Skip to content

International monetary source watchboard

Status: Maintained source and evidence-gap index; no watch schedule is created here. Original research cutoff: 2026-07-20; later saved resolutions are named separately below.
Purpose: Watch the records that can change the initiation map. Commentary, reposts and market narratives may point to an event; they do not promote its status.

Reading route: The maintained initiation answer owns the shared

cross-region conclusion. This specialist retains its detailed evidence and original research clocks. September 7 consolidation is saved-source reconciliation, not a fresh review of every region or scheduled milestone.

Saved resolutions and remaining evidence gaps

The original source/test rows below are preserved as research criteria. Apply these later saved dispositions before treating their earlier gaps as

unresolved. The Japan August source ledger owns the exact source rows.

Original questionSaved resolutionStill needed
Japan crypto-law promulgationJuly 23 Act No. 64; narrow enforcement subset effective August 12 (JPN-AUG-017)Main Cabinet-order commencement, registration transition and separate tax/ETF permissions; original transition tests still apply
Agorá first real-value phaseControlled July testing completed; official results July 30 (JPN-AUG-014)Production agreement, integrated RTGS/core connections, transaction/failure records and legal finality; prototype real value does not settle these
DCP tokenized-deposit architecture43-company validation began August 20, announced August 26 (JPN-AUG-015)Selected architecture, production use, failure handling and interbank finality
JGB repo study to implementationAugust 13 named Canton implementation PoC (JPN-AUG-016)Selected cash leg, completed DvP and production title/finality evidence
JPYSC reserve/redemption detailJune 30 reserve snapshot and direct-redemption route found in August (JPN-AUG-018)Updated attestation, actual redemption/use evidence and external circulation under published terms
Hangang operating scopeJuly 31 saved update supplies earlier July 15 designationsExecuted subsidy payments, operating manuals, usage, interoperability and legal-finality evidence remain separate

The Korea digital-money annex also records March 30 BOK-Wire+ hours,

May 26 ISO 20022 production and the older end-2026 offshore-KRW pilot versus later 2027 operation target. These do not resolve tokenized-KTB settlement or first actual subsidy-use tests. Dates retained below are saved research gates, not new reminders or evidence that a scheduled operation occurred.

Promotion rule

An item moves from proposal or scheduled only when the entity with legal or operating authority publishes the necessary record. The decisive fields are:

Japan

Watch objectPrimary source pathSignal that mattersPromotion / falsification test
Yen/JGB stressMOF JGB auctions, BOJ bond-market surveys, BOJ operationsSuper-long auction tails, dealer depth, implied volatility, intervention/operations, cross-currency basisA sustained multi-source break plus an official operation/margin/liquidity response; a dramatic price alone is insufficient
BOJ normalizationMonetary Policy Meetings, BOJ accountsRate path, purchase path, reserve remuneration, JGB income/costChanged operation or balance-sheet policy; accounting pressure alone is not incapacity
Domestic JGB absorptionGPIF disclosures, Japan Post Bank investor relationsSecurity-level holdings where available, hedged-foreign-bond share, actual Japan Post JGB ladder buildNamed JGB purchases and holdings, not broad “domestic bond” bucket movement
Bank JGB duration thresholdMUFG, Mizuho, SMFG, Resona and regional-bank investor presentationsAFS/HTM composition, remaining maturity, hedge resets, BOJ cash, deposit beta and foreign-currency fundingSeveral independent banks lengthen JGB duration at the same yield range; one classification move is insufficient
Trust-stablecoin reserve channelFSA electronic-payment-instrument material, issuer attestationsCovered legal form, reserve composition, sovereign maturity, valuation/cure eventsA licensed product actually uses the new option at material scale
SBI JPYSCSBI launch record, SBI VC Trade disclosuresReserve attestation, redemption, balances, lending, external withdrawal, chain and counterpartiesFirst external-wallet/public-chain transfer under disclosed legal and operational terms
Three-megabank trust stablecoinJoint bank releaseTrustee, currency, reserve assets, participant council, first user and redemptionCompleted real-value transaction during FY2026; announcement remains scheduled
Yucho DCJPYJapan Post Bank releasesOperating terms, customer scope, core-ledger connection, interbank finality and first useLive tokenized-deposit issuance/transaction; management-plan language is not production
JSCC/Canton collateral PoCJPX/JSCC releasesAuthoritative title record, production participant rules, collateral finality, operating dateFirst production collateral transfer recognized under the book-entry system
Progmat tokenized-JGB repoProgmat releasesOctober report, token legal form, cash leg, repo agreement, default handlingSpecific real-value issuance/repo with named cash and title ledgers
BOJ tokenized-reserve work / AgoráBOJ CBDC program, BIS AgoráIssuance decision, real-value phase, participant/rulebook and finalityReal-value transaction; sandbox demonstration stays pilot
FIEA crypto-market reformFSA Diet-law page, Diet proceeding historyPromulgation date/number, Cabinet-order commencement, registration transition, issuer disclosure, capital/custody rules and tax-qualified asset scopeDo not call the 2026-07-15 passage effective law, security classification, ETF approval or blanket tax change before the specific legal clock fires. After commencement, watch the 2-week notice, 3-month disclosure, 6-month application and 2-year outside transition clocks separately

South Korea

Watch objectPrimary source pathSignal that mattersPromotion / falsification test
Hangang Phase IIBOK payment and settlement releasesExact H2 opening, nine-bank roster, merchant/public-program uses, P2P and conversion termsPublic transaction record under published operating terms
Korean Treasury deposit-token useBOK and finance/climate ministry releasesFirst EV-charging subsidy, beneficiary bank token, BOK settlement and reversalsCompleted public-funds payment; 2030 policy goal alone is not occurrence
Tokenized Korean sovereign settlementBOK, KRX, KSD and FSC releasesToken legal record, KSD role, cash leg, finality and collateral treatmentFirst real tokenized KTB/security settled in BOK or bank deposit-token money
Tokenized-security implementationFSC English releasesSubordinate rules, KSD record hierarchy, issuer/intermediary eligibility, settlement cashEffective 2027 regime plus first compliant issuance/secondary settlement
Won stablecoin frameworkFSC / National Assembly enacted textLegal issuer, reserve assets, redemption priority, BOK/FSC divisionPromulgated law; committee discussion remains proposal
24-hour KRW settlementBOK payment-system mapOperator, participant access, central-bank-money funding, legal finalityFirst completed offshore KRW pilot settlement and operating rulebook
Korea–Indonesia QR/LCTBOK and Bank Indonesia releasesVolume, ACCD roster, FX quotation, settlement cycle, dispute rulesPublished production data and named settlement arrangement

Indonesia / ASEAN

Watch objectPrimary source pathSignal that mattersPromotion / falsification test
QRIS production corridorsBI QRIS Cross-BorderDirectionality, transaction/value growth, merchant/PSP scope, outages and settlement cyclesSustained growth beyond bounded tourism use; do not infer wholesale use
DHE SDA export-FX captureBI DHE rules, state-bank disclosuresSpecial-account balances, retention, conversion, use as collateral and placement by instrumentMeasured state-bank FX and FX SUN/SBSN flows; legal permission alone does not prove allocation
LCT/ACCDBI regulations, BI partner releasesUnderlying-transaction scope, dealer banks, direct-pair liquidity and trade/investment volumesExpansion into new instruments/use cases with operative bank rules
China/CNH/CIPS objectsBI/PBOC releases and CIPS participant recordsCNH–IDR operation volume, clearing-bank appointment, Mandiri CIPS activityKeep FX operations, QR, LCT and CIPS as separate promoted objects
Nexus / BI-FASTBI releases, BIS NexusCertification, FX-provider model, finality, participant go-liveFirst BI-FAST production transaction through Nexus
Digital RupiahProject GarudaPrototype/pilot transition, interface with BI-RTGS/SSSS, asset/cash ledgerFormal issuance/pilot decision and real participants; PoC remains exploration
Bullion ecosystemOJK releasesAllocated/unallocated title, custody, reserve ratios, financing/rehypothecation rightsDocumented payment or monetary-reserve link; otherwise keep separate from money rails

Europe

Watch objectPrimary source pathSignal that mattersPromotion / falsification test
PontesECB Pontes/Appia publicationsSeptember production notice, admitted platforms, rulebook, volumes, TARGET finalityFirst settled production transaction; scheduled launch is not occurrence
DLT collateral circuitECB collateral framework, ECMS/CSD transaction releasesRepeat issuances, maturities, CSD reachability and central-bank credit mobilizationRepeated transactions across issuers/platforms; one completed circuit proves capability, not ubiquity
Authorized DLT infrastructuresESMA listNew authorizations, exemptions, volume, withdrawals/failuresAuthorization plus transaction evidence; permission alone is not use
Digital-euro law and issuanceEuropean Parliament procedure, ECB progressTrilogues/final text, offline model, holding limits, intermediary duties, ECB decisionEnacted law, then separate ECB issuance decision
Digital-euro betaECB pilotParticipant selection, commercial-money funding, exact start and test resultsKeep explicitly separate from legal digital-euro issuance
Private euro moneyNational supervisors, Qivalis, SG-FORGE and bank tokenized-deposit termsQivalis DNB authorization; EURCV/redemption volumes; tokenized-deposit interoperability and settlement useSeparate each deposit/EMT issuer; 37-bank consortium membership is not issuance

BRICS and member-state coordination

Watch objectPrimary source pathSignal that mattersPromotion / falsification test
Leaders’ and finance declarationsBRICS documentsChange from “study/discuss” to named operator, rulebook, funding and effective dateBinding or operative act by an entity with authority
BPTF technical reportBanco Central do Brasil disclosure/classification registersDeclassification or official public summaryUntil public, do not infer detailed architecture
BRICS ClearLeaders, finance ministries, securities regulators/CSDsFeasibility result, legal operator, depository location, asset and finality rulesOperative rulebook and admitted production participants
CRA amendmentTreaty/depositary and member ratification recordsExecuted revised treaty, eligible currencies, drawing proceduresEffective amendment; proposal/consensus is not enough
NDB local-currency financeNDB reportsCurrency-specific funding/lending, swaps, repayment currencyContinue separating each national currency from any pooled unit
Russia digital-ruble accessBank of Russia2026-09-01 bank/merchant implementation, wallets, payments, budget and cross-border rulesActual staged access and usage; statutory date is not occurrence before cutover
Russia digital-currency / digital-rights market billDuma Bill No. 1194918-8, Bank of Russia concept, stablecoin consultationScheduled 2026-07-21 second reading; final taxonomy, investor limits, foreign stablecoin access, digital depositories, exchange offices, wallet reporting and subordinate rules. Revised draft separates 2026-09-01 main commencement, 2027-07-01 licensed-only/bank-blocking perimeter and 2027-09-01 48-hour antifraud controlsPromote only after both chambers, presidential signature and publication; keep digital currency, digital financial asset, foreign digital instrument, stablecoin and digital ruble separate
Brazil DrexBCB pilotPhase II report, privacy/governance solution, real-value participants and federal-security DvPSimulated-user pilot remains pilot until BCB authorizes real-value operation
BRICS PayConsortium legal documents and member-state central banksRegulated operator, state-system mandate, settlement asset, production volumePrivate demo/roadmap never promoted to bloc system without authority
UNITOfficial member-state/NDB acts plus issuer/custodian documentsLegal issuer, reserves, audit, redemption, official adoptionPrivate prototype stays private until an authorized institution adopts it

Cross-regional adapters

Watch objectPrimary source pathSignal that mattersPromotion / falsification test
Project AgoráBIS project pageReal-value phase, jurisdictions/banks, AML controls, governing law and loss allocationFirst real-value transaction under published rules
Swift shared ledgerSwift press releasesPioneer transaction, asset ledgers, final settlement systems, reversals/errorsSeparate orchestration from asset and finality on every use
FSB cross-border roadmapFSB cross-border paymentsCorridor plans, stablecoin use, data/legal frictionsOperational plan or measurable production change, not target restatement

Original research questions — route to the maintained answer

The maintained initiation answer owns the cross-region synthesis. These original questions retain the investigation’s scope and are not assertions that their answers remain wholly unknown.

  1. Which event first joins a tokenized asset to legally final central-bank money at production scale?
  2. Which local-currency retail corridor first expands into a documented trade, treasury or wholesale flow?
  3. Does a Japan stress event change collateral operations, or merely prices?
  4. Does Korea settle tokenized securities in BOK digital currency, deposit tokens, a regulated stablecoin or conventional BOK-Wire+ cash?
  5. Does Pontes admit multiple external platforms without weakening TARGET and collateral controls?
  6. Does any BRICS workstream acquire a legal operator and public rulebook, or do member-state rails remain the only production layer?
  7. Where does the United States enter: interface, collateral, law, sanctions, liquidity, or all five?

Sources

Full saved reading

View cited sources (40)

These are the sources cited by this reading. Each source keeps its own date and scope.

Document details and formats
Optional file downloads
For AI readers: complete text and record details
About the dates and filing language
Evidence date
When this document or named claim was checked. A newer collection, export or website date does not update it.
Current, private, Workbench or promotion
These can describe the saved document’s original filing or custody. This public reading preserves that history; publication does not turn its findings into government approval, binding law or newly verified evidence.
Master data and projection
The maintained factual record and a page generated from it. Repeated views are not additional independent evidence.
Provenance and source join
Where a record came from, and the exact reference connecting a claim to its source.
Gate, receipt and operating evidence
A required decision or condition, its documentary record, and evidence that the named activity actually occurred. Permission, delivery and operation stay separate.

Saved research reading. Its original dates and claim limits control; the export date does not refresh the evidence.