoritative transit/port record | Any | in_transit or bounded passage observation | vessel/IMO and timestamp | cargo grade, quantity or buyer absent the load record |
| Customs/import, terminal or refinery receipt | Any | discharged or received | vessel/cargo/import entry/receiver | seller payment or sovereign fiscal receipt |
| Invoice/LC/bank or controlled-account record | Venezuela/Iran/Russia/Iraq | paid | contract/cargo/invoice/account/value date | final beneficiary or state budget receipt |
| Treasury/state budget/royalty/tax receipt | Producer country | received fiscal state | payment/cargo or period plus named fiscal account | operational sustainability |
| Repeated monthly production + loading + receipt chain | Any | sustained | same asset/corridor and comparable periods | permanence beyond the tested period |
Priority source gaps
P0 — changes the present war-route picture
1. Hormuz passage and cargo reconciliation: official or method-disclosed
vessel passages joined to oil/LNG cargo categories, not raw ship counts.
2. Gulf loadings by terminal and grade: Kharg, Ras Tanura/Ju'aymah, Basra,
Mina al-Ahmadi, Ruwais and Qatar LNG load records with observation month.
3. Bypass throughput: dated actual flow through Saudi East-West/Yanbu,
Habshan-Fujairah and SUMED; capacity statements stay structural.
4. Red Sea realized movement: Yanbu loading and Bab el-Mandeb passage
reconciled to cargo/route, while MARAD/UKMTO risk remains a separate layer.
5. Russian refined-product exports: product, port and destination records
that can test the current near-halt estimate without substituting crude data.
P0 — decides whether the Venezuela deal is executing
1. Underlying U.S.–Venezuela agreement and implementing annexes, if public.
2. NABEP/OSC formation, equity, governance and offtake instruments.
3. Named fields, operator rights, work programs and approved reserves basis.
4. Capex source, financing close, contractors, equipment and rehabilitation
milestones.
5. Diluent import cargoes joined to Venezuelan field/blend/terminal output.
6. Production reports by field/operator and terminal lifting records.
7. At-cost pricing formula, invoice and controlled-account mechanics.
8. U.S. customs/refinery/SPR or other named federal receipt.
9. Royalty, tax or other Venezuelan fiscal receipt.
P1 — determines the global rebalance
1. Country/field production data reconciled to terminal loadings for the United
States, Canada, Brazil, Guyana and Argentina.
2. Buyer-level customs receipts for China, India, Türkiye, Europe, Japan and
South Korea with crude grade or product category preserved.
3. Refinery-assay/compatibility evidence where substitution claims are made.
4. Freight, insurance, voyage and storage evidence needed to distinguish
possible replacement from economic or delivered replacement.
5. LNG train/feedgas/load records and destination/regasification receipts,
separate from announced capacity.
P2 — enriches control and confidence
1. Vessel owner, beneficial owner, manager, charterer, flag, class and P&I
records, each with its own effective date.
2. Sanctions-list and license applicability by legal person and jurisdiction.
3. AIS/satellite gaps with method, access and false-positive limitations.
4. Cargo-title and payment evidence enabling physical/commercial/financial
joins rather than route-level inference.
Update procedure
1. Save or link the source object and record retrieval time/access state.
2. Identify the exact existing edge UID or create a new UID; never silently
overwrite an earlier claim with a different clock or evidence class.
3. Set the highest state the receipt actually proves.
4. Preserve quantity, unit, period and whether the number is reported,
estimated, claimed, forecast or targeted.
5. Write a one-sentence claim limit and the next receipt needed.
6. Regenerate the globe and compatibility CSV from the canonical master and geometry registry.
7. Run validate_energy_globe.py and the global workspace validator.
8. Treat Chronicle landing, a recurring reminder/watch, app shipment and
publication as separate authorized actions.
Wave 7 completion state
The initial recurrence architecture is complete: scheduled sources, expiry checks, event gates and priority gaps are defined. The refresh loop is not yet automated. Automation should be considered only after several manual returns show which sources materially change state and how much false-positive review they create.
Sources
Full saved reading
View cited sources (5)
These are the sources cited by this reading. Each source keeps its own date and scope.
- https://www.opec.org/pr-detail/613-6-september-2026.html>
- https://www.eia.gov/outlooks/steo/release_schedule.php>
- https://www.iea.org/data-and-statistics/data-product/oil-market-report-omr>
- https://www.maritime.dot.gov/msci-advisories>.
- https://ofac.treasury.gov/recent-actions/general-licenses>.
Document details and formats
Saved research reading. Its original dates and claim limits control; the export date does not refresh the evidence.