Skip to content

Entity-chart budget cards

Authorized by Katie on September 11, 2026: build the budget research into clickable cards inside the government entity chart.

Owners

The top toolbar opens the overall FY2027 comparison. Existing entity drawers expose a Budget card; covered entities open their own numbers, qualifications, related entities and sources. Uncovered entities explicitly show a research gap. A return button focuses the original chart entity. Proposed transfers do not change the tree hierarchy. Agency amounts must never be summed across overlapping parents/components or mixed measures.

Build and check

Run python3 '99 - Templates/add_entity_budget.py' from the Chronicle to rebuild. Use --check to verify the stored projection. The script is registered in the build manifest and synthesis conductor. --data and --html allow an isolated candidate; neither changes source authority.

The Workbench package is registered in Research Library under Public authority → Legal authority and institutions. Saving does not publish the package or rebuild the installed desktop app.

Validation status

Source review verified the April aggregate reconciliation and all 25 entity-name joins. Builder tests cover repeated injection, script escaping, duplicate joins, unknown citations and damaged markers; JavaScript syntax is checked. Live doctor and build results are recorded at completion below.

Browser preview was blocked by the browser tool's local-file URL policy. No alternate browser route was used to bypass that restriction; visual interaction QA remains a limitation.

Completion receipt — September 11, 2026

The live chart projection was generated and its freshness check passed. The build manifest is clean. Source tests and JavaScript syntax checks passed. The preparation layer includes OMB submission rules, planning documents, congressional-justification clearance/publication rules, and verified agency presentation examples.

The scheduled nightly refresh began at 20:10 Eastern; no competing full refresh or desktop-app build was launched. Installed-app delivery has not been verified. Global doctors still report unrelated vault/documentation issues, and Research Desk freshness awaits regeneration. Browser interaction testing remains unverified for the reason above.

Evidence-reading extension

The September 11 claim review adds Labor, HHS/AHA and Defense evidence notes and primary-source links to the factual input. The isolated chart projection generated successfully and four builder tests passed. These additions have not been separately generated into the live chart or verified in the installed app. The saved study links the maintained Claims and Evidence reading.

Justice–HHS evidence continuation: reviewed fraud-division staffing/model limits and cross-department HCFAC resource/return distinctions are now in BUDGET_DATA.json, including reciprocal Justice/HHS links and four primary sources. Isolated preview regenerated successfully; four existing projection tests passed. This receipt does not establish installed-app propagation or visual QA.

Education evidence continuation: three primary-reviewed notes (MEGA measurement, Work-Study measure reconciliation, IES comparator) and exact CJ links added to BUDGET_DATA.json. Isolated preview regenerated; all three note texts and three source URLs confirmed in output. Installed-app propagation and visual QA remain unverified.

Treasury DOSE reviewed comparison and policy-rationale notes added to existing Treasury card, with direct page-3 CJ route. Isolated preview regenerated and checked for both text and URL. Installed-app propagation and visual interaction remain unverified.

EPA electronic-manifest reviewed evidence note and direct source route regenerated into isolated preview; text presence verified. This does not verify live installation.

Latest isolated preview regenerated with CDC comparison note in HHS card. All source_ids in current card data resolve to declared sources; CDC note presence verified. This is structural verification only; installed-app and visual interaction checks remain open.

EPA Title42 study/proposal distinction regenerated in isolated preview; note and printed765 source route present. Installed-app and visual checks remain open.

Agriculture WIC evidence-timing note added and regenerated in isolated preview; text presence verified. Budget-proposal linkage remains explicitly open; installed application not verified.

Required seven-layer walkthrough — implementation gap

Live source inspection confirms the current entity renderer displays comparison tiles, legal notice, presentation entries, a flat list of evidence notes, funding records, and one pooled source list. It does not yet implement Katie’s requested layer-by-layer walkthrough. Existing notes and links must be retained when the canonical renderer is extended.

The required order and ownership are:

  1. Responsibilities: entity/program purpose and authority; distinguish overlapping parent/component scope.
  2. FY2026 comparator: amount, measure, accounting basis, source vintage and any current-estimate/enacted distinction.
  3. FY2027 proposal: requested amount and mechanism; account transfers, advance appropriations and credit limits remain explicit.
  4. Evidence and assumptions: claim-specific study/data links, methods, population, vintage, demonstrated reliance and open allocation bridge.
  5. Formation and presentation: agency planning inputs, OMB milestones, actual submission/presentation evidence and unresolved internal steps.
  6. Congress and legal funding: requested language, hearings, enacted authority and period of availability; a hearing is scrutiny unless evidence establishes earlier formative use.
  7. Implementation and open questions: historical results versus plans/targets, execution constraints, evidence gaps and follow-up sources.

Each layer needs its own notes and source links. Missing material must display an explicit research gap; existing flat notes must not be automatically assigned by keyword. Primary review must assign their layer and attach exact supporting sources. Shared budget-cycle entries can be linked from layer5 but must retain general-deadline versus actual-event labels. Pooled references remain useful as a complete source index, not a replacement for claim-level links.

Completion requires canonical template changes, regenerated chart projection, interaction verification where permitted, and installed-app delivery verification. The isolated preview and existing builder tests do not prove those requirements. No seven-layer UI completion is claimed by this specification.

Seven-layer staging implementation

The isolated renderer now displays seven expandable layers, with comparison fields routed to layers2/3, presentation entries to5, funding/legal records to6, and explicit gaps for unmapped material. Five primary-reviewed Defense notes have manual layer/source assignments in walkthrough_notes; other notes remain in an additional-notes disclosure and the complete source index is retained. No keyword-based note classification was used. Staging validator rejects invalid layer numbers or source-less mapped notes. JavaScript syntax and projection generation passed.

This supersedes the earlier statement that no renderer implementation exists, but does not complete the requirement: remaining notes need reviewed assignment, responsibilities and execution coverage remain incomplete, canonical template promotion and app delivery are pending, and visual interaction QA remains unverified. Current canonical templates are unchanged. The staged files are entity_budget.js, entity_budget.css, and add_entity_budget.py in _Working/federal-budget-2026-2027/.

Canonical seven-layer projection promoted — September 11, 2026, 23:00 ET pass

The three tested staging templates were promoted to their canonical 99 - Templates owners after exact pre-change byte checks. Originals are preserved in _Working/federal-budget-2026-2027/canonical-before-seven-layers/. The canonical Federal Group budget marker was regenerated; stripping that marker before/after proves all other authored/generated chart content remained identical. Canonical add_entity_budget.py --check passes and projection is idempotent. Five builder tests pass, including new layer/source validation.

This supersedes the earlier canonical-promotion-pending statement. It does not establish complete content mapping, visual interaction, Research Desk freshness, or installed-app delivery. Read-only doctors completed: vault reports one arc-map drift issue in test_front_page.py; docs reports36 issues including stale Research Desk/Library/file-index projections. Exit0 does not mean healthy for these doctors. No global HEALTHY or SYNTHESIS CLEAN claim is made. Output receipts: /tmp/budget-vault-check.txt, /tmp/budget-docs-check.txt (temporary).

Sources

Full saved reading

View the saved source references. This record has no direct external citation in its source-link list.

Document details and formats
Optional file downloads
For AI readers: complete text and record details
About the dates and filing language
Evidence date
When this document or named claim was checked. A newer collection, export or website date does not update it.
Current, private, Workbench or promotion
These can describe the saved document’s original filing or custody. This public reading preserves that history; publication does not turn its findings into government approval, binding law or newly verified evidence.
Master data and projection
The maintained factual record and a page generated from it. Repeated views are not additional independent evidence.
Provenance and source join
Where a record came from, and the exact reference connecting a claim to its source.
Gate, receipt and operating evidence
A required decision or condition, its documentary record, and evidence that the named activity actually occurred. Permission, delivery and operation stay separate.

Saved research reading. Its original dates and claim limits control; the export date does not refresh the evidence.