International monetary source watchboard
Status: Maintained source and evidence-gap index; no watch schedule is created here.
Original research cutoff: 2026-07-20; later saved resolutions are named separately below.
Purpose: Watch the records that can change the initiation map. Commentary, reposts and market narratives may point to an event; they do not promote its status.
Reading route: The maintained initiation answer owns the shared
cross-region conclusion. This specialist retains its detailed evidence and original research clocks. September 7 consolidation is saved-source reconciliation, not a fresh review of every region or scheduled milestone.
Saved resolutions and remaining evidence gaps
The original source/test rows below are preserved as research criteria. Apply these later saved dispositions before treating their earlier gaps as
unresolved. The Japan August source ledger owns the exact source rows.
| Original question | Saved resolution | Still needed |
|---|---|---|
| Japan crypto-law promulgation | July 23 Act No. 64; narrow enforcement subset effective August 12 (JPN-AUG-017) | Main Cabinet-order commencement, registration transition and separate tax/ETF permissions; original transition tests still apply |
| Agorá first real-value phase | Controlled July testing completed; official results July 30 (JPN-AUG-014) | Production agreement, integrated RTGS/core connections, transaction/failure records and legal finality; prototype real value does not settle these |
| DCP tokenized-deposit architecture | 43-company validation began August 20, announced August 26 (JPN-AUG-015) | Selected architecture, production use, failure handling and interbank finality |
| JGB repo study to implementation | August 13 named Canton implementation PoC (JPN-AUG-016) | Selected cash leg, completed DvP and production title/finality evidence |
| JPYSC reserve/redemption detail | June 30 reserve snapshot and direct-redemption route found in August (JPN-AUG-018) | Updated attestation, actual redemption/use evidence and external circulation under published terms |
| Hangang operating scope | July 31 saved update supplies earlier July 15 designations | Executed subsidy payments, operating manuals, usage, interoperability and legal-finality evidence remain separate |
The Korea digital-money annex also records March 30 BOK-Wire+ hours,
May 26 ISO 20022 production and the older end-2026 offshore-KRW pilot versus later 2027 operation target. These do not resolve tokenized-KTB settlement or first actual subsidy-use tests. Dates retained below are saved research gates, not new reminders or evidence that a scheduled operation occurred.
Promotion rule
An item moves from proposal or scheduled only when the entity with legal or operating authority publishes the necessary record. The decisive fields are:
- legal entity and authority;
- money/asset and creditor claim;
- authoritative ledger or record;
- settlement asset and finality rule;
- FX/liquidity mechanism;
- collateral/title structure;
- participant eligibility and control rights;
- exact status, date and first evidenced transaction.
Japan
| Watch object | Primary source path | Signal that matters | Promotion / falsification test |
|---|---|---|---|
| Yen/JGB stress | MOF JGB auctions, BOJ bond-market surveys, BOJ operations | Super-long auction tails, dealer depth, implied volatility, intervention/operations, cross-currency basis | A sustained multi-source break plus an official operation/margin/liquidity response; a dramatic price alone is insufficient |
| BOJ normalization | Monetary Policy Meetings, BOJ accounts | Rate path, purchase path, reserve remuneration, JGB income/cost | Changed operation or balance-sheet policy; accounting pressure alone is not incapacity |
| Domestic JGB absorption | GPIF disclosures, Japan Post Bank investor relations | Security-level holdings where available, hedged-foreign-bond share, actual Japan Post JGB ladder build | Named JGB purchases and holdings, not broad “domestic bond” bucket movement |
| Bank JGB duration threshold | MUFG, Mizuho, SMFG, Resona and regional-bank investor presentations | AFS/HTM composition, remaining maturity, hedge resets, BOJ cash, deposit beta and foreign-currency funding | Several independent banks lengthen JGB duration at the same yield range; one classification move is insufficient |
| Trust-stablecoin reserve channel | FSA electronic-payment-instrument material, issuer attestations | Covered legal form, reserve composition, sovereign maturity, valuation/cure events | A licensed product actually uses the new option at material scale |
| SBI JPYSC | SBI launch record, SBI VC Trade disclosures | Reserve attestation, redemption, balances, lending, external withdrawal, chain and counterparties | First external-wallet/public-chain transfer under disclosed legal and operational terms |
| Three-megabank trust stablecoin | Joint bank release | Trustee, currency, reserve assets, participant council, first user and redemption | Completed real-value transaction during FY2026; announcement remains scheduled |
| Yucho DCJPY | Japan Post Bank releases | Operating terms, customer scope, core-ledger connection, interbank finality and first use | Live tokenized-deposit issuance/transaction; management-plan language is not production |
| JSCC/Canton collateral PoC | JPX/JSCC releases | Authoritative title record, production participant rules, collateral finality, operating date | First production collateral transfer recognized under the book-entry system |
| Progmat tokenized-JGB repo | Progmat releases | October report, token legal form, cash leg, repo agreement, default handling | Specific real-value issuance/repo with named cash and title ledgers |
| BOJ tokenized-reserve work / Agorá | BOJ CBDC program, BIS Agorá | Issuance decision, real-value phase, participant/rulebook and finality | Real-value transaction; sandbox demonstration stays pilot |
| FIEA crypto-market reform | FSA Diet-law page, Diet proceeding history | Promulgation date/number, Cabinet-order commencement, registration transition, issuer disclosure, capital/custody rules and tax-qualified asset scope | Do not call the 2026-07-15 passage effective law, security classification, ETF approval or blanket tax change before the specific legal clock fires. After commencement, watch the 2-week notice, 3-month disclosure, 6-month application and 2-year outside transition clocks separately |
South Korea
| Watch object | Primary source path | Signal that matters | Promotion / falsification test |
|---|---|---|---|
| Hangang Phase II | BOK payment and settlement releases | Exact H2 opening, nine-bank roster, merchant/public-program uses, P2P and conversion terms | Public transaction record under published operating terms |
| Korean Treasury deposit-token use | BOK and finance/climate ministry releases | First EV-charging subsidy, beneficiary bank token, BOK settlement and reversals | Completed public-funds payment; 2030 policy goal alone is not occurrence |
| Tokenized Korean sovereign settlement | BOK, KRX, KSD and FSC releases | Token legal record, KSD role, cash leg, finality and collateral treatment | First real tokenized KTB/security settled in BOK or bank deposit-token money |
| Tokenized-security implementation | FSC English releases | Subordinate rules, KSD record hierarchy, issuer/intermediary eligibility, settlement cash | Effective 2027 regime plus first compliant issuance/secondary settlement |
| Won stablecoin framework | FSC / National Assembly enacted text | Legal issuer, reserve assets, redemption priority, BOK/FSC division | Promulgated law; committee discussion remains proposal |
| 24-hour KRW settlement | BOK payment-system map | Operator, participant access, central-bank-money funding, legal finality | First completed offshore KRW pilot settlement and operating rulebook |
| Korea–Indonesia QR/LCT | BOK and Bank Indonesia releases | Volume, ACCD roster, FX quotation, settlement cycle, dispute rules | Published production data and named settlement arrangement |
Indonesia / ASEAN
| Watch object | Primary source path | Signal that matters | Promotion / falsification test |
|---|---|---|---|
| QRIS production corridors | BI QRIS Cross-Border | Directionality, transaction/value growth, merchant/PSP scope, outages and settlement cycles | Sustained growth beyond bounded tourism use; do not infer wholesale use |
| DHE SDA export-FX capture | BI DHE rules, state-bank disclosures | Special-account balances, retention, conversion, use as collateral and placement by instrument | Measured state-bank FX and FX SUN/SBSN flows; legal permission alone does not prove allocation |
| LCT/ACCD | BI regulations, BI partner releases | Underlying-transaction scope, dealer banks, direct-pair liquidity and trade/investment volumes | Expansion into new instruments/use cases with operative bank rules |
| China/CNH/CIPS objects | BI/PBOC releases and CIPS participant records | CNH–IDR operation volume, clearing-bank appointment, Mandiri CIPS activity | Keep FX operations, QR, LCT and CIPS as separate promoted objects |
| Nexus / BI-FAST | BI releases, BIS Nexus | Certification, FX-provider model, finality, participant go-live | First BI-FAST production transaction through Nexus |
| Digital Rupiah | Project Garuda | Prototype/pilot transition, interface with BI-RTGS/SSSS, asset/cash ledger | Formal issuance/pilot decision and real participants; PoC remains exploration |
| Bullion ecosystem | OJK releases | Allocated/unallocated title, custody, reserve ratios, financing/rehypothecation rights | Documented payment or monetary-reserve link; otherwise keep separate from money rails |
Europe
| Watch object | Primary source path | Signal that matters | Promotion / falsification test |
|---|---|---|---|
| Pontes | ECB Pontes/Appia publications | September production notice, admitted platforms, rulebook, volumes, TARGET finality | First settled production transaction; scheduled launch is not occurrence |
| DLT collateral circuit | ECB collateral framework, ECMS/CSD transaction releases | Repeat issuances, maturities, CSD reachability and central-bank credit mobilization | Repeated transactions across issuers/platforms; one completed circuit proves capability, not ubiquity |
| Authorized DLT infrastructures | ESMA list | New authorizations, exemptions, volume, withdrawals/failures | Authorization plus transaction evidence; permission alone is not use |
| Digital-euro law and issuance | European Parliament procedure, ECB progress | Trilogues/final text, offline model, holding limits, intermediary duties, ECB decision | Enacted law, then separate ECB issuance decision |
| Digital-euro beta | ECB pilot | Participant selection, commercial-money funding, exact start and test results | Keep explicitly separate from legal digital-euro issuance |
| Private euro money | National supervisors, Qivalis, SG-FORGE and bank tokenized-deposit terms | Qivalis DNB authorization; EURCV/redemption volumes; tokenized-deposit interoperability and settlement use | Separate each deposit/EMT issuer; 37-bank consortium membership is not issuance |
BRICS and member-state coordination
| Watch object | Primary source path | Signal that matters | Promotion / falsification test |
|---|---|---|---|
| Leaders’ and finance declarations | BRICS documents | Change from “study/discuss” to named operator, rulebook, funding and effective date | Binding or operative act by an entity with authority |
| BPTF technical report | Banco Central do Brasil disclosure/classification registers | Declassification or official public summary | Until public, do not infer detailed architecture |
| BRICS Clear | Leaders, finance ministries, securities regulators/CSDs | Feasibility result, legal operator, depository location, asset and finality rules | Operative rulebook and admitted production participants |
| CRA amendment | Treaty/depositary and member ratification records | Executed revised treaty, eligible currencies, drawing procedures | Effective amendment; proposal/consensus is not enough |
| NDB local-currency finance | NDB reports | Currency-specific funding/lending, swaps, repayment currency | Continue separating each national currency from any pooled unit |
| Russia digital-ruble access | Bank of Russia | 2026-09-01 bank/merchant implementation, wallets, payments, budget and cross-border rules | Actual staged access and usage; statutory date is not occurrence before cutover |
| Russia digital-currency / digital-rights market bill | Duma Bill No. 1194918-8, Bank of Russia concept, stablecoin consultation | Scheduled 2026-07-21 second reading; final taxonomy, investor limits, foreign stablecoin access, digital depositories, exchange offices, wallet reporting and subordinate rules. Revised draft separates 2026-09-01 main commencement, 2027-07-01 licensed-only/bank-blocking perimeter and 2027-09-01 48-hour antifraud controls | Promote only after both chambers, presidential signature and publication; keep digital currency, digital financial asset, foreign digital instrument, stablecoin and digital ruble separate |
| Brazil Drex | BCB pilot | Phase II report, privacy/governance solution, real-value participants and federal-security DvP | Simulated-user pilot remains pilot until BCB authorizes real-value operation |
| BRICS Pay | Consortium legal documents and member-state central banks | Regulated operator, state-system mandate, settlement asset, production volume | Private demo/roadmap never promoted to bloc system without authority |
| UNIT | Official member-state/NDB acts plus issuer/custodian documents | Legal issuer, reserves, audit, redemption, official adoption | Private prototype stays private until an authorized institution adopts it |
Cross-regional adapters
| Watch object | Primary source path | Signal that matters | Promotion / falsification test |
|---|---|---|---|
| Project Agorá | BIS project page | Real-value phase, jurisdictions/banks, AML controls, governing law and loss allocation | First real-value transaction under published rules |
| Swift shared ledger | Swift press releases | Pioneer transaction, asset ledgers, final settlement systems, reversals/errors | Separate orchestration from asset and finality on every use |
| FSB cross-border roadmap | FSB cross-border payments | Corridor plans, stablecoin use, data/legal frictions | Operational plan or measurable production change, not target restatement |
Original research questions — route to the maintained answer
The maintained initiation answer owns the cross-region synthesis. These original questions retain the investigation’s scope and are not assertions that their answers remain wholly unknown.
- Which event first joins a tokenized asset to legally final central-bank money at production scale?
- Which local-currency retail corridor first expands into a documented trade, treasury or wholesale flow?
- Does a Japan stress event change collateral operations, or merely prices?
- Does Korea settle tokenized securities in BOK digital currency, deposit tokens, a regulated stablecoin or conventional BOK-Wire+ cash?
- Does Pontes admit multiple external platforms without weakening TARGET and collateral controls?
- Does any BRICS workstream acquire a legal operator and public rulebook, or do member-state rails remain the only production layer?
- Where does the United States enter: interface, collateral, law, sanctions, liquidity, or all five?
Sources
Full saved reading
View cited sources (40)
These are the sources cited by this reading. Each source keeps its own date and scope.
- MOF JGB auctions
- BOJ bond-market surveys
- Monetary Policy Meetings
- BOJ accounts
- GPIF disclosures
- Japan Post Bank investor relations
- FSA electronic-payment-instrument material
- SBI launch record
- Joint bank release
- JPX/JSCC releases
- Progmat releases
- BOJ CBDC program
- BIS Agorá
- FSA Diet-law page
- Diet proceeding history
- BOK payment and settlement releases
- FSC English releases
- BOK payment-system map
- Bank Indonesia releases
- BI QRIS Cross-Border
- BI DHE rules
- BI regulations
- BIS Nexus
- Project Garuda
- OJK releases
- ECB Pontes/Appia publications
- ECB collateral framework
- ESMA list
- European Parliament procedure
- ECB progress
- ECB pilot
- BRICS documents
- NDB reports
- Bank of Russia
- Duma Bill No. 1194918-8
- Bank of Russia concept
- stablecoin consultation
- BCB pilot
- Swift press releases
- FSB cross-border payments
Document details and formats
About the dates and filing language
- Evidence date
- When this document or named claim was checked. A newer collection, export or website date does not update it.
- Current, private, Workbench or promotion
- These can describe the saved document’s original filing or custody. This public reading preserves that history; publication does not turn its findings into government approval, binding law or newly verified evidence.
- Master data and projection
- The maintained factual record and a page generated from it. Repeated views are not additional independent evidence.
- Provenance and source join
- Where a record came from, and the exact reference connecting a claim to its source.
- Gate, receipt and operating evidence
- A required decision or condition, its documentary record, and evidence that the named activity actually occurred. Permission, delivery and operation stay separate.
Saved research reading. Its original dates and claim limits control; the export date does not refresh the evidence.