National security technology company-inference constitution
NSSTS company-inference constitution
As of: 2026-08-18
Applies to: every company node, role and relationship in the standalone NSSTS Technology-to-Company Map
1. Unit of analysis
The unit is an evidence-bearing path, not a company reputation:
CET family -> mission -> required capability -> federal owner or integrator -> anticipated instrument or access path -> typed company role -> exact legal entity
The company relationship is the forecasted edge. The other objects explain why the edge exists and what evidence would promote or defeat it.
2. Independent grades
FIT — technical and capacity relevance
| Grade | Meaning |
|---|---|
| 0 | No located capability match. |
| 1 | Broad adjacency or actor-claimed capability only. |
| 2 | Direct capability demonstrated, but not yet validated in the target mission. |
| 3 | Mission-relevant capability validated by a government, laboratory, regulator or named counterparty. |
| 4 | Qualified bottleneck or operating-scale capability with hard evidence at the relevant security, facility or production boundary. |
PATH — acquisition, funding and transition proximity
| Grade | Meaning |
|---|---|
| 0 | No public path to the target work. |
| 1 | General eligibility, market participation or consortium membership only. |
| 2 | Relevant federal vehicle, SBIR/STTR, OTA, CRADA, ACT agreement, test access or prior award. |
| 3 | Same agency or program office plus a live budget, RFI, BAA, RFA, NOFO, vehicle, test or transition path. |
| 4 | Named selection, team, negotiation, task order, agreement, award or operating relationship. The exact substate must still be preserved. |
PATH does not mean technical superiority. A selection for negotiation receives a high path grade while remaining legally distinct from an award, obligation, payment or delivered capability.
EVID — evidence quality
| Grade | Meaning |
|---|---|
| A | Formal government instrument, award record, regulator record or direct counterparty operating record. |
| B | At least two independent primary-source families, including a government or laboratory source. |
| C | One primary source or an actor-authored claim that has not been independently matched. |
| D | Secondary reporting or discovery-only material. |
3. Forecast labels
| Label | Minimum rule | Safe reading |
|---|---|---|
| CONFIRMED | PATH 4 with a named official instrument or operating relationship | The exact named state is confirmed; never shorten selection, negotiation or agreement to award. |
| STRONG INFERENCE | FIT at least 3, PATH at least 3, EVID A or B, and no hard blocker | The evidence supports a near-term role, but the target award or operation is not yet public. |
| SUPPORTED INFERENCE | FIT at least 2, PATH at least 2, EVID B or C | Both capability and a relevant federal bridge exist, but one or more transition gates remain. |
| PLAUSIBLE FIT | FIT at least 2, PATH 0 or 1 | The company could do the work; no current public contracting bridge has been established. |
| DISCOVERY ONLY | FIT 0 or 1, or EVID D | Candidate-generation only. |
| BLOCKED / CONTRADICTED | explicit eligibility, capacity, requirement, cancellation or down-selection conflict | Do not rank as a live candidate unless the blocker is removed. |
No company reaches STRONG INFERENCE from patents, hiring, lobbying, conference appearances, an investor presentation, a broad MOU or fame alone.
4. Official objects remain separate
Never merge these states:
- listed on an official page;
- member of a consortium;
- member-stated contribution;
- RFI respondent or market participant;
- project-team participant;
- selected for award negotiations;
- executed award or agreement;
- federal obligation;
- invoice or outlay;
- delivered system or completed milestone;
- agency acceptance or qualification; and
- production use.
Likewise, a reported aggregate partner commitment is not allocated to a company unless a primary source identifies the contributor, object, value and terms.
5. Signal priority
High-value signals
- same-office incumbent work in the same capability;
- agency-confirmed demonstration with a transition user;
- live budget line plus procurement forecast, sources sought, RFI, BAA, RFA, NOFO or consortium project call;
- vehicle or task-order access;
- follow-on milestone, down-selection, qualification or acceptance;
- a requirement matching a genuinely scarce capability; and
- an operating environment at the relevant classification, facility or production level.
Medium-value signals
- CRADA, ACT agreement or national-laboratory collaboration;
- SBIR/STTR, DIU, AFWERX, SpaceWERX or OTA project;
- federal user-facility access;
- construction, permitting, interconnection or manufacturing-capacity evidence;
- public-capital instrument tied to the relevant plant;
- clearance, cyber, export, quality or domestic-source readiness; and
- named customer qualification.
Discovery signals
- patents and publications;
- job postings;
- lobbying and advisory boards;
- conference panels;
- generic partnerships;
- venture-capital adjacency; and
- promotional language without an independent object.
Discovery signals may identify a candidate or timing clue. They do not prove a federal path.
6. Company and role identity
Every company node must resolve the best available legal performer identity. Keep separate:
- parent, operating subsidiary and project company;
- prime, subcontractor, supplier, investor, customer and facility owner;
- awardee, team member and consortium member;
- commercial brand and legal entity;
- U.S. entity and foreign parent; and
- announced site, financed site, constructed facility and operating facility.
Allowed company roles include:
- prime or integrator;
- platform, model or cloud provider;
- compute-system supplier;
- chip designer, foundry, packaging or photonics supplier;
- component or bottleneck supplier;
- manufacturer or facility operator;
- scientific instrument, robotics or test/measurement provider;
- data, provenance, identity or security provider;
- engineering software, simulation or digital-twin provider; and
- capital, offtake, power, cooling or logistics provider.
Laboratories, universities, FFRDCs, UARCs, nonprofits, investors, utilities and government agencies remain distinct entity types even when they appear on the same path.
7. Required disconfirmers
Every company edge must test at least these failure modes:
- the solicitation requirement does not match the product or maturity;
- no qualified capacity exists, or a facility slips;
- security, export, FOCI, FEOC or domestic-source rules bar participation;
- the named entity is only a parent, investor, customer or press-release partner;
- the vehicle is expired, inaccessible or owned by another program office;
- the agency selects a rival or different architecture;
- the program is canceled, rescoped or rephased;
- data-rights, open-interface or sovereign-hosting terms conflict with the offering;
- the demonstration lacks an acceptance authority or transition user;
- the commercial product is not cleared, qualified or fieldable; or
- financial distress, acquisition, supply dependency or customer-qualification failure changes the performer.
Absence of a public partnership is unknown, not no. Public silence may
reflect classification or timing, but it cannot be converted into positive
evidence.
8. Canonical record
Each forecasted edge must contain:
inference_id as_of cet_family mission required_capability federal_owner federal_program_or_facility anticipated_instrument company_legal_entity company_display_name company_role relationship_state fit_grade path_grade evidence_grade forecast_label supporting_signal_ids[] contrary_signal_ids[] missing_gate upgrade_trigger downgrade_trigger next_recheck expiry
Signals are separate dated records with source URL, source type, issuing party, exact claim, legal or operating state and the entity identities they support.
The registry is time-versioned. A forecast is never overwritten as if it had always been true; a later promotion, downgrade or expiry records a new state.
9. Visual grammar
The visual is a process map, not an organization chart:
sector -> capability / bottleneck -> federal demand / program -> company role -> company
- node color encodes sector or object type;
- node shape distinguishes government, program, company and facility;
- solid edge = verified official relationship;
- long-dashed edge = strong or supported inference;
- dotted edge = plausible or watch-only fit;
- muted red stop edge = explicit blocker or contradiction;
- edge labels use verbs such as
requires,funds,tests,qualifies,contracts_through,positioned_for,supplies,integratesandblocked_by; and - no edge is labeled merely
connected toorpartner.
The evidence drawer leads with:
- why the company fits;
- sector, capability and typed role;
- dated evidence chain;
- exact inference boundary;
- missing gate, promotion trigger and disconfirmers; and
- exact federal and source joins.
Federal Group entity names may be used only as exact deep-link keys. Companies remain outside the Federal Group topology and never inherit federal parentage.
10. Calibration
Before treating the model as predictive, back-test at least two known historical selections per wave using only evidence public before selection. Add at least two challenger companies per sector. The test should expose fame, incumbent and survivorship bias and show whether the selected indicators actually distinguish future performers from merely relevant companies.
11. Investment boundary
This is a federal industrial-capability and acquisition forecast, not an equity recommendation, valuation model or representation of future financial returns.
Sources
Full saved reading
View the saved source references. This record has no direct external citation in its source-link list.
Document details and formats
About the dates and filing language
- Evidence date
- When this document or named claim was checked. A newer collection, export or website date does not update it.
- Current, private, Workbench or promotion
- These can describe the saved document’s original filing or custody. This public reading preserves that history; publication does not turn its findings into government approval, binding law or newly verified evidence.
- Master data and projection
- The maintained factual record and a page generated from it. Repeated views are not additional independent evidence.
- Provenance and source join
- Where a record came from, and the exact reference connecting a claim to its source.
- Gate, receipt and operating evidence
- A required decision or condition, its documentary record, and evidence that the named activity actually occurred. Permission, delivery and operation stay separate.
Saved research reading. Its original dates and claim limits control; the export date does not refresh the evidence.