National security technology Quantum and Cryptographic Acceptance Claim Audit
NSSTS Quantum and Cryptographic Acceptance Claim Audit
As of: August 19, 2026
Automatic monitoring: false
Promotion: not authorized
Scope: 40 registry cases; four balanced waves
Claim rulings
| Proposed compression | Ruling | Why | Promotion object |
|---|---|---|---|
| QBI Stage B company is government validated | Reject | Stage B is plan, risk and prototype work before Stage C | Stage C selection and government V&V finding |
| QBI Stage C means a utility-scale machine exists | Reject | Stage C tests buildability/operability; it is not the full build and acceptance instrument | Machine contract, delivered system and government acceptance |
| Quantum CHIPS LOI is a final award | Reject | Proposed assistance and equity remain subject to final negotiation | Executed agreement, obligation and milestone record |
| QED-C member or completed project is production qualified | Reject | Membership and matched R&D are not customer lot/system qualification | Part/process qualification and accepted target integration |
| QCAL can approve procurement | Reject | Rydberg produces traceable calibration evidence; the acquirer owns acceptance | Acquirer-recognized method plus disposition on target device |
| A CAVP certificate makes the product FIPS validated | Reject | CAVP covers algorithm conformance, not the module or product | Active CMVP certificate and exact product mapping |
| A module in process is validated | Reject | IUT/MIP are workflow states | Issued active certificate and security policy |
| Any PQC capability in a module is an approved FIPS service | Reject | Security policy may mark it non-compliant/non-approved | Approved-service listing in exact certificate policy |
| Federal PKI incumbency means PQC readiness | Reject | Operating legacy profiles may still require module, profile and relying-party migration | Validated module, updated profile, interoperability and ATO |
| AWS PQC availability proves Genesis uses PQC | Reject | Client, endpoint, key and configuration choices are not public | Target configuration and ATO/SSP evidence |
| FIPS 206 is a current compliance target | Reject | FIPS 206 remains in development | Final published FIPS and later validation/profile evidence |
| NCCoE consortium participant is NIST endorsed | Reject | CRADA participation is collaborative R&D, not validation or endorsement | Separate product validation and target acceptance |
| Test laboratory validated the product | Reject | Lab creates evidence; NIST CMVP issues module validation | CMVP certificate and product mapping |
| CMVP validation is a DOE ATO | Reject | Module validation does not accept system residual risk | DOE/NNSA AO authorization for exact boundary |
| Globus identity role proves token PQC | Reject | Operating broker role does not disclose target signing/transport algorithms | Target issuer, algorithms, endpoints, CBOM and ATO |
Exact-entity and control rulings
- QUNNECT, INC. and Qunnect LLC remain separate award identities until an entity conversion, assignment or novation record resolves the clock.
- VESCENT TECHNOLOGIES INC. and Vescent Photonics, LLC cannot be silently collapsed because the award recipient and abstract performer names differ.
- Amphenol RF and XMA are not independent competitors after Amphenol's acquisition of XMA; the current contracting entity remains a W-9/instrument question.
- Qubitekk assets and contracts are separate objects. IonQ's asset purchase does not prove every historic agreement, warranty or support obligation moved.
- Vector Atomic is now controlled by IonQ. Historic capability should not be attributed to a new IonQ award without the exact instrument clock.
- Acumen Security should be read through Intertek ownership while preserving the lab name actually printed on a CMVP certificate.
- SB Technology Federal Inc. is the award entity in the Air Force record; SandboxAQ is the operating/company identity joined by the official abstract.
Decision-right matrix
| Evidence object | Creator/operator | Decider |
|---|---|---|
| Quantum component performance data | Supplier and test facility | System prime/customer |
| SI-traceable Rydberg calibration | Rydberg QCAL / University of Michigan | DARPA or acquiring program |
| QBI constructability and operability record | Performer plus independent V&V team | DARPA |
| Quantum manufacturing milestone | Award recipient / QMEC / foundry | Commerce, NIST or buying program |
| Algorithm conformance | Vendor plus accredited test path | NIST CAVP record within scope |
| Cryptographic-module test package | NVLAP-accredited CST laboratory | NIST CMVP |
| Product-to-certificate mapping | OEM/integrator and assessor | Buying agency / AO |
| Federal PKI trust profile | SSP, FPKI/GSA and relying parties | Subscriber agency for target use |
| Genesis identity token | Institutional IdP / Globus / upstream broker | Resource owner and DOE boundary |
| Genesis system residual risk | Assessment evidence from multiple actors | DOE/NNSA authorizing official |
Live clocks and manual return board
| Date / state | Watch | Return object | Unsafe early claim |
|---|---|---|---|
| 2026-08-28 | AOSense QuAIS II end | Released field result, platform qualification or follow-on | “Quantum IMU accepted” |
| 2026-09-21/22 | FIPS 140-2 transition | New-system acquisition disposition and 140-3 replacement | “140-2 remains sufficient for new systems” |
| 2026-09-30 | Several lab accreditation clocks | Updated NVLAP certificate/scope | “All listed labs remain current indefinitely” |
| 2026-10-15 | QBI IV&V close | Exact award, OCI plan and task scope | “Candidate is the QBI referee” |
| 2026-10-22 | M-26-15 agency plan due | DOE non-NSS plan, system priorities and inventory method | “Genesis is covered by the non-NSS plan” |
| Approximately 2027-03 | Federal CBOM minimum-elements work | Issued minimum elements and agency implementation | “Current proprietary inventory is federally CBOM-compliant” |
| 2027 onward | Quantum CHIPS/QMEC | Final agreements, work packages and qualified capacity | “Proposed foundry capacity is operating” |
| 2028-06-23 | Rydberg QCAL Phase II end | Operating lab, accepted methods, access and transition | “Phase II itself created universal calibration authority” |
| No date yet | FIPS 206 | Final standard | “FIPS 206 compliant” |
| No public object | Genesis PQC join | SSP/ATO, certificate profile, CBOM, target KMS/HSM configuration | “Genesis uses PQC” |
Disconfirming artifacts that must stay visible
- A CAVP record is algorithm evidence only.
- The published LS2 HSM FIPS 140-3 security policy marks ML-KEM and ML-DSA non-compliant in the FIPS state, demonstrating why capability cannot be compressed into approved use.
- NIST paused new CST-lab applications because validation capacity is constrained; that is a queue-risk signal, not proof that a particular product is delayed.
- DOE's public ModCon BaseTemplate workflow uses mutable action tags, has a commented publish trigger and exposes no public SBOM, release signature, attestation or admission verifier. This does not prove private production controls are absent; it blocks promotion of public GitHub hosting into a signed-artifact trust role.
- OMB M-26-15 excludes national-security systems. It cannot be applied to an NNSA classified Genesis workload without a system categorization and the relevant CNSS/NSA control path.
Manual promotion order
- Resolve QBI IV&V, because the independent-referee award can reveal test subcontractors and conflicts before any machine award.
- Follow QMEC and Quantum CHIPS final agreements for hidden cryogenic, laser, packaging, foundry and metrology work packages.
- Recheck Crypto4A, SafeLogic, Securosys, Bouncy Castle and Geomys for issued FIPS 140-3 certificates and read each security policy rather than the headline.
- Follow Entrust and WidePoint for FPKI profile, HSM and relying-party interoperability changes.
- Recheck the NVLAP laboratory roster and scope before attributing scarce validation capacity.
- Watch DOE after October 22 for the non-NSS migration plan, while preserving the separate classified/NSS path.
- Promote no Genesis PQC vendor until a named target configuration and DOE/NNSA authorization object exists.
Package boundary
This audit identifies evidence-producing and decision-controlling companies. It does not establish a Science Strategy target award, product endorsement, automatic watch, investment thesis or vault-canonical conclusion.
Sources
Full saved reading
View the saved source references. This record has no direct external citation in its source-link list.
Document details and formats
About the dates and filing language
- Evidence date
- When this document or named claim was checked. A newer collection, export or website date does not update it.
- Current, private, Workbench or promotion
- These can describe the saved document’s original filing or custody. This public reading preserves that history; publication does not turn its findings into government approval, binding law or newly verified evidence.
- Master data and projection
- The maintained factual record and a page generated from it. Repeated views are not additional independent evidence.
- Provenance and source join
- Where a record came from, and the exact reference connecting a claim to its source.
- Gate, receipt and operating evidence
- A required decision or condition, its documentary record, and evidence that the named activity actually occurred. Permission, delivery and operation stay separate.
Saved research reading. Its original dates and claim limits control; the export date does not refresh the evidence.