Skip to content

Authority Through the Adapter — Control-Point Evidence Matrix

Cutoff: 2026-08-31T10:42:24-04:00 America/New_York
Use: factual comparison beneath the interpretive deep dive
Stage vocabulary: F0 narrative, F1 authority, F2 constitution, F3 readiness, F4 consequence, F5 stress/exit

Monetary and securities cases

CaseNew machineryLegal claim / issuerAuthoritative recordFinality / cashEligibility / collateralCorrection / failure powerEvidence stateAuthority movement
Japan / Project Agorámulti-currency shared programmable platformtokenised reserves issued by central banks; tokenised deposits issued by commercial banksjurisdictional and unifying ledgers inside controlled prototype; external core/RTGS records remain requiredatomic inside prototype; issuance/redemption connect to external RTGS/core systemsparticipant and scenario scope set by testing agreementmaker-checker, manual approvals, operational facilitator, runbook and fallbackF4 for 30 controlled real-value transactions; not productionexecution migrated into prototype; issuer, external money and fallback authority retained
Japan / Canton JGB repo-DvP PoCsynchronized blockchain workflowstatutory book-entry JGB and undecided cash leglegal JGB remains in Book-Entry Transfer Act account system; chain state synchronizedcash architecture and completed DvP unresolvedtest participants and instruments selected by consortiumproduction error/default rule unpublishedF2-F3workflow state moves; legal security record does not
Japan / DCPcompeting tokenised-deposit and stablecoin link designsbank deposits and/or regulated token claim depending on selected designarchitecture still under validationpossible existing-settlement-system link; final form unresolved43-company controlled validationfailure and reversal terms unpublishedF3design contest inside bank/regulatory perimeter
SWIFT shared ledgerBesu/EVM-compatible shared orchestration ledgerbank-issued tokenised depositsbanks' own ledgers and the SWIFT commitment layer perform different rolesexisting RTGS, correspondent or agreed mechanisms remain final routeSWIFT and participating-bank rules; public constitution incompletebanks retain keys, assets and funding; loss/fallback terms still incomplete publiclyF3; ready for controlled initial use, 17 banks preparing pilotsorchestration moves; balance-sheet and settlement authority retained
DTC tokenization servicetokens on approved L1/L2 networks plus off-chain LedgerScanDTC security entitlement under Article 8; registered owner remains Cede & Co.LedgerScan constitutes DTC's official books and records for tokenised entitlementsinitial service does not settle in digitised form; traditional settlement requires detokenizationDTC selects eligible securities, networks, protocols and registered wallets; no initial DTC risk-management collateral valueprotocols must support distribution control and reversibility; DTC addresses error, loss and malfeasanceF1-F3; authorized limited production service, broader operation pendingparticipant transfer instruction moves on-chain; legal framework, official record and reversal remain DTC-governed
Eurosystem / Pontesbridge plus Eurosystem DLT platformcentral-bank money and regulated private settlement assetsmarket ledgers plus T2 / Eurosystem DLT according to leg and phaseinitial cash-leg legal finality in T2; later native Eurosystem-DLT finality plannedEurosystem defines eligible participants, operators and assetsTARGET/Eurosystem rulebook and central-bank liquidity perimeterF3; September 2026 launch pending at cutoffstate operational perimeter expands into DLT; private market ledgers remain plural
UK / GBTDtokenised sterling deposits and programmable paymentsparticipating commercial-bank depositbank and pilot records; general-production constitution not yet publishedBoE Synchronisation Lab explores atomic settlement in central-bank moneyseven participating banks and selected use casesconventional deposit protections stated; production failure terms pendingF3; pilot underway, completion and recurring production not establishedprogrammability moves; bank liability and public settlement anchor remain

Cross-domain analogues

CasePortable / programmable objectNative authority retainedPrivate or distributed roleStress / loss boundaryEvidence stateComparison limit
JBIC/NEXI U.S. gas-power financesigned loans, insurance cover and project milestonesJapanese public lenders/insurers define eligible project and covered risksponsors, commercial lenders, EPC and operators build and run assetspolicy/loan terms assign ordinary loss; systemic or political support remains public-policy-facingF2 signed instruments; no draw/operation proofcapital adapter, not a digital-ledger case
Insurance and reinsurancemodels, policies, capital and claims dataregulators define admissible capital; statutes and public pools define residual losscarriers, reinsurers, brokers, models and ILS distribute riskclaim, insolvency, assessment and public-backstop waterfallmixed F3-F5 by programshows failure constitution, not monetary finality
Federal Scientific Trust Stackidentity, provenance, attestations, agent delegation and execution logsaward, export, FOCI, data, facility and security authorities keep separate legal effectsinteroperable credentials, analytics, platforms and agents carry evidence and execute bounded taskssuspension, termination, correction, appeal and retraction remain authority-specificproduction components; joined stack missingadministrative analogy, not proof about money

Primary source anchors

Project Agorá and Japan

SWIFT

DTC

Europe and the United Kingdom

Cross-domain cases

Evidence exclusions

Sources

Full saved reading

View cited sources (16)

These are the sources cited by this reading. Each source keeps its own date and scope.

Document details and formats
Optional file downloads
For AI readers: complete text and record details
About the dates and filing language
Evidence date
When this document or named claim was checked. A newer collection, export or website date does not update it.
Current, private, Workbench or promotion
These can describe the saved document’s original filing or custody. This public reading preserves that history; publication does not turn its findings into government approval, binding law or newly verified evidence.
Master data and projection
The maintained factual record and a page generated from it. Repeated views are not additional independent evidence.
Provenance and source join
Where a record came from, and the exact reference connecting a claim to its source.
Gate, receipt and operating evidence
A required decision or condition, its documentary record, and evidence that the named activity actually occurred. Permission, delivery and operation stay separate.

Saved research reading. Its original dates and claim limits control; the export date does not refresh the evidence.