National security technology Phase 5 Program-Dossier Constitution
NSSTS Phase 5 Program-Dossier Constitution
Evidence cutoff: 2026-08-18
Status: active workbench research method
Boundary: standalone from the Federal Group; no vault or Observatory promotion authorized
Controlling shift
Waves 1–4 ask which companies are positioned to support the technology buildout. Phase 5 reverses the lens. The controlling object is a federal program, portfolio, facility, solicitation, project call or operating acquisition surface. Companies join only through evidence-bearing positions inside that object.
mission demand -> exact federal owner and program office -> budget / authority / acquisition instrument -> public requirement and contender field -> award, task or negotiation state -> facility and capacity dependencies -> test, authorization and qualification -> accepted operation or production
This phase does not rank companies. It asks which public evidence can and cannot distinguish an eventual performer, transition or acceptance outcome.
Program object types
| Type | Meaning | Required boundary |
|---|---|---|
market_research | RFI, sources sought or industry engagement | not a solicitation or selection |
operating_surface | deployed environment or active service | operating state does not disclose every task, workload or physical site |
rd_program | research, piloting or prototyping program | R&D award is not high-volume production |
parallel_project_portfolio | multiple independently selected projects | parallel awardees are not one winner or one architecture |
open_project_call | closed or open call with no public selection | possible participants are discovery candidates, not applicants |
production_program | production contract or incumbent successor build | production award is not delivery or acceptance |
prototype_program | funded prototype, OTA or demonstration | prototype selection is not production transition |
modernization_portfolio | related subprograms with distinct instruments | do not merge design, prototype and production clocks |
Program record
Every program dossier must carry:
- stable
program_id, exact public name and program-object type; - mission, sector, federal owner and program office;
- named authority, solicitation, vehicle, award or operating instrument;
- current state and the exact acceptance terminus;
- canonical company-edge joins;
- typed performer and contender positions;
- facility and site joins with independent evidence state;
- budget, acquisition, eligibility, authorization and test gates;
- adverse evidence and unresolved competition information;
- shared-rail and monitoring joins;
- dated promotion and downgrade tests; and
- a calibration posture describing what public evidence could have predicted.
Performer and contender states
The following states are mutually distinct:
operating_performer— named in an operating federal environment;production_awardee— holds a production contract or order;prototype_awardee— holds a funded prototype instrument;rd_awardee— holds a named research, pilot or qualification project;design_pool— received a design or study order before a later selection;named_system_partner— officially named in a system build, but task or
workshare may remain undisclosed;
eligible_incumbent— has relevant vehicle or same-office access without a
named current task;
supported_candidate— has both relevant capability and an evidenced
acquisition bridge, but no public selection;
plausible_candidate— technical fit exists without a live acquisition
bridge;
discovery_only— surfaced by adjacency, membership, hiring, patents or
company claims only; and
not_publicly_identified— the role, site, signatory or applicant field is
not disclosed.
The record must not call every position a competitor. Parallel awardees, incumbents, suppliers, design-pool members and undisclosed applicants are different objects.
Facility joins
A company role and a physical facility are calculated independently. Each facility join uses one of four states:
verified_program_site— the program source names the site;verified_company_capability_site— an official company or government record establishes relevant capacity, but the program does not name the site;planned_or_building_site— agreement, construction or expansion exists without commissioned program output; orundisclosed_or_unresolved— the public record does not locate the relevant workload, manufacturing, integration or test site.
Announced, financed, constructed, commissioned, qualified and accepted are separate facility clocks. A company job posting can discover a site but cannot promote it to a program site without a stronger join.
Acquisition and acceptance gates
The program path is never compressed. Preserve at least these objects when they apply:
budget request -> appropriation / allocation -> market research -> solicitation or project call -> selection / negotiation -> executed award or order -> obligation -> design review -> build or integration -> independent test / ATO / qualification -> delivery -> acceptance -> production option or recurring service
A ceiling is not an obligation. An IDIQ is not a task. Selection for negotiation is not an award. Installation is not acceptance. Launch is not checkout. A prototype is not a production program.
Eligibility membrane
Each dossier must test, where material:
- exact CAGE, UEI and legal signatory;
- vehicle and program-office access;
- facility clearance and classified-data authorization;
- ATO, cross-domain, identity and sovereign-hosting requirements;
- FOCI, FEOC, 1260H, export-control and foreign-parent exposure;
- Buy American, specialty-metal, domestic-source and origin requirements;
- cybersecurity, quality, safety and mission-assurance certification;
- novation, acquisition, subsidiary and beneficial-ownership changes; and
- data-rights, open-interface and government-purpose-rights requirements.
An unknown is a missing gate, not a negative finding.
Calibration
Back-tests use only evidence public before the selection event. Each case must state:
- the public candidate or design pool, when known;
- the later selected entities;
- the signals available before selection;
- the signals that were nonpublic or not differentiating;
- whether the model would have found the selected field; and
- whether the result exposes fame, incumbent, survivorship or false-precision bias.
Calibration quality is:
strongwhen the public predecision field and outcome are both known;partialwhen selected entities and relevant signals are known but the full applicant or evaluated field is not; ornot_calibratablewhen the public record lacks the predecision comparison set or decision object.
The model succeeds if it identifies a bounded serious field and preserves uncertainty. It is not required to guess a winner from information the agency did not publish.
Visual grammar
- program or acquisition object: federal/instrument node;
- company: private exact-entity node outside the Federal Group;
- facility: separate site node;
- test or acceptance event: gate node;
- solid edge: named official relationship;
- long dash: supported candidate or company-capability-site join;
- dotted edge: plausible or discovery-only position;
- red stop edge: cancellation, failed test, exclusion or explicit contradiction.
Every edge uses a verb: solicits, selects, awards, tasks, operates,
builds_at, tests_at, qualifies, positioned_for, depends_on or
blocked_by. Never use generic connected to or partner.
Promotion boundary
Phase 5 remains a research and calibration object. It does not join the Federal Group, activate monitoring, make an award prediction, establish an undisclosed supplier relationship or constitute investment advice. Canonical Wave 1–4 company edges remain authoritative for company relationships; Phase 5 adds the program-centered acquisition, facility and calibration views.
Sources
Full saved reading
View the saved source references. This record has no direct external citation in its source-link list.
Document details and formats
About the dates and filing language
- Evidence date
- When this document or named claim was checked. A newer collection, export or website date does not update it.
- Current, private, Workbench or promotion
- These can describe the saved document’s original filing or custody. This public reading preserves that history; publication does not turn its findings into government approval, binding law or newly verified evidence.
- Master data and projection
- The maintained factual record and a page generated from it. Repeated views are not additional independent evidence.
- Provenance and source join
- Where a record came from, and the exact reference connecting a claim to its source.
- Gate, receipt and operating evidence
- A required decision or condition, its documentary record, and evidence that the named activity actually occurred. Permission, delivery and operation stay separate.
Saved research reading. Its original dates and claim limits control; the export date does not refresh the evidence.