Status: current Cutoff: 2026-09-30 ET

IDClaimRulingCorrection
FA-01Every U.S. military base will be energy self-sufficient.OverstatedAccessible announcement says every major installation should generate independent power; scope and technical meaning remain undefined.
FA-02All major installations are already independent.FalseProgram establishment is not site delivery.
FA-03“Independent power” means permanently off-grid.FalseExisting microgrid strategy is normally grid-connected with island capability. Complete off-grid design is stated for the separate Next Great American Base.
FA-04FORTRESS covers only electricity.Not establishedAnnouncement uses power/energy language; §2920's energy definition also includes natural gas, steam, chilled water and heated water. Implementation must say what FORTRESS includes.
FA-05“Major installation” obviously means all bases.FalseCurrent statutory planning usage points to BSR “large sites”; the release does not publish a FORTRESS list.
FA-06The 99.9% statute requires every installation's full load.FalseIt covers the load required for critical missions.
FA-0799.9% availability equals multi-day island endurance.FalseAnnual availability and continuous outage endurance are different measures.
FA-08Net-zero proves outage resilience.FalseAnnual energy accounting does not prove start, transfer, islanding, fuel or load-carrying performance.
FA-09A microgrid automatically creates independent power.FalseGeneration, storage, controls, distribution, fuel, operator, cyber protection and tested islanding must work together.
FA-10On-base generation is government-owned.FalseUtility, lease, PPA and contractor-owned models can locate assets on military land.
FA-11The six Army SCI selections are completed plants.FalseThey are conditional lease-solicitation awards; agreements, finance, construction and tests remain.
FA-12Janus means five operating Army reactors.FalseVendor/site selection begins milestone paths; licensing/authorization, construction, criticality and power delivery remain.
FA-13Project Pele will power a named base.False at cutoffIt is a transportable prototype demonstration at INL.
FA-14Fort McCoy and Sigonella prove entire bases can run 14 days.FalseThe public scopes are the Main Gate/nearby facilities and DLA tenant facilities respectively.
FA-15MCAS Miramar's 21-day design statement means a 21-day full-base test occurred.Not establishedPublic material separately describes design capacity and a mission-critical islanding exercise.
FA-16FYDP alignment means the program is funded.FalseProgramming is not appropriation, transfer, obligation, executed agreement or payment.
FA-17FORTRESS created the military's first installation-energy policy.FalseStatute, plans, project finance, microgrids and exercises predate it. The new object is central synchronization.
FA-18One successful black-start test proves sustained readiness.FalseMaintenance, trained operators, fuel, cyber posture, recurring exercise and changed loads remain.

Negative findings

Sources

Full saved reading

View the saved source references. This record has no direct external citation in its source-link list.

Document details and formats
Optional file downloads
For AI readers: complete text and record details

Saved research reading. Its original dates and claim limits control; the export date does not refresh the evidence.