Military direct sites
Window: exclusive after 2026-09-03 20:09:34 EDT through frozen cutoff 2026-09-11 16:01:37 EDT
Inclusive replay: 2026-09-03 date-only publishers, then dedupe against Weekly Delta 2026-09-03, especially waves/WAVE_2D_MILITARY_DIRECT_SITES.md
Discovery rule: official service, combatant-command, Guard/Reserve, PEO, personnel, acquisition, and operational surfaces. Federal Register is not discovery.
Lane: Purse-military. Do not recensus classified ops.
Already in 1C/2C — fold, do not duplicate as a new atomic
- NNSA Y-12 B61-13 CSA complete (announced 2026-09-10; stamp 2026-09-01) is a civilian DOE production/acceptance object. 2C owns it. No later War / Pantex / service-site clock was retrieved in this sitting.
- EO 14427 DPA delegations (Interior/Energy/Commerce) are 1A legal / 1C industrial. No in-window War DPA instrument (Title I rated order, Title III award, or allocation) was found on war.gov.
Award ≠ obligation ≠ payment ≠ delivery ≠ fielding ≠ combat effect. 403 ≠ missing. Classified/nonpublic is classified_nonpublic, not inactivity.
Promotion-review objects
1. War announced a planned Crane microreactor; installation is not yet done
Actor: Department of War; Army Janus Program; ASN (EI&E); OUSW(R&E); OASW(CT); DIU; State of Indiana; Naval Weapons Station Crane
Clocks: announced 2026-09-09. Planned installation no later than September 2028. Safety, environmental, regulatory, and installation processes remain open.
URL: War release
Disposition: promotion_review
Commercially owned and operated Micro Modular Reactor at NWS Crane, framed as Indiana’s first advanced nuclear MMR and the Navy’s first shore-based advanced microreactor under Janus. Cross-service: Army is named executive agent for installation nuclear energy. This is an announced deployment plan, not a reactor in the ground, not an NRC license, not first megawatt-hour, and not a DPA Title III award.
Claim limit: Announcement ≠ site work start ≠ licensed operation ≠ grid independence demonstrated. “No later than September 2028” is a target, not a completed installation.
2. Air Force exercised an $826 million JASSM/LRASM large-lot production modification
Actor: Air Force Life Cycle Management Center, Eglin AFB; Lockheed Martin Missiles and Fire Control
Clocks: announced on the 2026-09-09 War contracts page as modification P00020 to FA8682-24-C-B001. Work expected through 2030-07-31.
URL: Contracts for Sept. 9, 2026
Disposition: promotion_review
Modification brings cumulative face value to $10,480,052,550 from $9,654,077,070. Funds obligated at award mix FY24–FY26 missile/weapons procurement, RDT&E, O&M, and $11,070,988 FMS. This is a production-lot option exercise on an existing large-lot contract, not first article, not delivery, not fielding, and not combat use.
Claim limit: Modification ≠ missiles delivered ≠ inventory increase observed ≠ FMS transfer complete.
3. Army awarded a $581 million IDIQ to stand up an IMX-104 manufacturing facility
Actor: Army Contracting Command, Rock Island; Nitradyn LLC
Clocks: announced 2026-09-09. Estimated completion 2030-08-09. Work locations and funding determined with each order.
URL: Contracts for Sept. 9, 2026
Disposition: promotion_review
Firm-fixed-price IDIQ to design, construct, and commission a facility to manufacture Insensitive Munition eXplosive-104. Industrial-base construction vehicle, not explosive produced, not loaded warheads, not a plant in operation.
Claim limit: Facility IDIQ ≠ commissioned plant ≠ IMX-104 output ≠ ammunition in inventory. Orders, not the ceiling, will move money.
4. Navy awarded NGEAU full-rate production IDIQ ($184.25 million)
Actor: Naval Surface Warfare Center Crane; General Dynamics Mission Systems
Clocks: announced 2026-09-10. Completion expected September 2032. Sole-source under 10 U.S.C. 3204(a)(1).
URL: Contracts for Sept. 10, 2026
Disposition: promotion_review
FFP/CPFF IDIQ for manufacture of Full Rate Production of Next Generation Electronics Attack Units, NGEAU sustainment, and Advanced Capability Mission Computer future sustainment. Obligated at award: FY26 APN $29,691,536 (74.1%) and FY25 APN $10,365,451 (25.9%). FRP award is not units delivered or EA aircraft modified.
Claim limit: FRP IDIQ ≠ first production lot shipped ≠ fielded NGEAU ≠ combat EA effect.
5. Navy exercised MK 48 MOD 7 All-Up-Round production options ($257.3 million)
Actor: NAVSEA; Lockheed Martin, Liverpool
Clocks: awarded 2026-09-03; announced on the 2026-09-09 contracts page. Completion expected September 2029.
URL: Contracts for Sept. 9, 2026
Disposition: promotion_review as an in-window publication clock of a Sept. 3 award. Date-only 09-03 replay then keep because 09-03 WAVE_2D did not carry this object.
Option exercise for production, spares, production-support material, engineering, and hardware repair of MK 48 Heavyweight Torpedo AUR / MOD 7. Mix: Navy (FY24–FY26 WPN) plus foreign-partner funds $74,799,495 (30%), including Royal Australian Navy. Option exercise is not torpedoes delivered.
Claim limit: Option exercise ≠ AUR accepted ≠ loaded on a submarine ≠ FMS delivery complete. $1,216,670 FY24 WPN expires at FYE.
6. Space Force selected Lake Kickapoo, Texas, as preferred DARC Site 3
Actor: USSF; Space Systems Command / Mission Delta 2; 20th Space Surveillance Squadron; UK and Australia as MOU partners
Clocks: announced 2026-09-09. Construction expected to begin 2027 after contract award and approvals; civil construction complete 2029; operational acceptance planned 2030. Site 1 (Western Australia) completed Dec 2024 / early-use 2025. UK Pembrokeshire still pending planning approval.
URL: Space Force
Disposition: promotion_review
Preferred-location / project-planning approval for the third and final Deep Space Advanced Radar Capability site. Completes the planned U.S.–UK–Australia trilateral GEO-coverage architecture. Not a construction start, not a radar radiating, not operational acceptance.
Claim limit: Preferred location ≠ contract award ≠ construction start ≠ 24/7 GEO coverage. UK site remains unapproved.
7. Hawaii Guard remained on state active duty for Lala recovery and staged for Hurricane Lowell
Actor: Hawaii National Guard; Hawaii Emergency Management Agency
Clocks: article 2026-09-08. As of 2026-09-07, 194 personnel on state active duty. Task Force Kauai staging 47 personnel for Lowell; Chinook resupply photographed 2026-09-09. Lala recovery still running on Hawaii Island/Maui.
URL: National Guard
Disposition: promotion_review as a later operating clock on the 09-03 Lala/Moke object, plus a new Lowell posture.
09-03 WAVE_2D owned Kauai/Oahu end-of-response with continuation on Hawaii Island and Maui (up to 250 activated). This window’s state is dual-mission: Lala debris/wellness (72,000+ lb debris; 421 safety checks as of Sep 4; Maui 80 damage assessments / 2,295 ft roadway) and Lowell staging. Volunteers on SAD; ~5,500 available. Statement of sister-state pledges is not a Title 32 or Title 10 order.
Claim limit: SAD count ≠ Title 10 mobilization. Staging ≠ storm impact. Debris pounds ≠ recovery complete.
8. Washington Guard closed a 44-day wildfire aviation/hand-crew activation
Actor: Washington National Guard; Washington DNR
Clocks: mission ended 2026-09-04; article 2026-09-08. Mobilized from 2026-07-18.
URL: National Guard
Disposition: promotion_review
Agency-reported output: 474.7 flight hours, 2,044 water-bucket drops, 1,943,269 gallons. First operational use of a WAARNG UH-72 Lakota as a helicopter command platform (Sinlahekin Fire). Hand crews on Little Giant Fire; traffic-control support after Spokane Complex. This is an operational self-report of mission end, not acres saved or fires contained.
Claim limit: Gallons dropped ≠ containment. First Lakota C2 use ≠ fleet conversion. Conclusion ≠ no further 2026 fire tasking.
9. Super Garuda Shield executed combined joint land-strike live fire
Actor: U.S. Army (HIMARS, AH-64); U.S. Marine Rotational Force–Darwin; Indonesian Army/Marines/Air Force
Clocks: live-fire 2026-09-04 and 2026-09-07; article 2026-09-08. Airborne jump opening field training 2026-09-04 (article 2026-09-05). Exercise window still Aug 31–Sep 11 as owned in 09-03.
URLs: joint land strike; airborne jump
Disposition: promotion_review as in-window exercise events on an already-owned Super Garuda Shield 26 object. Do not recensus the Aug 31 kickoff.
Ground: U.S. M142 HIMARS, Indonesian ASTROS II Mk6, Indonesian Marine RM-70. Air: Indonesian F-16s; U.S. and Indonesian AH-64s. Jump: 200+ U.S./partner paratroopers into Baturaja. Exercise ≠ deployment commitment, treaty, or combat engagement.
Claim limit: Live fire in an exercise ≠ combat strike. HIMARS presence ≠ permanent basing.
10. Yama Sakura 91 closed as a trilateral CPX
Actor: U.S. Army; Japan; Australia
Clocks: held 2026-09-02 through 2026-09-10 close at Camp Asaka. Article 2026-09-10.
URL: Army
Disposition: promotion_review
46th iteration; command-post exercise across Japan plus JBLM, Washington. Start sits before exclusive start; close is in-window. CPX completion is not a new basing, contingency plan executed, or combat readiness independently measured.
Claim limit: Exercise close ≠ operational plan executed.
11. Phoenix Express 2026 began in Tunisia
Actor: U.S. 6th Fleet / Naval Forces Africa; AFRICOM-sponsored; Tunisian Navy host
Clocks: began 2026-09-07 at La Goulette; 12-day / 21st iteration. Navy story 2026-09-08.
URL: Navy
Disposition: promotion_review
Participants named: Algeria, Belgium, Egypt, France, Georgia, Italy, Libya, Morocco, Tunisia, Türkiye, Saudi Arabia, Spain, United States. Maritime-security exercise, not a new basing or engagement.
Claim limit: Exercise start ≠ interdiction totals ≠ EEZ enforcement outcome.
12. Keel laid for future USS John E. Kilmer (DDG 134)
Actor: Navy; General Dynamics Bath Iron Works
Clocks: ceremony 2026-09-10 at Bath, Maine. Navy press-release index same day.
URL: Navy press-release index (10 September 2026 item)
Disposition: promotion_review
Keel laying is a construction-milestone ceremony, not launch, not delivery, not commissioning, not a Flight III combatant in the fleet.
Claim limit: Keel ≠ hull complete ≠ acceptance trials ≠ in commission.
Folded or clock-only (do not recensus as new actions)
| Object | Owner | This delta |
|---|---|---|
| NNSA Y-12 B61-13 CSA complete (stamp 2026-09-01; announced 2026-09-10) | 2C civilian DOE | Fold. No War, Pantex, or service-site later clock retrieved. CSA ≠ Pantex assembly ≠ War acceptance ≠ deployed B61-13. |
| EO 14427 DPA delegations | 1A legal / 1C industrial | No War DPA instrument in this window. Last retrieved War DPA Title III on war.gov was out of window (BAE RH45 July 7; germanium Jan 29). Aug 31 Camden Copper foil is IBAS, not DPA, and is before exclusive start. |
| Gen. Schiess CSO installation; Day-One message | 09-03 WAVE_2D | Fold. Leadership transition, not force-structure change. |
| Navy Millington / Project THETIS migration | 09-03 WAVE_2D | Fold. Migration ≠ THETIS complete. |
| DAF shaving-profile / CBRN / chaplain guidance | 09-03 WAVE_2D | Fold. No new in-window implementing MARADMIN/DAFI retrieved. |
| MARADMIN 405/26 FY2027 enlistment bonuses | 09-03 WAVE_2D | Fold. |
| M18 handgun supplemental inspection final report | 09-03 WAVE_2D | Fold. |
| NGB FORGE hybrid-microgrid APFIT | 09-03 WAVE_2D | Fold. Award ≠ fielding. |
| GTRI CAML prototype OTA (Aug 21) | 09-03 WAVE_2D | Fold. Prototype ≠ production. |
| SC Guard first HH-60M (Aug 27 arrival) | 09-03 WAVE_2D | Fold. One of three. |
| Northern Viking 26 concluded Sep 3 | 09-03 WAVE_2D | Navy/6th Fleet Sep 4 wrap is the same close. Fold. |
| Super Garuda Shield 26 kickoff Aug 31 / through Sep 11 | 09-03 WAVE_2D | Keep only in-window events (objects 9). Do not recensus kickoff. |
| PACAF Nepal C-130J (Sep 2) | 09-03 WAVE_2D | Fold. |
| Abraham Lincoln CSG Thailand arrival Sep 2 | 09-03 WAVE_2D | Later clock: CSG departed Thailand Sep 6. Port departure ≠ CENTCOM re-entry. Pacific Fleet |
| USS Delaware Tromsø arrival Sep 1 | 09-03 WAVE_2D | Later clock: concluded routine port visit Grøtsund Sep 7. Presence ≠ new basing. |
| MAFFS 1,070,017 gallons through Aug 31 | 09-03 WAVE_2D | Fold. |
| Atlas Angel II start Aug 31 | 09-03 WAVE_2D | Montana/Sri Lanka Sep 4 close article is the same five-day SME exchange. Fold. |
| Guam–Nebraska–RMI partnership (signed Aug 25) | 09-03 WAVE_2D | Fold. |
| Guard leadership statements (435k; MAVEN; NGRF 22k; IBCT conversions) | 09-03 WAVE_2D | Fold. Statement ≠ appropriation. |
| Heaviside MOTH $99M (awarded Aug 27) | 09-03 contracts / WAVE_2C industrial line | Fold the award. Sep 10 CPE-ISW REWSI article is a later wrapping (below). |
| TITAN initial production; HEL production; Anniston FORGE OTA | 09-03 WAVE_2C | Fold. No in-window delivery receipt. |
| Copper-foil IBAS $37.2M (announced Aug 31; award Apr 27) | pre-window War industrial | Fold. Not DPA; not this window. |
Additional in-window objects (lower rank or grouped)
REWSI first production contracts — PEO wrapping, mixed clocks
Actor: Army CPE Intelligence and Spectrum Warfare; PM EW&C; ACC-APG
Clocks: PEO article 2026-09-10. Heaviside $99M awarded Aug 27 (fold). RII $96.9M Dragonfly/Intrepid 1200 awarded Sep 3 (date-only; not in 09-03 2D). Five-year ordering periods.
URL: CPE-ISW
Disposition: admit_lower_rank / later-clock wrapping. First REWSI production framing is in-window; the Heaviside obligation is not.
Claim limit: Production IDIQ ≠ sensors fielded ≠ EMSO CoN satisfied. Award under AOS/CSO is not a program-of-record IOC.
Other War contracts clustered (not each a new atomic)
From retrieved Sept. 9 and Sept. 10 pages only (see coverage receipt for missing days):
- DFAS / EY labor-hour, max $989,996,050, DoW agency-wide and DWCF audits FY27–31. Face value this action $388,273,413; $62.6M FY26 WCF obligated now. Audit contract ≠ clean opinion.
- Accenture $480,365,950 JETMS to replace legacy task/correspondence systems. IT vehicle; funds obligated later. Not C2 fielding.
- Harper Construction $223,577,265 programmed depot-maintenance hangar, Oklahoma City; $106.4M FY26 MILCON obligated. Construction award ≠ hangar in service (ECD 2030-09-09).
- Charles Reed Knight Jr. $49,997,842 IDIQ for M110 semi-automatic sniper systems, variants, accessories, tools, training through 2031-09-10. IDIQ ≠ weapons issued.
- American Ordnance $15,500,977 IDIQ equipment for a new Advanced Multi-Purpose isostatic/warhead pressing facility at Iowa AAP. Equipment IDIQ ≠ press running.
- Griffon Aerospace Outlaw $17,515,469 IDIQ for communication subcomponents and training: announced Sep 4, actually awarded Sep 8 (correction on Sep 10 page). Award ≠ UAS fielded.
- BAE Ship Repair $115,659,256 (options to $527.5M) LPD-30/31 fitting-out and post-shakedown availabilities.
- Huntington Ingalls $13,217,537 LCS planning-yard (options to $742.8M). Planning yard ≠ hull modernization complete.
- BAE Land & Armaments $38,199,786 for two MK 45 Mod 4 overhauls.
- Boeing / DLA $23,175,320 ICBM cable assemblies (sole-source; complete 2030-10-31). Cables ≠ Sentinel fielding.
- KestrelX $9,987,285 COCO low-observable threat-replication aircraft (SBIR Phase III). Training support ≠ operational UAV.
- LPD FO/PSA, SONAR spares (Lockheed $17.4M, awarded Sep 3), VOLARE AFRL dual $85M ceilings, Rolls-Royce EPA on Tinker engine contract, DLA jackets/ACH pads — sustainment/research/commodity. Grouped.
Sept. 3 awards that only surfaced later: MK 48 (object 5), SONAR spares. Inclusive 09-03 replay kept them because 09-03 2D did not list them.
Force posture / movement (statement ≠ movement ≠ engagement)
- USS Ross (DDG 71) arrived Mombasa, Kenya, scheduled port visit Sep 5. Port call ≠ new mission.
- 13th MEU simultaneous EAB sensing/C2/fueling training underway in 3rd Fleet (Camp Pendleton article in-window). Training ≠ deployed EAB.
- Vermont ANG 158th FW returned Sep 6 from an overseas deployment. Return ≠ mission-effect finding.
- Pacific Partnership 2026 Malaysia stop opened Sep 3 (date-only; ~250 personnel). HA/DR preparedness ≠ disaster operation.
- Multilateral ASWEX (JMSDF/ROKN/RAN/RAAF/USN) completed Aug 25–27; Pacific Fleet Sep 9 story is later publication of an earlier event. Enrichment only.
- Saber Junction 26 “passing of a torch” Sep 9: leadership/ceremony inside an ongoing Europe exercise, not a new deployment.
- U.S.–Mongolia Bilateral Defense Framework Sep 8: DASW Alvaro Smith / MG Gankhuyag roadmap talk (spending, exercises, DIB). Dialogue ≠ assistance agreement executed. War release
- Big Rescue Kanagawa Sep 1 event, War.gov story Sep 9: disaster-medical exercise in Japan. Exercise ≠ real-world response.
Personnel / recruiting / civilian workforce
No in-window RIF instrument, civilian-workforce cut order, or recruiting-mission-change MARADMIN/DAFI was retrieved.
- MARADMIN 408/26 (signed 2026-09-03): FY27 solicitation for lateral move into Marine acquisitions officer MOS 8059/8061. Solicitation ≠ accessions.
- MARADMIN 411/26 (R 111400Z SEP 26): second-round USMC Innovation Challenge kickoff. Challenge ≠ fielded kit.
- MARADMIN 410/26 (Sep 11): FY27 Congressional Fellowship selection results. Personnel assignment, not end-strength.
- Florida ANG student flight (Sep 10): claimed BMT honor-graduate surge from restructured curriculum. Training-pipeline anecdote, not accession quota change.
- Navy CNO/MCPON visits NPTU Charleston (Sep 8) and Mayport/Kings Bay (Sep 9): leader travel, not manning action.
- STARCOM 320th Recruiting Squadron activation is Aug 19 (pre-window). Fold.
Industrial-base finance on service sites
No new Serra Verde / Trilogy / Atalco / Alcoa instrument. No in-window War DPA Title III. Crane MMR (object 1) and Nitradyn/Iowa AAP facility vehicles (object 3 and grouped American Ordnance) are the industrial objects. DLA newsroom did not surface a distinct in-window production/finance object beyond the War contracts commodity lines.
2026-09-03 date-only replay (then dedupe)
Reached: Navy THETIS (fold); Space Force Schiess (fold); DAF implementing guidance still on spaceforce.mil dated Aug 31 (fold); Super Garuda wildfire-safeguard article Sep 3 (pre-live-fire; owned as kickoff context); Army Reserve Catalyst Forge article dated Sep 2 describing July 12–25 event (09-03 already treated as evaluation, not PoR); MARADMIN 408/26 Sep 3 (personnel solicitation, kept as lower-rank); MK 48 and SONAR options awarded Sep 3 and published later (kept as objects/grouped).
09-03 WAVE_2D already owned Northern Viking close, Super Garuda kickoff, Lincoln Thailand arrival, Delaware Norway arrival, Hawaii Lala/Moke posture, MAFFS gallons, SC HH-60M, Atlas Angel II start. Those are not new atomics.
Bounded negatives
- No public War DPA Title I/III instrument after exclusive start.
- No public B61-13 Pantex assembly-complete or War-acceptance receipt on service/War pages.
- No public IOC / fielding claim that is not an exercise, experiment, or preferred-siting (DARC Site 3 is preferred location; EA-37B Compass Call Sep 3 formation photo is not a new IOC — 09-03 already had Grey Wolf IOC as an earlier-event enrichment).
- No Title 10 Guard/Reserve call-up instrument. Hawaii is state active duty; Washington wildfire close is a state/DNR support mission end.
- No census of SAM.gov, FPDS, USAspending, classified OTAs, or every PEO.
Surfaces
| Surface | Status | Note |
|---|---|---|
| war.gov Contracts Sept. 9 | reached | Full text retrieved |
| war.gov Contracts Sept. 10 | reached | Full text retrieved; includes Sep 4/8 Griffon correction |
| war.gov Contracts Sept. 3, 4, 8 | unread as dedicated pages | Awards from those days appear as later-page annotations (MK 48, SONAR, Griffon). Index is a JS shell (“simulated response” / Load More). Not treated as empty. |
| war.gov Contracts Sept. 11 | out of window if posted at 5 p.m. | Standing rule: contracts announced each business day at 5 p.m. Frozen cutoff is 16:01:37 EDT. Do not take a post-cutoff Sept. 11 dump as this wave. |
| war.gov Contracts Sept. 1–2 | reached via search; pre-window | Fold (GE F414 PBL $2.87B; Pacific CE IDIQ $400M ceiling; Fort Meade cyber facility $122M). |
| war.gov Releases | reached | Crane MMR; Mongolia BDF; 9/11 memorial closure (ceremonial) |
| war.gov News Stories | reached (selected) | Big Rescue Kanagawa; not a full COCOM census |
| army.mil news | reached | Super Garuda, Yama Sakura, 1st Cavalry TyrOS experiment (ranked down: experiment ≠ fielding) |
| cpeisw.army.mil | reached | REWSI wrapping |
| navy.mil Press Releases | reached (index) | Kilmer keel; CNO visits; THETIS fold. Individual Kilmer article URL 404’d once via guessed slug; index text is the controlling source. |
| navy.mil News Stories / c6f / cpf | reached | Phoenix Express; Ross Kenya; Delaware close; Lincoln departure; ASWEX later publication |
| marines.mil News | reached | 13th MEU EAB training; Super Garuda kickoff fold |
| marines.mil MARADMINS | reached | 408/26, 409/26, 410/26, 411/26 in-window; 405/26 fold |
| af.mil News | blocked 403 from this host (Akamai); reached via search/open_page for Week-in-Photos and selected tags | EA-37B photo Sep 3 is not a new IOC. No in-window recruiting/RIF instrument retrieved. |
| spaceforce.mil News | reached (open_page); curl 403 | DARC Site 3; Schiess fold; DASH experiment (ranked down: experiment ≠ kill-chain fielding) |
| nationalguard.mil News | reached | Hawaii Lowell/Lala; Washington wildfire close; Vermont return; Florida student flight; Patriot 26 / Nebraska FTX grouped as training |
| darpa.mil/news | reached; empty in-window as dated news | Index is a filter shell. Dated items retrieved by search are Aug 11 Lift Challenge (out of window) and Aug 6 “It’s About Time” manufacturing pipeline (out of window). SBIR topics closing Sep 23 are open solicitations, not awards. |
| dla.mil News | blocked 403 from this host; search reached older items only | No distinct in-window DLA newsroom production object. Commodity awards taken from War contracts pages. |
| dpaa.mil ID Announcements | reached via search | Sep 2 Aguirre WWII ID is date-only / pre-exclusive-start. No later ID in-window. POW/MIA Recognition Day is third Friday Sep 18 (after cutoff). |
| SAM.gov / FPDS / USAspending | not recensus’d | Bounded negative |
| Classified / nonpublic ops | classified_nonpublic | Not inactivity |
Coverage receipt
| Publisher family | Status | Missed (new) | Enrichment / clock | Routine/reject |
|---|---|---|---|---|
| War contracts (business-day $7.5M+) | mixed: Sep 9–10 reached; Sep 3/4/8 pages unread; Sep 11 after 5 p.m. out of window | 5 promoted production/industrial | 1 (Griffon date correction) | ~15 grouped |
| War releases / news | reached | 1 (Crane MMR) | 1 (Mongolia BDF) | ceremonial 9/11 |
| Army flagship + CPE-ISW | reached | 2 (SGS live fire; YS91 close) | 1 (REWSI wrap) | 1st Cav TyrOS experiment; 9/11 museum |
| Navy press + 6th/Pacific Fleet | reached | 2 (Phoenix Express; Kilmer keel) | 2 (Lincoln departure; Delaware close) | CNO travel; ASWEX later pub |
| Marines news + MARADMINS | reached | 0 | 1 (13th MEU EAB training) | fellowship/challenge MARADMINs |
| Air Force flagship | blocked 403 here; partial via search | 0 | 0 | Week-in-Photos; no new IOC |
| Space Force flagship | reached | 1 (DARC Site 3) | 0 | DASH experiment; Schiess fold |
| National Guard | reached | 2 (HI Lowell/Lala SAD; WA wildfire close) | 1 (VT return) | Patriot 26, Nebraska FTX, Egypt airshow |
| DARPA news | reached; empty dated in-window | 0 | 0 | open SBIR clocks |
| DLA news | blocked / no in-window newsroom object | 0 | 0 | contracts commodity only |
| DPAA | ID index reached | 0 | 0 | Sep 2 ID fold; Sep 18 Recognition Day later |
| Award systems | not enumerated | — | — | bounded |
Closed: no for a complete business-day contracts series (unread dedicated pages: Sept. 3, 4, 8; Sept. 11 5 p.m. is after cutoff). Yes for the named service newsrooms actually retrieved (Army, Navy press index, Marines, Space Force, Guard, War releases, CPE-ISW, DARPA news index). Named unread or blocked publishers: Air Force flagship af.mil (403 from this host), DLA newsroom (403), dedicated War contract pages for Sept. 3/4/8, SAM/FPDS. Those are tool-path or scope bounds, not inactivity findings.
This is public-surface research, not a census of every contract, PEO, COCOM action, field outcome, or classified operation.
Sources
Full saved reading
View cited sources (14)
These are the sources cited by this reading. Each source keeps its own date and scope.
Document details and formats
About the dates and filing language
- Evidence date
- When this document or named claim was checked. A newer collection, export or website date does not update it.
- Current, private, Workbench or promotion
- These can describe the saved document’s original filing or custody. This public reading preserves that history; publication does not turn its findings into government approval, binding law or newly verified evidence.
- Master data and projection
- The maintained factual record and a page generated from it. Repeated views are not additional independent evidence.
- Provenance and source join
- Where a record came from, and the exact reference connecting a claim to its source.
- Gate, receipt and operating evidence
- A required decision or condition, its documentary record, and evidence that the named activity actually occurred. Permission, delivery and operation stay separate.
Saved research reading. Its original dates and claim limits control; the export date does not refresh the evidence.
Original title: Wave 2D — military direct sites