Skip to content

DLT Maturity Ladder and Platform Census, 2025–2026

Why one maturity label fails

A DLT system can be production-grade for one state and experimental for another. SDX has a regulated production securities record while SNB wholesale CBDC remains a pilot. DTC conducted limited-production entitlement transfers while launch- phase cash settlement remains outside the tokenization service. Swift can be ready to orchestrate commitments while banks still settle externally.

Every row therefore receives a status vector rather than a single “live” label.

Maturity ladder

LevelExact stateMinimum proof
M0concept / policy intentiondated issuer statement or design paper
M1technical prototypeworking code or demonstrated component; no transaction claim
M2controlled simulationnamed scenarios using simulated value
M3controlled real-value testreal legal/economic value in a bounded test; amount, participants and setup identified
M4authorized / production-boundlegal permission and operative build, testing or published launch gate; no proven transaction required
M5limited productionreal transaction in a production environment or restricted live service; scope and limits disclosed
M6recurring productionrepeated customer use with named period, value/volume or recurring participant evidence
M7authoritative-record integrationthe ledger record has operative issuance, title, entitlement, custody or settlement effect under the governing system
M8liquidity integrationasset is actually accepted/mobilized as collateral or cash settles in central-bank/other identified money at production or controlled-real-value level
M9failure and exit provenpublic handled failure, correction, insolvency, unwind, redemption, maturity or participant-exit evidence
M10normalized infrastructurerecurring scale and outcomes plus material legacy retirement or default market use

Levels are not automatic promotions. A platform can have an M7 asset leg, an M3 cash leg, an M4 service clock and no M9 evidence.

Status-vector fields

FieldQuestion
legal / operating authorityWhich law, regulator, central bank, CSD or rulebook permits the activity?
real-value stateSimulation, controlled real value, limited production or recurring production?
authoritative recordWhich ledger/book constitutes issuance, ownership, entitlement or custody?
cash and finalityWhat money settles; where and when does legal finality attach?
collateral and liquidityIs the asset merely transferable, or actually eligible, valued, pledged and financeable?
failure and exitAre mismatch, outage, fork, default, correction, redemption and exit publicly proven?

Platform and project census

Securities, CSD and collateral rails

ObjectStatus vector at cutoffWhat actually movedWhat remains outside or unresolved
SIX/SDXauthority regulated CSD; real value M6 securities; record M7; cash M3/M5 limited wCBDC pilot; collateral partial M8; failure not publicDLT issuance, custody, settlement and servicing occur inside a regulated digital CSD. More than CHF2 billion of digital assets had been issued; Helvetia recorded same-ledger DvP in SNB wCBDC for a documented subset.SNB wCBDC is still a pilot rather than a permanent general rail. Current volume, secondary depth, repo/corporate-action performance, failed DvP, conversion stress and loss evidence remain incomplete. SIX
Clearstream D7 DLTauthority CSDR/Clearstream; real value M5/M6; record M7; cash connected conventional/central-bank rails; collateral M8 transaction; failure maturity return openThe €77.5 million EIB DLT-native commercial paper was issued to six named investors, mobilized through Clearstream triparty and ECMS, and used for Bundesbank financing.The public record does not yet close maturity/redemption, exception handling, collateral release, repayment or recurring multi-issuer scale. Broader D7 Digital totals must not be assigned wholly to D7 DLT. Clearstream
DTC Tokenization Serviceauthority three-year SEC staff no-action + DTC terms; real value M5 event; record participant entitlement on-chain + DTC control record; cash not digitized at launch; collateral workflow demonstrations but zero initial DTC settlement/collateral value; failure not publicJuly 15 used tokenized DTC-held assets in a DTC production environment across collateral, lending, repo/equity DvP, DvD, transfer and CCP-margin workflows with more than 30 firms.Traditional securities remain immobilized in DTC, the legal relationship is unchanged, DTC reconciliation/admin powers remain, and launch-phase transactions are not settled in digitized form. October service opening is a separate clock. DTCC event · FAQ
Euroclear D-FMIauthority Euroclear FMI/CSD; real value M6 issuance; record M7 within Euroclear; cash not proved on-chain; collateral DLT-asset eligibility policy, case-specific use unresolved; failure not publicEuroclear reported about €1.2 billion of digital-note issuance during 2025, including named issuers.Aggregate issuance does not establish atomic cash, central-bank settlement, recurring secondary liquidity or complete default/maturity evidence. Euroclear results
Euroclear–Canton Global Collateral Networkauthority pilot consortium; real value M2/M3 digital-twin pilot; record underlying Euroclear/custodian books; cash outside; collateral instruction/visibility pilot; failure not publicA pilot joined 27 participants, 14 Canton nodes, 11 applications and 500 transactions using digital twins.The first phase was design work, not a production collateral utility. No production rulebook, first named live pledge, cash leg or handled unwind was found. Euroclear
LSEG DMI private fundsauthority LSEG platform and connected regulated participants; real value M5 first transaction; record platform lifecycle state; cash case not fully public; collateral not primary use; failure not publicLSEG launched DMI in September 2025 and facilitated a primary fundraise with MembersCap and Archax.One first transaction does not establish recurring volume, legal-title finality, secondary liquidity, settlement asset or lifecycle completion. LSEG
LSEG Digital Securities Depositoryauthority planned, subject to approval; real value M0/M4 build; record future; cash future interoperability; collateral stated objective; failure futureLSEG announced an on-chain settlement capability spanning traditional and digital markets and multiple chains.The first deliverable was planned for 2026 subject to regulatory approval; announcement is not an operating depository or transaction. LSEG
Canton Global Synchronizerauthority network governance + application-specific rulebooks; real value production coordination network; record application-specific; cash application-specific; collateral application-specific; failure cross-application unwind not publicCanton provides privacy-preserving synchronization and atomic workflow across connected applications; DTC used it in the July production event.Canton is not a universal CSD, issuer, custodian, bank or settlement agent. Network/activity metrics cannot be treated as common legal-title or cash-settlement volume. Canton

Money, payment and central-bank settlement rails

ObjectStatus vector at cutoffWhat actually movedWhat remains outside or unresolved
JPM Kinexys / Blockchain Deposit Accounts / JPM Coinauthority JPM bank/deposit/compliance perimeter; real value M6; record JPM ledger + bank books; cash commercial-bank money; collateral production workflows; failure public rulebook incompleteKinexys reports material recurring institutional transfers and supports programmable bank-deposit money, on-chain collateral and tokenized-asset workflows.The legal claim remains a JPMorgan deposit. Aggregate Kinexys volume is not product-specific public-chain JPM Coin volume. Core-bank/BDA conversion, eligibility, freeze, insolvency and redemption terms remain decisive. JPM Coin
LSEG DiSHauthority announced account/rulebook structure; real value M4/controlled go-live; record DiSH deposit ownership record; cash commercial-bank deposits; collateral future connected use; failure not publicLSEG announced 24/7 transfer, PvP/DvP coordination and a notary layer for tokenized commercial-bank deposits.No public named recurring production transaction or volume was found; bank core books, bank insolvency and connected-asset finality remain. LSEG
Swift shared ledgerauthority Swift-operated ledger + bank environments; real value M4, live pilots pending; record interbank commitment/orchestration; cash external; collateral not primary; failure public rules incompleteThe EVM-compatible ledger records and validates interbank payment commitments; 17 banks were preparing initial tokenized-deposit pilots.Banks retain keys, assets, funding and settlement through RTGS, correspondent banking or another mechanism. No completed transaction at cutoff, common bank-money issuer, final cash record or public failure waterfall. Swift July status
Fnality Sterling Payment Systemauthority BoE-supervised, RTGS omnibus-account policy; real value M5 limited live; record operator ledger; cash 1:1 omnibus-backed central-bank money representation; collateral use-case dependent; failure official public data limitedInitial live payments occurred in 2023; operation under supervisory limits began in 2024. Funds are backed through a Bank of England RTGS omnibus account.A participant claim is not individually issued BoE wCBDC. Current volume, liquidity, scaling, correction and failure series were not located. BoE FMI report
Project Agoráauthority BIS/central-bank/bank controlled test; real value M3; record prototype unifying and jurisdictional ledgers; cash token reserves/deposits backed by external accounts; collateral not primary; failure runbook/fallback, no public incidentThirty real-value transactions across 17 scenarios and six currencies, about CHF800,000 total, tested tokenized reserves and deposits, single/dual-currency payments and PvP.It is not a finished product. Reserve issuance used external RTGS funding; deposit backing used bank core systems; scripted windows, maker-checker approvals, FX inputs, coordination and fallback remained. BIS
Eurosystem Pontesauthority Eurosystem production-bound service; real value M4 testing at cutoff; record DLT asset + Eurosystem/T2 cash path; cash T2 finality initially, Eurosystem DLT path planned; collateral eligible assets defined; failure not yet provenPontes is designed to synchronize DLT assets with central-bank-money settlement and later extend native public DLT capability.No official go-live/first transaction was admitted before the cutoff. At initial launch, legal cash finality remains in T2; later on-ledger finality, smart contracts and 24/7 operation are separate phases. ECB
Eurosystem Appiaauthority Eurosystem roadmap; real value M0/M1 design; record architecture open; cash central-bank money anchor intended; collateral design; failure designAppia evaluates single shared, Eurosystem-led and interoperable multi-ledger architectures; blueprint due in 2028.It is not a live unified ledger and creates no current participant, finality or settlement rule. ECB
SNB Helvetia IIIauthority SNB + regulated SDX pilot; real value M5 limited live; record SDX; cash same-ledger SNB wCBDC; collateral case-specific; failure not publicWholesale CBDC economically and legally represents SNB sight deposits and has settled tokenized securities by same-ledger DvP.The pilot is not a permanent general issuance decision. Current scale, failed trades, liquidity improvement and secondary lifecycle evidence remain incomplete. SNB
Project Samaraauthority Bank of Canada/EDC/RBC/TD closed experiment; real value M3; record purpose-built bond and cash ledgers; cash experimental wholesale central-bank digital money; collateral not main outcome; failure experiment observations onlyA C$100 million, sub-three-month EDC tokenized bond was issued, sold and traded in a closed real-world experiment with integrated cash/bond ledgers.One security in a closed experiment does not establish a production FMI. Complexity, liquidity cost, governance, fallback and regulatory gaps remained. Bank of Canada
RBA Project Acaciaauthority RBA/DFCRC pilot with relief; real value M3; record multiple pilot designs; cash wCBDC, deposit tokens, stablecoins and existing balances by case; collateral repo/securities use cases; failure pilot onlyTwelve real-money/real-asset pilots and eight simulations tested different assets and settlement money from August 2025 to February 2026.It was research, not an operating FMI or adoption decision. The final report found many benefits possible with existing central-bank money and kept further wCBDC exploration open. RBA
HKMA EnsembleTXauthority HKMA controlled pilot; real value M3 through 2026; record pilot platform; cash tokenized deposits; central-bank-money expansion possible; collateral use-case dependent; failure not publicHKMA describes real-value settlement of tokenized deposits and digital assets in a controlled pilot.A pilot “transition” does not prove general production, 24/7 central-bank money or measured outcomes. HKMA
UK Digital Securities Sandboxauthority BoE/FCA statutory sandbox; real value M4 live authorization; record participant-specific future activity; cash approved private/commercial alternatives; collateral case-specific; failure futureHSBC passed Gate 2 in July 2026, legally permitting bounded live activity.Authorization is not a transaction. No actual Gate-2 issuance/settlement receipt was found; tokenized wholesale central-bank money was unavailable. BoE dashboard
mBridgeauthority former BIS project, successor outside BIS; real value M3/MVP; record shared DLT prototype; cash multiple experimental wCBDCs; collateral not main; failure not production-provenEarlier pilots executed real-value cross-border wholesale-CBDC transactions and the project reached MVP.BIS exited; its General Manager said the system was not mature enough to operate and was many years away. It is not an evidenced production global rail. BIS

Cross-row conclusions

The production frontier is uneven

The strongest production evidence is in regulated securities issuance/CSD functions, commercial-bank DLT money inside a bank perimeter, and selected collateral workflows. The strongest central-bank-money evidence remains limited pilot or production-bound infrastructure rather than universal availability.

Record migration is more mature than cash migration

Several systems can issue or move securities on DLT. Fewer can complete the cash leg in the appropriate central-bank money on the same platform. This is why Pontes, Helvetia, Samara and Eurosystem collateral eligibility are pivotal.

Collateral recognition is a separate phase

A token can move without being eligible for triparty, CCP, central-bank or lender use. The EIB/Clearstream/ECMS/Bundesbank chain is the best public proof of tokenized issuance crossing into institutional liquidity.

Failure evidence is the common missing column

No row closes all of authoritative record, cash finality, collateral/liquidity, correction, insolvency, exit and recurring stressed operation. Until that column fills, platform launch counts should not be used as a proxy for systemic transition.

Sources

Full saved reading

View cited sources (22)

These are the sources cited by this reading. Each source keeps its own date and scope.

Document details and formats
Optional file downloads
For AI readers: complete text and record details
About the dates and filing language
Evidence date
When this document or named claim was checked. A newer collection, export or website date does not update it.
Current, private, Workbench or promotion
These can describe the saved document’s original filing or custody. This public reading preserves that history; publication does not turn its findings into government approval, binding law or newly verified evidence.
Master data and projection
The maintained factual record and a page generated from it. Repeated views are not additional independent evidence.
Provenance and source join
Where a record came from, and the exact reference connecting a claim to its source.
Gate, receipt and operating evidence
A required decision or condition, its documentary record, and evidence that the named activity actually occurred. Permission, delivery and operation stay separate.

Saved research reading. Its original dates and claim limits control; the export date does not refresh the evidence.

Saved source details

---

title: DLT Maturity Ladder and Platform Census, 2025–2026

status: current

artifact_role: evidence_index

opened: 2026-08-31

evidence_cutoff: 2026-08-31T12:08:12-04:00

vault_landings: []

---