Operations and delivery
Ranked movements
1. Navy MUSV production OTAs: three builders received production OTAs for
10 vessels each at a stated average procurement cost of $40 million per vessel; first delivery is scheduled before FY2027 ends. Award is not an obligation ledger, payment, delivery, acceptance or fielding receipt.
2. Domestic Shield: Army JIATF-401 established multiple-award counter-UAS
IDIQs for ten vendors with listed ceilings totaling $4.15 billion. A ceiling and vehicle do not prove a task order, obligation, delivery, installation or
operational deployment. Army
3. SAFE Vehicles Rule III: the final CAFE rule was signed September 25,
announced September 28, published September 30 and becomes effective November 30. In-window movement is publication, not effectiveness or
manufacturer compliance. NHTSA
4. EB-5 fee rule: the final rule was published September 30 and becomes
effective November 30. It changes fees and process but establishes no
in-window fee receipt or collected revenue. Federal Register
5. FY2027 hospital payment inputs: CMS corrected classifications, wage
indexes, MS-DRG weights, fixed-loss threshold, national rates and uncompensated-care factors effective October 1. These are rate-setting
inputs, not reimbursements already paid. Federal Register
6. SPR exchange solicitation: DOE requested bids for exchange of up to 40
million barrels from Big Hill and Bryan Mound. This is a solicitation, not an
award, delivered barrel or reserve movement. DOE
7. Akwel remediation: USTR closed the USMCA matter after reinstatement,
back pay/benefits, severance, training and complaint mechanisms, and directed Treasury to resume liquidation. The record does not separately prove every
customs liquidation. USTR
8. EPA Cleveland removal: EPA says physical hazardous-substance removal
began September 29. This is an operating start, not completed cleanup.
9. Adjudication and codification: EOIR's *Matter of G-R-B-* changed asylum
pretermission procedure; Education restored pre-2024 Title IX regulatory text after vacatur. These are legal/source states, not measured systemwide
effects. EOIR · Title IX rule
Holds
Hanford Tank A-103 wording conflicts between “is being pumped” and “about to”; retain only as a provisional start. FDA's September 30 advisory-committee recruitment page entered the monitor minutes before cutoff, but its body was not adjudicated. Daily defense contract and award systems require a later replay.
Sources
Full saved reading
View cited sources (10)
These are the sources cited by this reading. Each source keeps its own date and scope.
Document details and formats
Saved research reading. Its original dates and claim limits control; the export date does not refresh the evidence.
Saved source details
---
title: Fiscal-Year-Close Wave 2 — Operations and Delivery
status: complete
artifact_role: answer
research_id: federal-government-fiscal-year-close-delta-2026-09-30
---
Original title: Wave 2 — operations and delivery