Skip to content

DTCC Notice and Testing Clock Map

[!abstract] Durable status map

This note is the controlling dated map for public DTCC testing, attestation, membership, conversion and production-target clocks through September 18, 2026. It does not replace the constitutional, cash-leg, liquidity or record-sovereignty rulings in the three companion DTCC source documents.

Companions: DTCC Atomic Settlement Liquidity Stress Test — Source Document · DTCC Collateral AppChain and Record Sovereignty — Source Document · DTCC Operative Constitution and Public-Bank Model — Source Document · Clearing-House Transition — Factual Timeline

Evidence cutoff: 2026-09-18 ET
Research mode: public, read-only, primary-source-first
Lifecycle: incorporated live-vault source document
Authority: this source document controls the dated notice/testing map through the cutoff; the three companion DTCC source documents retain their narrower constitutional, liquidity and record-sovereignty authority

Controlling ruling

DTCC has several real change programs in motion, but they are not one test and they have not reached one common state.

The controlling project constitution therefore remains unchanged:

A movable token is not automatically a DTC entitlement; a DTC entitlement is not automatically eligible collateral; collateral movement is not FICC delivery; FICC delivery is not margin satisfaction; none of those states is federal-funds finality, legal discharge or accounting close.

Evidence grammar

StateWhat it establishesWhat it does not establish
AnnouncementDTCC stated an intended change or date.Test execution, deployment or use.
Scheduled testDTCC assigned a future environment or window.The test opened, passed or covered economic behavior.
Test openThe environment and test objects were actually available.Completion, participant coverage or acceptance.
Test resultDTCC or a participant reported what ran and what passed or failed.Production deployment unless separately shown.
AttestationA named party certified a defined condition.Independent validation or live funding.
Authorization / eligibilityRules or membership permit an action from a date.First use, volume, novation, settlement or finality.
Production targetDTCC identified a deployment or conversion time.Occurred go-live or successful first business processing.
Occurred operationA dated authoritative record shows the service actually ran.Scale, broad adoption or economic effect without more evidence.

September 18 whole-site refresh

The September review covered the whole public DTCC site rather than the press room alone: product and service pages, the Important Notices feed, DTC/NSCC/FICC rule filings, current Rules and service guides, transformation roadmaps and resources, member directories, events and replays, Insights, and policy, disclosure and financial pages. Sitemap modification dates were treated as technical metadata, not publication dates. The live notices feed briefly exposed TEST and DUMMY IMPORTANT NOTICE objects; those were excluded as feed-quality artifacts.

What changed outside the newsroom

Public objectState at September 18What it changesWhat it does not yet prove
DTC Tokenization Service product pageCurrent product architecture; AppChain, Canton and Stellar grouped as eligible networksSame-CUSIP rights; mint, burn, pause and clawback controls; LedgerScan ownership tracking; multi-network designThat all listed networks launch in October. DTCC separately targets Stellar for the first half of 2027.
Fund/SERV admission of Oasis Pro MarketsMembership announced September 16Bridges a tokenization platform into incumbent fund transaction, reconciliation, distribution, tax and regulatory-reporting railsFirst tokenized-fund transaction, DTC tokenization launch or volume.
SR-DTC-2026-010 / Important Notice 24808-26Proposed rule filing submitted September 15; no located SEC publication or operative service-guide revisionProposes AnnounceDirect as a standardized corporate-action submission system with agent good-order, timing and content dutiesEffectiveness, deployment, issuer/agent use or successful announcement processing.
CMU220-26Mandatory conversion schedulePSE testing and attestation October 2; optional dual-format production October 2–29; CSV-only production October 30Successful testing, participant completion or error-free production.
B24776-26Mandatory DTC settlement-system migration programReplaces the earlier Q3 2027 target with an exact launch date to be supplied in November 2027; Rule 2 connectivity duty and possible sanctions remain explicitA current production change or completed client migration.
NSCC 24x5Live since June 28; participating-firm testing reported completeExtends NSCC clearing intake and processing; first exchanges and SIPs target December 202624/7 cash finality, DTC token movement, exchange operation or Fedwire availability.
September member notices and directoriesEntity-specific eligibility changesTexas Stock Exchange fee collection and new/expanded FICC participant and sponsoring-member accountsFirst trade, comparison, novation, margin, settlement or exchange launch.

October and adjacent proof gates

ClockPublic stateClose condition
October 2026 DTC tokenization openingMonth-level target only; October 1 is approximateOperative DTC notice or equivalent participant terms, approved launch networks and assets, fees, wallet/control rules, and a dated first post-opening production record.
October 2 CMU PSE test and attestationScheduledEnvironment opened and required participant attestations/results received.
October 2–29 CMU dual-format productionScheduled optional transitionObserved production delivery and defect disposition.
October 30 CMU CSV-only cutoverFixed conversion targetOccurred CSV-only production and retirement of the legacy PDF print image.
October 8 transformation roadmap/connectivity/testing eventEvent listingPublished materials or replay can inform the map; the event itself is not a test result.
October 29 Americas Trading ConferenceEvent listingAny dated DTCC disclosure must be classified by its own legal or operating state.
December 2026 first exchanges and SIPs in 24x5TargetNamed exchange/SIP operating evidence.
First half 2027 Stellar availabilityTargetNetwork-specific terms, launch notice and occurred production.
November 2027 DTC settlement-system launch dateDate to be supplied laterExact date, successful client migration and first processing cycle.

Joined interpretation, kept bounded

The site-wide evidence shows four layers moving together but not on one clock:

  1. legal submission: AnnounceDirect and agent duties;
  2. machine-readable reporting: CMU CSV, ISO 20022 and later modernized client interfaces;
  3. operating day: 24x5 clearing and exchange/SIP expansion; and
  4. asset and record: tokenization, network controls and LedgerScan's joined on-chain/off-chain reconciliation.

The important institutional pattern is not a separate blockchain market replacing DTCC. DTCC is attaching tokenized assets and tokenization members to incumbent membership, account, risk, reconciliation, reporting and settlement controls. That is a strong architecture signal, not proof that every component is effective, live or economically material.

What newly surfaced or was indexed in the August 13–21 review window

Public objectDTCC entityState reached by cutoffClockState not reached / next proof
A9807 and B24712-26, rollover direct-loss processNSCC and DTCOne incident-remediation deadline cross-posted by two legal entitiesInformation concerning believed direct losses materially above the July 13 interest payment due August 31; no late submissionsThis is discretionary case-by-case review, not a formally accepted claim. No public submission count, loss value, acceptance, reimbursement, root-cause report or resiliency outcome.
GOV2198-26, Citibank foreign branchesFICC-GSDScheduled netting-member activationEffective trade date August 24Confirm directory/account status and, if disclosed, eligible trade submission.
A9809, Document Processing API revised datesNSCC I&RSRevised future test and production targets; indexed August 17, document dated August 12PSE March 25, 2027; production April 15; SOAP/XML decommission remains November 17Confirm PSE opening, client testing, production activation and final decommission.
GOV2200-26FICC-GSDAnnual officer/compliance attestation requiredCertificate due September 18 that the defined CCLF amount was incorporated into the member's liquidity planSubmission and review are likely nonpublic; this is not a funded-liquidity, broad readiness or default-test result.
MBS1587-26FICC-MBSDAnnual officer/compliance attestation requiredCertificate due September 18 under the distinct MBSD rule and measureSame proof boundary as GSD, under a distinct MBSD rule, metric and membership.
GOV2199-26, Barclays Omnibus CILFICC-GSDScheduled CIL-only sponsoring-member activationEffective August 24Confirm status and any publicly disclosed Sponsored GC CIL activity.
GOV2201-26, Goldman Sachs Omnibus CILFICC-GSDScheduled CIL-only sponsoring-member activationEffective August 24Distinct firm/account from GOV2199; same next-proof class.
A9815, Fall 2026 enhancement releaseNSCC I&RSScheduled testing and production deploymentSTL test October 29; PAR/RPL test November 12; production November 19 after 6:30 p.m. ETObtain exact release inventory, environment, cases, results and activation confirmation.
August 20 Clearing Defect Log & Testing Office Hours pageDTCC TransformationDated support-event page onlyAugust 20No public agenda, replay, minutes, defect list, disposition or outcome was located.
SEC Release 34-106127, SR-DTC-2026-009DTC / SECRule change approved August 13PWP implementation by December 31; exact date to be announced at least 14 business days before implementationApproval is not deployment. Watch for the required DTC Important Notice and occurred operating evidence.

Date-label cautions

Older notices with clocks active at the cutoff

NoticeEntity / serviceActive clockExact scopeNext proof
A9795 -> A9799 -> A9805NSCC CNS equities clearingAugust 24–October 9Receipt, expected record layout and file structure; continuity of existing MROs and MT 570. No value validation; no cash; selected MROs and print-image/CSV attestations excluded or deferred.Actual PSE opening, participant attestations or summarized results, defect disposition, later excluded-output testing, cutover confirmation.
24662-26DTC Asset Services, corporate-actions messagingSubscription request due August 21; testing September 7–October 30; findings due October 23; conversion November 15 at 8:00 a.m. ETISO 20022 Instructions for Distributions and Voluntary Reorganization through U/PSE and SWIFT UAT CUG; not a general securities-settlement ISO conversion.Connectivity, test findings, completion, first SR2026 production messages and incident/acceptance evidence.
24460-26 plus SEC 34-106127DTC Payment without Presentation redemption processingImplementation by December 31; exact date must be announced at least 14 business days in advanceApproved rule and implementation bound, not an exact launch date or operating result.Required Important Notice, deployment evidence and first operating record.

Continuity from the prior August 8 weekly delta

These notices were already captured by the preceding sweep. Their effective dates fell before this map's cutoff, but the notices alone do not establish occurred use.

NoticeNotice-defined clockState boundary at August 21Official source
A9802 / NSCC ETF create-redeem controlEffective August 17Effective date elapsed. The notice establishes the new $15 billion review-and-written-approval threshold, not an observed flagged instruction or completed approval.A9802
GOV2193-26 / FICC-GSD Deutsche Bank London BranchEffective trade date August 13Scheduled membership date elapsed; first submitted, compared, novated, margined or settled transaction not located.GOV2193-26
GOV2196-26 / FICC-GSD ASL Capital Markets / ACM OmnibusEffective August 17Scheduled membership date elapsed; first executing-firm-customer submission or later transaction state not located.GOV2196-26

Prior adjudication: Federal Government Weekly Delta 2026-08-08/waves/WAVE_1_MONEY_SETTLEMENT_PUBLIC_FINANCE.md.

CNS notice lineage and unresolved production clock

SourceWhat changedWhat still controls
A9795, PDF dated July 13 / index July 15Initially placed day-cycle CSV and CNS MRO testing in a July 27–October 9 window; extended print images in production beyond its stated November 16 go-live.Its July 27 start was superseded. Its continuing output-transition and print-image boundary remains relevant.
A9799, July 23Moved modernized CNS testing from July 27 to August 24; used November 14 as the go-live date.Testing-start change remains active; A9805 supplies the later scope and end date.
A9805, August 6Fixed the controlling August 24–October 9 output-test scope and explicit exclusions.Controlling test-scope notice at the cutoff.
August 2026 Equities Clearing Transformation Client RoadmapUses November 16 for the application being live for client use; places interface migration in Q2 2027 with the production migration deadline in Q3 2028.November is application modernization with legacy interfaces retained, not completion of CNS interface modernization.

The public dates remain conflicted. A9799 says November 14; A9795 and the August roadmap say November 16, with the roadmap defining the latter as available for client use. A weekend cutover followed by Monday client use is a reasonable inference, but DTCC has not publicly made that distinction in the reviewed objects.

Safe clock: November 14–16, 2026 production/cutover window; public semantics unresolved.

Close condition: a later DTCC Important Notice or roadmap that separately names technical cutover, first processing cycle and first client-use date.

Active clock map at August 21

Date / window, ET unless statedClockSubsidiary / programPublic state at cutoff
August 21ISO testing-subscription request deadlineDTC Asset ServicesDeadline date at cutoff; public subscription outcome not located.
August 24CNS output testing opensNSCC CNSScheduled, not yet observed open.
August 24Citibank GSD Netting Buy/Sell activationFICC-GSDScheduled eligibility.
August 24Barclays and Goldman CIL sponsoring-member activationsFICC-GSDTwo distinct scheduled CIL-only eligibility changes.
August 24–October 9CNS output testNSCC CNSNarrow future test window.
August 31Rollover direct-loss information deadlineDTC and NSCCRemediation deadline.
September 7–October 30ISO 20022 client testDTC Asset ServicesFuture mandatory client test window.
September 18CCLF officers' certificates dueFICC GSD and MBSDTwo division-specific officer/compliance attestations.
October 9CNS output-test closeNSCC CNSFuture close; no outcome inference.
October 23ISO findings dueDTC Asset ServicesFindings precede the October 30 test close.
October 29STL testNSCC I&RSScheduled test, criteria not public in the notice.
November 12PAR/RPL testNSCC I&RSScheduled test, criteria not public in the notice.
November 14–16CNS production/cutover windowNSCC CNSConflicted public dates; application modernization retains legacy interfaces.
November 15, 8:00 a.m.SR2026 conversionDTC Asset ServicesFixed production target.
November 19, after 6:30 p.m.STL/PAR/RPL enhancement deploymentNSCC I&RSProduction target; first business processing not established.
By December 31PWP implementation boundDTC redemption processingApproved; exact implementation date not yet stated in the reviewed evidence.
March 25, 2027Document Processing REST/JSON API in PSENSCC I&RSRevised target.
April 15, 2027Document Processing REST/JSON API productionNSCC I&RSRevised target.
November 17, 2027Legacy SOAP/XML decommissionNSCC I&RSExisting target retained.

DTCC's September 9 and October 7 testing-series events belong in an events lane, not as proof that a system test opened, ran or passed.

Notice-level evidence ledger

Notice / entityDateState classExplicit exclusions or boundaryOfficial source
A9795 / NSCCPDF July 13; index July 15Partially superseded schedule; continuing output-transition rulingJuly 27 start superseded; print-image PSE and attestation deferredA9795
A9799 / NSCCJuly 23Active schedule change, supplemented by A9805Does not state end date or test criteriaA9799
A9805 / NSCCAugust 6Controlling CNS output-test scopeNo value validation or cash; Buy-In, Miscellaneous Night and Miscellaneous Day MROs excluded; print-image/CSV attestations deferredA9805
A9807 / NSCC and B24712-26 / DTCAugust 13One incident-remediation deadline, two legal entitiesNo promised reimbursement, public incident report or outcome publicationA9807 · B24712-26
GOV2198-26 / FICC-GSDAugust 14Scheduled netting-member activationNo activity, volume, repo scope or broad readiness proofGOV2198-26
A9809 / NSCC I&RSPDF August 12; index August 17Revised API PSE/production targetsNo duration, cases, pass criteria or readiness resultA9809
GOV2200-26 / FICC-GSDAugust 18Annual officer/compliance attestationCertifies plan incorporation of the defined amount; not broad readiness, funded liquidity or a default drillGOV2200-26
MBS1587-26 / FICC-MBSDAugust 18Annual officer/compliance attestationDistinct rule and measure from GSD; not broad readiness or a live stress testMBS1587-26
GOV2199-26 / FICC-GSDAugust 19Scheduled CIL sponsoring-member activationCIL-only capacity, not general all-service activationGOV2199-26
GOV2201-26 / FICC-GSDAugust 19Scheduled CIL sponsoring-member activationDistinct Goldman account; same service boundary as GOV2199GOV2201-26
A9815 / NSCC I&RSAugust 20Scheduled test and deploymentNo exact enhancement inventory, environment, cases, pass criteria or attestationA9815
24662-26 / DTCJuly 22Mandatory client test and fixed conversionCorporate-actions message set, not settlement ISO generally24662-26
24460-26 / DTCJune 15Rule filing and implementation boundNo exact launch date or operating evidence24460-26
SEC 34-106127 / DTCAugust 13Rule approvalAuthorization is not deploymentSEC order

Testing proof gates

CNS application

  1. Test opened: dated PSE availability or participant receipt on or after August 24.
  2. Phase completed: DTCC or participant attestation, results or formal disposition after October 9.
  3. Defects closed: public defect ledger, minutes, replay or follow-up notice tying specific defects to dispositions.
  4. Economic readiness: a later test explicitly covering cash and economic values.
  5. Excluded outputs ready: print-image/CSV availability and the currently excluded MRO tests and attestations.
  6. Application live: occurred cutover plus first successful processing cycle, with November 14 and 16 semantics resolved.
  7. Interfaces modernized: separate Q2 2027 PSE availability, member migration and the Q3 2028 production migration deadline. Legacy-interface decommission requires separate proof; the roadmap does not establish it.

DTC ISO 20022 Asset Services

  1. subscriptions and connections accepted;
  2. client test messages exchanged;
  3. findings dispositioned by or after October 23;
  4. October 30 completion evidence;
  5. first SR2026 production messages after November 15 at 8:00 a.m.; and
  6. any production incident, acceptance or rollback evidence.

FICC liquidity and membership

I&RS

Bounded negatives and access gaps

No dated public item was located on the reviewed DTCC press-room, Transformation resources, events, Important Notices, digital-assets product pages, or SEC DTC/NSCC/FICC rulemaking surfaces through August 21 that:

This finding can be falsified by a date-stamped official DTCC or SEC item within the window, including a backfilled notice, revised roadmap, archived event material or member-facing artifact later made public. Referenced DTCC Learning specifications, scripts, onboarding materials, participant attestations and client-specific results may require authentication; their absence from this map is an access boundary, not proof that they do not exist.

The live Important Notices index topped out at August 20 during retrieval. The index was traversed through the point where August 13 notices appeared. No August 21 notice was visible; this is a retrieval result, not a claim that DTCC could not later backfill or re-index an item.

For 24x5, the latest located operating baseline remains NSCC's June 28 evening launch / June 29 announcement. DTCC reported all participating firms completed the earlier testing, but no new August 13–21 performance, incident or operating result was located. This 24x5 operating clock is separate from AppChain's 24/7 collateral-mobility capability language.

Relationship to the tokenization watch

The last located public DTC tokenization production milestone remains DTCC's July 15 controlled-production report. The September 18 product architecture is more specific about same-CUSIP rights, DTC controls and LedgerScan, and the Oasis Pro Markets admission shows a tokenization platform entering Fund/SERV's incumbent fund-processing rails. Neither object establishes the broader DTC service opening.

The watch must therefore keep three objects separate:

None of these objects alone identifies an atomic cash leg, proves a DTC-operated cash-and-securities rail, or closes participant, fee, wallet, first-use, volume, finality or accounting questions. The three August 2 DTCC packages remain controlling for those narrower questions.

Vault landing and authority lineage

Katie authorized durable promotion on August 21 and the September 18 refresh. This source document is routed from MONEY — READ FIRST; the canonical watch calendar carries the independent proof gates; and the factual Clearing-House timeline carries the corrected CNS test and unresolved November 14–16 production/cutover window.

The detailed Workbench package remains provenance. On September 18, Katie authorized the controlling interpretive update to `The Clearing-House Transition`: DTCC's joined submission, reporting, operating-hours, asset-record and settlement changes are now read as a regulated modular conversion of the market middle. That interpretation preserves the factual boundary that a test, attestation, membership eligibility date or deployment target does not itself establish effective law, launch or occurred use.

Source surface ledger

Bottom line at the cutoff

The whole-site sweep shows DTCC refactoring legal submission, reporting data, operating hours and tokenized recordkeeping at the same time, while preserving incumbent membership, account, risk and settlement controls. The October DTC tokenization opening remains a month-level target and requires launch-specific proof. The nearer exact operating clock newly surfaced outside the press room is CMU's October 30 CSV-only conversion; AnnounceDirect remains proposed, and the mandatory settlement-system migration runs to a later November 2027 launch date still to be supplied. Fund/SERV's Oasis admission and the current eligible- network list are meaningful integration evidence, but neither closes the DTC launch, cash-leg, first-use, volume, finality or accounting questions.

Sources

Full saved reading

View cited sources (42)

These are the sources cited by this reading. Each source keeps its own date and scope.

Document details and formats
Optional file downloads
For AI readers: complete text and record details
About the dates and filing language
Evidence date
When this document or named claim was checked. A newer collection, export or website date does not update it.
Current, private, Workbench or promotion
These can describe the saved document’s original filing or custody. This public reading preserves that history; publication does not turn its findings into government approval, binding law or newly verified evidence.
Master data and projection
The maintained factual record and a page generated from it. Repeated views are not additional independent evidence.
Provenance and source join
Where a record came from, and the exact reference connecting a claim to its source.
Gate, receipt and operating evidence
A required decision or condition, its documentary record, and evidence that the named activity actually occurred. Permission, delivery and operation stay separate.

Saved research reading. Its original dates and claim limits control; the export date does not refresh the evidence.

Saved source details

---

tags:

- research

- money

- dtcc

- clearing

- testing

- implementation

title: "DTCC Notice and Testing Clock Map — Source Document"

type: research

subtype: source-document

status: current

updated: 2026-09-18

source: "Whole-site primary-source DTCC review through 2026-09-18 ET, including products, Important Notices, rules and filings, transformation roadmaps, directories, events, insights, and policy and financial disclosures; detailed Workbench package retained as provenance."

---