Skip to content

National security technology Phase 5 Program-Dossier Constitution

NSSTS Phase 5 Program-Dossier Constitution

Evidence cutoff: 2026-08-18
Status: active workbench research method
Boundary: standalone from the Federal Group; no vault or Observatory promotion authorized

Controlling shift

Waves 1–4 ask which companies are positioned to support the technology buildout. Phase 5 reverses the lens. The controlling object is a federal program, portfolio, facility, solicitation, project call or operating acquisition surface. Companies join only through evidence-bearing positions inside that object.

mission demand
  -> exact federal owner and program office
  -> budget / authority / acquisition instrument
  -> public requirement and contender field
  -> award, task or negotiation state
  -> facility and capacity dependencies
  -> test, authorization and qualification
  -> accepted operation or production

This phase does not rank companies. It asks which public evidence can and cannot distinguish an eventual performer, transition or acceptance outcome.

Program object types

TypeMeaningRequired boundary
market_researchRFI, sources sought or industry engagementnot a solicitation or selection
operating_surfacedeployed environment or active serviceoperating state does not disclose every task, workload or physical site
rd_programresearch, piloting or prototyping programR&D award is not high-volume production
parallel_project_portfoliomultiple independently selected projectsparallel awardees are not one winner or one architecture
open_project_callclosed or open call with no public selectionpossible participants are discovery candidates, not applicants
production_programproduction contract or incumbent successor buildproduction award is not delivery or acceptance
prototype_programfunded prototype, OTA or demonstrationprototype selection is not production transition
modernization_portfoliorelated subprograms with distinct instrumentsdo not merge design, prototype and production clocks

Program record

Every program dossier must carry:

Performer and contender states

The following states are mutually distinct:

  1. operating_performer — named in an operating federal environment;
  2. production_awardee — holds a production contract or order;
  3. prototype_awardee — holds a funded prototype instrument;
  4. rd_awardee — holds a named research, pilot or qualification project;
  5. design_pool — received a design or study order before a later selection;
  6. named_system_partner — officially named in a system build, but task or

workshare may remain undisclosed;

  1. eligible_incumbent — has relevant vehicle or same-office access without a

named current task;

  1. supported_candidate — has both relevant capability and an evidenced

acquisition bridge, but no public selection;

  1. plausible_candidate — technical fit exists without a live acquisition

bridge;

  1. discovery_only — surfaced by adjacency, membership, hiring, patents or

company claims only; and

  1. not_publicly_identified — the role, site, signatory or applicant field is

not disclosed.

The record must not call every position a competitor. Parallel awardees, incumbents, suppliers, design-pool members and undisclosed applicants are different objects.

Facility joins

A company role and a physical facility are calculated independently. Each facility join uses one of four states:

Announced, financed, constructed, commissioned, qualified and accepted are separate facility clocks. A company job posting can discover a site but cannot promote it to a program site without a stronger join.

Acquisition and acceptance gates

The program path is never compressed. Preserve at least these objects when they apply:

budget request
  -> appropriation / allocation
  -> market research
  -> solicitation or project call
  -> selection / negotiation
  -> executed award or order
  -> obligation
  -> design review
  -> build or integration
  -> independent test / ATO / qualification
  -> delivery
  -> acceptance
  -> production option or recurring service

A ceiling is not an obligation. An IDIQ is not a task. Selection for negotiation is not an award. Installation is not acceptance. Launch is not checkout. A prototype is not a production program.

Eligibility membrane

Each dossier must test, where material:

An unknown is a missing gate, not a negative finding.

Calibration

Back-tests use only evidence public before the selection event. Each case must state:

Calibration quality is:

The model succeeds if it identifies a bounded serious field and preserves uncertainty. It is not required to guess a winner from information the agency did not publish.

Visual grammar

Every edge uses a verb: solicits, selects, awards, tasks, operates, builds_at, tests_at, qualifies, positioned_for, depends_on or blocked_by. Never use generic connected to or partner.

Promotion boundary

Phase 5 remains a research and calibration object. It does not join the Federal Group, activate monitoring, make an award prediction, establish an undisclosed supplier relationship or constitute investment advice. Canonical Wave 1–4 company edges remain authoritative for company relationships; Phase 5 adds the program-centered acquisition, facility and calibration views.

Sources

Full saved reading

View the saved source references. This record has no direct external citation in its source-link list.

Document details and formats
Optional file downloads
For AI readers: complete text and record details
About the dates and filing language
Evidence date
When this document or named claim was checked. A newer collection, export or website date does not update it.
Current, private, Workbench or promotion
These can describe the saved document’s original filing or custody. This public reading preserves that history; publication does not turn its findings into government approval, binding law or newly verified evidence.
Master data and projection
The maintained factual record and a page generated from it. Repeated views are not additional independent evidence.
Provenance and source join
Where a record came from, and the exact reference connecting a claim to its source.
Gate, receipt and operating evidence
A required decision or condition, its documentary record, and evidence that the named activity actually occurred. Permission, delivery and operation stay separate.

Saved research reading. Its original dates and claim limits control; the export date does not refresh the evidence.