Skip to content

Iran Financial Pressure — Watchboard

Read first: Iran Financial Pressure — Source Document

Rule: move only the state named by the triggering object. Silence is not proof of failure.

IDQuestionCurrent stateExact triggerStop rule
W-01Which banks are disconnected from SWIFT?exact 2025–26 set unresolvedSWIFT, EU/Belgian authority or bank notice with institution/BIC and effective timeno generic “Iran is off SWIFT” promotion
W-02Did August 7 close a correspondent/PTA?legal risk, no named actionTreasury order, U.S. bank notice or foreign-bank disclosure naming account/currency/datewarning alone does not move account state
W-03Are cross-border payments failing?transaction state unknownauthenticated rejection/return/hold with route, clock and reasonanecdotal delay without transaction identity
W-04Did Shetab/Shaparak stop?no outage proofCBI/operator/member-bank incident notice with start/end and affected serviceforeign designation alone
W-05Did PAYA/SATNA fail finality?current rules/telemetry missingrulebook or incident naming settlement asset, irrevocability, liquidity and outageretail-app problem alone
W-06Were crypto assets frozen?designation/address listingissuer, exchange or custodian record with address/account, asset, amount and timeOFAC list reused as executor proof
W-07Were assets seized/forfeited?not establishedwarrant/control transfer; then forfeiture order and finality state“blocked” or “frozen” wording alone
W-08Did a bank collapse?attributed claim unresolvednamed bank plus regulator/auditor/resolution record, depositor state and effective timeprice/inflation or sanctions status alone
W-09Is CBI losing hard-currency capacity?mechanism supported; magnitude unresolvedreserve/FX data, settlement arrears, intervention or correspondent recordsrial price alone
W-10Is CIMS/SPFS/Mir a production substitute?messaging link, constitution unresolvedparticipant/rulebook/account map plus completed production transaction and finalityMoU or capability claim
W-11Are humanitarian corridors operational?legal pathways, access unresolvednamed corridor/bank, authorized category, completed payment and receiptlicense text alone
W-12Did a license/delisting reverse pressure?no August 7 reversalOFAC/EU/UK amendment, account restoration or successful disputed transactionrhetoric alone

Refresh triggers

There is no dated public deadline in the August 7 actions, so this note does not create a second queue or a watch_calendar.json entry.

Refresh on:

Negative-result protocol

Before finalizing “not found,” refresh the exact agency/operator recent-actions page and delayed dynamic/list source, search the named legal person, state the cutoff, and write not located in this pass rather than does not exist.

Return gate

The original question is answered unless one of four states changes: messaging eligibility, account/payment execution, domestic service availability, or bank liquidity/solvency.

Sources

Full saved reading

View the saved source references. This record has no direct external citation in its source-link list.

Document details and formats
Optional file downloads
For AI readers: complete text and record details
About the dates and filing language
Evidence date
When this document or named claim was checked. A newer collection, export or website date does not update it.
Current, private, Workbench or promotion
These can describe the saved document’s original filing or custody. This public reading preserves that history; publication does not turn its findings into government approval, binding law or newly verified evidence.
Master data and projection
The maintained factual record and a page generated from it. Repeated views are not additional independent evidence.
Provenance and source join
Where a record came from, and the exact reference connecting a claim to its source.
Gate, receipt and operating evidence
A required decision or condition, its documentary record, and evidence that the named activity actually occurred. Permission, delivery and operation stay separate.

Saved research reading. Its original dates and claim limits control; the export date does not refresh the evidence.

Saved source details

---

title: "Iran Financial Pressure — Watchboard"

type: research

subtype: watchboard

plotlines: [Iran, Economy, Crypto]

created: 2026-08-07

updated: 2026-08-07

source: "Evidence triggers derived from the August 7, 2026 Iran financial-pressure audit. No watch-calendar item created because the action supplies no dated public deadline."

---