Direct sites: operations, industry, security, science, and delivery
Window: exclusive after 2026-09-03 20:09:34 EDT through frozen cutoff 2026-09-11 16:01:37 EDT
Inclusive replay: 2026-09-03 date-only publishers, then dedupe against Weekly Delta 2026-09-03
Discovery rule: official operational, technical, program, award, procurement, and library pages. Federal Register is not discovery. FR objects live in WAVE_1C_OPERATIONS_INDUSTRY_DELIVERY.md.
Not in this wave: full military/service census (Wave 2D). War/DOE industrial objects that landed on civilian sites may be noted.
Do not recensus: Genesis through 2026-09-09 15:40 EDT; OPM RIF-appeals already operational as of Sep 2.
Award ≠ obligation ≠ payment ≠ delivery ≠ operation. 403 ≠ missing.
Promotion-review objects (direct-site primary)
1. DOE EDF financially closed Duane Arnold restart loan (up to $1.9 billion)
Actor: DOE Office of Energy Dominance Financing; NextEra Energy; NRC as later gate
Clocks: close announced 2026-09-08. Plant ceased 2020. Restart pending NRC licensing. Stated 615 MW is nameplate claim, not generated power.
URL: DOE close
Disposition: promotion_review
This is the week’s strongest civilian energy money-state move: financial close, not a newsroom paraphrase of a future FOA. Keep the ladder: close ≠ first draw ≠ construction complete ≠ NRC authorization ≠ criticality ≠ MWh.
Claim limit: “Up to $1.9 billion” is a ceiling. Close is not outstanding principal. Job counts are agency projection.
2. NNSA completed B61-13 canned-subassembly production at Y-12
Actor: NNSA; Y-12 / Consolidated Nuclear Security; Pantex as next assembly node; Department of War as recipient
Clocks: diamond-stamp / War-Reserve certification 2026-09-01; NNSA announcement 2026-09-10. Agency says complete production cycle ~7 months ahead of last-production-unit need.
URL: NNSA Y-12
Disposition: promotion_review as a production/acceptance object on a civilian DOE site. Not a 2D service-site census.
Canned subassemblies are the secondary-stage hardware. After Y-12 they ship to Pantex for weapon assembly, then to War. This is completed CSA production and acceptance testing, not a fielded bomb, not a delivery to a combat unit, and not a stockpile upload receipt.
Claim limit: CSA complete ≠ Pantex assembly complete ≠ War acceptance ≠ deployed B61-13. Yield/target language in the release is program description, not a use event.
3. GSA OneGov AI 2.0: 27-month OpenAI ChatGPT consumption agreement
Actor: GSA Federal Acquisition Service; OpenAI
Clocks: announced 2026-09-10; expected effect 2026-10-01; 27-month term. Ordering through Multiple Award Schedule once live.
URL: GSA release; OneGov agreements
Disposition: promotion_review
Governmentwide vehicle: 50% token discount including FedRAMP-authorized environments; no platform fee, no minimum, no spend commitment; federal/state/local/tribal eligibility; GSA AI terms. GSA claims ~$1.68B OneGov savings to date (~$1.4B from AI agreements / ~3.5 million employees). Those savings are agency-reported, not audited here.
Claim limit: Agreement announcement is not agency onboarding, not a token burned, not FedRAMP authorization of a new model, not proof of mission use. Oct 1 is the access clock.
4. GSA listed Lanham Federal Building + Fort Worth garage for disposition (~$348 million claimed avoidance)
Actor: GSA
Clocks: announced 2026-09-10. Disposition plans, not a closed sale.
URL: GSA Fort Worth
Disposition: promotion_review
Agency claims >127 properties disposed since Jan 2025, $614 million proceeds, $1.15 billion avoided delinquent maintenance/operating expense. The Fort Worth object is addition to the disposition list plus a claimed $348 million cost avoidance. Not a deed, not proceeds in hand, not tenant move complete.
Claim limit: Listing ≠ sale ≠ proceeds ≠ vacated building. Avoidance figure is not cash recovered.
5. NASA opened the U.S. Space Academy host-state RFI
Actor: NASA; Presidential Commission on the United States Space Academy (Isaacman chair)
Clocks: EO signed 2026-08-28 (out of window; 120-day commission mandate). First commission meeting 2026-09-09. RFI posted 2026-09-10; responses due 2026-10-26 18:00 EDT; one submission per governor. Stated build path: groundbreaking ≤2027; first 300 students 2028 (temporary); permanent campus 2031.
URL: NASA release; SAM.gov RFI
Disposition: promotion_review
In-window state is the RFI + first commission meeting, not the August EO. Not a site selection, not a groundbreaking, not a student body.
Claim limit: RFI is not a location decision, appropriation, construction start, or academy in operation.
6. EPA issued the first Good Samaritan abandoned-mine cleanup permit (Bodie Mine, WA)
Actor: EPA; Trout Unlimited Inc.
Clocks: permit approved 2026-09-09. First of 15 statutory pilots under the 2024 Good Samaritan Act. Agency says it has 7 years to implement the pilot set.
URL: EPA permit
Disposition: promotion_review
Authorization to remediate abandoned hardrock tailings at Bodie Mine (Okanogan County, WA) affecting Toroda Creek. Not work complete, not contaminant reduction measured, not all 15 pilots granted.
Claim limit: Permit ≠ shovel in the ground ≠ cleanup result. “First ever” is program-status, not a national mine-cleanup outcome.
7. DOT stood up the SPACE Task Force; FAA marked Texas eVTOL pilot flights
Actor: USDOT; FAA; Secretary Duffy
Clocks: SPACE Task Force launched 2026-09-09; FAA eVTOL pilot-program celebration 2026-09-10 (experimental commercial flights under the department testing initiative).
URLs: DOT SPACE Task Force; FAA eVTOL (2026-09-10 item)
Disposition: promotion_review as operating-coordination / test-program objects
SPACE Task Force is an intradepartmental coordination body for the National Space Transportation Policy (launch infrastructure, regulation streamlining, airspace integration). Not a license, not a spaceport, not 10,000 annual launches (that figure is a 2035 projection in the release). eVTOL item is celebration of experimental flights under an existing pilot, not type certification or commercial passenger service.
Claim limit: Task force ≠ launched vehicle. Experimental flight ≠ certified air carrier operation.
8. DOE selected $73 million in Mine of the Future proving-ground projects
Covered as 1C object 9; repeated here because the controlling source is the DOE newsroom, not FR.
URL: DOE mining
Disposition: promotion_review (same claim limits as 1C). Selection for award negotiations.
9. NNSA declared Vermont free of high-risk cesium-137 devices
Actor: NNSA
Clocks: announced 2026-09-10. Agency: 15th state/territory; 97% of targeted Cs-137 devices eliminated or contracted; third 2026 U.S. cleanout after North Dakota and South Carolina.
URL: NNSA Vermont
Disposition: admit_lower_rank / promotion_review as a completed removal on a civilian DOE site.
Completed state cleanout is an operating result for the named material in Vermont. It is not a U.S.-wide end of Cs-137, not a dirty-bomb plot, and not a medical-capacity finding.
Claim limit: “Free of high-risk quantities” is NNSA’s program definition, not a radiological survey of every device in the state.
Direct-site enrichments of 1C legal objects
These do not replace the FR instruments. They confirm agency-site operation or implementation.
| 1C object | Direct-site confirmation | Limit |
|---|---|---|
| EO 14427 DPA | White House signed page reached; no Interior/DOE DPA implementing order found on energy.gov or doi.gov in-window | Delegation ≠ rated order |
| EO 14421 bulk-power | CESER RFI webinar page 2026-09-10; webinar 2026-09-16 | RFI ≠ prohibition |
| FSA AFT | FSA news 2026-09-03 reached | Permanent rule still effective 2026-10-01 |
| Ranchers / livestock EOs | USDA Ranchers First updated 2026-09-04 with “additional four actions” (BRAND endorsement expected early 2027; SPUR guaranteed-loan program named) | Program names ≠ loans or insurance in force |
| EPA RFS deadline | EPA HQ news index reached; SRE “what they are saying” page exists; controlling text remains FR 2026-18132 | Extension ≠ RIN retirement |
| WOTUS SNPRM | epa.gov/wotus live; comment close 2026-10-09 | Proposal ≠ jurisdiction change |
| Census NPRM | FR-primary; Commerce newsroom did not surface it on the department press index | Ops implication stays with 1C |
| FCC 2026-18535 | Not hunted as FCC newsroom (1A legal). Ops effect taken from retrieved rule | See 1C object 11 |
Existing-object clocks checked (not new atomics)
| Object | Clock this window | Result |
|---|---|---|
| DOE PJM Order 202-26-41 | expired 23:59 ET 2026-09-08 | Expired. No public EEA3/dispatch receipt on the order page. PJM order page |
| DOE Carolinas 202-26-43 | expired 2026-09-08 | Expired. 09-03 already owned. |
| DOE Stanton OUC | through 2026-11-30 | Still live. No new order. |
| TransAlta Centralia 202-26-28 | through 2026-09-12 | Carry; expires just after cutoff. Order page |
| Craig 202-26-31 | through 2026-09-26 | Carry. |
| Genesis SBIR pitch | 2026-09-10 14:00 ET | Fold into genesis-mission. Deadline occurrence is not a new FOA and not IOC. |
| OPM RIF appeals | notices on/after 2026-09-02; 30 days after action effective date | No new clock. Live page still describes the Sep 2 transfer, eFile, exclusive administrative remedy. DC operating status 2026-09-11: Open (routine). |
| NASA Blue Origin Mars network | 09-03 award | No in-window delivery. |
| NASA Roman | Aug 30 launch | Parker Solar Probe 29th perihelion 2026-09-04 + beacon 2026-09-07 is mission-status, not a new launch. Parker check-in |
| NRC North Anna ESP renewal application notice | FR 2026-18516 (2026-09-11) | Application under consideration, not a renewed permit. |
Other direct-site objects reviewed and ranked down
- DOE GEMS Prize $300,000 (2026-09-10): algorithm prize, submissions due 2026-12-03. Not a geothermal discovery or well. HGEO
- DOE geothermal workforce $1.2 million (2026-09-08): award announcement, not trained workers.
- DOE ASPECT FOA up to $58 million: funding notice released 2026-09-04; concept papers 2026-10-09. Opportunity ≠ selection. ASPECT
- EPA drinking-water non-targeted study (2026-09-09): study launch, not contaminant findings. EPA study
- EPA $3.5 million tribal 319 RFP (2026-09-10): funding notice, not awards.
- EPA Wisconsin CCR (2026-09-10 news): same as FR 2026-18552 proposal.
- NASA Artemis Accords Djibouti media advisory for 2026-09-14 signing (72nd). Advisory ≠ signature in this window.
- NASA / IBM lunar AI foundation model (2026-09-10): model launch announcement, not operational mapping product adopted as a federal standard.
- NSF “golden age of science” leadership letter (2026-09-10): direction-setting; promised later DCLs/funding opportunities. Not an award. NSF
- GSA FY2027 per diem files published 2026-09-03 on gsa.gov (date-only replay; FR notice 2026-09-10). Effective 2026-10-01. Hygiene.
- GSA FMR Bulletin B-51 rescission is FR-primary (1C grouped).
- FAA hazmat proposed $77,750 penalty (2026-09-11): allegation, 30-day response. Not a finding.
- FAA 9/11 commemorative (2026-09-11): ceremonial.
- DOT OACP airline-privacy review closed (posted 2026-09-04): no violation found. Oversight close, not a privacy rule.
- Commerce G20 Innovation Ministerial (Sep 2–3): consensus statement. Date-only replay at the exclusive-start boundary; ministerial text is not a U.S. operating program. Fold unless 1A/2B wants the statement.
- Interior press index: newest item 2026-08-30 (FWS officer death). Empty in-window on the department newsroom. NPR-A NPRM did not appear there.
- NRC news: Belews Creek ESP hearing advisory (2026-09-09); new-reactor licensing webinar (2026-09-08); Chairman speech (2026-09-04). No new license, restart, or 50.59 operating change promoted. Power-reactor status 2026-09-11 is routine snapshot (McGuire 1 and North Anna 2 at 0% — outage state, not a weekly event without a docketed cause).
Libraries / procurement / delivery pages
| Surface | Result | Note |
|---|---|---|
| energy.gov newsroom | reached | Duane Arnold, mining $73M, NNSA Y-12, Vermont Cs, GEMS, CESER webinar |
energy.gov CESER 202(c) index doe-electricity-emergency-authorities | 404 | Individual order pages reached (PJM, TransAlta, Craig, Stanton). Index blocked/moved ≠ missing orders |
| DOE loan / EDF pages | reached via close release | No public amortization schedule retrieved |
| commerce.gov/news | reached | No in-window department press after G20 (Sep 2–3). Census NPRM not on this index |
| census.gov / FR 2026-18481 | FR reached; bureau newsroom not separately recensus’d | Ops object is the NPRM |
| usda.gov/about-usda/news/press-releases | 403 / Access Denied | Akamai block. Not treated as empty |
| fsa.usda.gov news | reached | AFT / farm-loan 2026-09-03 |
| usda.gov/ranchers-first | reached | Sep 4 additional actions |
| doi.gov/news press releases | reached; empty in-window | Latest 2026-08-30 |
| blm.gov / eplanning NPR-A | FR + regulations.gov supporting EIS reached | Direct BLM newsroom not separately required once FR/EIS in hand |
| epa.gov newsreleases | reached | Good Samaritan, WOTUS, drinking-water study, CCR, tribal 319 |
| transportation.gov briefing room | reached | SPACE Task Force |
| faa.gov newsroom | reached | eVTOL, AIG (fold), hazmat penalty |
| nasa.gov news-release | reached | Space Academy, Djibouti advisory, Crew-12 advisory |
| sam.gov Space Academy RFI | reached | opp 274445df4c224846adf7de19c11c4c6a |
| gsa.gov news releases | reached | OneGov ChatGPT, Fort Worth, Sep 3 capital projects (fold) |
| gsa.gov per diem files | reached | FY27 files dated 2026-09-03 |
| itvmo.gsa.gov/onegov | linked from release; not re-crawled item-by-item | Vehicle page cited |
| opm.gov RIF appeals | reached | No new clock |
| opm.gov/chcoc/published-memos | reached | Sep 2 RIF-regs memo = 09-03 object |
| nsf.gov/news | reached | Leadership letter only |
| nrc.gov news 2026 | reached | Advisories; ISR NPRM is FR publication of 09-03 object |
| SAM.gov / USAspending / FPDS | not recensus’d | Bounded negative: no transaction-level pass |
Coverage receipt
| Publisher family | Status | Missed (new) | Enrichment / clock | Routine/reject |
|---|---|---|---|---|
| DOE newsroom / EDF / CMEI / HGEO | reached | 4 | 2 | 3 |
| DOE CESER emergency orders | mixed: index 404; order pages reached | 0 | 3 expirations checked | 0 |
| NNSA civilian pages | reached | 2 | 0 | 1 (cesium narrative extras) |
| Commerce / NIST / NOAA / ITA / Census sites | Commerce news reached; Census NPRM FR-primary | 0 | 0 | 2 (G20; ITA not recensus’d) |
| USDA department press | blocked 403 | — | — | — |
| FSA / Ranchers First | reached | 1 (AFT news; 1C-primary) | 1 (Sep 4 Ranchers First add-on) | 0 |
| Interior / BLM / USGS / FWS news | Interior empty in-window; NPR-A via FR | 0 | 0 | 1 |
| EPA newsroom | reached | 2 | 1 (WOTUS) | 3 |
| DOT / FAA / NHTSA / FRA / FHWA | FAA+DOT reached; FRA/FHWA news not separately hit | 2 | 0 | 3 |
| NASA news + SAM RFI | reached | 1 | 1 (Parker) | 3 |
| GSA news / per diem / OneGov | reached | 2 | 1 (per diem) | 1 |
| OPM adjudications / status / CHCO | reached | 0 | 1 (RIF page unchanged) | 1 (Open status) |
| NSF news | reached | 0 | 0 | 2 |
| NRC news / reactor status | reached | 0 | 1 (ISR FR fold) | 4 |
| FCC | FR rule retrieved in 1C; newsroom not used as discovery | 0 | 0 | — |
| Award systems (SAM/USAspending/FPDS) | not enumerated | — | — | bounded |
The service-site line is not opened. NNSA Y-12 / cesium objects are civilian DOE postings that happen to be nuclear-security industrial; Wave 2D owns a military census if opened.
Closed: yes for the named 2C publisher families above, with three access limits left visible: USDA department press 403, CESER 202(c) index 404, and no SAM/USAspending transaction census. Those are tool-path or scope bounds, not inactivity findings.
Sources
Full saved reading
View cited sources (22)
These are the sources cited by this reading. Each source keeps its own date and scope.
Document details and formats
About the dates and filing language
- Evidence date
- When this document or named claim was checked. A newer collection, export or website date does not update it.
- Current, private, Workbench or promotion
- These can describe the saved document’s original filing or custody. This public reading preserves that history; publication does not turn its findings into government approval, binding law or newly verified evidence.
- Master data and projection
- The maintained factual record and a page generated from it. Repeated views are not additional independent evidence.
- Provenance and source join
- Where a record came from, and the exact reference connecting a claim to its source.
- Gate, receipt and operating evidence
- A required decision or condition, its documentary record, and evidence that the named activity actually occurred. Permission, delivery and operation stay separate.
Saved research reading. Its original dates and claim limits control; the export date does not refresh the evidence.
Original title: Wave 2C — direct sites: operations, industry, security, science, and delivery