Research Design and Evidence Standard — Investment-to-Funding Ledger
The seven clocks
Each project is recorded independently across:
- announcement or memorandum;
- legal owner / project-SPV formation;
- board-approved capex;
- customer support (offtake, capacity reservation, PPA or prepayment);
- signed financing commitment (equity subscription, facility, bond or private placement);
- financial close and first draw; and
- actual construction spend, placed-in-service date and operating revenue.
Only clocks 5–7 answer where project money is actually coming from. Clock 1 is often the only clock visible in an administration investment list.
Capital-stack fields
| Object | Required evidence | Claim limit |
|---|---|---|
| Sponsor equity / corporate cash | audited cash-flow and debt notes; 8-K/JV agreement; subsidiary accounts | Does not prove exclusive cash funding of a named project. |
| Parent-company debt | bond prospectus/indenture, credit agreement, 10-K debt note | Use of proceeds may be corporate-wide rather than project-specific. |
| Project-finance debt | SPV credit agreement, lender disclosure, mortgage/UCC filing, official statement | Commitment is not a full draw or final distributed holder. |
| Syndicated loan | agreement, arranger disclosure, borrower/lender filing | Lead arranger is not necessarily the economic holder of the whole credit. |
| Bonds / private placements | prospectus, indenture, issuer financial statements, EMMA official statement | Do not assign it to a project without a specific proceeds covenant. |
| Private credit / fund finance | borrower/lender filings, BDC/insurer reports, security filings | Private terms can remain undisclosed. Carry the gap honestly. |
| Public grant, loan or guarantee | signed award/agreement, USAspending, agency docket, appropriation | Conditional award or guarantee is not cash draw. |
| Tax credit or tax equity | project/investor disclosures and credit-registration/transfer evidence | Projected value is not available construction cash merely at announcement. |
| Foreign direct investment | parent/affiliate filings, investment agreement; BEA only as macro cross-check | Country-level FDI is not a site-by-site cash record. |
| Customer support | contract exhibit, deferred-revenue note, utility/FERC/PUC filing | Revenue support does not necessarily fund all construction. |
| Utility/public infrastructure | interconnection agreement, rate case, PUC/FERC docket, municipal-bond statement | A project announcement does not prove shifted ratepayer/public cost. |
Primary-source ladder
- Executed financing document; bond prospectus/indenture; SEC 8-K, 10-K or 10-Q; PUC/FERC order or tariff; official municipal-bond statement.
- Government award/loan agreement and its actual disbursement record.
- Audited borrower, sponsor and lender financial statements.
- County mortgage/deed-of-trust and UCC filing.
- Named lender, sponsor or utility release.
- Site-selection announcement, MOU, political total or media estimate.
Macro controls, separate from project funding
The banking question needs two different records:
- Project ledger: arranger → commitment → initial funding → syndication/distribution → final economic holder.
- System sheet: bank capital, funding, liquidity, risk and concentration conditions; aggregate corporate bonds, bank loans, private credit, FDI and foreign financial-account flows.
Do not infer a named project’s creditor from the system sheet. Equally, do not infer that an announced aggregate must occupy the balance sheet of U.S. commercial banks. The Federal Reserve’s Financial Accounts show nonfinancial-business debt outstanding, but its categories include bonds, mortgages, depository loans, commercial paper and other loans; those claims ultimately sit across bank and nonbank investors.
Crypto return gate
Crypto becomes a funding object only if at least one of the following is documented:
| Possible role | What must be proved |
|---|---|
| Sponsor sells crypto treasury | audited holdings, sale, proceeds and capital contribution to the borrower/SPV |
| Stablecoin payment rail | named payment terms, wallet/custody structure and invoices/settlement evidence |
| Tokenized bond or loan participation | security/loan terms, issuer/SPV, investor proceeds, servicing and custody |
| DeFi/on-chain loan | legal borrower/lender, enforceable terms, collateral, draw and borrower receipt |
| Tokenized Treasury/MMF collateral | collateral and financing agreement showing its actual function |
Tokenization may alter distribution, settlement or collateral management. It does not, without an identified investor or lender balance sheet, create net construction capital.
First-wave registry fields
Project / parent / SPV Headline amount and exact source wording Announcement date and horizon Location, land owner and utility/interconnection entity Claim class: announced | board-approved | committed | closed | drawn | spent | operating Capex uses: building | equipment | compute | grid/water | working capital Sponsor equity/cash source Debt: instrument, arranger/lenders, commitment, draw, security, maturity Bond/private placement and stated use of proceeds Government assistance: award, conditions, disbursement Tax-credit pathway and monetization state Customer/offtake/prepayment Utility/public-infrastructure allocation Foreign parent: equity versus intercompany debt Construction / energization / operating clock Evidence links, date and confidence Open document request / falsifier
Sources
Full saved reading
View the saved source references. This record has no direct external citation in its source-link list.
Document details and formats
About the dates and filing language
- Evidence date
- When this document or named claim was checked. A newer collection, export or website date does not update it.
- Current, private, Workbench or promotion
- These can describe the saved document’s original filing or custody. This public reading preserves that history; publication does not turn its findings into government approval, binding law or newly verified evidence.
- Master data and projection
- The maintained factual record and a page generated from it. Repeated views are not additional independent evidence.
- Provenance and source join
- Where a record came from, and the exact reference connecting a claim to its source.
- Gate, receipt and operating evidence
- A required decision or condition, its documentary record, and evidence that the named activity actually occurred. Permission, delivery and operation stay separate.
Saved research reading. Its original dates and claim limits control; the export date does not refresh the evidence.
Saved source details
---
title: "Research Design and Evidence Standard — Investment-to-Funding Ledger"
status: current
artifact_role: research-method
---