Skip to content

Source Ledger

Status: current Cutoff: 2026-09-30 ET

Controlling and framework sources

SourceTier/accessSupportsDoes not prove
Department September 30 releaseofficial primary; linked but direct retrieval failed, accessible through indexed official text/mirrorprogram, acronym, five pillars, major-installation objective, Next Great American Base distinctiontechnical implementation or delivery
Signed FORTRESS memorandumofficial_link_access_hold; PDF viewer, HTTP and asset retrieval produced no usable documentmemo identity; indexed text exposes office/governance directionvisually verified wording, signature/layout or complete custody
10 U.S.C. §101enacted coderesilience/security definitionsproject implementation
10 U.S.C. §2920enacted codeFY2030 availability, critical-load planning, microgrid/on-site preference, information fieldscurrent compliance
10 U.S.C. §2864enacted codemajor-installation master plans and BSR cross-referenceFORTRESS adoption of the definition
Current Base Structure Report libraryofficial current surfacelarge-site threshold; multiple-site warning; current report access controlspublic covered-site list
Installation Energy Resilienceofficial program surfaceestate scale, grid dependence and five-part strategysite readiness
On-Site Distributed Energy Resourcesofficial program surfacetechnology-neutral posture and finance/authority vehiclesagreement close or operation
Black Start Exercisesofficial method surfaceoperating-test definitionresult at an unlisted site
AEPRR reportsofficial annual-report route; latest listed public report FY2023project and performance reporting routecurrent 2026 portfolio completeness
2025 Military Installation Resilience reportofficial reportMILCON planning, ERCIP, UFC and control-system contextFORTRESS implementation

Delivery sources

SourceSupportsBoundary
Army SCI June solicitationseven-site private-generation model and 14-day requirementsolicitation
Army SCI September selectionssix conditional developer/site pairingsnot executed leases or plants
Army Janus selectionsfive vendor/site pairings and milestone frameworknot reactors in operation
NWS Crane MMR announcementplanned commercial MMR at NWS Crane by September 2028; joint Navy/Army Janus path and critical-operations purposeannouncement is not agreement, authorization, construction, criticality or accepted service
EO 14299executive-agent and first-reactor directionnot authorization/build/operation
Eielson microreactorup-to-5-MW critical-infrastructure proposal and NOITA statenegotiation/licensing path
Project Peleprototype construction/test pathnot base power service
MCAS Yuma100% current/projected requirement backup description2016–17 design/activation-era statement
MCAS Miramarcompletion, mixed sources, up-to-21-day description and mission-critical islanding exercisedesign and observed test scopes differ
SUBASE New Londongeneration, first-right power and island controlsessential-function scope
Fort McCoy Main Gateoperational gate-area microgrid and stated 14-day capabilitynot full installation
DLA Sigonellaactivated tenant microgrid and stated 14-day fuel-load capabilityDLA facilities, not full NAS

Access and refresh notes

Sources

Full saved reading

View cited sources (23)

These are the sources cited by this reading. Each source keeps its own date and scope.

Document details and formats
Optional file downloads
For AI readers: complete text and record details
About the dates and filing language
Evidence date
When this document or named claim was checked. A newer collection, export or website date does not update it.
Current, private, Workbench or promotion
These can describe the saved document’s original filing or custody. This public reading preserves that history; publication does not turn its findings into government approval, binding law or newly verified evidence.
Master data and projection
The maintained factual record and a page generated from it. Repeated views are not additional independent evidence.
Provenance and source join
Where a record came from, and the exact reference connecting a claim to its source.
Gate, receipt and operating evidence
A required decision or condition, its documentary record, and evidence that the named activity actually occurred. Permission, delivery and operation stay separate.

Saved research reading. Its original dates and claim limits control; the export date does not refresh the evidence.