Physical Production Systems Full-Surface Wave — August 4, 2026
This package merges bounded full-publishing-topology sweeps of USDA, Interior, EPA, DOE and NRC. It uses the August 1 whole-site recertification as its baseline and does not re-promote objects already captured there.
Result
The highest-priority live change is DOE Order 202-26-37A. DOE added the August 3 extension to its official SPP order page while this wave was in progress, superseding the earlier finding that the July 26 order had expired without a visible successor. The extension now runs from August 4 through August 10.
The other material objects are USDA's FY2026 PART Energy procedural opening, EPA's Oklahoma new-source-review SIP rule becoming effective, DOE's Gulf LNG export-commencement extension, APHIS's new Mexico NWS travel-document regime and Interior's Arctic exploratory-drilling proposal. The Arctic proposal's Federal Register publication identity and exact comment deadline remain unresolved and are not inferred.
Read order
— findings, clocks, entity coverage, bounded negatives, access gaps and watchboard.
— controlling baseline used for deduplication.
Method boundary
- Material parent, bureau and non-news publishing surfaces were tested without
bulk document downloads.
- Announcement, publication, legal effect, authorization, award, obligation,
physical activity, delivery and observed outcome remain distinct.
- Dynamic, blocked, delayed or weakly indexed public systems are named as
access gaps.
- The report is complete for the enumerated sweep contract, not a claim that
every endpoint on every federal server was inspected.
No live-vault object has been changed.
Sources
Full saved reading
View the saved source references. This record has no direct external citation in its source-link list.
Document details and formats
Saved research reading. Its original dates and claim limits control; the export date does not refresh the evidence.
Saved source details
---
title: Physical Production Systems Full-Surface Wave — August 4, 2026
status: pending-human-review
artifact_role: research-package-router
opened: 2026-08-04
evidence_cutoff: 2026-08-04 ET
vault_landings: []
---