Skip to content

National security technology QUANTUM CRYPTOGRAPHIC ACCEPTANCE REGISTRY 2026-08-19

{
  "title": "NSSTS Quantum and Cryptographic Acceptance Registry",
  "as_of": "2026-08-19",
  "status": "pending_workbench_evidence",
  "purpose": "Map the less-visible component, calibration, validation, PKI, cryptographic-module and authorization actors between a quantum or post-quantum capability claim and accepted federal use.",
  "governance": {
    "exact_entity_required": true,
    "qbi_stage_b_is_not_government_vv": true,
    "qbi_stage_c_is_not_a_utility_scale_machine": true,
    "letter_of_intent_is_not_final_award": true,
    "qedc_membership_is_not_award": true,
    "cavp_is_not_cmvp": true,
    "iut_or_mip_is_not_validation": true,
    "fips_140_certificate_is_not_product_or_target_mapping": true,
    "pki_incumbency_is_not_pqc_readiness": true,
    "capability_is_not_target_configuration": true,
    "evidence_producer_is_not_authorizing_official": true,
    "automatic_monitoring_active": false,
    "investment_use": false,
    "vault_or_observatory_promotion_authorized": false
  },
  "waves": [
    {"wave":1,"scope":"Quantum policy, benchmarking, calibration and performance acceptance","case_count":10},
    {"wave":2,"scope":"Quantum component, cryogenic, photonic, sensing and networking supply chain","case_count":10},
    {"wave":3,"scope":"PQC implementation, PKI, HSM and product-validation migration","case_count":10},
    {"wave":4,"scope":"Independent validation, Genesis trust rails and target authorization","case_count":10}
  ],
  "cases": [
    {"id":"quantum-eo-14413-qc-adds","wave":1,"domain":"quantum policy","entity":"Department of Commerce / Department of Energy / Department of War","entity_clock":"Executive Order 14413 was signed 2026-06-22.","role":"Coordinate QC-ADDS, a national quantum-performance assessment center, sensing and networking plans, foundry access and supply-chain measures.","state":"directed_not_completed","evidence_object":"Implementation plans, designated center, operating test protocols, project awards and accepted performance results.","decision_authority":"The named departments establish programs and acquisition criteria; performers and test centers produce evidence.","fit":4,"path":2,"evidence":"A","missing_gate":"Named operating center, awards, protocols and accepted project results.","disconfirmers":["An executive order is not an award","A national center is directed but not yet publicly operating","A supply-chain plan does not identify suppliers"],"sources":["https://www.whitehouse.gov/presidential-actions/2026/06/ushering-in-the-next-frontier-of-quantum-innovation/"]},
    {"id":"quantum-chips-lois","wave":1,"domain":"quantum manufacturing","entity":"GlobalFoundries U.S. Inc.; IBM planned foundry subsidiary; Atom Computing Inc.; Diraq US Inc.; D-Wave Quantum Inc.; Infleqtion, Inc.; PsiQuantum Corp.; Quantinuum; Rigetti Computing, Inc.","entity_clock":"Commerce announced nine nonbinding preliminary memoranda/letters of intent on 2026-05-21.","role":"Proposed foundry, fabrication and quantum-system capacity supported by up to $2.013 billion and contemplated noncontrolling federal equity.","state":"letter_of_intent_only","evidence_object":"Final assistance agreement, incorporated project entity, obligation, milestones, facility build and acceptance.","decision_authority":"Commerce negotiates and executes final CHIPS instruments; recipients deliver milestones.","fit":4,"path":2,"evidence":"A","missing_gate":"Final agreements, obligations, exact subsidiaries, milestones and accepted capacity.","disconfirmers":["LOIs are not final awards","Proposed amounts are not obligations","Minority equity conditions do not prove a closed investment"],"sources":["https://www.nist.gov/news-events/news/2026/05/department-commerce-announces-letters-intent-9-companies-2-billion"]},
    {"id":"sri-qmec","wave":1,"domain":"quantum manufacturing engineering","entity":"SRI International","entity_clock":"NIST announced the QMEC cooperative agreement and initial $20 million on 2026-06-29.","role":"Establish the Quantum Manufacturing Engineering Center for cryostats, lasers, components, process development and scalable manufacturing.","state":"awarded_center_buildout","evidence_object":"Cooperative agreement, work packages, partner instruments, qualified processes and manufacturing-transfer records.","decision_authority":"NIST administers the agreement; SRI operates the center; downstream customers accept products.","fit":4,"path":4,"evidence":"A","missing_gate":"Named component partners, completed process qualifications and customer acceptance.","disconfirmers":["Center launch is not component qualification","Initial funding is not full manufacturing capacity","A partner ecosystem is not a supplier award ledger"],"sources":["https://www.nist.gov/news-events/news/2026/06/nist-launches-center-drive-manufacture-quantum-technologies"]},
    {"id":"qbi-stage-c","wave":1,"domain":"quantum computing validation","entity":"Microsoft Corporation; PsiQuantum Corp.","entity_clock":"DARPA advanced both US2QC performers to QBI Stage C.","role":"Undergo government verification and validation of whether a utility-scale quantum-computer design can be built and operated.","state":"government_vv_stage","evidence_object":"Stage C test plans, government measurements, constructability/operability findings and disposition.","decision_authority":"DARPA's government V&V team evaluates evidence; performers do not self-certify.","fit":4,"path":4,"evidence":"A","missing_gate":"Released Stage C findings and a later build, delivery and system-acceptance instrument.","disconfirmers":["Stage C does not itself build a utility-scale machine","Selection is not a production award","Company benchmarks are not government acceptance"],"sources":["https://www.darpa.mil/research/programs/quantum-benchmarking-initiative/stage-b-selection"]},
    {"id":"qbi-stage-b-cohort","wave":1,"domain":"quantum computing validation","entity":"DARPA QBI Stage B performer cohort","entity_clock":"DARPA's current public QBI page identifies eleven Stage B companies.","role":"Develop detailed R&D plans, retire key risks and support prototype-based evaluation before possible Stage C.","state":"pre_vv_risk_reduction","evidence_object":"Stage B plans, risk-retirement evidence and Stage C selection decision.","decision_authority":"DARPA decides advancement; company plans and prototypes are inputs.","fit":4,"path":3,"evidence":"A","missing_gate":"Stage C selection and government V&V record for each performer.","disconfirmers":["Stage B is not government V&V","A cohort listing is not equal progress","Prototype work is not production acceptance"],"sources":["https://www.darpa.mil/research/programs/quantum-benchmarking-initiative/stage-b-selection"]},
    {"id":"qbi-ivv-open","wave":1,"domain":"quantum independent validation","entity":"DARPA QBI independent verification and validation performer unresolved","entity_clock":"DARPA-PA-26-02-01 remains open through 2026-10-15.","role":"Supply independent technical measurements and analysis to the QBI government V&V function.","state":"open_call_no_public_awardee","evidence_object":"Award, conflict-of-interest plan, task scope, accepted test report and government disposition.","decision_authority":"DARPA owns the V&V decision; an IV&V contractor produces evidence.","fit":4,"path":1,"evidence":"A","missing_gate":"Named awardee and executed IV&V task.","disconfirmers":["An open call is not an award","Potential support suppliers are not selected performers","An IV&V role can create organizational-conflict restrictions"],"sources":["https://www.darpa.mil/work-with-us/opportunities/darpa-pa-26-02-01"]},
    {"id":"rydberg-qcal","wave":1,"domain":"quantum calibration","entity":"RYDBERG TECHNOLOGIES INC","entity_clock":"DARPA OASIC/QCAL Phase II STTR HR0011-25-9-0191 runs 2025-06-24 through 2028-06-23.","role":"Build and operate a Quantum Calibration Lab for SI-traceable Rydberg RF-sensor methods, protocols, benchmarks and laser/nanophotonic characterization.","state":"active_calibration_lab_build","evidence_object":"Operational lab, released protocols, traceability chain, access mechanism and accepted calibration reports.","decision_authority":"Rydberg and University of Michigan produce calibration evidence; DARPA and acquiring programs decide recognition and acceptance.","fit":4,"path":4,"evidence":"A","missing_gate":"Operational demonstration, accepted protocols and Phase III access/recognition.","disconfirmers":["Calibration evidence is not procurement acceptance","Phase II is not production qualification","QCAL does not own the acquirer's decision"],"sources":["https://www.sbir.gov/awards/216000","https://www.darpa.mil/news/2025/small-business-accelerates-transition-quantum-tech-lab-market"]},
    {"id":"ionq-vector-atomic-clocks","wave":1,"domain":"quantum timing manufacturing","entity":"IonQ, Inc. / Vector Atomic, Inc.","entity_clock":"IonQ acquired Vector Atomic on 2025-10-02; DARPA announced an It’s About Time manufacturing contract in 2026.","role":"Develop manufacturing capacity for Evergreen-05 optical atomic clocks under a $28 million modification; a separate option for 100 units remains unexercised.","state":"capacity_development_not_unit_acceptance","evidence_object":"Exact PIID, modification, delivered lots, government inspection and exercised production options.","decision_authority":"DARPA accepts contract deliverables; IonQ/Vector manufactures.","fit":4,"path":4,"evidence":"A","missing_gate":"Public base PIID, accepted 25-unit delivery and exercise of any 100-unit option.","disconfirmers":["Capacity funding is not accepted units","An option is not an order","Acquisition changed the controlling entity clock"],"sources":["https://www.darpa.mil/news/2026/its-about-time","https://www.ionq.com/news/updated-darpa-selects-ionq-to-produce-next-generation-atomic-clocks"]},
    {"id":"qunnect-entity-chain","wave":1,"domain":"quantum networking validation","entity":"QUNNECT, INC. / Qunnect LLC","entity_clock":"DOE's earlier award names QUNNECT, INC.; the 2025 USAF award names Qunnect LLC. The public record does not resolve the transition.","role":"Develop quantum-buffer and entanglement-validation devices for network testbeds.","state":"active_award_entity_seam","evidence_object":"Novation/entity records, delivered validation device, testbed results and customer acceptance.","decision_authority":"AFRL or the relevant customer accepts the device and test result; Qunnect produces network-state evidence.","fit":4,"path":4,"evidence":"A","missing_gate":"Exact entity continuity and released acceptance/test record.","disconfirmers":["Inc. and LLC must not be silently merged","A validation device does not certify an entire network","SBIR award is not field acceptance"],"sources":["https://www.sbir.gov/awards/216813","https://www.sbir.gov/awards/177602"]},
    {"id":"nist-bcqt","wave":1,"domain":"quantum characterization","entity":"National Institute of Standards and Technology Boulder Cryogenic Quantum Testbed","entity_clock":"NIST continues the BCQT as a measurement and characterization program.","role":"Provide traceable cryogenic quantum-device characterization and measurement methods.","state":"operating_government_measurement_node","evidence_object":"Calibration service, reference methods, uncertainty budget and customer-specific test record.","decision_authority":"NIST owns measurement claims within scope; program/acquirer still owns procurement acceptance.","fit":4,"path":3,"evidence":"A","missing_gate":"Target-specific test order and acceptance use.","disconfirmers":["NIST measurement is not a production award","A testbed does not qualify every tested product","Characterization does not confer system ATO"],"sources":["https://www.nist.gov/programs-projects/quantum-characterization"]},

    {"id":"maybell-flax","wave":2,"domain":"cryogenic interconnect","entity":"MAYBELL QUANTUM INDUSTRIES, INC.","entity_clock":"DARPA SBIR II W912CG23C0002 completed 2024-02-09; separate QED-C matched R&D completed in February 2026.","role":"Develop flexible low-thermal-load cryogenic wiring and related quantum-control infrastructure.","state":"completed_component_rd","evidence_object":"Prime subcontract, production lot, reliability data, incoming inspection and system qualification.","decision_authority":"System prime/customer qualifies the component; QED-C completion is not that qualification.","fit":3,"path":2,"evidence":"A","missing_gate":"Target order, production-lot qualification and accepted integration.","disconfirmers":["Completed R&D is not production qualification","QED-C participation is not a target award","Component performance does not establish system performance"],"sources":["https://www.sbir.gov/awards/206815","https://quantumconsortium.org/qed-c-members-rigetti-computing-amphenol-rf-maybell-quantum-industries-and-xma-release-results-of-research-to-enhance-quantum-control-electronics/"]},
    {"id":"amphenol-xma","wave":2,"domain":"cryogenic RF interconnect","entity":"Amphenol Corporation / XMA Corporation","entity_clock":"Amphenol acquired XMA in 2023; Amphenol RF is a business name and the exact operating award entity remains unresolved.","role":"Cryogenic RF attenuators, terminations, cabling and control/readout interconnect developed in QED-C matched R&D.","state":"completed_rd_parent_consolidated","evidence_object":"Exact contracting entity, qualified part number, target bill of materials and lot acceptance.","decision_authority":"Prime/customer accepts parts; Amphenol's internal entity structure controls the signatory.","fit":3,"path":2,"evidence":"A","missing_gate":"Current legal seller and target qualification record.","disconfirmers":["XMA and Amphenol RF are not independent suppliers after acquisition","Business brand is not necessarily signatory","QED-C result is not target acceptance"],"sources":["https://quantumconsortium.org/qed-c-members-rigetti-computing-amphenol-rf-maybell-quantum-industries-and-xma-release-results-of-research-to-enhance-quantum-control-electronics/","https://investor.amphenol.com/news-and-events/news-details/2023/Amphenol-Reports-Third-Quarter-2023-Results-and-Announces-Dividend-Increase/default.aspx"]},
    {"id":"bluefors-cryocooler","wave":2,"domain":"cryogenic field service","entity":"Bluefors Cryocooler Technologies Inc.","entity_clock":"Bluefors acquired Cryomech after CFIUS approval in 2023; NASA PO 80NSSC26P0369 completed 2026-06-11.","role":"Refurbish cryogenic cold heads and support low-temperature operating infrastructure.","state":"completed_maintenance_comparator","evidence_object":"Target service order, maintenance scope, post-service performance test and return-to-service record.","decision_authority":"Facility owner/customer releases the system; Bluefors performs service.","fit":2,"path":2,"evidence":"A","missing_gate":"Target quantum-system order and accepted return to service.","disconfirmers":["A NASA maintenance PO is not a Science Strategy quantum assignment","Foreign ownership is an eligibility fact, not disqualification by itself","Cold-head service is not quantum-device qualification"],"sources":["https://www.usaspending.gov/award/CONT_AWD_80NSSC26P0369_8000_-NONE-_-NONE-","https://bluefors.com/press-releases/bluefors-closes-the-acquisition-of-cryomech/"]},
    {"id":"aosense-quais","wave":2,"domain":"quantum inertial sensing","entity":"AOSENSE, INC.","entity_clock":"Navy QuAIS II N68335-23-C-0078 runs through 2026-08-28.","role":"Develop and field-demonstrate a strategic quantum inertial measurement unit in a marine-relevant environment.","state":"late_stage_field_demo_award","evidence_object":"Released marine field result, qualification report, platform integration and follow-on order.","decision_authority":"The Navy evaluates and accepts the demonstration; AOSense supplies the instrument.","fit":3,"path":4,"evidence":"A","missing_gate":"Public field outcome, platform qualification and transition award.","disconfirmers":["An active Phase II is not an accepted field result","Marine relevance is not platform integration","Prototype success would not itself prove production"],"sources":["https://www.sbir.gov/awards/206957"]},
    {"id":"photon-spot","wave":2,"domain":"single-photon detection cryogenics","entity":"PHOTON SPOT INC","entity_clock":"NIST-CHIPS Phase I 70NANB24H276 runs through 2027-07-31.","role":"Develop compact low-vibration cryogenics for superconducting nanowire single-photon detectors.","state":"phase_i_prototype","evidence_object":"Phase II/III instrument, yield/reliability data, target installation and acceptance.","decision_authority":"NIST administers the R&D award; a customer qualifies the production system.","fit":3,"path":2,"evidence":"A","missing_gate":"Phase II/III, manufacturing evidence and target qualification.","disconfirmers":["Phase I is not production","SNSPD capability is not a complete quantum network","Compact cryogenics are not target acceptance"],"sources":["https://www.sbir.gov/awards/209676","https://www.sbir.gov/awards/150173"]},
    {"id":"vescent-identity-seam","wave":2,"domain":"quantum laser and timing controls","entity":"VESCENT TECHNOLOGIES INC. / Vescent Photonics, LLC","entity_clock":"SBIR recipient records name VESCENT TECHNOLOGIES INC.; award abstracts also name Vescent Photonics, LLC as performer.","role":"Develop lasers, frequency controls and timing-related quantum subsystems.","state":"active_awards_identity_mismatch","evidence_object":"Contracting records, intercompany agreement, delivered subsystem and customer qualification.","decision_authority":"NASA/Navy accept their deliverables; the entity record determines contract attribution.","fit":3,"path":2,"evidence":"A","missing_gate":"Resolved legal performer and target qualification.","disconfirmers":["Abstract performer and recipient cannot be silently merged","R&D delivery is not platform acceptance","RIMROC collaboration is not an NSSTS target award"],"sources":["https://www.sbir.gov/awards/203956","https://www.sbir.gov/awards/205528","https://www.sbir.gov/awards/194495"]},
    {"id":"qedc-cryogenic-cohort","wave":2,"domain":"quantum cryogenics","entity":"FormFactor, Inc.; Northrop Grumman Systems Corporation; Quantum Opus, LLC; Triton Systems, Inc.","entity_clock":"QED-C announced completed NIST-backed cryogenics research in 2025 following 2022 awards.","role":"Advance cryogenic packaging, test, control and component technologies.","state":"completed_consortium_rd","evidence_object":"Exact subaward, released metrics, production transfer, qualified part and target acceptance.","decision_authority":"QED-C/NIST sponsor research; system prime/customer qualifies products.","fit":3,"path":2,"evidence":"A","missing_gate":"Company-specific transition and customer qualification records.","disconfirmers":["Shared R&D does not prove equal deliverables","Membership is not an award","Reported advances are not production acceptance"],"sources":["https://quantumconsortium.org/qed-c-announces-member-advancements-in-cryogenics-for-quantum-technology/"]},
    {"id":"phix-photonic-packaging","wave":2,"domain":"photonic packaging","entity":"PHIX Photonics Assembly","entity_clock":"PHIX is an independent European photonic assembly business as of the cutoff.","role":"Provide photonic integrated-circuit packaging and assembly relevant to quantum networking and sensing.","state":"commercial_capability_no_target_award","evidence_object":"U.S. target order, controlled-technology review, qualified assembly process and acceptance record.","decision_authority":"Prime/customer accepts assemblies and determines eligibility.","fit":3,"path":1,"evidence":"B","missing_gate":"Named U.S. federal target order and qualified process.","disconfirmers":["Commercial capability is not a federal role","Foreign production may trigger separate eligibility review","Packaging competence is not device performance"],"sources":["https://www.phix.com/quantum-photonics/"]},
    {"id":"qubitekk-ionq-assets","wave":2,"domain":"quantum key distribution","entity":"Qubitekk, Inc. / IonQ, Inc.","entity_clock":"IonQ acquired substantially all Qubitekk operating assets in January 2025.","role":"Historic ORNL/EPB quantum-network and grid-QKD operating technology; current contract and IP custody require asset/novation resolution.","state":"operating_comparator_after_asset_sale","evidence_object":"Asset schedule, novation, current operating support agreement and accepted network performance.","decision_authority":"ORNL/EPB control operating acceptance; asset purchase alone does not transfer every obligation.","fit":4,"path":3,"evidence":"A","missing_gate":"Exact current IonQ entity and contract/obligation transfer.","disconfirmers":["Asset acquisition is not automatic novation","Historic operation is not a new target award","Grid QKD does not establish PQC migration"],"sources":["https://www.ornl.gov/news/epb-ornl-announce-plans-research-collaborative-focused-energy-resilience-quantum-technology","https://www.ionq.com/news/ionq-to-acquire-id-quantique-enter-into-strategic-partnership-with-sk"]},
    {"id":"quantum-network-test-authorities","wave":2,"domain":"quantum networking test","entity":"Air Force Research Laboratory Quantum Networking Group / Oak Ridge National Laboratory / EPB","entity_clock":"These government and utility nodes operate adjacent quantum-network test environments.","role":"Provide testbed conditions, network truth data and customer acceptance context for quantum-network components.","state":"operating_adjacent_test_nodes","evidence_object":"Target test plan, configuration, ground truth, signed results and transition decision.","decision_authority":"Government/utility owners accept their test results; vendors do not self-approve.","fit":4,"path":3,"evidence":"A","missing_gate":"Named target component test and government disposition.","disconfirmers":["Testbed access is not production approval","Operating a network does not identify every supplier","A successful experiment is not recurring service acceptance"],"sources":["https://www.ornl.gov/news/epb-ornl-announce-plans-research-collaborative-focused-energy-resilience-quantum-technology"]},

    {"id":"omb-m2615-clock","wave":3,"domain":"federal PQC migration","entity":"Office of Management and Budget","entity_clock":"M-26-15 was issued 2026-06-24; non-NSS agency plans are due 2026-10-22.","role":"Set non-national-security-system discovery, pilot, migration, TLS 1.3, crypto-inventory and vendor-responsibility clocks.","state":"binding_non_nss_migration_policy","evidence_object":"Agency plan, prioritized inventory/CBOM, pilot, procurement requirement and completed migration.","decision_authority":"Agency leadership and authorizing officials implement; OMB governs the federal non-NSS schedule.","fit":4,"path":4,"evidence":"A","missing_gate":"DOE plan and target-specific prioritization after the due date.","disconfirmers":["M-26-15 excludes NSS","A policy clock is not vendor selection","Inventory is not completed migration"],"sources":["https://www.whitehouse.gov/wp-content/uploads/2026/06/M-26-15-Execution-of-the-Migration-to-Post-Quantum-Cryptography.pdf"]},
    {"id":"entrust-pki-hsm","wave":3,"domain":"federal PKI and HSM","entity":"Entrust Corporation","entity_clock":"Entrust remains a current GSA PKI shared-service-provider contractor; nShield 5s CMVP certificate 5329 issued 2026-06-15.","role":"Operate federal PKI shared services and supply validated HSM infrastructure with PQC algorithm implementations under separate evidence objects.","state":"operating_pki_cmvp_link_incomplete","evidence_object":"Security policy proving PQC approved service, exact product/version/environment mapping, certificate profile, interoperability and target ATO.","decision_authority":"NIST validates modules; FPKI/GSA govern trust service; agency AO accepts target deployment.","fit":4,"path":3,"evidence":"A","missing_gate":"Exact PQC-to-module approved-service linkage and deployed target profile.","disconfirmers":["PKI incumbency is not PQC readiness","CAVP algorithm records are not the HSM certificate","CMVP certificate is not agency ATO"],"sources":["https://www.gsaelibrary.gsa.gov/ElibMain/home.do/sinDetails.do?executeQuery=YES&scheduleNumber=MAS&specialItemNumber=541519PKI","https://www.idmanagement.gov/fpki/","https://csrc.nist.gov/projects/cryptographic-module-validation-program/certificate/5329"]},
    {"id":"widepoint-pki","wave":3,"domain":"federal PKI","entity":"WidePoint Cybersecurity Solutions Corp.","entity_clock":"WidePoint remains one of two current GSA MAS 541519PKI shared-service-provider contractors.","role":"Operate FPKI/ECA trust services and legacy certificate infrastructure that can become a migration chokepoint.","state":"operating_pki_no_public_pqc_evidence","evidence_object":"PQC CAVP/CMVP record, updated certificate profile, relying-party interoperability and target ATO.","decision_authority":"FPKI/GSA and subscriber agencies govern the trust relationship; WidePoint operates the service.","fit":4,"path":2,"evidence":"A","missing_gate":"Public PQC product, validation and deployment evidence.","disconfirmers":["Current PKI role is not proof of PQC capability","ECA roots do not prove new algorithms","A schedule contract is not a task order"],"sources":["https://www.gsaelibrary.gsa.gov/ElibMain/home.do/sinDetails.do?executeQuery=YES&scheduleNumber=MAS&specialItemNumber=541519PKI","https://www.idmanagement.gov/trust-services/","https://crl.gds.disa.mil/pke/config/eca_crldps.html"]},
    {"id":"sandboxaq-federal","wave":3,"domain":"cryptographic inventory","entity":"SB Technology Federal Inc. / SandboxAQ","entity_clock":"Air Force Phase I FA8649-23-P-0197 ran 2022-11-01 to 2023-01-31; official SBIR text ties the recipient to SandboxAQ.","role":"Prototype post-quantum cryptographic inventory analysis and performance benchmarking.","state":"completed_phase_i_inventory_rd","evidence_object":"Follow-on award, production inventory deployment, target CBOM and agency acceptance.","decision_authority":"The agency owns migration prioritization and accepts the inventory output.","fit":4,"path":2,"evidence":"A","missing_gate":"Production federal deployment and target acceptance.","disconfirmers":["A Phase I is not an enterprise deployment","DISA's technology-watch status does not name SandboxAQ","Inventory output is not migration completion"],"sources":["https://www.sbir.gov/awards/204722","https://www.disa.mil/partners/tech-watchlist-2026"]},
    {"id":"crypto4a-qasm","wave":3,"domain":"hardware security module","entity":"Crypto4A Technologies Inc.","entity_clock":"QASM has PQC CAVP A5631; FIPS 140-2 certificate 4250 reaches the new-use cliff 2026-09-21; a FIPS 140-3 submission remained in process in July 2026.","role":"Supply a sovereign HSM platform with PQC implementations and validated entropy.","state":"algorithm_validated_module_transitioning","evidence_object":"Issued FIPS 140-3 certificate and security policy explicitly listing PQC approved services, then exact product and target mapping.","decision_authority":"NIST CMVP validates the module; customer AO accepts deployment.","fit":4,"path":3,"evidence":"A","missing_gate":"Active 140-3 certificate with PQC approved-service linkage.","disconfirmers":["CAVP is not CMVP","A module in process is not validated","FIPS 140-2 certificate does not solve the 140-3 acquisition cliff"],"sources":["https://csrc.nist.gov/projects/cryptographic-module-validation-program/entropy-validations/certificate/96","https://csrc.nist.gov/projects/cryptographic-module-validation-program/certificate/4250","https://csrc.nist.gov/projects/cryptographic-module-validation-program/modules-in-process/modules-in-process-list"]},
    {"id":"safelogic-cryptocomply","wave":3,"domain":"embedded cryptographic module","entity":"SafeLogic, Inc.","entity_clock":"CryptoComply FIPS Provider held PQC CAVP A8228 and entropy validation E241; its FIPS 140-3 module remained in CMVP review in July 2026.","role":"Provide an OEM-embeddable cryptographic module with PQC algorithms.","state":"cavp_and_entropy_cmvp_pending","evidence_object":"Active CMVP certificate, security policy, OEM product/version mapping and target approved-mode evidence.","decision_authority":"NIST validates the module; OEM and agency establish product and use-boundary mapping.","fit":4,"path":3,"evidence":"A","missing_gate":"Issued 140-3 validation and exact OEM/target mapping.","disconfirmers":["CAVP plus entropy is not CMVP","A provider library is not every OEM product","CMVP would not itself create an ATO"],"sources":["https://csrc.nist.gov/projects/cryptographic-algorithm-validation-program/details?validation=8228","https://csrc.nist.gov/projects/cryptographic-module-validation-program/modules-in-process/modules-in-process-list"]},
    {"id":"secure-micro-itus","wave":3,"domain":"PQC HSM bridge","entity":"Secure Micro Technologies LLC","entity_clock":"NIST SBIR 70NANB25H071 is a small-business prototype award.","role":"Develop Itus, a flexible bridge between classical and post-quantum HSM functions.","state":"prototype_rd","evidence_object":"Phase II/III, CAVP, entropy validation, CMVP certificate, product mapping and deployment acceptance.","decision_authority":"NIST administers R&D; CMVP and customer AO govern later validation and use.","fit":3,"path":2,"evidence":"A","missing_gate":"Follow-on, independent validation and accepted product deployment.","disconfirmers":["SBIR prototype is not validated module","Flexible design is not interoperability proof","NIST award is not NIST CMVP approval"],"sources":["https://www.sbir.gov/awards/220249"]},
    {"id":"pqsecure-cores","wave":3,"domain":"embedded PQC cores","entity":"PQSecure Technologies, LLC","entity_clock":"Multiple PQC CAVP records were active through the cutoff.","role":"Supply embedded software libraries and hardware cores implementing standardized PQC algorithms.","state":"algorithm_validated_components","evidence_object":"Entropy record, active CMVP module, OEM mapping, integration test and target acceptance.","decision_authority":"NIST validates algorithms/modules; OEM and agency accept the integrated product.","fit":3,"path":2,"evidence":"A","missing_gate":"Active 140-3 module and named federal product/deployment.","disconfirmers":["CAVP does not validate a module","A hardware core is not a complete HSM","No target federal deployment is public"],"sources":["https://csrc.nist.gov/projects/cryptographic-algorithm-validation-program"]},
    {"id":"securosys-primus","wave":3,"domain":"hardware security module","entity":"Securosys SA","entity_clock":"Primus PQC held CAVP A8744 on 2026-07-09; earlier FIPS 140-2 certificate 4583 was historical and FIPS 140-3 work remained under review.","role":"Supply enterprise HSMs with PQC algorithm capability.","state":"cavp_with_1403_pending","evidence_object":"Active 140-3 certificate/security policy, U.S. product mapping, PKI interoperability and target ATO.","decision_authority":"NIST validates modules; customer AO accepts the system.","fit":3,"path":2,"evidence":"A","missing_gate":"Issued 140-3 validation expressly covering approved PQC services.","disconfirmers":["CAVP is not CMVP","Historical 140-2 is not a current new-system answer","Foreign commercial capability is not federal acceptance"],"sources":["https://csrc.nist.gov/projects/cryptographic-module-validation-program/modules-in-process/modules-in-process-list"]},
    {"id":"bouncycastle-geomys","wave":3,"domain":"software cryptographic modules","entity":"Legion of the Bouncy Castle Inc. / Geomys LLC","entity_clock":"BC-FJA and Geomys Go modules held 2026 PQC CAVP records while associated 140-3 paths remained incomplete.","role":"Provide Java/.NET and Go cryptographic software layers that can propagate into many downstream products.","state":"algorithm_validated_software_modules_pending","evidence_object":"Active CMVP certificate, dependency inventory, exact downstream product version, approved-mode test and ATO.","decision_authority":"NIST validates; downstream OEM/customer maps the dependency and accepts use.","fit":4,"path":2,"evidence":"A","missing_gate":"Active module certificate and exact dependency-to-product mapping.","disconfirmers":["Library CAVP is not product validation","A transitive dependency may not operate in approved mode","One language module does not cover every application"],"sources":["https://csrc.nist.gov/projects/cryptographic-module-validation-program/modules-in-process/modules-in-process-list"]},

    {"id":"cavp-cmvp-ladder","wave":4,"domain":"cryptographic acceptance governance","entity":"NIST CAVP / NVLAP / CMVP","entity_clock":"NIST's 2026 implementation guidance supports ML-KEM, ML-DSA and SLH-DSA testing; FIPS 206 remains in development.","role":"Separate algorithm conformance, accredited laboratory testing and cryptographic-module validation.","state":"operating_validation_system","evidence_object":"CAVP records, entropy evidence, laboratory report, issued CMVP certificate/security policy and exact product mapping.","decision_authority":"NIST CMVP validates modules; it does not issue a system ATO.","fit":4,"path":4,"evidence":"A","missing_gate":"Target product, environment, approved-mode and ATO mapping.","disconfirmers":["CAVP is not CMVP","A CMVP certificate is not a system authorization","No valid FIPS 206 compliance claim exists while the standard is unfinished"],"sources":["https://csrc.nist.gov/Projects/Post-Quantum-Cryptography/Post-Quantum-Cryptography-Standardization","https://csrc.nist.gov/projects/cryptographic-module-validation-program"]},
    {"id":"nvlap-capacity-pause","wave":4,"domain":"validation capacity","entity":"NIST National Voluntary Laboratory Accreditation Program","entity_clock":"NIST paused acceptance of new cryptographic/security-testing laboratory applications from 2025-01-01; bulletin LB-163-2026 was published 2026-03-09.","role":"Accredit the finite independent laboratory base that tests modules before CMVP validation.","state":"operating_with_capacity_constraint","evidence_object":"Accredited lab scope, queue position, completed test report and CMVP disposition.","decision_authority":"NVLAP accredits laboratories; CMVP validates modules.","fit":4,"path":4,"evidence":"A","missing_gate":"Demonstrated throughput sufficient for the migration wave and product-specific completed reviews.","disconfirmers":["Lab accreditation is not product validation","Application pause is not proof every review is delayed","A vendor cannot self-create the CMVP decision"],"sources":["https://www.nist.gov/nvlap/nvlap-lab-bulletin-lb-163-2026"]},
    {"id":"lightship-lab","wave":4,"domain":"independent cryptographic testing","entity":"Lightship Security, Inc.","entity_clock":"Lightship is an active NVLAP cryptographic/security testing laboratory and tested Entrust nShield 5s and multiple entropy implementations.","role":"Produce independent module and entropy test evidence for CMVP/NIST review.","state":"operating_evidence_producer","evidence_object":"Product-specific test report, CMVP submission and issued certificate.","decision_authority":"Lightship tests; NIST validates; agency AO accepts deployment.","fit":4,"path":3,"evidence":"A","missing_gate":"Target product assignment and issued validation.","disconfirmers":["A lab is not the CMVP","Testing one module does not validate the vendor portfolio","Test evidence is not DOE ATO"],"sources":["https://csrc.nist.gov/projects/cryptographic-module-validation-program/certificate/5329"]},
    {"id":"atsec-lab","wave":4,"domain":"independent cryptographic testing","entity":"atsec information security corporation","entity_clock":"atsec's NVLAP accreditation runs through 2026-09-30; it tested AWS-LC CMVP certificate 5429.","role":"Test cryptographic software/modules and produce evidence packages for NIST validation.","state":"operating_evidence_producer","evidence_object":"Target module test report, issued certificate and product/ATO mapping.","decision_authority":"atsec tests; NIST and the agency retain validation and authorization decisions.","fit":4,"path":3,"evidence":"A","missing_gate":"Genesis-specific target module/assessment assignment.","disconfirmers":["AWS-LC validation does not prove Genesis configuration","Laboratory testing is not system authorization","Accreditation expiry must be rechecked after the cutoff"],"sources":["https://csrc.nist.gov/projects/cryptographic-module-validation-program/certificate/5429"]},
    {"id":"intertek-acumen-lab","wave":4,"domain":"independent cryptographic testing","entity":"Intertek Acumen Security","entity_clock":"Intertek acquired Acumen Security in 2017; Acumen is named as the test lab on AWS KMS HSM CMVP certificate 4884.","role":"Create independent test evidence for cloud HSM modules.","state":"operating_evidence_producer","evidence_object":"Current certificate, target module inventory and system-boundary assessment.","decision_authority":"NIST validates the module; DOE/NNSA AO decides target use.","fit":4,"path":3,"evidence":"A","missing_gate":"Genesis-specific module mapping and authorization evidence.","disconfirmers":["Certificate 4884 lists classical approved algorithms publicly","Module validation does not prove approved-mode use","Acumen/Intertek is not the DOE authorizing official"],"sources":["https://csrc.nist.gov/projects/cryptographic-module-validation-program/certificate/4884"]},
    {"id":"other-cst-labs","wave":4,"domain":"independent cryptographic testing","entity":"Gossamer Security Solutions, Inc.; Leidos, Inc. AT&E; AEGISOLVE, INC.; Penumbra Security, Inc.; Advanced Data Security, LLC","entity_clock":"These firms appear in the active NVLAP cryptographic/security-testing laboratory population with different 2026 accreditation clocks.","role":"Provide scarce independent conformance and module-test capacity.","state":"operating_validation_capacity","evidence_object":"Target engagement, lab scope, completed report, CMVP disposition and conflict controls.","decision_authority":"Labs create evidence; NIST validates; agencies authorize.","fit":4,"path":2,"evidence":"A","missing_gate":"Named PQC product assignments and resulting active certificates.","disconfirmers":["Accreditation is not a target task","Testing capacity is not validation throughput","No lab grants agency ATO"],"sources":["https://www.nist.gov/nvlap/cryptographic-and-security-testing-laboratory-accreditation-program"]},
    {"id":"nccoe-pqc-consortium","wave":4,"domain":"PQC interoperability","entity":"NIST National Cybersecurity Center of Excellence PQC Migration Project Consortium","entity_clock":"The consortium and migration project remain active with public participants.","role":"Develop migration practices, interoperability experiments, discovery methods and reference architectures through CRADAs.","state":"collaborative_rd_not_procurement","evidence_object":"Published practice guide, test configuration, interoperable profile and separate target deployment.","decision_authority":"NIST publishes guidance; consortium membership does not validate products or authorize systems.","fit":4,"path":2,"evidence":"A","missing_gate":"Final guidance and target-specific adoption/ATO.","disconfirmers":["CRADA is not procurement award","Participant listing is not endorsement","Reference architecture is not production acceptance"],"sources":["https://www.nccoe.nist.gov/applied-cryptography/migration-to-pqc"]},
    {"id":"genesis-globus","wave":4,"domain":"Genesis federated identity","entity":"The University of Chicago / Globus","entity_clock":"Argonne identifies the ALCF Inference Service as a Genesis/AmSC tool relying on Globus Compute and Auth.","role":"Broker OAuth2/OIDC identity and delegated access for national-facility compute; subscriber IdP authenticates and resource owner authorizes.","state":"operating_direct_identity_join_no_pqc_join","evidence_object":"Genesis SSP/ATO, token-signing profile, endpoint FIPS/PQC configuration, CBOM and target logs.","decision_authority":"Globus brokers access; the subscriber/resource owner and DOE AO govern authorization and risk acceptance.","fit":4,"path":4,"evidence":"A","missing_gate":"Any public Genesis-specific PQC configuration or system authorization evidence.","disconfirmers":["Operating identity role is not PQC deployment","Subscriber OS must enable documented FIPS endpoint posture","OAuth/OIDC brokerage is not DOE risk acceptance"],"sources":["https://www.alcf.anl.gov/news/alcf-launches-first-large-scale-ai-inference-service-open-science","https://www.globus.org/events/Improving-Scientific-Software-2026"]},
    {"id":"genesis-aws","wave":4,"domain":"Genesis classified cloud cryptography","entity":"Amazon Web Services, Inc.","entity_clock":"NNSA announced on 2026-06-30 that its first enterprise-authorized S/RD cloud will house inaugural Genesis workloads.","role":"Operate authorized Secret/Restricted Data cloud infrastructure and optional ML-KEM/ML-DSA-capable services.","state":"authorized_infrastructure_pqc_configuration_unproven","evidence_object":"Target KMS/HSM identifiers, client versions, negotiated key exchange, ML-DSA chain, SSP/SAR and ATO boundary.","decision_authority":"NNSA AO accepts target risk and configuration; AWS supplies infrastructure and cryptographic services.","fit":4,"path":4,"evidence":"A","missing_gate":"Public evidence that PQC capability is enabled for a named Genesis workload.","disconfirmers":["AWS feature availability is not customer activation","CMVP module validation is not target mapping","M-26-15 does not govern classified/NSS systems"],"sources":["https://www.energy.gov/nnsa/articles/nnsa-launches-secretrestricted-data-enterprise-cloud-environment-collaboration-amazon","https://aws.amazon.com/security/post-quantum-cryptography/aws-pq-readiness-confidentiality/"]},
    {"id":"genesis-upstream-trust","wave":4,"domain":"Genesis identity governance","entity":"Saviynt, Inc.; NCSA at the University of Illinois / CILogon","entity_clock":"Saviynt operates DOE MyIdentity; CILogon is an upstream federation bridge used by Globus, but neither has a public Genesis-specific assignment.","role":"Aggregate entitlements and bridge InCommon SAML identities into OAuth/OIDC/JWT pathways.","state":"operating_adjacent_no_target_assignment","evidence_object":"Genesis responsibility matrix, issuer/audience metadata, service-identity scope, target token trace and ATO inheritance.","decision_authority":"DOE authoritative identity sources and resource owners decide identity/authorization; Saviynt and CILogon support the chain.","fit":3,"path":2,"evidence":"B","missing_gate":"Genesis-specific SSP or configuration naming either service.","disconfirmers":["Saviynt is not DOE's authoritative identity source","CILogon adjacency is not target assignment","Federation tokens do not establish PQC"],"sources":["https://www.energy.gov/cio/articles/privacy-impact-assessments","https://www.cilogon.org/oidc"]}
  ]
}

Sources

Full saved reading

View the saved source references. This record has no direct external citation in its source-link list.

Document details and formats
Optional file downloads
For AI readers: complete text and record details
About the dates and filing language
Evidence date
When this document or named claim was checked. A newer collection, export or website date does not update it.
Current, private, Workbench or promotion
These can describe the saved document’s original filing or custody. This public reading preserves that history; publication does not turn its findings into government approval, binding law or newly verified evidence.
Master data and projection
The maintained factual record and a page generated from it. Repeated views are not additional independent evidence.
Provenance and source join
Where a record came from, and the exact reference connecting a claim to its source.
Gate, receipt and operating evidence
A required decision or condition, its documentary record, and evidence that the named activity actually occurred. Permission, delivery and operation stay separate.

Saved research reading. Its original dates and claim limits control; the export date does not refresh the evidence.