Skip to content

NARA compute and infrastructure supplier map

Bottom line

NARA is not building its electronic-record and AI transition on one vertically integrated vendor. It is assembling a brokered, multi-cloud, hybrid stack:

The material control point is therefore not simply “which cloud?” It is the chain from NARA to its broker, hyperscaler, integrator, application and storage suppliers—and whether those layers preserve exportable, auditable records as the archive becomes more cloud- and AI-dependent.

Supplier topology

NARA / OCIO / Electronic Records Initiative
|
+-- cloud procurement rail: CTAC / PICARD BPA
|   |
|   +-- AWS IaaS and PaaS
|   |   +-- strongest disclosed compute substrate for ERA 2.0
|   |   +-- broader enterprise cloud workloads
|   |
|   +-- Microsoft Azure
|   |   +-- EOP 46 Presidential-record holding
|   |   +-- Azure AI and ML sandbox / A1 Museum AI route
|   |
|   +-- Google Cloud Platform
|       +-- development sandbox
|       +-- Vertex AI-linked archival experiments in NARA inventory
|
+-- archival and application operations
|   +-- Fearless Solutions: ERA 2.0 managed services and DevOps
|   +-- AccelGov: NITTSS enterprise program management and IT O&M
|   +-- Skylight: EOP 46, PERMA, AI-search and ERA-discovery work
|   +-- Hitachi Vantara / ThunderCat: EOP 46 storage-content components
|   +-- Cortina Productions: A1 Museum renovation and experience layer
|   +-- Forum One: Archives.gov redesign and migration
|
+-- enterprise software and user-facing AI
|   +-- DH Technologies -> Google Workspace Enterprise -> Gemini access
|   +-- Regan Technologies -> Microsoft enterprise subscriptions
|   +-- Carahsoft -> Alfresco Enterprise for ERA 2.0
|   +-- Regan Technologies -> RemedyForce
|   +-- Advanced Computer Concepts -> ServiceNow
|
+-- transport, local storage and hybrid infrastructure
    +-- Manhattan Telecommunications: EIS network and voice
    +-- ThunderCat -> NetApp maintenance
    +-- V3Gate -> switches and VMware
    +-- Alvarez -> F5 and Infoblox refreshes
    +-- GovSmart -> Sunbird DCIM
    +-- Sterling Computers -> network-monitoring SaaS

This is a responsibility map, not proof that every product is installed, accepted or serving every NARA workload. Reseller identity and underlying technology provider are preserved separately.

The cloud procurement rail: CTAC and PICARD

NARA awarded CTAC the single-award Platform and Infrastructure Cloud for Archives and Records Depositories (PICARD) blanket purchase agreement in

  1. Its published base-and-options value is $86 million, which is a

ceiling—not an obligation. The parent period of performance runs through

September 29, 2026.

The relevant cloud-platform calls located under PICARD total $47,169,095.24 in obligations:

Platform familyLocated callsObligationsWhat the public award record proves
AWS IaaS/PaaS5 annual calls$43,572,356.61AWS is by far the largest named PICARD platform family; the current $7,872,100 call ends September 29, 2026.
Azure for EOP 462 calls$3,327,750.00Azure is the named EOP 46 cloud platform; the current $1.4 million call runs through December 8, 2026.
GCP sandbox4 calls$174,535.83GCP sandbox capacity is a small but persistent experimentation rail; the current $60,000 call runs through July 26, 2027.
Azure AI/ML sandbox2 calls$94,452.80A small Azure AI/ML development lane existed; the most recent located call expired August 20, 2026 and no successor was located by cutoff.

This comparison is not a total-cloud-spend statement. It is the sum of the named platform calls located under the PICARD award family. It excludes application integrators, software licenses, network equipment and other contracts outside the BPA.

What the contract structure means

  1. Direct payee is not the compute owner. CTAC is usually the award recipient; AWS, Microsoft and Google are the underlying service providers.
  2. Multi-cloud is asymmetric. The disclosed AWS obligations dwarf the GCP and Azure-AI sandbox calls. Azure is more consequential when the separate EOP 46 production holding is included.
  3. Broker continuity is a control dependency. The parent PICARD BPA and current AWS call both end September 29, 2026. No public successor rail was located by the August 23 cutoff.
  4. Cloud portability is unproved. A second cloud provider, sandbox or alternative instance does not itself establish portable applications, portable data, tested exit procedures or equivalent operating capability.

Primary award objects: PICARD parent, current AWS call, current Azure EOP 46 call, and current GCP sandbox call.

Compute plane

AWS: dominant disclosed enterprise route

NARA's 2016 ERA 2.0 architecture briefing placed its development, pilot and to-be-production environments in AWS and described a custom Java/open-source application using cloud elastic compute and virtual workbenches. The current annual PICARD AWS order supplies enterprise AWS IaaS and PaaS through September 29, 2026.

The combined evidence makes AWS the strongest disclosed candidate for ERA 2.0's primary compute substrate. It does not prove:

Azure: Presidential records and a separate AI route

The Azure evidence is more workload-specific. Current awards identify Azure as the cloud platform for EOP 46, the electronic Presidential records of the 46th administration. A Hitachi Vantara award describes operations and maintenance for Hitachi components in the Azure-based Object Based Storage holding that contains Tier 1 EOP 46 records. Skylight task orders surround that holding with discovery, transfer, processing, security and performance work.

NARA's AI inventory also names Azure OpenAI in the A1 Museum project, while PICARD carried a small Azure AI/ML sandbox through August 20, 2026. The Cortina museum-renovation contract is much broader than AI, so its full value cannot be treated as Azure or model spend.

Google: Workspace AI and experimental archival workloads

There are two distinct Google paths:

Archive, application and operations plane

SupplierIdentified rolePublished obligation / current horizonProof boundary
Fearless SolutionsERA 2.0 managed services and DevOps$21,031,027.25; through Sep. 28, 2026Does not disclose accepted capabilities, SLA performance or a successor award.
AccelGovNITTSS program management, quality control and enterprise IT O&M$40,761,448.17; through Aug. 27, 2027Enterprise support is not dedicated AI compute.
SkylightEOP 46 core, transfer/processing, modernization; PERMA/AI-search and ERA discovery workMultiple task orders; core vehicle through Mar. 31, 2030Task-order descriptions do not prove launch, accuracy or complete project scope.
Hitachi VantaraO&M for Hitachi components in Azure-based EOP 46 object storage$1,026,612.20; through Jan. 5, 2027Does not allocate the award among storage, software and services.
ThunderCatHitachi HCP/HCI support; separate NetApp maintenance$171,000 EOP support through Jul. 31, 2027; $263,322.74 NetApp through Oct. 31, 2026ThunderCat is the award recipient/reseller, not the underlying manufacturer.
Cortina ProductionsA1 Museum and Learning Center renovation$5,978,807; ended Dec. 31, 2025NARA's inventory names Cortina/Azure OpenAI, but the full renovation value is not AI spend.
Forum OneArchives.gov redesign and migration$686,122.38; through Nov. 30, 2026Website migration does not prove general AI search launch.

Key award objects: Fearless ERA 2.0, AccelGov NITTSS, Skylight EOP 46 core, and Hitachi EOP 46.

Historical execution warning

NARA OIG's 2023 audit found that ERA 2.0 had been delayed and inadequately planned, lacked a complete overall program plan, schedule and baseline, and had incomplete documentation showing deliverable acceptance. The report described programming and development as outsourced and reported $94.577 million in ERA 2.0 costs from FY 2015 through FY 2022.

That is a historical audit finding. It is evidence for why acceptance records, baselines and contractor accountability matter; it is not proof that every finding remained unresolved at the August 2026 cutoff.

Storage, transport and hybrid infrastructure

NARA's budget documents show why cloud transition is not simply a model or search project. The agency has described on-premises storage as nearing capacity, staged more than 80 million files and nearly 2,000 TB in interim cloud storage for future ERA 2.0 ingest, and planned a second ERA 2.0 instance in an alternative cloud service provider with copies across regions.

The FY 2027 request retains that alternative-provider plan but rebases the published transfer targets sharply: the FY 2026 plan showed a 2026 target of 510 TB / 101 million files, while the FY 2027 plan shows 200 TB / 24 million files for 2026. The public documents reviewed do not state whether that change reflects scope, timing, measurement or another cause. It should be monitored as a target-definition or execution question, not labeled a failure without the supporting explanation.

The disclosed hybrid/local supply chain includes:

LayerDirect award recipientUnderlying technology / roleCurrent horizon
Network transportManhattan TelecommunicationsNARA EIS network and voiceJul. 15, 2027
On-prem storageThunderCatNetApp maintenance for NARANET/NISPOct. 31, 2026
VirtualizationV3GateVMware renewalJul. 4, 2027
SwitchingV3GateAccess/core-layer switchesSep. 12, 2026
Load balancingAlvarezF5 BIG-IP refreshAug. 30, 2026
DNS/DHCP/IPAMAlvarezInfoblox refreshSep. 6, 2027
Data-center managementGovSmartSunbird DCIMSep. 26, 2026
Network monitoringSterling ComputersUnnamed monitoring SaaSAug. 30, 2027

These awards prove procurement and published scope. They do not expose rack locations, owned-versus-colocation capacity, power providers, hyperscaler facilities, network topology, installation acceptance or workload placement.

Near-term contract and return-object watch

DateObjectWhy it mattersExact return object
Aug. 30, 2026F5 refresh order endsVery short refresh window at the hybrid edgeAcceptance record, extension or successor award
Sep. 7, 2026Skylight PERMA / NEEMO tasks endApplication discovery and processing lane may roll into a successor taskModification, completion/acceptance record or successor task order
Sep. 12, 2026Switch refresh endsPhysical/network modernization checkpointDelivery and acceptance or modification
Sep. 26, 2026Sunbird DCIM renewal endsLocal data-center management continuityRenewal or successor product/award
Sep. 28, 2026Fearless ERA 2.0 award endsPrimary disclosed ERA 2.0 DevOps/managed-services cliffSuccessor award, bridge, insourcing record or accepted closeout
Sep. 29, 2026PICARD BPA and current AWS call endCloud-broker and largest named platform lane expire togetherSuccessor vehicle/call, extension, migration or recompete outcome
Dec. 8, 2026Current Azure EOP 46 call endsPresidential-record hosting continuityRenewal/successor or accepted transfer to another rail
Dec. 14, 2026Google Workspace award endsGemini/Workspace enterprise routeRenewal, product change or separate AI license disclosure

No successor should be inferred from continued service, a solicitation, an option, or a new umbrella vehicle. The return object must identify the award or accepted operating change.

Observatory joins

This supplier map overlaps earlier Observatory research but adds a missing federal-customer layer:

  1. The data-center and compute buildout: existing work maps land, power, chips, facilities and sovereign-compute projects. NARA adds a demand-side institution whose archival mission is pushing records into hyperscale and hybrid storage without publicly exposing the underlying region, chip or facility map.
  2. The AI build-out: existing work tracks models, scientific compute and federal AI policy. NARA shows the documentary infrastructure underneath AI: search, ingest, metadata, preservation, logs and retention all depend on the cloud and contractor chain.
  3. Government control and evidence: NARA both depends on commercial platforms and sets the government-wide records boundary for AI material. Supplier contracts therefore become part of the evidence-control plane: custody, export, logging, retention and audit access matter as much as model performance.
  4. Concentration and transition risk: “multi-cloud” does not remove concentration. CTAC is a broker chokepoint; AWS is the largest named cloud lane; and workload-specific integrators hold operational knowledge above the hyperscalers.

What remains unresolved

The reviewed public record does not establish:

Safe material claim

NARA's electronic-record and AI transition is being supplied through a layered hybrid stack: CTAC brokers AWS, Azure and GCP capacity; AWS is the largest named cloud lane and the historically disclosed ERA 2.0 platform; Azure carries EOP 46; Google supports Workspace/Gemini and GCP/Vertex experiments; and specialist integrators and storage/network vendors operate the archival applications above and beside those clouds. Several of the largest disclosed continuity objects reach contract cliffs in September 2026, while the successor cloud and ERA 2.0 operating rails remain unresolved in the public award record reviewed through August 23.

Source shelf and method

The supplier ledger preserves direct recipient, underlying platform, award ID, period, value type, state, proof level and proof limit. Dollar figures are obligations unless explicitly labeled as a ceiling. Award dates and values were

checked against the official USAspending API,

whose last-update endpoint reported August 23, 2026 at the research cutoff.

Primary non-award sources:

Sources

Full saved reading

View cited sources (16)

These are the sources cited by this reading. Each source keeps its own date and scope.

Document details and formats
Optional file downloads
For AI readers: complete text and record details
About the dates and filing language
Evidence date
When this document or named claim was checked. A newer collection, export or website date does not update it.
Current, private, Workbench or promotion
These can describe the saved document’s original filing or custody. This public reading preserves that history; publication does not turn its findings into government approval, binding law or newly verified evidence.
Master data and projection
The maintained factual record and a page generated from it. Repeated views are not additional independent evidence.
Provenance and source join
Where a record came from, and the exact reference connecting a claim to its source.
Gate, receipt and operating evidence
A required decision or condition, its documentary record, and evidence that the named activity actually occurred. Permission, delivery and operation stay separate.

Saved research reading. Its original dates and claim limits control; the export date does not refresh the evidence.

Saved source details

---

title: NARA Compute and Infrastructure Supplier Map 2026-08-23

status: current

cutoff: 2026-08-23

artifact_role: supplier-control-map

disposition: retained-research-desk-reference

---