Amtrak Cascades Airo October 2026 completed trips and on-time performance
Full saved reading
View cited sources (6)
These are the sources cited by this reading. Each source keeps its own date and scope.
Saved research reading. Its original dates and claim limits control; the export date does not refresh the evidence.
Saved source details
---
title: Amtrak Cascades Airo October 2026 completed trips and on-time performance
status: current
artifact_role: answer
research_id: federal-government-fiscal-year-close-delta-2026-09-30
evidence_cutoff: 2026-11-11
source_posture: primary
---
Amtrak Cascades Airo October 2026 completed trips and on-time performance
The official records checked through November 11, 2026 did not establish whether more scheduled Amtrak Cascades trips were completed on time in October after Airo entered passenger service. Oregon’s public quarterly table ends in September 2026. The Federal Railroad Administration’s latest indexed quarterly route report, fiscal Q3, covers April through June 2026. Amtrak’s corporate monthly financial report index runs through September FY2026. Its October FY2026 entry covers October 2025. Establishing October 2026 service would require a dated trip log or report with scheduled and operated runs, cancellations and punctuality for matching routes and periods. Attribution to Airo requires equipment assignments for the runs. ODOT report, PDF pp. 1–2 and 5–7 · FRA report index · FRA Cascades profile, p. 27 · Amtrak reports index
Amtrak reported two Airo trainsets entering passenger service on September 30, 2026 on four daily scheduled services. Train numbers 503 and 508 run between Seattle and Eugene. Numbers 516 and 519 run between Seattle and Vancouver, British Columbia. The route fleet page corroborates the two-set start and records the fourth trainset arriving in Seattle on October 26, 2026. That update gives a fleet arrival. Oregon’s quarterly report says two trainsets on page 1 and three Airo trains entering revenue service on page 2. The report leaves that count discrepancy unresolved. Amtrak launch and schedules · Route fleet updates · ODOT report, PDF pp. 1–2
For the Portland–Eugene segment in July through September 2026, ODOT reported that 61% of customers arrived within 15 minutes of schedule. ODOT separately counted 182 trains operated in each direction. Of those, 58 northbound trains reached Portland more than 15 minutes late and 77 southbound trains reached Eugene more than 15 minutes late. The quarter includes the September 30 launch day and supplies no October or equipment-specific result. ODOT’s monthly ridership table sums to 40,464 for the quarter versus 40,334 a year earlier. The report’s summary describes 1% growth. The table and summary do not reconcile to that percentage. ODOT report, PDF pp. 1–2 and 5–7