Authority Through the Adapter — Control-Point Evidence Matrix
Cutoff: 2026-08-31T10:42:24-04:00 America/New_York
Use: factual comparison beneath the interpretive deep dive
Stage vocabulary: F0 narrative, F1 authority, F2 constitution,
F3 readiness, F4 consequence, F5 stress/exit
Monetary and securities cases
| Case | New machinery | Legal claim / issuer | Authoritative record | Finality / cash | Eligibility / collateral | Correction / failure power | Evidence state | Authority movement |
|---|---|---|---|---|---|---|---|---|
| Japan / Project Agorá | multi-currency shared programmable platform | tokenised reserves issued by central banks; tokenised deposits issued by commercial banks | jurisdictional and unifying ledgers inside controlled prototype; external core/RTGS records remain required | atomic inside prototype; issuance/redemption connect to external RTGS/core systems | participant and scenario scope set by testing agreement | maker-checker, manual approvals, operational facilitator, runbook and fallback | F4 for 30 controlled real-value transactions; not production | execution migrated into prototype; issuer, external money and fallback authority retained |
| Japan / Canton JGB repo-DvP PoC | synchronized blockchain workflow | statutory book-entry JGB and undecided cash leg | legal JGB remains in Book-Entry Transfer Act account system; chain state synchronized | cash architecture and completed DvP unresolved | test participants and instruments selected by consortium | production error/default rule unpublished | F2-F3 | workflow state moves; legal security record does not |
| Japan / DCP | competing tokenised-deposit and stablecoin link designs | bank deposits and/or regulated token claim depending on selected design | architecture still under validation | possible existing-settlement-system link; final form unresolved | 43-company controlled validation | failure and reversal terms unpublished | F3 | design contest inside bank/regulatory perimeter |
| SWIFT shared ledger | Besu/EVM-compatible shared orchestration ledger | bank-issued tokenised deposits | banks' own ledgers and the SWIFT commitment layer perform different roles | existing RTGS, correspondent or agreed mechanisms remain final route | SWIFT and participating-bank rules; public constitution incomplete | banks retain keys, assets and funding; loss/fallback terms still incomplete publicly | F3; ready for controlled initial use, 17 banks preparing pilots | orchestration moves; balance-sheet and settlement authority retained |
| DTC tokenization service | tokens on approved L1/L2 networks plus off-chain LedgerScan | DTC security entitlement under Article 8; registered owner remains Cede & Co. | LedgerScan constitutes DTC's official books and records for tokenised entitlements | initial service does not settle in digitised form; traditional settlement requires detokenization | DTC selects eligible securities, networks, protocols and registered wallets; no initial DTC risk-management collateral value | protocols must support distribution control and reversibility; DTC addresses error, loss and malfeasance | F1-F3; authorized limited production service, broader operation pending | participant transfer instruction moves on-chain; legal framework, official record and reversal remain DTC-governed |
| Eurosystem / Pontes | bridge plus Eurosystem DLT platform | central-bank money and regulated private settlement assets | market ledgers plus T2 / Eurosystem DLT according to leg and phase | initial cash-leg legal finality in T2; later native Eurosystem-DLT finality planned | Eurosystem defines eligible participants, operators and assets | TARGET/Eurosystem rulebook and central-bank liquidity perimeter | F3; September 2026 launch pending at cutoff | state operational perimeter expands into DLT; private market ledgers remain plural |
| UK / GBTD | tokenised sterling deposits and programmable payments | participating commercial-bank deposit | bank and pilot records; general-production constitution not yet published | BoE Synchronisation Lab explores atomic settlement in central-bank money | seven participating banks and selected use cases | conventional deposit protections stated; production failure terms pending | F3; pilot underway, completion and recurring production not established | programmability moves; bank liability and public settlement anchor remain |
Cross-domain analogues
| Case | Portable / programmable object | Native authority retained | Private or distributed role | Stress / loss boundary | Evidence state | Comparison limit |
|---|---|---|---|---|---|---|
| JBIC/NEXI U.S. gas-power finance | signed loans, insurance cover and project milestones | Japanese public lenders/insurers define eligible project and covered risk | sponsors, commercial lenders, EPC and operators build and run assets | policy/loan terms assign ordinary loss; systemic or political support remains public-policy-facing | F2 signed instruments; no draw/operation proof | capital adapter, not a digital-ledger case |
| Insurance and reinsurance | models, policies, capital and claims data | regulators define admissible capital; statutes and public pools define residual loss | carriers, reinsurers, brokers, models and ILS distribute risk | claim, insolvency, assessment and public-backstop waterfall | mixed F3-F5 by program | shows failure constitution, not monetary finality |
| Federal Scientific Trust Stack | identity, provenance, attestations, agent delegation and execution logs | award, export, FOCI, data, facility and security authorities keep separate legal effects | interoperable credentials, analytics, platforms and agents carry evidence and execute bounded tasks | suspension, termination, correction, appeal and retraction remain authority-specific | production components; joined stack missing | administrative analogy, not proof about money |
Primary source anchors
Project Agorá and Japan
- BIS, Project Agorá and real-value testing
- MUFG, JGB repo/DvP proof of concept
- DCP, 43-company validation
- SBI Shinsei Trust, JPYSC reserve and redemption structure
SWIFT
- SWIFT, MVP design: operator, bank control and off-ledger settlement
- SWIFT, July 2026 readiness and 17-bank pilot cohort
DTC
Europe and the United Kingdom
- ECB, Pontes design and eligibility
- ECB, Central banks on-chain
- UK Finance, Great British Tokenised Deposits
Cross-domain cases
- JBIC, Pennsylvania financing
- JBIC, Texas financing
- NEXI, insurance decision
- White House, Science: A New Golden Age
- Federal Register, Executive Order 14363 / Genesis Mission
Evidence exclusions
- No row converts a planned launch into production operation.
- A tokenized representation is not assumed to be the legal asset.
- Atomicity is not treated as a complete insolvency, fraud, outage or emergency constitution.
- A regulator's or issuer's release establishes its own action and description; it does not independently prove performance at scale.
- Cross-domain analogues do not add evidence weight to the monetary cases merely because they share a pattern.
Sources
Full saved reading
View cited sources (16)
These are the sources cited by this reading. Each source keeps its own date and scope.
- Project Agorá and real-value testing
- JGB repo/DvP proof of concept
- 43-company validation
- JPYSC reserve and redemption structure
- MVP design: operator, bank control and off-ledger settlement
- July 2026 readiness and 17-bank pilot cohort
- DTC tokenization-service no-action letter
- service and implementation FAQ
- Pontes design and eligibility
- Central banks on-chain
- Great British Tokenised Deposits
- Pennsylvania financing
- Texas financing
- insurance decision
- Science: A New Golden Age
- Executive Order 14363 / Genesis Mission
Document details and formats
About the dates and filing language
- Evidence date
- When this document or named claim was checked. A newer collection, export or website date does not update it.
- Current, private, Workbench or promotion
- These can describe the saved document’s original filing or custody. This public reading preserves that history; publication does not turn its findings into government approval, binding law or newly verified evidence.
- Master data and projection
- The maintained factual record and a page generated from it. Repeated views are not additional independent evidence.
- Provenance and source join
- Where a record came from, and the exact reference connecting a claim to its source.
- Gate, receipt and operating evidence
- A required decision or condition, its documentary record, and evidence that the named activity actually occurred. Permission, delivery and operation stay separate.
Saved research reading. Its original dates and claim limits control; the export date does not refresh the evidence.