Skip to content

Global Oil and Gas Movements — Return Trigger and Source-Gap Matrix

October 30 return: the updated globe audit and next waves dispose of the October release and maritime-successor returns and add August U.S. trade/LNG records. The dated September plan below remains the receipt method; its initial observations are history.

Updated: 2026-09-15
Status: current Wave 7 method; no automation or Chronicle watch created
Evidence cutoff: 2026-09-15, America/New_York

Ruling

This project should return on a hybrid cadence:

1. fixed releases for comparable aggregates and forecast revisions;

2. expiry/successor checks for maritime and sanctions permissions;

3. event-driven returns for cargo, field, contract, payment and receipt evidence;

4. monthly reconciliation only after the source object exists.

A new article, price move or AIS trace is not by itself a reason to advance a route or deal state. Every return asks whether a named public receipt changes a specific master record projected to ROUTE_EDGE_STARTER.csv or resolves a gap below.

This file is a return method, not a scheduled task, Chronicle watch, publication authorization or promise that a source will publish on time.

Fixed-date returns

Return dateSource objectWhat to compareState-change testDo not infer
2026-10-04OPEC statement after the next seven-country voluntary-adjustment meetingOctober/November required production; compensation language; any country-specific scheduleChange target only if the dated official table changes; change production only with a later measured seriesA quota or required level is not production, export or compliance
2026-10-06EIA October Short-Term Energy Outlook and tablesMiddle East export recovery assumption; Gulf production; Russia crude/products; U.S. supply; LNG and prices versus SeptemberReplace the forecast vintage; retain September as superseded history; create a separate current record only when EIA reports an occurred periodA forecast revision is not a cargo or operating receipt
2026-10-14IEA October Oil Market Report and Monthly Oil StatisticsGulf crude/product trade, shut-ins, refinery throughput, Russian products, non-OPEC replacement supply, stocks and demandUpdate the dated estimate layer and preserve model/reference-period differencesIEA and EIA estimates are not interchangeable even when both use mb/d
2026-11-10EIA November STEOSame comparison with October; first post-October recovery testAdvance only reported historical periods; keep forecast periods as forecastCalendar passage does not convert October forecasts into facts
2026-11-13IEA November OMRSame comparison with OctoberRecord revisions explicitly, including any backward revision to September/OctoberA lower estimate does not prove physical interdiction
2026-12-08EIA December STEOYear-end Middle East, Russia, Americas and LNG outlookCompare forecast vintage and occurred-period tablesYear-end forecast is not an annual final
2026-12-11IEA December OMRYear-end supply, trade, refining, stocks and demandPreserve December publication date and underlying data month separatelyPublication month is not observation month
2026-12-31 or first business return afterVenezuela “at-cost oil by end of 2026” claimExecuted pricing/offtake instrument, invoice, cargo nomination, bill of lading, payment-account entry or recipient recordAdvance VEN-NABEP-ATCOST-YE26 only to the highest evidenced rungA White House deadline or entity announcement is not performance
2026-12-31 or earlier effective noticeGeoPark Bare CPPApprovals, authorizations, regulatory and sanctions conditions; transaction closing; approved work programAdvance VEN-GEOPARK-BARE-CPP from described execution to effective/operating only with the relevant notices and field receiptsA stated maximum 120-day condition period is not automatic effectiveness or field investment
2027-01-04 and monthly until resolvedVenezuela “material production to the United States in early 2027” claimField/operator production report, terminal loading, customs/import record, refinery receipt, SPR or other named federal receiptAdvance each field/cargo/payment link separately; do not jump directly to sustainedA U.S.-bound destination, U.S. license or U.S. buyer rumor is not discharge or federal receipt
2027-01-04 and through Q1 until resolvedNabors awarded Venezuela rigNamed customer/field, rig identity, mobilization/import, installation, spud and accepted operating recordAdvance VEN-NABORS-RIG-2027 only as each field-service state occursA signed multi-year contract and expected start date are not a mobilized or operating rig

Official schedule sources:

- OPEC's 2026-09-06 statement sets the next participating-country meeting for

2026-10-04: <https://www.opec.org/pr-detail/613-6-september-2026.html>

- EIA's STEO schedule sets 2026 releases for 10-06, 11-10 and 12-08 and states

that unforeseen changes may occur:

<https://www.eia.gov/outlooks/steo/release_schedule.php>

- IEA's OMR schedule sets 2026 releases for 10-14, 11-13 and 12-11 at 10:00

Paris time: <https://www.iea.org/data-and-statistics/data-product/oil-market-report-omr>

Expiry and successor returns

First returnObjectCurrent public state at cutoffRequired actionState-change test
2026-09-16MARAD 2026-005, Black Sea and Sea of AzovListed active with automatic expiry 2026-09-15Check the active-advisories index for a successor, extension, cancellation or archival statusReplace the risk-state clock only with the new official advisory; absence of a successor does not prove navigational safety
2026-09-23MARAD 2026-006, Red Sea/Bab el-Mandeb/Gulf of AdenListed active with expiry 2026-09-22Check successor and any changed threat geography or operator guidanceA renewed warning changes the official risk layer, not cargo flow
2026-10-22MARAD 2026-007 and 2026-008Listed active with expiry 2026-10-21Check successor/cancellation and relevance to energy-vessel operationsGlobal technology/security warnings remain separate from a route disruption
2026-12-22MARAD 2026-009, Gulf of GuineaListed active with expiry 2026-12-21Check successor and geographyPiracy risk is not proof of a missed loading
2027-02-05MARAD 2026-010, Gulf of Aden/Arabian Sea/Indian OceanListed active with expiry 2027-02-04Check successorGeneral piracy risk does not replace Red Sea conflict evidence
2027-03-09MARAD 2026-011, Persian Gulf/Hormuz/Gulf of OmanListed active with expiry 2027-03-08Check successor and any change to Iranian-threat descriptionAdvisory status is not passage volume or closure status
Event-driven, at every Venezuela OFAC actionCurrent Venezuela general licenses and FAQsSeveral licenses were amended in August–September 2026Diff license number, issue/supersession date, covered parties/transactions, payment route, reporting and exclusionsA license authorizes conduct; it does not prove production, lifting, payment or receipt
Event-driven, at every Russia/Iran/EU/UK sanctions actionNew regulation, general license, designation or price-cap instrumentLive control layer is jurisdiction- and date-specificAdd the legal object and separately test vessel/cargo/party applicabilityA list entry or allegation does not establish cargo identity or adjudicated illegality

Current MARAD index used for the expiry clocks:

<https://www.maritime.dot.gov/msci-advisories>. Current OFAC general-license

index: <https://ofac.treasury.gov/recent-actions/general-licenses>.

Event-driven receipt ladder

Return immediately when one of these objects becomes public. The object opens only the corresponding gate.

Receipt objectTheatreGate it can openJoin key requiredStill does not prove
Signed binational oil agreement or operative annexVenezuelasigned_or_granted scope, parties and effective clockinstrument name/date/partiesfinancing, field work, cargo or payment
NABEP/OSC equity, governance or State offtake instrumentVenezuelalegal control, voting, marketing and offtake rightsentity registration/instrument/contractproduction, exercised nomination or delivery
Field concession, operator agreement or approved development planVenezuelaasset/operator/scope and field clockfield/block/instrumentreserves certainty, capex funding or production
FID, financing close, rig/service award, rehabilitation contractVenezuela and balancersfinanced or under_construction_or_rehabilitationproject/field/contractor/datecompletion or operating output
Operator production report with field and periodAnyproducedfield/operator/period/unitexport, title, buyer or receipt
Terminal nomination or lifting scheduleAnynominatedterminal/grade/cargo windowloading occurred
Bill of lading, quantity certificate or authoritative port loading recordAnyloadedvessel/IMO, terminal, grade, date, quantitylegal permission, payment or discharge
Authoritative transit/port recordAnyin_transit or bounded passage observationvessel/IMO and timestampcargo grade, quantity or buyer absent the load record
Customs/import, terminal or refinery receiptAnydischarged or receivedvessel/cargo/import entry/receiverseller payment or sovereign fiscal receipt
Invoice/LC/bank or controlled-account recordVenezuela/Iran/Russia/Iraqpaidcontract/cargo/invoice/account/value datefinal beneficiary or state budget receipt
Treasury/state budget/royalty/tax receiptProducer countryreceived fiscal statepayment/cargo or period plus named fiscal accountoperational sustainability
Repeated monthly production + loading + receipt chainAnysustainedsame asset/corridor and comparable periodspermanence beyond the tested period

Priority source gaps

P0 — changes the present war-route picture

1. Hormuz passage and cargo reconciliation: official or method-disclosed

vessel passages joined to oil/LNG cargo categories, not raw ship counts.

2. Gulf loadings by terminal and grade: Kharg, Ras Tanura/Ju'aymah, Basra,

Mina al-Ahmadi, Ruwais and Qatar LNG load records with observation month.

3. Bypass throughput: dated actual flow through Saudi East-West/Yanbu,

Habshan-Fujairah and SUMED; capacity statements stay structural.

4. Red Sea realized movement: Yanbu loading and Bab el-Mandeb passage

reconciled to cargo/route, while MARAD/UKMTO risk remains a separate layer.

5. Russian refined-product exports: product, port and destination records

that can test the current near-halt estimate without substituting crude data.

P0 — decides whether the Venezuela deal is executing

1. Underlying U.S.–Venezuela agreement and implementing annexes, if public.

2. NABEP/OSC formation, equity, governance and offtake instruments.

3. Named fields, operator rights, work programs and approved reserves basis.

4. Capex source, financing close, contractors, equipment and rehabilitation

milestones.

5. Diluent import cargoes joined to Venezuelan field/blend/terminal output.

6. Production reports by field/operator and terminal lifting records.

7. At-cost pricing formula, invoice and controlled-account mechanics.

8. U.S. customs/refinery/SPR or other named federal receipt.

9. Royalty, tax or other Venezuelan fiscal receipt.

P1 — determines the global rebalance

1. Country/field production data reconciled to terminal loadings for the United

States, Canada, Brazil, Guyana and Argentina.

2. Buyer-level customs receipts for China, India, Türkiye, Europe, Japan and

South Korea with crude grade or product category preserved.

3. Refinery-assay/compatibility evidence where substitution claims are made.

4. Freight, insurance, voyage and storage evidence needed to distinguish

possible replacement from economic or delivered replacement.

5. LNG train/feedgas/load records and destination/regasification receipts,

separate from announced capacity.

P2 — enriches control and confidence

1. Vessel owner, beneficial owner, manager, charterer, flag, class and P&I

records, each with its own effective date.

2. Sanctions-list and license applicability by legal person and jurisdiction.

3. AIS/satellite gaps with method, access and false-positive limitations.

4. Cargo-title and payment evidence enabling physical/commercial/financial

joins rather than route-level inference.

Update procedure

1. Save or link the source object and record retrieval time/access state.

2. Identify the exact existing edge UID or create a new UID; never silently

overwrite an earlier claim with a different clock or evidence class.

3. Set the highest state the receipt actually proves.

4. Preserve quantity, unit, period and whether the number is reported,

estimated, claimed, forecast or targeted.

5. Write a one-sentence claim limit and the next receipt needed.

6. Regenerate the globe and compatibility CSV from the canonical master and geometry registry.

7. Run validate_energy_globe.py and the global workspace validator.

8. Treat Chronicle landing, a recurring reminder/watch, app shipment and

publication as separate authorized actions.

Wave 7 completion state

The initial recurrence architecture is complete: scheduled sources, expiry checks, event gates and priority gaps are defined. The refresh loop is not yet automated. Automation should be considered only after several manual returns show which sources materially change state and how much false-positive review they create.

Sources

Full saved reading

View cited sources (5)

These are the sources cited by this reading. Each source keeps its own date and scope.

Document details and formats
Optional file downloads
For AI readers: complete text and record details

Saved research reading. Its original dates and claim limits control; the export date does not refresh the evidence.