Skip to content

Remaining government corporations and GSEs

Window: exclusive after 2026-09-03 20:09:34 EDT through frozen cutoff 2026-09-11 16:01:37 EDT
Inclusive replay: 2026-09-03 date-only publishers, then dedupe against Weekly Delta 2026-09-03 (especially WAVE_2B EXIM/MCC/DFC and WAVE_2E MCC Kiribati hold)
Discovery rule: official roots, newsrooms, and financials/libraries/minutes/APMs/information statements if present. Federal Register is not discovery. FR backbone has one EXIM row this window (2026-18186 advisory-committee meeting), already grouped routine in WAVE_1B.
Lane: remaining government corporations and GSEs. Not a 392-node census.

Skip (already opened 1A–2E): Fannie Mae, Freddie Mac, FHFA, USPS, Amtrak, FDIC.
Skip: twelve Reserve Bank public sites through 2026-09-08 19:18 EDT (fed-clearing-treasury).
NCUA as credit-union regulator is WAVE_3D; this slice owns only the Central Liquidity Facility.

Inspect broadly. Empty hunts are coverage. Promote narrowly. Award ≠ obligation ≠ disbursement ≠ delivery. Agenda ≠ decision. Comment-period close ≠ financing. Signing ≠ first draw. Staff briefing ≠ a rule.

Most of these publishers expose calendar dates, not intraday timestamps. September 11 objects are date-bounded and are not asserted to precede 16:01:37 EDT.

Mutation: Workbench only. No vault, Catalog, Registry, watches, entity chart, app, or Git. promotion_review is a hunt disposition, not vault authority.

09-03 continuation clocks this slice was required to verify

Firefly Aerospace, named in the 09-03 WAVE_2B paraphrase of the Sep 10 gate, is not on the live agenda. The published Sep 10 items are: (1) military-policy satellites-into-Small-Craft-Exclusion; (2) Turkish Airlines / Boeing PDP via PEFCO; (3) Ferromex / J.P. Morgan / Progress Rail refurbished locomotives.

Promotion-review objects

1. EXIM signed a $280 million MMIA credit agreement with CesiumAstro (Sep 9)

Actor: Export-Import Bank of the United States; CesiumAstro

Clocks: signed 2026-09-09 (date-only; FOR IMMEDIATE RELEASE). Prior EXIM package: $185 million direct loan approved January 2026. May 2026 MMIA Deal of the Year is provenance, not this clock. Not on the Sep 10 Board agenda — treated as delegated MMIA authority, not a Sep 10 Board vote.

URL: EXIM release

Disposition: promotion_review

EXIM signed a $280 million credit agreement under Make More in America at CesiumAstro’s Austin headquarters and calls it the Bank’s largest MMIA loan approval to date. CesiumAstro manufactures satellite-communications hardware. The January 2026 $185 million loan is described as having supported purchase of the Austin plant, infrastructure upgrades, and equipment, with an agency-claimed 500+ jobs. This Sep 9 object is a second financing package and a signed credit agreement, not a tour.

Claim limit: Signed credit agreement is not first disbursement, not outstanding principal, not factory complete, not a satellite on orbit, and not a Board minute for the Sep 10 agenda items. “Largest MMIA loan approval” is EXIM’s characterization of approval size, not proof of dollars drawn. Job counts are agency/issuer claims.

2. DFC approved a $10 million loan to Financiera MiCrédito Honduras (announced Sep 9)

Actor: U.S. International Development Finance Corporation; Financiera MiCrédito Honduras, S.A. / MiCrédito Holding Corp

Clocks: DFC says it “yesterday announced project approval” in a 2026-09-09 release → approval clock 2026-09-08; signing ceremony in Washington the same news cycle (CPO Caroline Vik and MiCrédito Regional CEO Verónica Herrera; Honduran finance/central-bank/trade officials present). No disbursement clock.

URL: DFC release

Disposition: promotion_review

$10 million loan to a majority U.S.-owned Honduran financial for on-lending to MSMEs. At least 50% of proceeds are to finance eligible U.S. goods and services (agency examples: tractors and harvest equipment, irrigation/pumping, fertilizers distributed by U.S. companies). This is project approval plus a ceremonial signing, not Board minutes for a >$50 million transaction (DFC’s own process page: Board required over $50 million).

Claim limit: Approval/signing is not commitment-as-disbursed, not a first MSME sub-loan, not a U.S. export volume, and not a Honduras-host-state statute. The 50% U.S.-goods test is a use-of-proceeds condition, not a shipment.

3. MCC Kiribati Threshold Amendment 1 payload is now line-read (Sep 1 instrument; 09-03 hold)

Actor: Millennium Challenge Corporation; Republic of Kiribati (MEHR)

Clocks: landing dated 2026-09-01; PDF retrieved this sitting from assets.mcc.gov. Amendment “shall enter into force on the date of the last signature.” Signed for MCC by Martha Bowen, Vice President (Acting), Department of Policy and Evaluation, Washington. Underlying Threshold Program Grant Agreement: 2023-09-25. Original Completion Date was four years after entry into force; Amendment §1.4 restates Completion Date as four years and nine months after EIF. Grant ceiling in Annex II remains $29,100,000.

URL: landing · PDF

Disposition: hold_for_source cleared / fold as the 09-03 object. Do not recensus as a new in-window action. Exclusive start is after 2026-09-03 20:09:34 EDT; this instrument is Sep 1.

Operative moves versus the 2023 agreement (09-03 could not assert these):

ItemAfter Amendment 1
Project Objective (§1.2)Restated to add “exploring economic development opportunities including or associated with proposed or currently ongoing infrastructure investments on Kiritimati Island.”
New activityKiritimati Island Economic Development Study Activity — MCC Service Provider study/studies, funded from Flexible Assistance Funds, of economic-development opportunities around proposed or ongoing infrastructure (wharf/jetty named as example), including opportunities engaging U.S. private or public entities.
Completion Date (§6.1)Four years and nine months after EIF. Grant may not pay expenditures after that date unless MCC agrees otherwise.
Additional Representatives (§7.3)Adds Secretary of the Ministry of Line and Phoenix Islands Development and Secretary of the Ministry of Information, Communications and Transport.
Annex II allocation (ceiling unchanged)MANIM $26,579,000 (MARI 1 $2,410,000; MARI 2 $6,100,000; UUTI $16,600,000; Kiritimati Island Study $1,469,000); M&E $765,000; administration $1,756,000; Program Total $29,100,000. Versus 2023 annex: MARI 1 down from $3,212,000; M&E down from $1,432,000; new $1,469,000 study line.

Claim limit: Amendment is not a compact, not an amount increase, not a first study delivered, not a wharf/jetty built, and not a U.S. private-sector offtake. Reallocation inside a frozen $29.1 million ceiling is not new appropriated budget. Sep 1 remains the legal clock; this sitting only supplies the payload 09-03 lacked.

4. EXIM Sep 10 Board meeting is marked Completed; no public decision issued

Actor: EXIM Board of Directors

Clocks: meeting 2026-09-10 9:30 a.m. ET via teleconference (agenda posted 2026-08-31). Live minutes URL still titled as agenda; wrapper prints Completed; no Summary of Minutes / Board Decision: block (those blocks exist on older decided meetings, e.g. 2025-03-13). Through freeze, the three agenda items remain Decision Required: Approval, not Approved/Denied/Deferred.

URL: Sep 10 page · minutes index

Disposition: verify_later — the 09-03 gate moved from “scheduled” to “meeting occurred on the public calendar,” not to “decision published.”

Open items still awaiting a published Board Decision:

  1. Open / OGC: EXIM Military Policy — Addition of Satellites to the Small Craft Exclusion. Review required: None. Decision required: Approval.
  2. Closed / Transportation AP300196XX: Turk Hava Yollari / Boeing / PEFCO — pre-delivery payment financing for commercial aircraft. NAC yes; congressional notification no.
  3. Closed / Transportation AP300140XX: Grupo Ferroviario Mexicano / Ferrocarril Mexicano / J.P. Morgan Chase / Progress Rail — refurbished locomotives. NAC yes; congressional notification no.

Claim limit: Completed on an agenda page is not a vote, not a commitment, not a disbursement, and not a military-policy text change. Do not infer Firefly from the satellites line. Closed-session items will not have deal terms on this page even after minutes post.

Admit-lower-rank / grouped (do not promote as weekly atomics unless Wave 10 wants one crop-insurance cluster)

5. RMA/FCIC in-window product notices (Sep 8–11)

Actor: USDA Risk Management Agency administering FCIC

Clocks: PM-26-053 dated 2026-09-08 (FCIC Board approved the PRF/Hawaii-PRF modifications 2026-08-20, before exclusive start; this is the AIP implementation bulletin). Grapevine earthquake coverage and related grapevine “stage”/reporting changes announced 2026-09-10, effective 2027 crop year. Monterey County lemon end-of-insurance date Jul 31 → Sep 30 beginning 2028 crop year, plus Texas shellfish expansion and two Massachusetts oyster-county flexibilities, announced 2026-09-11.

URL: PM-26-053 · grapevine / Springfield RO · RMA news

Disposition: admit_lower_rank as FCIC/RMA product-term changes. The Aug 20 Board vote is pre-window; Sep 8 is the in-window AIP clock.

PRF/RI changes (2027+, except some RI Basic Provisions 2028): intended-use-of-grazing must show insurable interest in livestock equating to at least 25% of an average stocking rate; stocking-rate records kept 3 years after crop year; January–February interval percent-of-value capped at 25%. Grapevine: earthquake added as an insured cause of loss in the TDO plan counties. Lemon date change is Monterey County only.

Claim limit: Product-term change is not an indemnity paid, not a 2026 crop-year rewrite (these are 2027/2028), and not a new FCIC organic act. FCIC Board meetings archive for 2026 did not expose an in-window sitting on the live meetings page (JS-thin); do not invent a Sep Board meeting from the RMA newsroom.

6. FCA informational meeting received the June 30 System condition report (Sep 10)

Actor: Farm Credit Administration Board

Clocks: informational meeting 2026-09-10 10 a.m., McLean. Report as of 2026-06-30. One notational vote since Aug 13: Sep 9 approval of Aug 13 minutes. Sep 3 (date-only replay): Examination Manual update EM-21.3 Investments.

URL: NR 26-13 · quarterly PDF

Disposition: admit_lower_rank as a staff briefing / exam-manual hygiene. Not a regulation, premium, or merger.

Agency-reported H1 2026: modest loan growth, increased earnings, sound capital; nonperforming assets 1.09% of loans + OPO as of June 30, up from 1.02% a year earlier. Staff slides: composite FIRS “3 or worse” 3 institutions (of 59 rated) vs 2 a year earlier; System capital $88.7 billion / 15.2% of assets; less-than-acceptable loans 6.8% of portfolio vs 5.9% June 2025. 9/11 remarks are ceremonial.

Claim limit: Informational receipt of a lagged quarter is not an FCA enforcement action, not a funding-stress finding, and not FCSIC premium action. Exam-manual update is examiner guidance, not 12 CFR.

Material enrichments, not new action clocks

Coverage receipt — every named publisher

PublisherRoot / surfacesStatusIn-window materialClaim limit
TVAtva.gov 301s to tva.com; newsroom via live fetch; investors curl-403reached (newsroom); investors blocked on curlSep 9 Sequoyah exercise (routine)Exercise ≠ generation/rate/board
EXIMexim.gov news + minutes libraryreachedSep 9 CesiumAstro $280M MMIA signing; Sep 10 Board Completed without published decision; Sep 10 roundtable (event)Signing ≠ draw; Completed ≠ vote
DFCdfc.gov newsroom + ESIA libraryreachedSep 8/9 $10M MiCrédito Honduras approval + ceremony. ESIA empty of new rowsApproval ≠ disbursement
MCCmcc.gov home, documents, Kiribati landing + PDFreachedKiribati Amendment 1 payload (Sep 1 hold fill). Philippines 9/10 ceremony listing unresolved as signingAmendment ≠ compact; listing ≠ signed grant
PBGCpbgc.gov news, press, reports, premium libraryreached / empty_hunt for new instrumentsNews latest 2026-08-10. Premium-page CMS stamp Sep 10Stamp ≠ rate change. Oct 15 due date unchanged
Ginnie Maeginnie mae.gov newsroom/APM JS-thin; press-releases and APM indexes via searchreached (indexes) / JS-thin on HTMLLatest APM 26-08 Aug 13; latest press Aug 13 July $2.99T print. Daily files routineNo new APM/MBS Guide clock
Federal Financing Bankffb.treasury.gov home + monthly-activity-reportsreached / empty_hunt2026 monthly list through August; no September report; no dated in-window posting noticeListing of August is not a new lending program
FHLBanks (Council)fhlbanks.comreached / empty_huntNo dated Council press in windowCouncil marketing ≠ OF issuance
FHLB Office of Financefhlb-of.com newsreachedSep 9 announce / Sep 10 price $1B 2-year Global; Sep 3 DM CEO (replay)Global is ordinary funding, not a policy
FHLB New Yorkfhlbny.comreachedSep 11 MSD weekly market updateResearch note ≠ advance
FHLB Atlantacorp.fhlbatl.comreached / empty_huntNo dated instrument extractedThin homepage
Farm Credit Systemfarmcredit.com; farmcreditfunding.com information statementsreached / empty_hunt for System legalCouncil FSA-rule statement (comment). Latest Funding Corp statement still Q2 2026Comment ≠ FCS instrument; Q2 print not timestamped in-window
Farm Credit Administrationfca.gov home, newsroom, NR 26-13, quarterly PDFreachedSep 10 informational meeting + June 30 condition report; Sep 3 EM-21.3Briefing ≠ rule
FCSICfcsic.gov homereached / empty_huntLatest Board premium review 2026-07-08Silence ≠ premium change
NCUA Central Liquidity Facilityncua.gov/support-services/central-liquidity-facility + monthly-reports searchreached / empty_huntLatest CLF monthly FS: July 2026 posted 2026-08-28. No in-window advance or IRPSMonthly FS ≠ an advance
Power Marketing (DOE hub)energy.gov/power-marketing-administrationsreached / empty_hunt for PMA-specificSep 10 widget is department-wide press (Duane Arnold is 2C), not a PMA rateDo not steal 2C’s loan close
Bonnevillebpa.gov + /about/newsroomreached / empty_huntLatest news 2026-08-31 refreshed strategy / Aug 13 FY2026 third financial forecast — both pre-window or 09-03-adjacentNo in-window ROD/rate
WAPAwapa.gov + /newsroomreached / empty_huntNo Sep 4–11 newsroom object extracted. Sierra Nevada rate letters are March/earlierNo in-window Administrator rate order
SEPAenergy.gov/sepa/southeastern-power-administrationreached / empty_huntNo dated in-window SEPA operating objectHub page only
SWPAenergy.gov/swpa/southwestern-power-administrationreached / empty_huntNo dated in-window SWPA operating objectHub page only
CCCUSDA CCC explainer URLblocked (403 Akamai)Not independently reached. FSA farm-loan-delivery rule is WAVE_1C403 ≠ CCC inactivity. Do not recensus 1C
FCICrma.usda.gov/about-rma/fcic + RMA news + PM-26-053reachedSep 8–11 product notices (see object 5). 2026 Board-meetings archive JS-thinProduct terms ≠ organic-act change
UNICORunicor.govblocked (403)Not reached403 ≠ inactivity
Presidio Trustpresidio.gov + /about/pressreached / empty_huntLatest press 2026-08-17 CANOPY lease. In-window items are park eventsEvent ≠ charter/lease
St. Lawrence Seaway / GLSseaway.dot.govblocked on live fetch (403); /latest-news index reached via searchIndex: no GLS press after 2026-07-31 through freeze. Sep 1 “published” stamp on a 2018 advisory is CMS noise. Binational greatlakes-seaway.com is not the U.S. corporation403 ≠ lock closure. Do not treat Canadian notices as GLS

FR census (not discovery): only EXIM 2026-18186 (advisory committees open meeting) matches this slice; already 1B routine.

Surfaces (reached / empty_hunt / blocked / unresolved)

SurfaceResult
tva.com newsroom (live fetch)reached; Sep 9 Sequoyah exercise
tva.com/investorsblocked (curl 403)
exim.gov/newsreached
exim.gov/news/meeting-minutes + Sep 10 URLreached; agenda/Completed; no decision block
dfc.gov/media/newsroom + Honduras releasereached
dfc.gov ESIA listreached; no new 2026 window row
mcc.gov + documents + Kiribati PDFreached; payload line-read
mcc.gov news-and-events HTMLJS-templated; home/events used instead
pbgc.gov news/press/reports/premiumreached; empty of new instruments
ginnemae.gov HTML newsroom/APMJS shell; indexes reached via search
ffb.treasury.gov reportsreached
fhlbanks.comreached
fhlb-of.com/newsreached
fhlbny.com / corp.fhlbatl.comreached
farmcredit.com + farmcreditfunding.com information statementsreached
fca.gov newsroom + NR 26-13 + quarterly PDFreached
fcsic.govreached
ncua.gov CLF + monthly-reports searchreached
energy.gov PMA + SEPA + SWPAreached
bpa.gov newsroomreached
wapa.gov newsroomreached
usda.gov CCC explainerblocked
rma.usda.gov/about-rma/fcic + news + PM-26-053reached
unicor.govblocked
presidio.gov/about/pressreached
seaway.dot.govblocked live; latest-news reached via search index

A 403, JS shell, or empty fetch is a tool-path failure, not a finding that the publisher was silent — except where a second path (search index, alternate URL, PDF) actually enumerated the surface, which then may be empty_hunt.

Skips honored

Fannie / Freddie / FHFA / USPS / Amtrak / FDIC (1A–2E). Twelve Reserve Banks through 2026-09-08 19:18 EDT. NCUA-as-regulator except CLF (3D). Genesis, SR 26-6, SWIFT, COMEX recensus.

Lane closed?

Yes for the named 3B publishers through the frozen cutoff. Every named publisher has a status. Open gates, not incompleteness theater:

No vault write. No Catalog/Registry mutation. No entity-chart write.

Sources

Full saved reading

View cited sources (11)

These are the sources cited by this reading. Each source keeps its own date and scope.

Document details and formats
Optional file downloads
For AI readers: complete text and record details
About the dates and filing language
Evidence date
When this document or named claim was checked. A newer collection, export or website date does not update it.
Current, private, Workbench or promotion
These can describe the saved document’s original filing or custody. This public reading preserves that history; publication does not turn its findings into government approval, binding law or newly verified evidence.
Master data and projection
The maintained factual record and a page generated from it. Repeated views are not additional independent evidence.
Provenance and source join
Where a record came from, and the exact reference connecting a claim to its source.
Gate, receipt and operating evidence
A required decision or condition, its documentary record, and evidence that the named activity actually occurred. Permission, delivery and operation stay separate.

Saved research reading. Its original dates and claim limits control; the export date does not refresh the evidence.

Original title: Wave 3B — remaining government corporations and GSEs