Operations, industry, procurement, and delivery
Window: exclusive after 2026-09-11 16:01:37 EDT through frozen cutoff 2026-09-16 19:10:34 EDT
Inclusive replay: 2026-09-11 date-only FR/PI and date-only agency publishers, then dedupe against Weekly Delta 2026-09-11
Lane: Purse civilian. FR ops objects for DOE, Commerce, USDA, Interior, EPA, DOT, NASA, GSA, NSF, NRC, plus Canada §338 entry/operating clocks and GSA/FAR procurement consequence. Direct-site hunt is WAVE_2C_DIRECT_SITES_OPERATIONS_SECURITY.md.
Legal writeups owned by 1A: presidential instruments as law. This wave owns industrial/production/delivery/procurement-operating implication only.
Do not recensus: Genesis Mission through 2026-09-09 15:40 EDT; Forest Service roadless NPRM 2026-18648; EPA RFS 2025 deadline extension to Oct 1; Duane Arnold financial close (Sep 8; later drawdown/NRC/MWh only if they moved); FSA AFT as the Sep 4 final (effective still Oct 1).
Award ≠ obligation ≠ payment ≠ delivery ≠ operation. A 403 is a blocked surface, not a missing source.
Promotion-review objects
1. Water-quality EO — Chesapeake Bay funding redirect and rain-tax pressure (ops implication only)
Actor: President; EPA (publication costs); Secretaries of War, Interior, Agriculture, Commerce, Homeland Security
Clocks: signed 2026-09-16; White House posted same day. Not in the frozen FR presidential census. No later EPA, USDA, Interior, or Army Corps implementing order, grant-term rewrite, or WOTUS interaction retrieved before freeze.
URL: signed EO; fact sheet
Disposition: promotion_review for funding-priority / stormwater-fee operating implication. Cross-ref 1A for the legal writeup; do not duplicate it.
The order revokes EO 13508 (May 12, 2009). Named departments must assess current Chesapeake Bay support and focus fiscal and personnel resources on “more direct, on-the-ground projects, in areas of highest need.” All agencies that fund Bay health “shall prioritize funding” that “directly reduce[s] nutrient and sediment run-off,” redirecting money away from activities that do not generate measurable progress. EPA shall coordinate with MD/VA/PA/DE/NY/WV and DC to assess stormwater-management-fee burdens, explore non-cost-increasing alternatives, and “take measures to encourage the repeal or rescission” of those fees. Strategies must use documented performance indicators (sediment, phosphorus, nitrogen; water quality). Subject to applicable law and appropriations. Fact sheet cites FY2026 Chesapeake Bay Program streamlining (~$1 million administrative cut; +$2.7 million to watershed jurisdictions vs FY2025) as prior EPA work, not a new award in this object.
Claim limit: Revocation is not a CWA permit change, not a WOTUS rewrite, not a state-fee repeal, not a grant deobligation, and not an Army Corps construction start. “Encourage the repeal” is not a preemption finding. No in-window EPA/USDA/Corps implementation step was retrieved.
2. Procurement-reciprocity presidential memorandum — Canadian-origin civil procurement (ops consequence only)
Actor: President; OMB; USTR; FAR Council; GSA (addressee); NASA (addressee); Administrator for Federal Procurement Policy; Secretary of War
Clocks: posted 2026-09-16 as a Presidential Memorandum, not an EO. Fact sheet same day. No FAR text, GSA schedule delisting, or Buy American clause change retrieved before freeze.
URL: signed memorandum; fact sheet
Disposition: promotion_review for GSA/FAR/civil-procurement operating consequence. 1A owns instrument type.
OMB and USTR, in coordination with the FAR Council, shall “identify and take all steps permitted by applicable law” so that Canadian-origin items in the Federal civil procurement system can, where warranted, be “removed or made non-available for purchase.” OMB is to notify agencies of domestic alternatives. USTR monitors Canadian federal/provincial treatment of U.S.-origin items and may recommend restoring availability. Each agency head “shall take all appropriate measures within the agency’s authority.” Publication costs assigned to OMB. Fact sheet ties the memorandum to the Sep 8 §338 Canada actions; that is narrative, not a new HTSUS line.
Claim limit: Memorandum ≠ FAR amendment ≠ GSA MAS deletion ≠ Buy American waiver revocation ≠ awarded contract cancelled. WTO GPA coverage figure (~$280 billion) is the fact sheet’s claim, not a measured U.S. obligation change. No GSA newsroom object after Sep 10 was retrieved.
3. Canada §338 entry clock fired 2026-09-15 12:01 a.m. ET — CBP HTSUS operating guidance
Actor: CBP Office of Trade; President (already-owned Sep 8 proclamations); FR as publication clock
Clocks: signatures owned by 09-11 weekly; FR publication of five proclamations 2026-09-14 (2026-18835 … 2026-18839); entry/withdrawal clock 12:01 a.m. ET 2026-09-15; CSMS #69851916 sent 2026-09-11 16:49 EDT (after the 09-11 freeze).
URL: CSMS #69851916; FR 2026-18838 example alcohol-scope modification
Disposition: promotion_review as the operating test of already-owned signatures. Do not recensus the proclamations as new law.
CBP instructs filers for goods entered or withdrawn on/after 12:01 a.m. ET Sep 15 under HTSUS 9903.03.12 and 9903.03.14. Attached list is the complete Sep 15 classification set, including 122 additional HTSUS lines now subject to 9903.03.12 or 9903.03.14 (bold on the attachment). No change to 9903.03.13 lines. Named removals (no longer subject):
| Heading | HTSUS no longer subject |
|---|---|
| 9903.03.12 | 2208.30.60; 2208.70.00 |
| 9903.03.14 | 2501.00.00; 2523.29.00; 2940.00.60; 4803.00.40; 4818.90.00; 7801.10.00; 8537.10.91; 9507.10.00 |
As of Sep 15, only goods subject to 9903.03.13 may claim 9903.03.15 (0% additional; aluminum/steel/copper, autos/light trucks and parts, MHDVs, wood, semiconductors, patented pharmaceuticals). 9903.03.16 civil-aircraft 0% path remains. Chapter 98 exceptions and FTZ privileged-foreign-status / drawback language are restated. Additional 50% *ad valorem* remains stacked with other duties. Annex line items in the Word attachment were not line-read.
Claim limit: Entry-clock fire ≠ collected revenue, seizure, or trade-volume finding. CSMS is operating guidance, not a new proclamation. 122-count is CBP’s; unread annex PDFs remain a hole.
4. EPA fuel-waiver clocks at Sep 15 — federal summer RVP lapsed; Texas boutique extended through Oct 1
Actor: EPA (consultation with DOE)
Clocks: federal summer-control season ends 2026-09-15; Aug 20 national waiver ran federal volatility through that date. Sep 8 boutique-fuel renewal: Texas through 2026-10-01; Arizona and California for the full 20 days allowed under CAA §211(c)(4)(C). No later nationwide extension of the federal RVP waiver was retrieved before freeze.
URL: EPA Fuel Waivers (JS shell on direct fetch; page content reached via official-site search index). Sep 8 PDF not retrieved (guessed system-files URL 404).
Disposition: promotion_review as a carry-clock result, not a new nationwide waiver.
Two clocks, kept separate: (1) the federal summer RVP / winter-pull-forward waiver that was in force through Sep 15 lapsed on schedule; post-Sep 15 winter gasoline is the ordinary ASTM D-4814 state, not a new emergency. (2) the state boutique enforcement waiver was renewed Sep 8 and is still live in Texas through Oct 1 (AZ/CA 20-day CAA maximum). That is not an extension of the nationwide E15/RVP emergency past Sep 15.
Claim limit: Lapse ≠ pump-price finding. Boutique extension ≠ California SIP repeal. PDF of the Sep 8 letter was not retrieved.
5. EPA signed a partial repeal of the 2024 power-plant carbon standards; proposed residual GHG rescission
Actor: EPA Administrator Zeldin
Clocks: signed / announced 2026-09-14 at the G20 Energy Abundance Ministerial (Houston). Not in the frozen FR book. Program page lists pre-publication PDFs. Proposal: public hearing 15 days after FR publication; 45-day comment. Effective date of the final not retrieved from the PDF.
URL: news release; program page (docket EPA-HQ-OAR-2025-0124)
Disposition: promotion_review
Two objects, same day: (a) final Partial Repeal of the Carbon Pollution Standards for Fossil Fuel-Fired Electric Generating Units — EPA says it strikes most of the 2024 Carbon Pollution Standards as exceeding CAA §111 because the required controls were not adequately demonstrated; agency projects $310 billion savings and “coal production for power sector use … increase by more than 10 times.” (b) proposal to rescind remaining GHG findings/standards for fossil EGUs under CAA §111; agency projects an additional $370 million in direct compliance-cost savings if finalized. Direct HTML of both PDFs was not retrieved (JS shells).
Claim limit: Signature ≠ FR publication ≠ CFR text in force ≠ plant restart. $310 billion is an EPA projection, not an observed bill. Proposal is not a remaining-standard repeal. Not a §202(c) order and not a Duane Arnold object.
6. DOE issued a new FPA §202(c) order keeping Centralia Unit 2 available through Dec 11
Actor: Secretary of Energy; TransAlta Centralia Generation, LLC; Gridforce Energy Management, LLC / SPP Western RC as dispatchers
Clocks: Order No. 202-26-44 issued 2026-09-11; effective 2026-09-13 through 2026-12-11. Predecessor Order 202-26-28 ran through 2026-09-12 (09-11 weekly carried that expiration).
URL: DOE news; order page; PDF linked as DOE Order No. 202-26-44
Disposition: promotion_review
New numbered emergency order, not a silent extension of 202-26-28. Directs TransAlta to keep Unit 2 of Centralia Generating Station (WA) available to operate at the direction of Gridforce or SPP Western RC. Agency: Unit 2 had been scheduled to shut down at the end of 2025. WECC-Northwest reliability rationale. Availability ≠ dispatched MWh.
Claim limit: Order ≠ generation, EEA3, or observed blackout prevented. Ceiling of “available to operate” is not a capacity factor. Craig 202-26-31 (through Sep 26) and Stanton (through Nov 30) were not replaced.
7. FERC approved NERC CIP-014-4 physical-security reliability standard
Actor: FERC; NERC as ERO
Clocks: issued 2026-09-10 (RD26-9-000); FR 2026-18868 published 2026-09-15 (91 FR 58430); effective Oct 1, 2028 (first day of first calendar quarter beginning 24 months after the approval order takes effect). CIP-014-3 retires immediately before that date. Initial R5 risk assessment due on or before the effective date.
URL: FR 2026-18868
Disposition: promotion_review
CIP-014-4 tightens physical-security risk assessments for critical transmission stations/substations/control centers: joint-ownership applicability; 36-month facility-list and risk-assessment cycle (was 30/60); proximate-station identification within 1,500 feet; documented methodology with peak and off-peak cases; no new bright-line minimum physical protections for all BES stations. ~344 transmission owners; FERC estimates +10 hours/$834 per TO annually. Not a plant-security incident and not EO 14421 bulk-power implementation.
Claim limit: Approval ≠ Oct 2028 operation ≠ substation hardening complete. Does not expand CIP-014’s facility universe to all BES stations.
8. RUS opened the Affordable Rural Cooperative (ARC) NOFO — $175 million, nuclear and transmission
Actor: USDA Rural Utilities Service
Clocks: RD news 2026-09-14; FR notices 2026-18769 (2026-09-14) and 2026-18980 (2026-09-16) — same NOFO, two publication clocks. Letters of Interest 2026-10-19 11:59 a.m. ET through 2026-11-20 11:59 a.m. ET. Webinars Sep 14/16/23/30 and Oct 7.
URL: RD release; program page; FR 2026-18769
Disposition: promotion_review
Loans and grants to eligible rural electric cooperatives (current/former RE Act borrowers, coops serving predominantly rural areas, or their wholly/jointly owned subsidiaries) for nuclear energy and transmission-efficiency projects. Agency headline: $175 million available. LOI window is the next operating clock. Not a PART-program object (PART LOIs opened Sep 8, out of exclusive start).
Claim limit: NOFO ≠ LOI received ≠ loan obligated ≠ reactor, SMR, or line in service. $175 million is available BA, not awarded.
9. FSA opened 2026/2027 ARC-PLC enrollment after allocating ~30 million new base acres
Actor: USDA Farm Service Agency
Clocks: news 2026-09-15; 2026 crop-year election/enrollment 2026-09-16 through 2026-12-11; 2027 crop-year 2026-11-02 through 2027-03-15. Base-allocation notifications available beginning 2026-09-16 (Login.gov). 3.69% pro-rata reduction applied to eligible acreage.
URL: FSA news
Disposition: promotion_review as a delivery clock on already-enacted OBBBA base-acre authority. The underlying ARC/PLC final is not recensus’d.
Agency: first base-acre increase in two decades; “more than 30 million new base acres”; allocation complete; producers may now elect/enroll. This is the enrollment machine turning on, not a payment.
Claim limit: Enrollment window ≠ ARC or PLC payment issued. Allocation notification ≠ producer election. 3.69% reduction is FSA’s stated factor, not independently recomputed here.
10. State ITAR civil-aircraft ASE correction (clerical to Aug 28 IFR)
Actor: Department of State, DDTC
Clocks: FR 2026-18914 published 2026-09-16 (91 FR 58610); effective 2026-10-13; comments on the underlying IFR still due 2026-09-28. Corrects Amendatory Instruction 2 of the Aug 28 IFR (91 FR 55457).
URL: FR 2026-18914
Disposition: admit_lower_rank / fold as clerical. Not a new ASE policy.
Instruction 2 for 22 CFR 120.54 is corrected to revise (a)(6)(iii) and (a)(7)(iii) and add (a)(8) and (a)(9). One-page correction.
Claim limit: Correction is not a new ITAR category, license, or civil-aircraft determination.
11. Coast Guard Boca Chica rocket-test safety zone (operating restriction)
Actor: Coast Guard, COTP Corpus Christi
Clocks: actual notice from 2026-09-04; FR 2026-18855 published 2026-09-15, effective without actual notice through 2026-10-31. Enforced only during explosive/hazardous testing; BNMs/MSIBs announce times.
URL: FR 2026-18855
Disposition: promotion_review as small-but-relevant operating restriction. Not a launch license.
Temporary safety zone on the Rio Grande within ~0.5 mile of SpaceX Massey’s test site (25°57′09.0″ N, 97°14′50.0″ W) for cryogenic and structural rocket tests. Vessels need COTP permission (VHF-16 / 800-874-2143) during enforcement. Placeholder until a permanent zone (USCG-2025-0898 / 90 FR 61112) is finalized. Not a Boca Chica orbital launch authorization.
Claim limit: Safety zone ≠ test conducted ≠ Starship flight. Starship FLT-14 appears on FAA ATCSCC plans (primary 09-18) as NAS planning, not this zone’s legal text.
Folded or clock-only (do not recensus as new actions)
| Object | Owner | This delta |
|---|---|---|
| Canada §338 signatures Sep 8 | 09-11 weekly / 1A | Fold signatures. Record FR publication Sep 14 + entry clock (object 3). Annexes still unread as line items. |
| Forest Service roadless NPRM 2026-18648 | 09-11 weekly | Skip recensus. Comments still due 2026-10-06. |
| EPA RFS 2025 compliance deadline to Oct 1 (2026-18132) | 09-11 weekly | Skip recensus. |
| FSA Application Fast Track permanent / farm-loan final 2026-18164 | 09-11 weekly | No earlier operational object. Effective remains 2026-10-01. FSA news 09-03 still the last agency explainer. PLP delegated authority through traditional narratives starts Oct 1; electronic system “early 2027.” |
| GSA OneGov ChatGPT vehicle | 09-11 WAVE_2C | No new clock. Still expected effect 2026-10-01; 27-month term. GSA newsroom newest items remain 09-10. |
| Duane Arnold loan close (up to $1.9B) | 09-11 weekly | No later drawdown, NRC restart authorization, or MWh clock. EDF project page still states close + “pending NRC licensing.” NRC plant page: draft EA comment closed Sep 2; final EA pending; staff target for licensing decisions 2028-01-29. |
| EO 14421 bulk-power RFI 2026-18370 | 09-11 weekly | Webinar 2026-09-16 15:00–16:00 ET occurred in-window; comments still through 2026-10-09. Webinar ≠ prohibition. |
| Genesis Mission | genesis-mission through 2026-09-09 15:40 | Skip. No later official DOE/lab Genesis object retrieved. |
| WOTUS SNPRM / Census NPRM / FCC 2026-18535 ops gate | 09-11 | Skip recensus. FCC still effective 2026-10-13. |
| DOE PJM 202-26-41 / Carolinas 202-26-43 | 09-03 / 09-11 | Remain expired. No public dispatch receipt. |
| TransAlta 202-26-28 through 2026-09-12 | 09-11 carry | Expired as scheduled. Replaced in function by new Order 202-26-44 (object 6), not a silent extension. |
| Craig 202-26-31 through 2026-09-26; Stanton through 2026-11-30 | prior | Still live. No new order. |
Additional in-window objects (lower rank or grouped)
12. NRC proposed a broad reactor-licensing/oversight overhaul (Sep 11 after freeze)
Actor: NRC
Clocks: news 26-077 dated 2026-09-11; Law360 stamp 21:25 EDT (after 09-11 freeze). ANS: staff anticipated FR publication 2026-09-25. Not in this window’s FR book. Official nrc.gov story URL 403.
URL: NRC 2026 news index (row reached)
Disposition: promotion_review as proposal only, subject to the access limit. 2C owns the newsroom hunt.
Proposal “Regulatory Enhancements for Reactor Licensing, Decommissioning, and Operational Oversight,” implementing EO 14300: risk-informed seismic design; remove SDA 15-year expiration; control-room staffing flexibility; backfit/new-requirement process; defect/noncompliance and nonemergency-event reporting; financial qualification aligned to Part 53; reduced routine reporting. Applies to operating plants and new applicants. Not a license, not Duane Arnold, not CIP-014-4.
Claim limit: Proposal ≠ FR text ≠ final rule. Primary PDF not retrieved (403).
13. Commerce ITA solar-cell finals (Indonesia, Laos, India) and China L-lysine orders
Actor: Commerce ITA
Clocks: published 2026-09-16 as 2026-18939/18940 (Indonesia AD/CVD), 2026-18941/18942 (Laos), 2026-18945/18947 (India); L-lysine AD+CVD orders 2026-18924. Critical-circumstances findings in part. ITC injury clock still required before AD/CVD orders for the solar investigations; L-lysine is already an order.
Disposition: admit_lower_rank / grouped industrial-trade. Determination ≠ collection.
14. FAA MOSAIC sport-pilot PTS alignment; restricted-category firefighter NPRM
- 2026-18776 (Rule, 2026-09-14): aligns sport-pilot practical test standards with the MOSAIC final. Certification-standard change, not a new airman issued.
- 2026-18799 (Proposed Rule, 2026-09-14): evaluating whether firefighters may be transported on certain restricted-category aircraft for ground wildfire suppression. Proposal ≠ authorization.
Other grouped FR ops (not individually promoted)
- EPA: San Joaquin ozone motor-vehicle-budget SIP final 2026-18748; Bacillus amyloliquefaciens AT-332 tolerance exemption 2026-18830; Maryland/DC OSWI negative-declaration proposals; Sacramento Metro 1997 ozone clean-data proposal; Indiana CCR permit-program NPRM 2026-19027 (see 2C); SW-846/TCLP RFI 2026-18754.
- USDA FNS: sixteen state SNAP demonstration-project comment notices 2026-18879 … 2026-18897 (2026-09-15). Comment invitations, not eligibility rewrites in force.
- Forest Service: Roca Honda Mine EIS intent 2026-18765 (Cibola NF, NM) — NOI, not a mine. NUCFAC meeting 2026-18725.
- NOAA: striped-marlin catch/retention framework 2026-18849; Area 2A halibut inseason 2026-18911; other in-season fishery.
- DOT/FAA/PHMSA/FRA: ADs and airspace grouped routine; PHMSA special-permit notices 2026-18915/16/17; FRA Ohio NEPA-assignment audit 2026-18986; FRA ICRs.
- Interior/NPS: NAGPRA inventory/repatriation cluster 2026-09-16; NGAC nominations; Alaska subsistence meetings.
- FERC: combined filings; hydro EAs; water-quality-certification timing; Seminoe pumped-storage SEIS; gas-project EA schedules (Vinton Dome, Tupelo Trail, Permian Basin Expansion, South Texas Enhancement). Docketing ≠ certificate.
- NASA / NSF / GSA FR: NASA none in new-window FR; NSF advisory-committee reestablishment 2026-19008; GSA zero new-window FR rows.
- NRC FR: biweekly no-significant-hazards notice 2026-18783.
2026-09-11 date-only replay (then dedupe)
Replay FR 2026-09-11 1C-adjacent objects already in the 09-11 package (FCC 2026-18535, FHWA I-81, DOT org-terminology, roadless extension, FAA ADs, NOAA fishery) stay folded. Newly retrieved on the 09-11 calendar date after 16:01:37 EDT: CBP CSMS #69851916 (object 3); DOE Order 202-26-44 news/order pages (object 6); NRC 26-077 proposal (object 12, 21:25 EDT). NOAA commercial-satellite SBEM IDIQ (effective Sep 1; news Sep 10, updated Sep 11) is out of exclusive start and was not treated as a 09-11 date-only new object here.
Bounded negatives
No exhaustive pass of SAM.gov, USAspending, FPDS, every DOE loan ledger, FSA county offices, NRC ADAMS restart docket beyond the plant page, CBP HTSUS annex Word file line-by-line, or classified DPA orders. No public Duane Arnold drawdown schedule. No GSA OneGov go-live receipt. No FAR Council deviation or GSAR text implementing the Canada-procurement memorandum. No EPA/USDA/Corps Chesapeake implementing instrument after the EO. No new public §202(c) order besides 202-26-44. No Genesis IOC.
Coverage receipt (FR ops backbone)
| Family | Status | Promotion-review | Fold / clock-only | Routine/reject |
|---|---|---|---|---|
| Presidential industrial (water-quality EO; procurement memo) | WH HTML reached; not in FR book | 2 (ops implication) | 0 | ceremonial proclamations to 1A |
| Canada §338 operating | CSMS + FR publication reached; annex Word unread | 1 | signatures folded | — |
| DOE / FERC FR | reached | 2 (202-26-44 is 2C-primary; CIP-014-4) | 3 (bulk-power webinar; Craig/Stanton) | combined filings, hydro EAs |
| USDA / FSA / FNS / FS / RUS | FR + FSA/RD reached; usda.gov press 403 | 2 (ARC NOFO; ARC-PLC enrollment) | 2 (AFT Oct 1; roadless) | SNAP demos; NAGPRA-adjacent FS; NUCFAC |
| Interior / BLM / FWS | FR notices reached | 0 | NPR-A still proposal | NPS NAGPRA cluster |
| EPA | FR + signed-not-published final reached; fuel-waiver PDF unread | 2 (fuel clocks; power-plant signed final) | 1 (RFS) | SIP/tolerance/CCR NPRM/RFI |
| DOT / FAA / NHTSA / FHWA / FRA / PHMSA | FR reached; transportation.gov 403 on $1.1B slug | 0 in 1C (airport $1.1B is 2C) | eVTOL/SPACE folded | ADs, airspace, hazmat SPs, firefighter NPRM grouped |
| Commerce / Census / ITA / NIST / NOAA / BIS | ITA/NOAA FR reached; BIS newsroom empty in-window; NIST 0 | 0 (solar/L-lysine grouped) | Census NPRM skip | fishery; AD/CVD admin reviews |
| NASA / NSF / NRC / GSA FR | NSF 1 notice; NASA/GSA 0 FR | 1 (NRC proposal is 2C-primary) | GSA OneGov; Duane Arnold | NSF committee; NRC biweekly |
| State ITAR | FR correction reached | 0 (clerical) | 1 | — |
| Coast Guard ops | Boca Chica retrieved | 1 small-but-relevant | — | fireworks/drone SLRs grouped |
Closed: yes for the 1C FR-ops census of named MUST objects and in-window rules/proposed rules for the listed agencies, subject to: USDA department newsroom 403; EPA fuel-waiver PDF unread; EPA power-plant pre-publication PDFs not text-retrieved; CBP annex Word unread; NRC 26-077 story 403; transportation.gov $1.1B slug 403; CESER 202(c) index still 404 (individual order pages reached). Direct sites continue in Wave 2C.
Sources
Full saved reading
View cited sources (20)
These are the sources cited by this reading. Each source keeps its own date and scope.
Document details and formats
About the dates and filing language
- Evidence date
- When this document or named claim was checked. A newer collection, export or website date does not update it.
- Current, private, Workbench or promotion
- These can describe the saved document’s original filing or custody. This public reading preserves that history; publication does not turn its findings into government approval, binding law or newly verified evidence.
- Master data and projection
- The maintained factual record and a page generated from it. Repeated views are not additional independent evidence.
- Provenance and source join
- Where a record came from, and the exact reference connecting a claim to its source.
- Gate, receipt and operating evidence
- A required decision or condition, its documentary record, and evidence that the named activity actually occurred. Permission, delivery and operation stay separate.
Saved research reading. Its original dates and claim limits control; the export date does not refresh the evidence.
Original title: Wave 1C — operations, industry, procurement, and delivery