Skip to content

Independents: science, safety, and economic regulators

Window: exclusive after 2026-09-03 20:09:34 EDT through frozen cutoff 2026-09-11 16:01:37 EDT

Inclusive replay: 2026-09-03 date-only publishers, then dedupe against Weekly Delta 2026-09-03 and this package’s 1A–2E

Lane: inspect-broadly / promote-narrowly across independently sweepable science, safety, economic, cultural, and regional-commission publishers. Materiality still gates what we keep. Empty hunts are coverage.

Discovery rule: official roots, newsrooms, libraries, commission/board pages, FOIA/publications if present. FR is not discovery; FR rows for these families are used only as a cross-check after the site pass.

Already owned elsewhere: EPA / GSA / FCC / NASA 1C–2C objects — looked at those roots for *other* in-window items, then folded duplicates. NRC ISR NPRM publication (FR 2026-18504) already folded in 1C/2C — this pass hunts licenses / exemptions / orders. NCUA joint TPRM is 2B-primary. NSF leadership letter is 2C-grouped.

Do not recensus: Genesis through 2026-09-09 15:40 EDT; FTC personalized-pricing comment clock (now Sep 25, 09-03 WAVE_2E); NCUA WeDevelopment merger (Sep 1 / 09-03); SBA 8(a) rule text (Aug 11 FR; effectiveness Sep 10 was a known clock).

Award ≠ obligation ≠ payment ≠ delivery ≠ operation. Certificate ≠ construction ≠ in-service. Proposal ≠ license. Declassification ≠ a new intelligence finding. 403 ≠ missing.

Promotion-review objects

1. NRC proposed an EO 14300 overhaul of reactor licensing and oversight

Actor: Nuclear Regulatory Commission (Chairman Ho K. Nieh)

Clocks: news release 26-077 dated 2026-09-11; comments for 30 days after Federal Register publication at regulations.gov docket NRC-2025-1138; virtual public meeting during the comment period (staff will not take comments at the meeting). Not in the 513-row FR census through freeze.

URL: NRC 26-077 PDF; 2026 news index

Disposition: promotion_review as the first in-window proposal of a reactor-regulation rewrite. Not a license, exemption, order, or 50.59 operating change.

The proposal is framed as EO 14300 implementation. Stated moves: more risk-informed graded earthquake design; remove the expiration date for standard design approvals; add flexibility for licensing reactor control-room staff; update how NRC establishes new or revised requirements for existing facilities; clarify defect/noncompliance and nonemergency-event reporting; align financial qualification with Part 53; reduce routine reporting/recordkeeping; refine how new-reactor applicants address issues affecting operating reactors; clarify decommissioning, including decommissioning-trust use. Applies to existing plants and new applicants.

Claim limit: Proposal ≠ final rule ≠ license ≠ restart authorization ≠ Duane Arnold or Crane operating change. Comment clock does not start until FR publication. No in-window license, exemption, or order was found on the 2026 news index besides this NPRM, meeting advisories, and the already-folded ISR proposal.

2. FERC voted a physical-security reliability standard and three NGA pipeline certificates

Actor: Federal Energy Regulatory Commission (Sep 10, 2026 public meeting)

Clocks: voted 2026-09-10. Office of External Affairs summaries posted the same day; individual order PDFs were not independently line-read this sitting (summaries state links post when orders issue). CIP-014-4 implementation follows the associated NERC implementation plan, not the vote date. Pipeline certificates authorize construction, not in-service.

URL: Sep 2026 meeting summaries; FERC news index

Disposition: promotion_review for the reliability-standard approval and the NGA certificates. Other Sep 10 items grouped below.

Voted objects that move a control or construction-authorization state:

ItemDocketState
E-1 CIP-014-4 Physical SecurityRD26-9-000Approves NERC CIP-014-4 and associated implementation plan, VRFs, VSLs; retires CIP-014-3. Tightens assessment timelines, applicability thresholds, verification/oversight for critical transmission stations/substations and primary control centers.
C-1 Kosciusko Junction Pipeline ProjectCP25-547-000 / CP25-549-000NGA §7(b)/(c) certificates and abandonments for Gulf South and Texas Gas: construct/operate new facilities, two capacity leases, acquire/abandon existing facilities in Mississippi. Stated ~1.175 million Dth/d incremental firm transportation.
C-2 Gator Express capacity increaseCP26-104-000Denies Healthy Gulf protest; authorizes Venture Global Gator Express to increase certificated capacity by 627,000 Dth/d.
C-3 Carnation ProjectCP26-16-000Certificate for Texas Gas: new compressor unit at Crosby-Harrison and Mainline System Block Valve 64 modifications (Hamilton County, OH). Stated 170,000 Dth/d new firm transportation.

Also voted, ranked down from this object: ISO-NE EL26-45-000 finds the ISO-NE Tariff unjust and unreasonable for lacking a path to accept/correct/refund erroneous or improper market payments and directs a 120-day compliance filing (finding + compliance clock, not a refund paid); UGI Auburn CP26-9 certificates/leases; Cornell Hydro P-2639-028 new license (30.75 MW, existing project); Goldendale P-14861-003 rehearing sustained / stay denied on the already-issued Jan 22, 2026 original license; three WECC soft-cap *Mobile-Sierra* no-further-action orders; Tri-State SPP West change-in-status (conditional); Grays Harbor/Gray Wolf EC26-76 disposition authorization.

Claim limit: Meeting vote ≠ posted order PDF. CIP-014-4 approval ≠ implemented physical-security plans at named substations. NGA certificate ≠ shovel, compressor in service, or molecule moved. 120-day ISO-NE compliance is not a refund. Goldendale license was Jan 22 — this is rehearing, not a new license.

3. ISCAP released 9/11 Commission PDB-summary and interview MFRs

Actor: Interagency Security Classification Appeals Panel (NARA ISOO hosts); George W. Bush Presidential Library holds the PDB summary as a Presidential record

Clocks: released 2026-09-11 (ISOO Overview post 15:51 UTC / 11:51 EDT — inside freeze). Appeals 2022-008 and 2023-001 (PDB summary); MFR bundle 2026-201. Remaining 25X1/X4/X5/X7/X8 redactions affirmed under E.O. 13526.

URL: ISOO Overview; PDB summary PDF; MFR index

Disposition: promotion_review as a completed declassification/release. Not a new intelligence product and not a finding about 2001 events.

ISCAP declassified a ~7,000-word 9/11 Commission compilation of PDBs mentioning al-Qaeda, Osama bin Laden, and Afghanistan in the three years before the attacks, plus eleven Commission Memorandums for the Record of interviews with Sandy Berger, Richard A. Clarke, Condoleezza Rice, Michael Scheuer, and George Tenet. PIDB’s companion post records the Board’s June 2026 letter to the President as advocacy, not the legal act; the legal act is the ISCAP ruling plus public posting. Redactions remain for sources/methods, a weapon-system technology, military war plans, protectee security, and current emergency-preparedness vulnerabilities (25X, another 25 years).

Claim limit: Release of historical Commission work-product is not a new PDB, not a finding that prior classification was unlawful, and not a complete unredacted file. CIA’s companion “9/11-relevant segments” of the underlying briefs are noted by PIDB; they were not independently line-read this sitting.

4. SBA put defense-critical NAICS at the front of the 8(a) queue as the race-neutral rule took effect

Actor: Small Business Administration; Smaller War Plants Commission (SBA–Department of War partnership, Aug 25)

Clocks: guidance announced 2026-09-10, the same day the Aug 11 final rule (FR 2026-16370) became effective. Pending individually-owned 8(a) applications returned via “Return to Business”; applicants have 45 calendar days to update financials and resubmit at certifications.sba.gov.

URL: SBA 26-90

Disposition: promotion_review for the processing-priority + Return-to-Business clock. Fold the underlying Aug 11 rule text (already a known Sep 10 effectiveness clock).

Named defense-critical NAICS for prioritized 8(a) processing: 332992, 332993, 336414, 336413, 334511, 334419, 331110, 332710, 332999, 336611. SBA also says it is restoring statutory “potential for success” reviews. Race-neutral social-disadvantage proof (no racial presumption) is the Aug 11 rule now in force, not this guidance.

Claim limit: Processing priority ≠ an 8(a) certification, set-aside, or contract. Return-to-Business is not a denial. Smaller War Plants Commission is a partnership, not an appropriation or plant. Effectiveness of the Aug 11 rule is not recensus’d as a new rule.

Folded or clock-only (do not recensus as new actions)

ObjectOwnerThis delta
NRC ISR monitoring / decommissioning-timeliness NPRM FR 2026-18504 (2026-09-10)09-03 WAVE_2C news 26-076 (Sep 1); 1C/2C foldFold publication clock.
NRC North Anna ESP renewal application FR 2026-185162C already: application under considerationFold. Not a renewed permit.
NRC Belews Creek ESP hearing advisory; new-reactor licensing webinar; Chairman speech S-26-0052CFold.
NSF “golden age of science” leadership letter (Sep 10)2C groupedFold. Not an award.
NCUA WeDevelopment → CommunityAmerica merger (Sep 1)09-03 WAVE_2BFold.
Fed/FDIC/NCUA/OCC proposed third-party risk management guidance + core-service-provider statement (Sep 11 10:00 EDT)WAVE_2BFold. NCUA is a co-publisher, not a standalone 3D instrument.
FTC personalized-pricing policy-statement comment close Sep 25 (extended Sep 3)09-03 WAVE_2EClock unchanged. Fold.
FTC/states Amazon hidden-ad-surcharge complaint (Aug 31 / 09-03 adjacent)09-03 WAVE_2CFold.
SBA 8(a) race-neutral rule text FR 2026-16370 (Aug 11); effectiveness Sep 1008-13 weekly named the Sep 10 clockFold the rule. Object 4 is the guidance + Return-to-Business overlay.
EPA Good Samaritan Bodie Mine permit; WOTUS SNPRM; RFS deadline; drinking-water study; tribal 319; Wisconsin CCR1C/2CLooked; no other in-window EPA national instrument beyond 2C. Fold.
GSA OneGov ChatGPT; Fort Worth disposition; FY27 per diem; FMR B-511C/2CLooked; no other. Fold.
NASA Space Academy RFI; Djibouti Accords advisory; Parker perihelion2CLooked; no other operating object. Fold.
FCC Covered-List component-part rule FR 2026-18535 (effective 2026-10-13)1A legal / 1C ops-effectFold the FR rule. Sep 9–10 Covered List operating items are object 5 / grouped below, not a recensus of the July-adopted rule.
SSA OIG Numident-matching audit (Sep 3)09-03 WAVE_2EFold.
Genesis through 2026-09-09 15:40 EDTgenesis-missionFold. NSF in-window items are not Genesis awards.

Additional in-window objects (lower rank or grouped)

5. FCC posted Covered List conditional approvals and a consolidated prohibited-entities list

Actor: FCC Public Safety and Homeland Security Bureau / OET

Clocks: Covered List page dated 2026-09-09; DA-26-957 conditional approvals for certain routers and advanced robotic devices 2026-09-09; DA-26-962 consolidated prohibited-entities list 2026-09-10. Distinct from 1C’s FR 2026-18535 (July-adopted component-part rule, effective Oct 13).

URLs: Covered List; DA-26-957; DA-26-962

Disposition: admit_lower_rank / promotion_review as authorization-gate operations on the already-owned Covered List. Not a new Covered List producer, not the Oct 13 component-part rule going live.

ASUS RT/ROG/TUF/ExpertWiFi/ZenWiFi/5G MiFi series received a router conditional approval window through 2028-03-06. Conditional approval ≠ equipment authorization of a new model and ≠ removal from the Covered List category.

6. USITC asked how it should implement 19 U.S.C. § 1338(g)

Actor: U.S. International Trade Commission

Clocks: news 26-129 2026-09-04; FR 2026-18385 published 2026-09-09 (MISC-053). Comment request, not a discrimination finding.

URL: USITC news index (26-129); FR 2026-18385

Disposition: admit_lower_rank. § 1338 is the Commission’s duty to investigate foreign discrimination against U.S. commerce and advise the President. A comment request is not an investigation instituted, not a Presidential proclamation, and not a duty.

Commissioner Samuel T. Negatu sworn 2026-09-10 (personnel). Sunset/AD determinations (wire mesh Mexico; OCTG; PVA China/Japan; plywood; rebar Bulgaria/Egypt/Vietnam) grouped as ordinary 701/731 traffic.

7. Peace Corps signed a Solomon Islands country agreement

Actor: Peace Corps (Acting Director Christopher Landau); Solomon Islands

Clocks: signed 2026-09-06 in Honiara. Initial volunteers expected early 2028, education sector. Program was suspended 2000 / closed 2008. Sep 2 North Pacific letter of intent (Micronesia / Marshall Islands / Palau) is before exclusive start — fold, do not recensus.

URL: Peace Corps release

Disposition: admit_lower_rank. Bilateral agreement ≠ volunteers on the ground ≠ a 2026 operating post.

8. FTC stipulated payment-processor orders; withdrew a superseded health-app policy statement

Actor: FTC

Clocks: Nuvei complaint + stipulated order 2026-09-04 ($4.85 million); Humboldt Merchant Services complaint 2026-09-08 and stipulated order entered 2026-09-11 ($12 million); 2021 Health Apps / connected-devices policy statement rescinded 2026-09-09 as obsolete after the 2024 Health Breach Notification Rule update; HISA 2027 budget FR 2026-18505 (14-day comment, then Commission approve/disapprove). Personalized-pricing comments still due Sep 25.

URLs: Humboldt; policy withdrawal; HISA budget

Disposition: grouped admit_lower_rank. Stipulated order ≠ litigated liability finding on the merits. Policy-statement rescission is hygiene against a superseded 2021 document, not a change in the 2024 HBNR. HISA budget is a comment clock. Early-termination HSR notices (Sep 9) are routine waiting-period grants.

Other grouped (not individually promoted)

2026-09-03 date-only replay (then dedupe)

NRC AI-workshop advisory 26-026-A (Sep 3) is a meeting. FERC sunshine notice for the September meeting (Sep 3) is the predicate of object 2, not a separate atomic. SBA CHOICE Arrangements (Sep 3) grouped above. FTC personalized-pricing extension (Sep 3) remains 09-03. Peace Corps North Pacific LOI (Sep 2) is before exclusive start. SSA OIG Numident (Sep 3) folded. NEA Poetry Out Loud (Sep 3) grouped.

Bounded negatives

No exhaustive ADAMS, eLibrary, EDIS, CPSC recall-docket, NTSB docket, CSB recommendation-status, DNFSB classified technical, NARA ARC catalog, SBA certifications.sba.gov application-level, SSA POMS full-diff, STB unreported decisions, PRC eDockets crawl, or SAM/USAspending pass. Silence on an unopened docket is not inactivity. DNFSB’s withheld technical reports are an access bound, not a finding that the Board was idle.

Coverage receipt

PublisherStatusNew material / clockEnrichmentRoutine / reject / fold
FERC ferc.gov news + Sep 10 summariesreached1 family (CIP-014-4 + 3 NGA certificates)ISO-NE 120-day; Cornell license; Goldendale rehearingcombined notices; staff EAs/SEIS; winter review
NRC nrc.gov 2026 newsreached1 (26-077 NPRM)North Anna ESP application (2C)ISR FR fold; advisories; PRA; no license/order
NSF nsf.gov/newsreached00leadership letter fold; podcast; PRA
FTC ftc.gov press + legal libraryreached (index JS-thin; objects via search + case-document index)0 promotedHumboldt/Nuvei stipulated orders; HBNR policy rescissionHISA budget; HSR ETs; Sep 25 pricing clock fold
NCUA ncua.govreached0 (TPRM is 2B)0WeDevelopment fold; PRA FR 2026-18224
FCA fca.gov newsroomreached; empty_hunt00last Board news Jun 11
FMC fmc.gov + FRreached0Samsung v CMA CGM complaint; WSC Sep 26 clockOTI applicants; agreement filed
USITC usitc.gov news + noticesmixed: news index reached; some story URLs 403 Akamai1 lower (§1338(g) comments)Negatu sworn701/731 sunsets/institution; 337 IDs
CPSC cpsc.gov recalls + newsreached0Sep 10 recall batchlast Commission press Aug 5
NTSB ntsb.gov newsreached021 Air 7598 recorder update; FY26–30 plan FRAug 28 vice-chair retirement
CSB csb.gov newsreached; empty_hunt0Sep 17 meeting after freezeAug 28 products
DNFSB dnfsb.govreached; classified_nonpublic on some technical0Hanford weeklies postedno new recommendation
NARA archives.gov + ISOO/PIDB blogsreached1 (ISCAP 9/11 release)Constitution exhibit opens Sep 14records schedules; CUI notices Sep 2
SBA sba.gov articlesreached1 (8(a) priority + Return-to-Business)0disasters; SBIC; matching; CHOICE
SSA ssa.gov news + emergencyreached0local office-status; POMS9/11 ceremonial; OIG fold
Peace Corps peacecorps.gov newsreached1 lower (Solomon Islands agreement)volunteers 2028Sep 2 North Pacific LOI pre-window
STB stb.gov news + FRreached0Flixbus/Greyhound control notice; Fortress exemption noticelast press Jun 3
PRC prc.gov + FRreached00new postal products; complaint notice
SSS sss.gov newsreached; empty_hunt0auto-registration still Dec 2026no in-window release
USTDA ustda.govreached0Luzon forum; PH ship-repair support; Africa ports; Ghana fiberRFP close Sep 11
NEA arts.gov newsreached0Poetry Out Loud cycle launchJazz Masters Sep 15 after freeze
NEH neh.gov newsroomreached0grantee “in the news”no agency award drop
Smithsonian si.edu newsdeskreached0Secretary Bunch retirement 09-089/11 programming; panda birthday
EPA (other-than-2C)looked; fold002C objects
GSA (other-than-2C)looked; fold002C objects
FCC (other-than-1C FR)reached1 lower (conditional approvals + prohibited-entities list)Covered List page Sep 9FR 2026-18535 fold
NASA (other-than-2C)looked; fold002C objects
ARC arc.gov newsreached; empty in-window0listening sessions scheduledAug 20 chartbook
DRA dra.govreached; empty in-window00last RSS Dec 2025
Denali denali.govreached; empty in-window00stale news
NBRC nbrc.govindex hit; empty in-window00June awards
SCRC / SBRC / Gulf Restoreindexes hit; empty in-window00FY27 CJs / June FPL
NeighborWorks / LSC / SIPCharvest-adjacent look0 federal-control0no instrument

Surfaces (reached / empty_hunt / blocked / unresolved)

SurfaceResult
ferc.gov/news-events/newsreached
ferc.gov Sep 2026 meeting summariesreached; order PDFs unread
nrc.gov 2026 news index + 26-077 PDFreached
nsf.gov/newsreached
ftc.gov/news-events/news/press-releasesindex JS-thin; objects reached via search + case-document index
ncua.gov news / press-releasesreached
fca.gov/newsroom/newsreached; empty in-window
fmc.gov news + FR complaintsreached
usitc.gov/news_releases + commission_noticesindex reached; some story URLs blocked 403
cpsc.gov/Recalls + Newsroom/News-Releasesreached
ntsb.gov newsroom + DCA26MA352reached
csb.gov/newsreached; empty in-window
dnfsb.gov What’s Newreached; some technical classified_nonpublic
archives.gov press + ISOO/PIDB blogs + ISCAP PDFsreached
sba.gov/articles + 26-90reached (legacy host redirect)
ssa.gov/news/en + /agency/emergencyreached
peacecorps.gov/newsreached
stb.gov news-communications + FRreached
prc.gov + FRreached
sss.gov/news-and-mediareached; empty in-window
ustda.gov events + sector newsreached
arts.gov/newsreached
neh.gov/newsroomreached
si.edu/newsdeskreached
epa.gov / gsa.gov / nasa.gov newslooked for other; 2C objects folded
fcc.gov Covered List + DA-26-957/962reached (other-than-1C)
arc.gov / dra.gov / denali.gov / nbrc.gov news indexesreached; empty in-window
neighborworks.org / lsc.gov / sipc.orgharvest-adjacent look; no federal-control object

A 403, JS shell, or empty fetch is a tool-path failure, not a finding that the publisher was silent.

Lane closed?

Yes for the named core list (FERC, NRC, NSF, FTC, NCUA, FCA, FMC, USITC, CPSC, NTSB, CSB, DNFSB, NARA, SBA, SSA, Peace Corps, STB, PRC, SSS, USTDA, NEA, NEH, Smithsonian), plus the instructed EPA/GSA/FCC/NASA other-item look and a pass on regional-commission news indexes and harvest-adjacent NeighborWorks/LSC/SIPC for federal-control objects. Open gates, not incompleteness theater:

No vault write. No Catalog/Registry mutation. No entity-chart write. Workbench only.

Sources

Full saved reading

View cited sources (17)

These are the sources cited by this reading. Each source keeps its own date and scope.

Document details and formats
Optional file downloads
For AI readers: complete text and record details
About the dates and filing language
Evidence date
When this document or named claim was checked. A newer collection, export or website date does not update it.
Current, private, Workbench or promotion
These can describe the saved document’s original filing or custody. This public reading preserves that history; publication does not turn its findings into government approval, binding law or newly verified evidence.
Master data and projection
The maintained factual record and a page generated from it. Repeated views are not additional independent evidence.
Provenance and source join
Where a record came from, and the exact reference connecting a claim to its source.
Gate, receipt and operating evidence
A required decision or condition, its documentary record, and evidence that the named activity actually occurred. Permission, delivery and operation stay separate.

Saved research reading. Its original dates and claim limits control; the export date does not refresh the evidence.

Original title: Wave 3D — independents: science, safety, and economic regulators