National security technology HIDDEN SUPPLY CHAIN CANDIDATE REGISTRY 2026-08-19
{
"title": "NSSTS Hidden Supply Chain Candidate Registry",
"as_of": "2026-08-19",
"purpose": "Track less-obvious companies positioned at engineering, commissioning, grid-control, cooling, storage, biomanufacturing, packaging and qualification seams without converting adjacency into a target-program award.",
"governance": {
"standalone_from_federal_group": true,
"vault_or_observatory_promotion_authorized": false,
"automatic_monitoring_active": false,
"investment_use": false,
"target_program_assignment_requires_primary_source": true,
"subsidiary_evidence_must_remain_with_exact_entity": true
},
"grade_scale": {
"fit": "1 weak to 4 direct technical fit",
"path": "1 capability adjacency; 2 prior or reusable acquisition path; 3 current operating position at target institution; 4 direct named federal award, team or field-demonstration path",
"evidence": "A primary federal, regulator, laboratory or counterparty record; B company-authored record with a checkable named project; C company or partner claim without an independently verified target edge"
},
"classifications": [
"current_operating_precedent",
"direct_federal_path_target_unassigned",
"adjacent_capability_candidate",
"controlling_noncompany_node"
],
"candidates": [
{
"id": "hidden-naes-corporation",
"entity": "NAES Corporation",
"parent_or_control": "100%-owned subsidiary of ITOCHU Corporation; intermediate ownership has included ITOCHU International Inc. and I-Power Investment Inc.",
"classification": "adjacent_capability_candidate",
"lanes": ["grid operations", "commissioning", "onsite power", "data-center power"],
"role": "Owner-side engineering, construction monitoring, commissioning, O&M, compliance and asset management on behalf of owners.",
"current_hook": "Operating energy-services platform with power-plant O&M, commissioning and grid-operations capabilities; ITOCHU reports NAES-group electrical construction for Amazon-owned data centers, and NAES reports completed advisory preparation to relocate three GE 6FB turbines for a 120 MW U.S. mega-data-center project.",
"fit": 3,
"path": 1,
"evidence": "B",
"missing_gate": "Named DOE, national-laboratory, Genesis, Argonne or federal AI-site O&M, commissioning, owner-engineer or onsite-power instrument and accepted operation.",
"disconfirmers": ["Role is held by the asset owner, EPC, utility, OEM or ITOCHU sibling rather than NAES", "Data-center record remains unnamed or advisory only", "Target requires hardware manufacture or greenfield transmission EPC rather than integration and operation"],
"sources": ["https://www.naes.com/about/", "https://www.naes.com/grid-operations/", "https://www.naes.com/project-services/", "https://www.itochu.co.jp/en/files/ITC241204_3_e.pdf"]
},
{
"id": "hidden-olsson-industrial-electric",
"entity": "Olsson Industrial Electric, Inc.",
"parent_or_control": "Wholly owned subsidiary of NAES Corporation",
"classification": "direct_federal_path_target_unassigned",
"lanes": ["federal power construction", "controls", "testing", "commissioning"],
"role": "Electrical construction and hydroelectric protection, control, excitation, installation, testing and commissioning.",
"current_hook": "Active USACE/BPA work at Libby Dam and Chief Joseph Dam, with McNary Dam controls history.",
"fit": 4,
"path": 2,
"evidence": "A",
"missing_gate": "Named Science Strategy, national-laboratory or AI-campus electrical, substation, controls or commissioning task and owner acceptance.",
"disconfirmers": ["Federal hydro experience does not translate to the target site's procurement vehicle", "Scheduled completion appears without a commissioning or acceptance record"],
"sources": ["https://www.defense.gov/News/Contracts/Contract/Article/3790490/", "https://www.usaspending.gov/award/CONT_AWD_W912DW24C0010_9700_-NONE-_-NONE-", "https://www.defense.gov/News/Contracts/Contract/Article/3993982/", "https://www.defense.gov/News/Contracts/Contract/Article/2530911/source/GovDelivery/"]
},
{
"id": "hidden-gridforce-energy-management",
"entity": "Gridforce Energy Management, LLC",
"parent_or_control": "Subsidiary of NAES Corporation",
"classification": "current_operating_precedent",
"lanes": ["balancing authority", "transmission operation", "control centers", "NERC compliance"],
"role": "BA/TOP, dispatch, switching, telemetry, outage coordination, restoration and secure remote control-center services.",
"current_hook": "NERC-certified operating entity with Houston primary and backup control centers; the 2024 public audit reported no potential noncompliance in scope.",
"fit": 4,
"path": 1,
"evidence": "A",
"missing_gate": "Site-specific BA, TOP, market-operations or reliability-services agreement for a named AI/science power system.",
"disconfirmers": ["NERC credentials do not establish procurement at a target site", "Gridforce is conflated with NAES or treated as operator of every NAES-served plant"],
"sources": ["https://www.nerc.com/globalassets/programs/organization-certification/approved-certification-final-reports/top-certification-of-gridforce-energy-management.pdf", "https://www.nerc.com/pa/comp/Audit%20Repots%20DL/NCR11393_GRID_WECC_Pub_2024_Both.pdf"]
},
{
"id": "hidden-greenberry-industrial",
"entity": "Greenberry Industrial LLC",
"parent_or_control": "Wholly owned subsidiary of NAES Corporation",
"classification": "direct_federal_path_target_unassigned",
"lanes": ["DOE/NNSA facilities", "nuclear QA", "critical power", "industrial utilities"],
"role": "Qualified fabrication, testing, backup-power systems, clean utilities and mechanical construction.",
"current_hook": "DOE and Bechtel records document fabricated, tested and delivered Hanford vessels, about 20 Vit Plant projects, a nuclear-environment UPS and follow-on work at LANL and Y-12.",
"fit": 4,
"path": 2,
"evidence": "B",
"missing_gate": "Named Genesis, Argonne or successor science-facility task, exact scope and accepted equipment or utility system.",
"disconfirmers": ["Past DOE/NNSA qualification does not confer a new task", "Exact work is performed by a different NAES family entity"],
"sources": ["https://www.energy.gov/em/articles/crews-safely-deliver-large-vessels-hanford-waste-treatment-plant", "https://www.hanfordvitplant.com/newsroom/greenberry-industrial-provides-crucial-equipment-for-vit-plant/"]
},
{
"id": "hidden-gecko-robotics",
"entity": "Gecko Robotics, Inc.",
"parent_or_control": "Independent company; strategic counterparty to NAES",
"classification": "adjacent_capability_candidate",
"lanes": ["plant reliability", "robotic inspection", "life extension"],
"role": "AI, robots, drones and sensors for inspection and plant modernization across NAES-managed assets.",
"current_hook": "NAES and Gecko announced a multi-year agreement above $100 million, with an option above $250 million.",
"fit": 3,
"path": 1,
"evidence": "C",
"missing_gate": "Named federal-science facility deployment with accepted capacity, availability or maintenance results.",
"disconfirmers": ["Commercial strategic agreement does not produce accepted site results", "No target federal path emerges"],
"sources": ["https://www.geckorobotics.com/news/naes-and-gecko-announce-100m-deal", "https://www.naes.com/naes-and-gecko-announce-100m-deal-deploying-ai-and-robotics-to-transform-the-american-power-grid/"]
},
{
"id": "hidden-bridgers-paxton",
"entity": "Bridgers & Paxton Consulting Engineers, Inc.",
"parent_or_control": "Independent company",
"classification": "direct_federal_path_target_unassigned",
"lanes": ["HPC cooling", "laboratory infrastructure", "electrical and controls"],
"role": "A/E engineering for secured scientific-compute cooling, power, plumbing and controls.",
"current_hook": "Current Sandia A/E partner; company record describes LANL Strategic Computing Complex exascale warm-water cooling with 33.2 MW available cooling and 22,760 GPM.",
"fit": 4,
"path": 4,
"evidence": "B",
"missing_gate": "Named Argonne, Genesis or successor laboratory-compute task and accepted new cooling capacity.",
"disconfirmers": ["LANL precedent is not an Argonne award", "Target architecture uses a different thermal design"],
"sources": ["https://www.sandia.gov/working-with-sandia/current-suppliers/construction-and-facilites/", "https://www.bpce.com/project/los-alamos-national-laboratory-strategic-computing-complex/"]
},
{
"id": "hidden-sargent-lundy",
"entity": "Sargent & Lundy Engineering Services Inc.",
"parent_or_control": "Sargent & Lundy corporate family; exact task entity must be preserved",
"classification": "direct_federal_path_target_unassigned",
"lanes": ["owner engineering", "substations", "SCADA", "commissioning"],
"role": "Owner-side power and cooling design review, interconnection, factory acceptance and commissioning oversight.",
"current_hook": "Current Sandia A/E partner and holder of a DOE SCMC shared A/E agreement.",
"fit": 4,
"path": 4,
"evidence": "A",
"missing_gate": "Task order joining the exact entity to Argonne, a Genesis center or a named AI-energy campus.",
"disconfirmers": ["DOE-wide vehicle access is mistaken for a task", "Corporate data-center capability is attributed to the wrong legal entity"],
"sources": ["https://scmc.energy.gov/news/discovering-infrastructure-opportunities-at-scmc-supplier-industry-day/", "https://www.sandia.gov/working-with-sandia/current-suppliers/construction-and-facilites/"]
},
{
"id": "hidden-burns-mcdonnell",
"entity": "Burns & McDonnell Engineering Company Inc.",
"parent_or_control": "Employee-owned company; exact listed A/E entity retained",
"classification": "direct_federal_path_target_unassigned",
"lanes": ["utility interconnection", "substation EPC", "SCADA", "commissioning"],
"role": "Mission-critical power, long-lead procurement, feeder commissioning and DOE facility delivery.",
"current_hook": "Current Sandia A/E partner; company DOE record includes data-center secondary-feeder commissioning.",
"fit": 4,
"path": 4,
"evidence": "B",
"missing_gate": "Named Genesis or Argonne task, exact scope and accepted energization.",
"disconfirmers": ["Sandia access is mistaken for Argonne access", "Company project history is mistaken for a new federal order"],
"sources": ["https://www.sandia.gov/working-with-sandia/current-suppliers/construction-and-facilites/", "https://info.burnsmcd.com/doe-project-delivery"]
},
{
"id": "hidden-emprimus",
"entity": "Emprimus LLC",
"parent_or_control": "Independent company",
"classification": "current_operating_precedent",
"lanes": ["transformer protection", "geomagnetic resilience", "field demonstration"],
"role": "Neutral-blocking devices protecting high-voltage transformers from geomagnetically induced current.",
"current_hook": "WAPA commissioned and energized an Emprimus device at White Substation and observed it operate as expected during a February 2023 G3 event.",
"fit": 4,
"path": 4,
"evidence": "A",
"missing_gate": "Repeat utility orders, qualified production and longer-duration fleet evidence.",
"disconfirmers": ["Single threat-specific installation is generalized to ordinary interconnection", "One event is treated as fleet acceptance"],
"sources": ["https://www.wapa.gov/protecting-the-grid-from-solar-storms/"]
},
{
"id": "hidden-ermco",
"entity": "Electric Research and Manufacturing Cooperative, Inc.",
"parent_or_control": "Independent cooperative",
"classification": "direct_federal_path_target_unassigned",
"lanes": ["distribution transformers", "power electronics", "storage"],
"role": "Distribution Transformer Extender developer.",
"current_hook": "DOE selected the exact entity for a $1.84 million FITT project.",
"fit": 3,
"path": 4,
"evidence": "A",
"missing_gate": "Executed assistance agreement, tested hardware, named utility installation and accepted performance.",
"disconfirmers": ["Selection does not mature into deployable equipment", "Device only complements conventional transformer supply"],
"sources": ["https://www.energy.gov/oe/articles/energy-department-advances-us-electric-grid-resilience-and-reliability-new-transformer"]
},
{
"id": "hidden-transforma-energy",
"entity": "Transforma Energy, Inc.",
"parent_or_control": "Independent company",
"classification": "direct_federal_path_target_unassigned",
"lanes": ["distribution transformers", "power electronics"],
"role": "Electronically controlled drop-in transformer developer.",
"current_hook": "DOE selected the exact entity for the $1.45 million DIRECT FITT project.",
"fit": 2,
"path": 4,
"evidence": "A",
"missing_gate": "Executed agreement, full prototype, independent testing and utility field acceptance.",
"disconfirmers": ["Proposed architecture does not reach mature hardware", "No manufacturing-scale or accepted utility product emerges"],
"sources": ["https://www.energy.gov/oe/articles/energy-department-advances-us-electric-grid-resilience-and-reliability-new-transformer"]
},
{
"id": "hidden-sel",
"entity": "Schweitzer Engineering Laboratories, Inc.",
"parent_or_control": "Employee-owned company",
"classification": "direct_federal_path_target_unassigned",
"lanes": ["protection relays", "synchrophasors", "inverter-rich grids"],
"role": "Protection, control and synchrophasor analytics.",
"current_hook": "Named NREL partner on DOE PROTECT-IT and separately recorded as a DOE synchrophasor-analysis performer.",
"fit": 4,
"path": 4,
"evidence": "A",
"missing_gate": "Published field results, accepted relay architecture and repeat deployment at named large-load sites.",
"disconfirmers": ["Research-team status does not transition into procurement", "No equipment supply edge reaches a target AI/science site"],
"sources": ["https://www.energy.gov/cmei/systems/solar-and-wind-grid-services-and-reliability-demonstration-funding-program", "https://www.energy.gov/oe/big-data-synchrophasor-analysis"]
},
{
"id": "hidden-sc-electric",
"entity": "S&C Electric Company",
"parent_or_control": "Independent company",
"classification": "current_operating_precedent",
"lanes": ["medium-voltage switching", "microgrids", "distribution protection"],
"role": "Automated switching and fault interruption.",
"current_hook": "DOE records an ongoing Fort Bragg microgrid demonstration using S&C IntelliRupter equipment.",
"fit": 4,
"path": 4,
"evidence": "A",
"missing_gate": "Completed demonstration results, accepted operating configuration and follow-on orders.",
"disconfirmers": ["One base demonstration is generalized to AI campuses", "No completed acceptance evidence is published"],
"sources": ["https://www.energy.gov/cmei/femp/2022-federal-energy-and-water-management-awards-winners"]
},
{
"id": "hidden-flexnode",
"entity": "Flexnode, Inc.",
"parent_or_control": "Independent company",
"classification": "direct_federal_path_target_unassigned",
"lanes": ["liquid cooling", "modular data centers"],
"role": "Prefabricated liquid-cooled modular micro-data-center developer.",
"current_hook": "Active ARPA-E COOLERCHIPS prime through January 2027.",
"fit": 3,
"path": 4,
"evidence": "A",
"missing_gate": "Independent evaluation, production design, accepted operating module and named federal workload.",
"disconfirmers": ["Modular edge design does not scale to a large center", "R&D does not reach production"],
"sources": ["https://arpa-e.energy.gov/programs-and-initiatives/search-all-projects/prefab-modular-liquid-cooled-micro-data-center"]
},
{
"id": "hidden-hrl",
"entity": "HRL Laboratories, LLC",
"parent_or_control": "Jointly owned by The Boeing Company and General Motors Company",
"classification": "direct_federal_path_target_unassigned",
"lanes": ["chip cooling", "advanced materials"],
"role": "Aligned-graphite microchannel cooling blocks for high heat flux.",
"current_hook": "Active ARPA-E COOLERCHIPS project.",
"fit": 3,
"path": 4,
"evidence": "A",
"missing_gate": "Evaluation results, manufacturing partner, rack-scale reliability and system insertion.",
"disconfirmers": ["Component R&D is mistaken for whole-facility cooling integration", "No production transition occurs"],
"sources": ["https://arpa-e.energy.gov/programs-and-initiatives/search-all-projects/aligned-graphite-microchannel-cooling-agmc-system-additively-manufactured-manifolds"]
},
{
"id": "hidden-wwt",
"entity": "World Wide Technology, LLC",
"parent_or_control": "Independent company",
"classification": "current_operating_precedent",
"lanes": ["HPC integration", "AI infrastructure", "Argonne"],
"role": "System integration for Argonne AI/HPC deployments.",
"current_hook": "Argonne names WWT as Minerva integrator and within its current NVIDIA/HPE deployment relationship.",
"fit": 4,
"path": 3,
"evidence": "A",
"missing_gate": "Disclosed Argonne center or American Science Cloud response, agreement, delivery and acceptance.",
"disconfirmers": ["Current deployment relationship does not extend to the new center", "Different prime or integration architecture is selected"],
"sources": ["https://www.alcf.anl.gov/news/argonne-expands-nation-s-ai-infrastructure-powerful-new-supercomputers-and-public-private"]
},
{
"id": "hidden-sambanova",
"entity": "SambaNova Systems, Inc.",
"parent_or_control": "Independent company",
"classification": "current_operating_precedent",
"lanes": ["AI accelerators", "Argonne testbed"],
"role": "SN40L inference platform available through ALCF.",
"current_hook": "Metis is deployed and allocation-accessible in the ALCF AI Testbed.",
"fit": 4,
"path": 3,
"evidence": "A",
"missing_gate": "Named center or American Science Cloud service instrument and accepted workloads.",
"disconfirmers": ["Testbed access does not transition", "Alternate accelerator standard is chosen"],
"sources": ["https://www.alcf.anl.gov/alcf-ai-testbed"]
},
{
"id": "hidden-cerebras",
"entity": "Cerebras Systems Inc.",
"parent_or_control": "Independent company",
"classification": "current_operating_precedent",
"lanes": ["AI accelerators", "Argonne testbed"],
"role": "Wafer-scale AI compute available through ALCF.",
"current_hook": "ALCF offers allocations on a Cerebras CS-3 system.",
"fit": 4,
"path": 3,
"evidence": "A",
"missing_gate": "Named future-center instrument, deployment and workload acceptance.",
"disconfirmers": ["Testbed system is not selected for the new center", "Future architecture excludes the platform"],
"sources": ["https://www.alcf.anl.gov/alcf-ai-testbed"]
},
{
"id": "hidden-groq",
"entity": "Groq, Inc.",
"parent_or_control": "Independent company",
"classification": "current_operating_precedent",
"lanes": ["AI inference", "Argonne testbed"],
"role": "Low-latency inference platform available through ALCF.",
"current_hook": "GroqRack is allocation-accessible in the ALCF AI Testbed.",
"fit": 4,
"path": 3,
"evidence": "A",
"missing_gate": "Named future-center or AmSC instrument and accepted workloads.",
"disconfirmers": ["Testbed presence does not transition", "Different inference architecture is selected"],
"sources": ["https://www.alcf.anl.gov/alcf-ai-testbed"]
},
{
"id": "hidden-vast-data",
"entity": "VAST Data, Inc.",
"parent_or_control": "Independent company",
"classification": "current_operating_precedent",
"lanes": ["scientific storage", "Argonne"],
"role": "Data platform underlying Argonne's Draco storage system.",
"current_hook": "Argonne reports Draco is based on VAST Data and remains in testing with networking and performance work underway.",
"fit": 4,
"path": 3,
"evidence": "A",
"missing_gate": "Production acceptance and named center-storage role.",
"disconfirmers": ["Testing or network performance fails acceptance", "Different storage architecture is selected"],
"sources": ["https://ar25.alcf.anl.gov/year-in-review/year-in-review"]
},
{
"id": "hidden-natcast",
"entity": "Natcast, Inc.",
"parent_or_control": "Purpose-built nonprofit operator; not an investment candidate",
"classification": "controlling_noncompany_node",
"lanes": ["advanced packaging", "NAPMP", "facility operation"],
"role": "Operator of NSTC prototyping and NAPMP piloting capabilities.",
"current_hook": "Final $1.1 billion award; planned co-location at ASU Research Park in Tempe with 2028 operating target.",
"fit": 4,
"path": 4,
"evidence": "A",
"missing_gate": "Final ASU site contract confirmation, construction, tool installation, baseline flows, operating readiness and qualified package transitions.",
"disconfirmers": ["Nonbinding site LOI does not reach final contract", "Construction, tool install or qualification is delayed"],
"sources": ["https://www.nist.gov/news-events/news/2025/01/us-department-commerce-announces-14-billion-final-awards-support-next", "https://www.nist.gov/news-events/news/2025/01/biden-harris-administration-announces-arizona-state-university-research", "https://natcast.org/assets/uploads/2025/08/NatcastInc_FS_Locked.pdf"]
},
{
"id": "hidden-absolics",
"entity": "Absolics, Inc.",
"parent_or_control": "Subsidiary of SKC Ltd.; exact U.S. award entity retained",
"classification": "direct_federal_path_target_unassigned",
"lanes": ["glass-core substrates", "advanced packaging", "qualification"],
"role": "Glass-core substrate prototyping, integration and validation.",
"current_hook": "Confirmed $100 million final NAPMP award around its Covington, Georgia low-volume facility.",
"fit": 4,
"path": 4,
"evidence": "A",
"missing_gate": "Validated prototype results, yield and reliability data, customer qualification and high-volume transition.",
"disconfirmers": ["Prototype results fail qualification", "Low-volume facility does not transition to scale"],
"sources": ["https://www.nist.gov/chips/absolics-inc-covington"]
},
{
"id": "hidden-solugen",
"entity": "Solugen, Inc.",
"parent_or_control": "Independent company",
"classification": "adjacent_capability_candidate",
"lanes": ["distributed biomanufacturing", "modular facilities", "DBPC"],
"role": "Multi-use modular production of dual-use chemical precursors.",
"current_hook": "DoD DBIMP planning-award precedent; no evidence of DBPC application or selection.",
"fit": 4,
"path": 2,
"evidence": "A",
"missing_gate": "APEx membership/application, named Hawaii team and site, selection and executed prototype agreement.",
"disconfirmers": ["Hawaii logistics, feedstock or utilities do not fit", "No applicant or selection evidence emerges"],
"sources": ["https://www.war.gov/News/Releases/Release/Article/3965368/dod-releases-final-nine-awards-for-distributed-bioindustrial-manufacturing-prog/", "https://www.techaccelerator.us/projects/apex-rwp-013"]
},
{
"id": "hidden-liberation-labs",
"entity": "Liberation Labs Holdings Inc.",
"parent_or_control": "Independent U.S. holding company; exact operating/award entity must be resolved",
"classification": "adjacent_capability_candidate",
"lanes": ["precision fermentation", "distributed biomanufacturing", "DBPC"],
"role": "Flexible industrial-scale precision-fermentation infrastructure.",
"current_hook": "DoD DBIMP planning-award precedent for Richmond, Indiana; no evidence of DBPC application or selection.",
"fit": 4,
"path": 2,
"evidence": "A",
"missing_gate": "Exact applicant entity, APEx/application record, Hawaii team and site, selection and prototype agreement.",
"disconfirmers": ["Fixed Indiana infrastructure does not translate to Hawaii", "Legal entity does not match the applicant or performer"],
"sources": ["https://www.war.gov/News/Releases/Release/Article/3965368/dod-releases-final-nine-awards-for-distributed-bioindustrial-manufacturing-prog/", "https://www.sec.gov/Archives/edgar/data/1952448/000195244825000001/xslFormDX01/primary_doc.xml", "https://www.techaccelerator.us/projects/apex-rwp-013"]
},
{
"id": "hidden-pinnacle-xray",
"entity": "Pinnacle Industrial X-Ray Laboratories, LLC",
"parent_or_control": "Exact project-agreement entity unresolved; award notice shortens the participant name",
"classification": "direct_federal_path_target_unassigned",
"lanes": ["additive manufacturing", "non-destructive inspection", "QTIME"],
"role": "Large-part industrial X-ray and NDI on the selected QTIME Topic 1 team.",
"current_hook": "America Makes names Pinnacle Industrial X-Ray Laboratory on Northrop Grumman's selected QTIME team.",
"fit": 4,
"path": 4,
"evidence": "A",
"missing_gate": "Exact agreement entity, work share, delivered NDI method, test results, government acceptance and transition-user adoption.",
"disconfirmers": ["Legal entity differs from the apparent company", "Selected-team work does not reach accepted qualification"],
"sources": ["https://www.americamakes.us/america-makes-announces-winners-of-qtime-project-call-worth-5m-in-funding/"]
},
{
"id": "hidden-applied-optimization",
"entity": "Applied Optimization, Inc.",
"parent_or_control": "Independent company",
"classification": "direct_federal_path_target_unassigned",
"lanes": ["additive manufacturing", "process qualification", "QTIME"],
"role": "Complex-part inspection, process modeling and prequalification on a selected QTIME team.",
"current_hook": "America Makes names the company on ASTRO America's selected Topic 2 team; separate America Makes history covers AM prequalification and model validation.",
"fit": 4,
"path": 4,
"evidence": "A",
"missing_gate": "Project work share, delivered method, test results, government acceptance and production adoption.",
"disconfirmers": ["Selected-team status is mistaken for completion", "Method fails transition-user acceptance"],
"sources": ["https://www.americamakes.us/america-makes-announces-winners-of-qtime-project-call-worth-5m-in-funding/", "https://www.americamakes.us/projects/5567-004-am-process-pre-qualification/"]
},
{
"id": "hidden-intact-solutions",
"entity": "Intact Solutions, Inc.",
"parent_or_control": "Independent company",
"classification": "direct_federal_path_target_unassigned",
"lanes": ["additive manufacturing", "simulation", "physical-test integration", "QTIME"],
"role": "Simulation and physical-test integration on RTX Technology Research Center's selected QTIME Topic 2 team.",
"current_hook": "Named participant on a selected America Makes QTIME team.",
"fit": 4,
"path": 4,
"evidence": "A",
"missing_gate": "Work-share agreement, delivered validation artifacts, government acceptance and transition-user adoption.",
"disconfirmers": ["Team selection does not reach delivered capability", "Validation does not transfer to a production user"],
"sources": ["https://www.americamakes.us/america-makes-announces-winners-of-qtime-project-call-worth-5m-in-funding/", "https://intact-solutions.com/company/"]
}
]
}
Sources
Full saved reading
View the saved source references. This record has no direct external citation in its source-link list.
Document details and formats
About the dates and filing language
- Evidence date
- When this document or named claim was checked. A newer collection, export or website date does not update it.
- Current, private, Workbench or promotion
- These can describe the saved document’s original filing or custody. This public reading preserves that history; publication does not turn its findings into government approval, binding law or newly verified evidence.
- Master data and projection
- The maintained factual record and a page generated from it. Repeated views are not additional independent evidence.
- Provenance and source join
- Where a record came from, and the exact reference connecting a claim to its source.
- Gate, receipt and operating evidence
- A required decision or condition, its documentary record, and evidence that the named activity actually occurred. Permission, delivery and operation stay separate.
Saved research reading. Its original dates and claim limits control; the export date does not refresh the evidence.