Skip to content

Ustda project decision gate ledger

project_id,published_on,country_or_market,project,recipient_or_sponsor,selected_us_contractor,current_state,upstream_work_product,policy_or_procurement_surface,next_public_receipt,claim_limit,official_source
ustda-rmi-ports,2026-09-21,Marshall Islands,Majuro and Ebeye port modernization,Marshall Islands Ports Authority,Valentine Enterprises LLC,technical_assistance_contractor_selected,"conceptual designs; demand forecast; customs and security recommendations; phased roadmap","port capital plan; customs and security design; financing; equipment and works procurement","accepted roadmap; financing commitment; works or equipment award","does not prove financed or completed port upgrades",https://ustda.gov/ustda-backs-marshall-islands-port-modernization-to-strengthen-pacific-trade-and-supply-chains/
ustda-lobito-power,2026-09-22,DRC and Zambia,Lobito Corridor electrification,Anzana Electric Group Limited,,active_rfp_closes_2026-10-26,"expansion plan; U.S. supply map; draft legal documents; business plan; DRC system and mining-demand assessment; Zambia EPC tenders and five ESIAs","utility structure; permits and safeguards; EPC procurement; project financing","contractor award; accepted study; permits; financing close; EPC award","does not prove contractor selection construction or power delivery",https://ustda.gov/business_opp_oversea/lobito-corridor-electrification-project-feasibility-study/
ustda-turkiye-smr,2026-09-22,Türkiye,Small modular reactor deployment framework,Türkiye Nükleer Enerji Anonim Şirketi,,agreement_signed_rfp_future,"regulatory institutional and financial roadmap; policy and investment steps; U.S. design review","Ministry and nuclear-regulator procedures; institutional allocation; financing and technology screening","RFP and contractor; adopted rules; license or technology decision","does not prove a reactor selection license build or generation",https://ustda.gov/ustda-accelerates-turkiyes-path-to-small-modular-reactor-deployment/
ustda-drc-refinery,2026-09-23,DRC,Buenassa copper-cobalt refinery,Buenassa Resources S.A.,,agreement_signed_rfp_future,"feedstock assessment; technical refinery design; economic and financial parameters","feedstock strategy; project sizing; bankability; equipment and process procurement","RFP and contractor; feedstock contract; finance; permit; equipment award","does not prove a financed permitted or operating refinery",https://ustda.gov/ustda-funds-critical-mineral-refinery-in-the-drc/
ustda-nigeria-afridata,2026-09-23,Nigeria,AFRIDATA Lagos and Delta AI-ready data centers,INFRAGORA Global Capital (Pty) Ltd,,active_rfp_closes_2026-10-13,"technical and commercial feasibility; bankability; product-market fit; U.S. vendors; regulatory risk; financing requirements","SPV and strategic-operator design; vendor shortlist; financing; capacity and service model","contractor award; operator or finance commitment; power/connectivity contract; construction","does not prove financed built or operating compute capacity",https://ustda.gov/business_opp_oversea/afridata-nigeria-data-center-feasibility-study/
ustda-vietnam-stavian,2026-09-23,Vietnam,Stavian Digital Park AI data center campus,Stavian Hightech Infrastructure JSC,Cushman & Wakefield Inc.,feasibility_contractor_selected,"procurement framework; financial model; master plan; power cooling and connectivity; secure-equipment criteria","financing; campus design; customer and equipment eligibility; vendor procurement","accepted study; financing; hyperscaler commitment; construction or commissioning","does not prove financing customers construction or operation",https://ustda.gov/ustda-advances-major-ai-data-center-campus-in-vietnam/
ustda-ecuador-power,2026-09-25,Ecuador,Private power-generation regulatory framework,Agency for the Regulation and Control of Electricity (ARCONEL),The Innovation Network LLC,technical_assistance_contractor_selected,"regulatory assessment; international comparison; workshops; recommended regulations; adoption roadmap","ARCONEL regulations and procedures; private-generation approvals; equipment grid and cyber procurement","adopted and published regulation; licensed project; investment or capacity receipt","does not prove adoption investment or added generation",https://ustda.gov/ustda-partners-with-ecuador-to-expand-private-investment-in-power-generation/

Sources

Full saved reading

View the saved source references. This record has no direct external citation in its source-link list.

Document details and formats
Optional file downloads
For AI readers: complete text and record details
About the dates and filing language
Evidence date
When this document or named claim was checked. A newer collection, export or website date does not update it.
Current, private, Workbench or promotion
These can describe the saved document’s original filing or custody. This public reading preserves that history; publication does not turn its findings into government approval, binding law or newly verified evidence.
Master data and projection
The maintained factual record and a page generated from it. Repeated views are not additional independent evidence.
Provenance and source join
Where a record came from, and the exact reference connecting a claim to its source.
Gate, receipt and operating evidence
A required decision or condition, its documentary record, and evidence that the named activity actually occurred. Permission, delivery and operation stay separate.

Saved research reading. Its original dates and claim limits control; the export date does not refresh the evidence.