Military Modernization — Source Watchboard
Status: current saved source watchboard; no live watch or refresh implied
Cutoff: 2026-07-15; targeted FAST watch added 2026-09-25; targeted Project Meridian watch added 2026-09-30
Watch rule
Watch the entity that can move the clock. A speech does not move a contract; a contract does not move operational acceptance; a test does not move appropriation.
| Track | Authoritative sources | Clock moved | Promotion trigger |
|---|---|---|---|
| Department strategy/organization | White House presidential actions; Defense/War releases and memoranda; DoD/DoW CIO; CDAO | direction, charter, reporting line | signed directive, strategy, charter, reorganization or cancellation |
| Budget/funding | DoD Comptroller; service budget justification; Congress.gov; enacted appropriations | request, authorization, appropriation | exact programme line and legal funding state |
| Contracts | Defense contract releases; SAM.gov; service contracting commands | solicitation, award, modification, obligation | named entity, vehicle, value type, scope and period |
| JADC2/joint requirements | Joint Staff; Secretary memoranda; DoD CIO/CDAO | requirement, implementation, reform | new validation rule, responsible entity or joint baseline |
| Army NGC2 | Army news; CPE C2IN/C3N; ASA(ALT); Army budget books | prototype, baseline, validation, delivery | unit implementation, PC-C6 result, production/delivery decision, interface/data-right document |
| Right to Integrate | Army CTO/ASA(ALT); participating programme offices | interface validation, hardening, fielding | capability moves from hackathon result to operational deployment |
| DAF Battle Network/ABMS | DAF PEO C3BM; AFLCMC; Air Force budget books | architecture, programme delivery, operational node | named fielded node, operational acceptance or portfolio reorganization |
| Navy Overmatch/PAE MS | NAVWAR; DON CIO; Navy budget books; PAE releases | fleet installation, software delivery, entity integration | class/ship/unit fielding, operational validation, formal transfer document |
| PWSA | SDA releases, awards and On Orbit page; Space Force budget | award, launch, on-orbit, operational handoff | tranche completion, operational acceptance or new common-ground/interface state |
| Golden Dome | White House; Golden Dome office; MDA; SDA; Space Force; Comptroller | architecture, award, fielding | objective architecture, production award, test, operational element |
| SATCOM/PNT | Space Systems Command; Space Force; budget books | contract, launch, test, operational transfer, cancellation | MUOS/ESS/PTES/PTS/PNT delivery or operational state |
| Cloud/edge | DISA; DoD CIO; JWCC task-order notices; budget books | vehicle, task order, deployment | follow-on vehicle, classified-edge capability, exit/portability or operational deployment evidence |
| Zero trust/identity | DoD CIO; DISA; component CIOs; DODIG/GAO | deployment, compliance, audit | component-level evidence against FY2027 target |
| Data/AI | CDAO; AI strategy reports; contract releases; GAO/DODIG | demo, transition, contract, fielding | named six-month PSP result, transition user, operational authorization or scale |
| Maven | Army contracts; CDAO; operational-unit releases; test/evaluation | licence, user, fielding, model/application scope | unit/system state or contract/data-right change |
| Autonomy/Replicator | DIU; DoD releases; service programme offices; GAO | production, delivery, unit training, operational use | verified quantity/state, successor initiative or completion report |
| Counter-UAS | JIATF 401; Army; DHS/FAA for domestic seams; DODIG | entity, authority, capability delivery | task-force implementation, fielded system, domestic-authority change |
| NC3/continuity | STRATCOM/NC3 Enterprise Center; DISA; Air Force/Navy/Space Force budgets and contracts | development, terminal/satellite/aircraft delivery, operational acceptance | E-4C, E-130J, ESS or secure-services milestone |
| Acquisition reform | White House; A&S; service acquisition executives; Federal Register/DFARS | legal/process, portfolio transfer, cancellation | implementing regulation, portfolio reorganization, programme cancellation/selection |
| FAST / resource governance | Deputy Secretary; USW(C)/CFO; Military Departments; Joint Staff; Defense Agencies and Field Activities | review, recommendation, disposition, implementation, measured result | named Director/charter; target and recommendation; authorized acceptance/rejection; budget, contract, organization or personnel action; measured savings/readiness result |
| Project Meridian / future-warfare study | Secretary; DoW CTO; named partner organization; Joint Staff and services; Federal Register and GSA FACA database where applicable | commission, constitution, study, report, disposition, implementation | partner instrument; roster/governance/conflict controls; January 28, 2027 report; named government disposition; later requirement, budget, award, test or fielding receipt |
| Subterranean capability | DARPA; Army Futures Command/DEVCOM; ERDC; DTRA; CPE CBRND; service labs and acquisition offices | research, prototype, transition, acquisition, field use | integrated system or program with named owner; unit evaluation; map/PNT/network/hazard performance; production or fielding receipt |
| Oversight/failure | GAO; DODIG; DOT&E; congressional hearings | risk, delay, test failure, recommendation | accepted programme risk, schedule breach, failed test or cancellation |
Immediate watches
Project Meridian
- Identity of the partner organization and the agreement, charter, task order or other instrument used to commission it.
- Full roster, compensation, selection, records, security, intellectual-property and conflict/recusal rules.
- Federal Advisory Committee Act determination or listing if the final structure is a covered advisory committee; absence of a same-day listing is not dispositive.
- Joint Staff and service inputs, requests for information, meetings and interim products.
- Findings and recommendations due January 28, 2027; separate public-report publication from classified-annex custody.
- Named official disposition of each recommendation and any later requirement, funding, solicitation, award, test or fielding action.
- Keep Project Agincourt and the announced Autonomous Warfare Command on their own execution clock.
Subterranean domain
- Transition receipt for multi-robot autonomy, subterranean mapping, mesh communications or CBRN payloads into a named program and unit.
- Demonstrated GPS-free navigation accuracy and duration in a representative underground environment.
- A common interface for maps, confidence data, relay nodes and command systems across vendors.
- An operational evaluation that measures map accuracy, communications recovery, endurance, hazard detection and operator workload.
- Field-hardening and transition evidence for compact optical clocks, nonlinear inertial sensors, quantum sensors or deep-imaging systems.
- Rapid tactical-tunneling or robotic underground-logistics result beyond a completed research program.
- Evidence that the surface and underground force share one authoritative, versioned common operating picture.
FAST
- Named Director, charter, staffing, review criteria and target list.
- First recommendation and the official with authority to accept, reject or modify it.
- Separate budget, reprogramming, contract, directive, organization or personnel instrument implementing any accepted recommendation.
- Measured cost, cycle-time, delivery or readiness result against a stated baseline.
- Formal interface with the Performance Improvement Officer, CAPE, A&S, CIO and Inspector General.
- Evidence that the team does not duplicate the review layers it was created to reduce.
Army NGC2
- Project Convergence Capstone 6 result and whether the June baseline changes after validation.
- Delivery/fielding scope for 4th ID and 25th ID.
- Full interface, government-purpose-rights, data portability and cyber authorization terms.
- Whether Right to Integrate results become hardened operational releases.
2026 AI strategy
- Initial demonstrations due under the six-month clock.
- Named sponsors and transition users for Agent Network, Open Arsenal and Ender's Foundry.
- Whether “kill chain execution” remains decision support or crosses into new engagement governance.
- Evidence that component data catalogues were delivered and the seven-day denial/escalation mechanism is being used.
- Whether contracts actually require 30-day frontier-model refresh and prime-independent third-party integration.
Navy PAE Mission Systems
- Formal organization/charter documents showing which authorities and personnel actually transferred.
- First delivery decision issued by the new PAE.
- Overmatch fleet-installation and operational-readiness detail.
Space and Golden Dome
- Remaining PWSA Tranche 1 launches and initial warfighting capability declaration.
- AMDT3 delivery and launch readiness against the end-2028 statement.
- Golden Dome objective architecture, common ground system and battle-management integrator.
- PNT successor path after OCX cancellation.
Continuity
- E-4C aircraft conversion/delivery and test milestones.
- Evolved Strategic SATCOM satellites, terminals and operational transition.
- E-130J TACAMO delivery and mission-system integration.
- Any public NC3 cybersecurity, AI or automation governance document.
Commercial dependency
- JWCC follow-on acquisition and actual task-order distribution.
- Microsoft enterprise agreement ordering/obligation detail.
- Open DAGIR portability and government-data-right terms.
- multi-provider strategic SATCOM acquisition decisions.
Evidence that does not move a state by itself
- conference remarks;
- vendor press releases without government confirmation;
- a budget request without enactment;
- a ceiling without an order/obligation;
- a launch without on-orbit checkout;
- an exercise without a result;
- a demonstration without a transition user;
- “AI-enabled,” “secure,” “resilient” or “open” without a testable definition.
Sources
Full saved reading
View the saved source references. This record has no direct external citation in its source-link list.
Document details and formats
About the dates and filing language
- Evidence date
- When this document or named claim was checked. A newer collection, export or website date does not update it.
- Current, private, Workbench or promotion
- These can describe the saved document’s original filing or custody. This public reading preserves that history; publication does not turn its findings into government approval, binding law or newly verified evidence.
- Master data and projection
- The maintained factual record and a page generated from it. Repeated views are not additional independent evidence.
- Provenance and source join
- Where a record came from, and the exact reference connecting a claim to its source.
- Gate, receipt and operating evidence
- A required decision or condition, its documentary record, and evidence that the named activity actually occurred. Permission, delivery and operation stay separate.
Saved research reading. Its original dates and claim limits control; the export date does not refresh the evidence.