National security technology Quantum and Cryptographic Acceptance Claim Audit

NSSTS Quantum and Cryptographic Acceptance Claim Audit

As of: August 19, 2026
Automatic monitoring: false
Promotion: not authorized
Scope: 40 registry cases; four balanced waves

Claim rulings

Proposed compressionRulingWhyPromotion object
QBI Stage B company is government validatedRejectStage B is plan, risk and prototype work before Stage CStage C selection and government V&V finding
QBI Stage C means a utility-scale machine existsRejectStage C tests buildability/operability; it is not the full build and acceptance instrumentMachine contract, delivered system and government acceptance
Quantum CHIPS LOI is a final awardRejectProposed assistance and equity remain subject to final negotiationExecuted agreement, obligation and milestone record
QED-C member or completed project is production qualifiedRejectMembership and matched R&D are not customer lot/system qualificationPart/process qualification and accepted target integration
QCAL can approve procurementRejectRydberg produces traceable calibration evidence; the acquirer owns acceptanceAcquirer-recognized method plus disposition on target device
A CAVP certificate makes the product FIPS validatedRejectCAVP covers algorithm conformance, not the module or productActive CMVP certificate and exact product mapping
A module in process is validatedRejectIUT/MIP are workflow statesIssued active certificate and security policy
Any PQC capability in a module is an approved FIPS serviceRejectSecurity policy may mark it non-compliant/non-approvedApproved-service listing in exact certificate policy
Federal PKI incumbency means PQC readinessRejectOperating legacy profiles may still require module, profile and relying-party migrationValidated module, updated profile, interoperability and ATO
AWS PQC availability proves Genesis uses PQCRejectClient, endpoint, key and configuration choices are not publicTarget configuration and ATO/SSP evidence
FIPS 206 is a current compliance targetRejectFIPS 206 remains in developmentFinal published FIPS and later validation/profile evidence
NCCoE consortium participant is NIST endorsedRejectCRADA participation is collaborative R&D, not validation or endorsementSeparate product validation and target acceptance
Test laboratory validated the productRejectLab creates evidence; NIST CMVP issues module validationCMVP certificate and product mapping
CMVP validation is a DOE ATORejectModule validation does not accept system residual riskDOE/NNSA AO authorization for exact boundary
Globus identity role proves token PQCRejectOperating broker role does not disclose target signing/transport algorithmsTarget issuer, algorithms, endpoints, CBOM and ATO

Exact-entity and control rulings

  1. QUNNECT, INC. and Qunnect LLC remain separate award identities until an entity conversion, assignment or novation record resolves the clock.
  2. VESCENT TECHNOLOGIES INC. and Vescent Photonics, LLC cannot be silently collapsed because the award recipient and abstract performer names differ.
  3. Amphenol RF and XMA are not independent competitors after Amphenol's acquisition of XMA; the current contracting entity remains a W-9/instrument question.
  4. Qubitekk assets and contracts are separate objects. IonQ's asset purchase does not prove every historic agreement, warranty or support obligation moved.
  5. Vector Atomic is now controlled by IonQ. Historic capability should not be attributed to a new IonQ award without the exact instrument clock.
  6. Acumen Security should be read through Intertek ownership while preserving the lab name actually printed on a CMVP certificate.
  7. SB Technology Federal Inc. is the award entity in the Air Force record; SandboxAQ is the operating/company identity joined by the official abstract.

Decision-right matrix

Evidence objectCreator/operatorDecider
Quantum component performance dataSupplier and test facilitySystem prime/customer
SI-traceable Rydberg calibrationRydberg QCAL / University of MichiganDARPA or acquiring program
QBI constructability and operability recordPerformer plus independent V&V teamDARPA
Quantum manufacturing milestoneAward recipient / QMEC / foundryCommerce, NIST or buying program
Algorithm conformanceVendor plus accredited test pathNIST CAVP record within scope
Cryptographic-module test packageNVLAP-accredited CST laboratoryNIST CMVP
Product-to-certificate mappingOEM/integrator and assessorBuying agency / AO
Federal PKI trust profileSSP, FPKI/GSA and relying partiesSubscriber agency for target use
Genesis identity tokenInstitutional IdP / Globus / upstream brokerResource owner and DOE boundary
Genesis system residual riskAssessment evidence from multiple actorsDOE/NNSA authorizing official

Live clocks and manual return board

Date / stateWatchReturn objectUnsafe early claim
2026-08-28AOSense QuAIS II endReleased field result, platform qualification or follow-on“Quantum IMU accepted”
2026-09-21/22FIPS 140-2 transitionNew-system acquisition disposition and 140-3 replacement“140-2 remains sufficient for new systems”
2026-09-30Several lab accreditation clocksUpdated NVLAP certificate/scope“All listed labs remain current indefinitely”
2026-10-15QBI IV&V closeExact award, OCI plan and task scope“Candidate is the QBI referee”
2026-10-22M-26-15 agency plan dueDOE non-NSS plan, system priorities and inventory method“Genesis is covered by the non-NSS plan”
Approximately 2027-03Federal CBOM minimum-elements workIssued minimum elements and agency implementation“Current proprietary inventory is federally CBOM-compliant”
2027 onwardQuantum CHIPS/QMECFinal agreements, work packages and qualified capacity“Proposed foundry capacity is operating”
2028-06-23Rydberg QCAL Phase II endOperating lab, accepted methods, access and transition“Phase II itself created universal calibration authority”
No date yetFIPS 206Final standard“FIPS 206 compliant”
No public objectGenesis PQC joinSSP/ATO, certificate profile, CBOM, target KMS/HSM configuration“Genesis uses PQC”

Disconfirming artifacts that must stay visible

Manual promotion order

  1. Resolve QBI IV&V, because the independent-referee award can reveal test subcontractors and conflicts before any machine award.
  2. Follow QMEC and Quantum CHIPS final agreements for hidden cryogenic, laser, packaging, foundry and metrology work packages.
  3. Recheck Crypto4A, SafeLogic, Securosys, Bouncy Castle and Geomys for issued FIPS 140-3 certificates and read each security policy rather than the headline.
  4. Follow Entrust and WidePoint for FPKI profile, HSM and relying-party interoperability changes.
  5. Recheck the NVLAP laboratory roster and scope before attributing scarce validation capacity.
  6. Watch DOE after October 22 for the non-NSS migration plan, while preserving the separate classified/NSS path.
  7. Promote no Genesis PQC vendor until a named target configuration and DOE/NNSA authorization object exists.

Package boundary

This audit identifies evidence-producing and decision-controlling companies. It does not establish a Science Strategy target award, product endorsement, automatic watch, investment thesis or vault-canonical conclusion.

Sources

Full saved reading

View the saved source references. This record has no direct external citation in its source-link list.

Document details and formats
Optional file downloads
For AI readers: complete text and record details
About the dates and filing language
Evidence date
When this document or named claim was checked. A newer collection, export or website date does not update it.
Current, private, Workbench or promotion
These can describe the saved document’s original filing or custody. This public reading preserves that history; publication does not turn its findings into government approval, binding law or newly verified evidence.
Master data and projection
The maintained factual record and a page generated from it. Repeated views are not additional independent evidence.
Provenance and source join
Where a record came from, and the exact reference connecting a claim to its source.
Gate, receipt and operating evidence
A required decision or condition, its documentary record, and evidence that the named activity actually occurred. Permission, delivery and operation stay separate.

Saved research reading. Its original dates and claim limits control; the export date does not refresh the evidence.