Skip to content

Direct sites: operations, industry, security, science, and delivery

Window: exclusive after 2026-09-11 16:01:37 EDT through frozen cutoff 2026-09-16 19:10:34 EDT
Inclusive replay: 2026-09-11 date-only publishers, then dedupe against Weekly Delta 2026-09-11
Discovery rule: official operational, technical, program, award, procurement, and library pages. Federal Register is not discovery. FR objects live in WAVE_1C_OPERATIONS_INDUSTRY_DELIVERY.md.
Not in this wave: full military/service census (Wave 2D). War/DOE industrial objects that landed on civilian sites may be noted.
Do not recensus: Genesis through 2026-09-09 15:40 EDT; Duane Arnold close; GSA OneGov ChatGPT announcement; FSA AFT as the Sep 3/4 object; Forest Service roadless; EPA RFS deadline.

Award ≠ obligation ≠ payment ≠ delivery ≠ operation. 403 ≠ missing.

Promotion-review objects (direct-site primary)

1. DOE CESER issued Order 202-26-44 keeping Centralia Unit 2 available

Covered as 1C object 6; repeated here because the controlling sources are the DOE newsroom and CESER order page, not FR.

Actor: Secretary Wright; TransAlta Centralia Generation, LLC

Clocks: issued 2026-09-11; effective 2026-09-13 through 2026-12-11. Replaces expired Order 202-26-28 (through 2026-09-12).

URL: news; order page

Disposition: promotion_review

Availability-to-operate order for a coal unit previously scheduled to retire end-2025. Dispatchers named: Gridforce Energy Management, LLC or SPP Western RC. No public MWh or EEA3 receipt on the order page.

Claim limit: Same as 1C. Order PDF linked; not independently hashed here.

2. EPA signed the 2024 power-plant carbon-standard partial repeal (newsroom + program page)

Covered as 1C object 5; controlling public announcement is epa.gov, FR book empty at freeze.

URL: news release; EGU GHG page

Disposition: promotion_review (same claim limits as 1C). Pre-publication PDFs listed; HTML of those PDFs not retrieved (JS shells on the listing pages).

3. CBP CSMS implemented the Sep 15 Canada §338 HTSUS change

Covered as 1C object 3; controlling operating source is CSMS, not FR.

URL: CSMS #69851916 — sent 2026-09-11 16:49 EDT (after the 09-11 freeze). Attachment: Section 338 Canada Modified HTS LIST eff 091526 (003) Final.docx (unread as line items).

Disposition: promotion_review. 122 added lines; named removals; 9903.03.15 now only with 9903.03.13.

4. USDA Rural Development opened ARC ($175 million) for rural nuclear and transmission

Covered as 1C object 8; controlling announcement is rd.usda.gov.

URL: RD release; program page

Disposition: promotion_review. LOI window Oct 19–Nov 20, 2026, 11:59 a.m. ET. NOFO ≠ loan.

5. FSA opened ARC/PLC enrollment after completing the ~30 million-acre base allocation

Covered as 1C object 9; controlling source is fsa.usda.gov.

URL: FSA 2026-09-15

Disposition: promotion_review. 2026 enrollment Sep 16–Dec 11; 2027 Nov 2, 2026–Mar 15, 2027. Notifications from Sep 16 via Login.gov. Not a payment.

6. DOE CMEI opened the $16 million PROSPECT Planning Prize

Actor: DOE Office of Critical Minerals and Energy Innovation; National Laboratory of the Rockies (American-Made)

Clocks: launched 2026-09-14; submissions due 2026-10-05. Up to $1 million per winner from a $16 million pool.

URL: CMEI prize news; PROSPECT page

Disposition: promotion_review as a prize opening, not a workforce trained.

University planning prize for mining/critical-minerals education pipelines. Funded under the larger (Aug 7) up-to-$100 million PROSPECT initiative. Prize ≠ selection ≠ students enrolled.

Claim limit: Opening ≠ winner ≠ graduate hired. Not the Sep 9 $73 million Mine of the Future selections (09-11 owned).

7. NSF opened a $20 million SBIR/STTR commercialization-readiness pilot and added X-Labs topics

Actor: NSF TIP; University of Central Florida NCTI as pilot administrator

Clocks: $20 million two-year pilot announced 2026-09-14; X-Labs additional topics 2026-09-16 (AI for Physical Systems live; From Sequence to Function and Computation at the Limit of Physics previewed). X-Labs RFI comments through 2026-10-30.

URL: SBIR pilot; X-Labs topics

Disposition: promotion_review as funding-opportunity / topic-opening objects.

Pilot is authorized under NSF SBIR/STTR Commercialization Readiness Pilot Program: commercialization funding, mentorship, investor connections, and evaluation of what works. X-Labs completes the CY2026 topic portfolio of the May $1.5 billion initiative. Neither is an award to a named company.

Claim limit: Pilot announcement ≠ small-business award. Topic invitation ≠ funded X-Lab. Sep 10 “golden age of science” letter remains 09-11 folded.

8. NRC proposed the reactor-licensing/oversight overhaul (direct-site primary)

Covered as 1C object 12. Discovery is the NRC 2026 news index; the story URL 403’d.

URL: NRC 2026 index — 09/11/2026, 26-077. Long Mott mandatory-hearing advisory 26-029-A (2026-09-14) is a hearing notice, not a COL.

Disposition: promotion_review as proposal. Primary PDF unread.

9. DOT announced $1.1 billion in airport grants, including runway-vehicle transmitters

Actor: USDOT / FAA; Secretary Duffy

Clocks: news 2026-09-14. Agency: record $10.9 million to equip 3,000 runway vehicles with transmitters at 61 airports, inside a $1.1 billion airport-upgrade package.

URL: transportation.gov press-releases index reached (press-releases); individual slug 403.

Disposition: promotion_review as an award-announcement with an access limit on the full release.

Keep the ladder: announcement ≠ obligation shown in FAA grant ledger ≠ installed transmitter ≠ NAS performance change. Distinct from the Sep 3 $481 million AIG package (09-03/09-11 fold).

Claim limit: Dollar figure is the department headline. Full grant list not retrieved.

10. Westinghouse eVinci reached criticality in a DOE/NNSA test (Sep 3 event; Sep 16 DOE post)

Actor: Westinghouse; Los Alamos / INL / NNSS / NCERC (NNSA facility in Nevada); DOE-NE as publisher

Clocks: criticality 2026-09-03 at 663 °C; peak 1,011 °C claimed as NCERC reactivity-measurement record. DOE-NE article 2026-09-16. Sep 3 is before exclusive start; the official DOE post is in-window.

URL: DOE-NE

Disposition: admit_lower_rank / promotion_review as a test-article criticality, not a commercial reactor.

Heat-pipe TRISO microreactor test article, not a licensed plant, not 5 MWe delivered, not a remote-community or data-center operation. Commercial design still prospective.

Claim limit: Test criticality ≠ NRC license ≠ deployed eVinci. Sep 3 physical event is out of exclusive start; treat the DOE publication as the in-window object.

These do not replace the FR / signed instruments. They confirm agency-site operation or implementation.

1C objectDirect-site confirmationLimit
Water-quality EOWH signed page + fact sheet reached. epa.gov, usda.gov, doi.gov, usace.army.mil no implementing grant, fee, or Corps project instrument retrieved in-windowRevocation ≠ rain-tax repeal
Procurement-reciprocity memoWH signed page + fact sheet reached. gsa.gov newsroom unchanged after 09-10; no FAR/GSAR textMemo ≠ delisting
Canada §338 entryCSMS #69851916 is the operating object (above). cbp.gov media releases in-window are enforcement/color, not HTSUSCSMS ≠ annex line-read
EPA fuel waiverFuel-waivers index content reached via search; HTML JS shell; Sep 8 PDF unreadSee 1C clocks
EPA power-plant repealNews + program page reached; PDFs listed not text-pulledSigned ≠ FR
FSA AFTfsa.usda.gov 09-03 page still the last explainer; effective Oct 1No earlier go-live
GSA OneGov ChatGPTGSA 09-10 release still newest AI vehicle news; Buy AI still lists ChatGPT Enterprise “$1 from now until Sep 2026” and the Oct 1 consumption agreement as expectedAnnouncement ≠ token burned
EO 14421 bulk-powerCESER webinar page still points to 2026-09-16 15:00–16:00 ET; RFI comments through Oct 9Webinar ≠ covered-equipment list
ITAR ASE correctionFR-primary; state.gov DDTC newsroom not separately requiredClerical
Boca Chica zoneFR-primary; FAA ATCSCC 09-13 plan lists Starship FLT-14 primary 09-18 as NAS planning, not the zone textPlan ≠ license

Existing-object clocks checked (not new atomics)

ObjectClock this windowResult
TransAlta 202-26-28through 2026-09-12Expired. Functionally succeeded by 202-26-44 (object 1), not extended.
DOE Order 202-26-442026-09-13 … 2026-12-11Live. New object.
Craig 202-26-31through 2026-09-26Still live. No new order page.
Stanton OUCthrough 2026-11-30Still live.
PJM 202-26-41 / Carolinas 202-26-43expired 2026-09-08Remain expired.
Duane Arnold closeSep 8 closeNo drawdown. EDF project page still “closed on an up to $1.9 billion loan” / “pending NRC licensing.” NRC DAEC page: draft EA comment ended Sep 2; final EA pending; licensing-decision target 2028-01-29.
FSA AFTeffective 2026-10-01No earlier operational object.
GSA OneGov ChatGPTexpected 2026-10-01Unchanged. GSA news releases table still tops out 09-10.
CESER bulk-power webinar2026-09-16 15:00–16:00 ETOccurred. RFI still open Oct 9.
NASA Space Academy RFIresponses 2026-10-26 18:00 EDTStill open. No site selection.
NASA Djibouti Artemis Accordsceremony 2026-09-14 11:00 EDT (advisory was 09-11)Signing in-window as scheduled (72nd). Advisory ≠ the signature; treat as clock completion, not a new Accords regime.
NASA Crew-13targeted “as soon as early October” as of 2026-09-16 ISS blogSlip is mission-status, not a new vehicle. Oxidizer-valve replacement on Dragon noted. Progress 96 launched 09-16 09:33 EDT; docking targeted 09-19.
EPA RFS 2025 reportsdue 2026-10-01Skip recensus.
Roadless NPRM commentsdue 2026-10-06Skip recensus.

Other direct-site objects reviewed and ranked down

Libraries / procurement / delivery pages

SurfaceResultNote
energy.gov newsroom / newsroom-legacyreached202-26-44, IAEA statement, PROSPECT prize, eVinci post; Duane Arnold/mining $73M still listed
energy.gov CESER 202(c) index doe-electricity-emergency-authorities404 (unchanged)Individual pages reached: 202-26-44 (new), Craig, Stanton. 202-26-28 page still describes the expired order
energy.gov/documents/doe-order-no-202-26-44linked from order pagePDF not hashed
energy.gov/edf/duane-arnoldreachedClose language unchanged
commerce.gov/news and /news/blogreached; empty in exclusive windowLast: G20 Sep 2–3
bis.doc.gov newsno in-window hitEmpty hunt
nist.gov newsno in-window hitEmpty hunt
census.govnot recensus’dNPRM remains 1C/09-11
usda.gov/about-usda/news/press-releases403 / Access DeniedSame block as 09-11. Not empty
rd.usda.gov newsroomreachedARC $175M Sep 14
fsa.usda.gov newsreachedARC/PLC Sep 15; AFT Sep 3 unchanged
doi.gov/news press releasesreached; empty in-windowLatest still pre-window
epa.gov newsreleases indexJS shellIndividual releases reached via search + known URLs
epa.gov/gasoline-standards/fuel-waiversJS shell; content via search indexSep 8 PDF unread
transportation.gov briefing-room / press-releasesindex reached; $1.1B slug 403SPACE/eVTOL remain 09-11
faa.gov newsroomtestimony reached; ADs are FRATCSCC plan reached (Starship FLT-14 NAS planning)
nasa.gov news-release / 2026-news-releasesreachedDjibouti clock, Crew-12 advisory, NFL update, Progress coverage
gsa.gov news releasesreachedNewest still 09-10 OneGov + Fort Worth
gsa.gov/artificial-intelligence/buy-aireachedOct 1 ChatGPT vehicle still “expected”; other OneGov prices listed
nsf.gov/newsreached$20M pilot; X-Labs topics
nrc.gov 2026 news indexreached26-077 row; story URL 403
nrc.gov DAEC plant pagereachedNo new restart authorization
cbp.gov newsroom / CSMSCSMS reached; media releases routineAnnex Word unread
whitehouse.gov presidential-actions / fact-sheetsreachedWater-quality EO; procurement memo
SAM.gov / USAspending / FPDSnot recensus’dBounded negative

Coverage receipt

Publisher familyStatusMissed (new)Enrichment / clockRoutine/reject
DOE newsroom / EDF / CMEI / CESER / NEreached3 (202-26-44, PROSPECT prize, eVinci post)2 (bulk-power webinar; Duane Arnold no-move)4 (IAEA remarks, Building America, ASPECT webinar, campuses page)
DOE CESER emergency ordersmixed: index 404; 202-26-44 page reached13 expirations/carries checked0
NNSA civilian pageseVinci via DOE-NE00test-article only
Commerce / NIST / NOAA / ITA / BIS / Census sitesCommerce empty; BIS/NIST empty; ITA via FR; NOAA SBEM out of start002
USDA department pressblocked 403———
FSA / Rural Developmentreached21 (AFT still Oct 1)0
Interior / BLM / USGS / FWS newsInterior empty in-window001
EPA newsroom / program pagesmixed: index JS; named releases reached21 (fuel waiver)5 (G20, MOU, NEEAC, wetlands, CCR news=FR)
DOT / FAA / NHTSA / FRA / FHWAindex reached; $1.1B slug 403103 (testimony, ATCSCC, firefighter NPRM is FR)
NASA news + blogsreached02 (Djibouti clock; Crew-13 slip)4
GSA news / Buy AI / OneGovreached01 (Oct 1 still expected)0
NSF newsreached21 (Sep 10 letter fold)1 (podcast)
NRC news / DAEC pageindex reached; story 40311 (DAEC no restart)2 (Long Mott/Belews advisories)
CBP CSMS / newsroomCSMS reached10media releases
Award systems (SAM/USAspending/FPDS)not enumerated——bounded

The service-site line is not opened. eVinci NCERC testing is a civilian DOE/NNSA facility posting; Wave 2D owns a military census if opened.

Closed: yes for the named 2C publisher families above, with access limits left visible: USDA department press 403; CESER 202(c) index 404; EPA news index and fuel-waiver page JS shells (named URLs reached); EPA power-plant and Sep 8 fuel-waiver PDFs unread; NRC 26-077 story 403; transportation.gov $1.1B slug 403; CBP annex Word unread; no SAM/USAspending transaction census. Those are tool-path or scope bounds, not inactivity findings.

Sources

Full saved reading

View cited sources (19)

These are the sources cited by this reading. Each source keeps its own date and scope.

Document details and formats
Optional file downloads
For AI readers: complete text and record details
About the dates and filing language
Evidence date
When this document or named claim was checked. A newer collection, export or website date does not update it.
Current, private, Workbench or promotion
These can describe the saved document’s original filing or custody. This public reading preserves that history; publication does not turn its findings into government approval, binding law or newly verified evidence.
Master data and projection
The maintained factual record and a page generated from it. Repeated views are not additional independent evidence.
Provenance and source join
Where a record came from, and the exact reference connecting a claim to its source.
Gate, receipt and operating evidence
A required decision or condition, its documentary record, and evidence that the named activity actually occurred. Permission, delivery and operation stay separate.

Saved research reading. Its original dates and claim limits control; the export date does not refresh the evidence.

Original title: Wave 2C — direct sites: operations, industry, security, science, and delivery