Federal fusion date, time and place ledger, 2020–2035

Evidence cutoff: 2026-08-15 17:34:07.266 UTC
Status: current Workbench research; factual clock register
Scope: material U.S. fusion-policy, scientific, regulatory, licensing, publication and forward-target clocks in the Federal Science / fusion bridge
Astrology boundary: this Research file contains factual clocks only. Chart conventions and readiness selections are maintained separately in Chronicle Astrology Files and have no evidence vote.

Short answer

Only a few fusion objects presently support a genuinely timed chart. The strongest physical clock is NIF's first ignition shot at **1:03:50 a.m. local facility time on December 5, 2022**. The strongest federal administrative clock is the fusion proposed rule's **8:45 a.m. Eastern public-inspection filing on February 25, 2026**. DOE's August 15 campaign supplies an exact digital

publication instant—1:34:04.501 p.m. EDT for the root post—but no

source-attested physical posting place.

The June 9 roadmap release is date-only. Exact timestamps found in its webpage and PDF metadata describe page creation, later modification or file production; none is proven to be the public-release instant.

The project-registry extension adds a date-only physical clock for Realta's June 19, 2026 WHAM direct-energy-conversion experiment and exact publication clocks at 7:00 a.m. ET on June 30 for that result and 8:00 a.m. ET on July 15 for its Forge/Hammir site announcement. It also preserves exact Type One publication clocks while keeping their underlying contract, LOI and filing times unresolved. Tennessee's March 11 rule receipt is stamped 10:37 a.m., but the source omits the timezone and therefore does not support an exact-instant chart.

Governing clock rules

1. Preserve the object's real clock role. Experiment, announcement, filing,

publication, signature, enactment, effectiveness and deadline are separate events even when they concern the same instrument.

2. Preserve only the precision stated or deterministically recoverable from a

primary object. Never manufacture midnight, noon, a timezone or a place as historical fact.

3. Source place or locus is factual metadata. An institutional headquarters,

press-release dateline, project site and online publication origin are not interchangeable.

The D.C.-cast chart convention and chart-readiness overlay are maintained separately in Chronicle Astrology Files at 03 - Astrology/Astrology Files/Mundane Story Overlaps/Federal Fusion Chart Readiness 2020-2035.md. They do not contribute factual evidence to this ledger.

Durable vocabulary

- Date precision: datetime, date, month, year, conditional,

not_publicly_resolved.

- Clock status: occurred, scheduled, conditional, postponed,

cancelled, not_occurred, not_publicly_resolved.

- Time precision: exact_second, exact_minute, approximate_source,

bounded_source_window, daytime_no_clock, date_only_no_clock,

not_publicly_stated, not_applicable_partial_date.

- Locus class: physical_event, legal_regulatory_locus,

publication_locus, distributed_operation, online_publication,

source_place_not_publicly_stated.

Factual clock register

All unknowns below are affirmative research findings: the source was checked and did not establish the missing field. Derived means a transparent calendar or civil-time conversion, not a source-printed value.

Clock IDObject and clock roleSource date and timePrecision / timezoneSource place or locusStatus and fact establishedBoundary / open retrievalPrimary source
FUS-LAW-20201227Energy Act of 2020 milestone-program authorization enacted within P.L. 116-2602020-12-27; time not publicly stateddate; date_only_no_clockSignature place not established in the enrolled lawoccurred; authorization createdNot an appropriation, award or operating program milestone; exact signature time/site unresolvedP.L. 116-260
FUS-POL-20220317White House fusion summit scheduled opening and event window2022-03-17, 10:00 a.m.–1:00 p.m. ETdatetime; opening exact_minute, event bounded_source_window; EDT / America/New_YorkPhysical venue not stated in the official agendaoccurred as a scheduled federal policy event; 10:00 a.m. is the advertised openingActual opening instant and venue require a recording or event recordOSTP/DOE agenda
FUS-NIF-20221205NIF first fusion-ignition shot; physical experiment2022-12-05, 1:03:50 a.m. local facility timedatetime; exact_second; timezone not printed, derived as PST / America/Los_Angeles; derived UTC 09:03:50ZNational Ignition Facility, Lawrence Livermore National Laboratory, Livermore, Californiaoccurred; physical ignition shotPreserve the derived-zone caveat; do not substitute the December 13 public announcement or treat target gain as facility/grid gainLLNL exact clock
FUS-MILESTONE-SELECT-20230531DOE selects eight Milestone Program recipients2023-05-31; time not publicly stateddate; date_only_no_clockDOE selection/publication locus not establishedoccurred; funding cohort selectedSelection is not an executed agreement, obligation, verification, payment or plantDOE award list
FUS-STRAT-20240606DOE Fusion Energy Strategy 2024 published; strategy clock2024-06-06; time not publicly stateddate; date_only_no_clockDOE release has Washington, D.C. dateline and identifies a White House event; exact release/event locus and time unresolvedoccurred; strategy and related funding opportunity announcedStrategy publication, event, funding opportunity and later award are distinct clocksDOE strategy release
FUS-MILESTONE-TIA-PUB-20240606DOE announces all eight Milestone TIAs signed June 3–52024-06-06; individual agreements dated within 2024-06-03–05; times not statedannouncement date; agreement window; date_only_no_clock / bounded_source_windowDOE online publication; signature places unresolvedoccurred; eight executed program agreements publicly establishedAnnouncement is not a milestone review or payment; signature window is not a single event instantDOE strategy and agreement announcement
FUS-LAW-20240709ADVANCE Act section 205 enacted2024-07-09; time not publicly stateddate; date_only_no_clockExact signature site not established in the enacted recordoccurred; fusion definitions and related NEIMA provisions amended; the pre-existing 2027 framework deadline retainedNot a completed rule or project licenseADVANCE section 205 · NEIMA section 103(a)(4)
FUS-REALTA-WHAM-20240715WHAM first plasma; physical experiment2024-07-15; time not publicly stateddate; date_only_no_clockPhysical Sciences Laboratory, Stoughton, Wisconsinoccurred; first plasma in the 17 T mirror machineNot scientific/engineering gain, electricity or a private power plantUW–Madison
FUS-CFS-LIC-20241024CFS reports Massachusetts grant of SPARC broad-scope radioactive-materials license2024-10-24; issuance time not publicly stated in checked releasedate; date_only_no_clockMassachusetts Agreement-State regulatory object; SPARC site Devensoccurred as company-reported license grantExact agency issuance clock, operative terms, amendments, inspections and first-plasma authorization remain separateCFS license announcement
FUS-NIF-20250407NIF record-yield shot; physical experiment2025-04-07, “shortly after 4 a.m.” local facility timedatetime; approximate_source; timezone not printed, derived as PDT / America/Los_AngelesNIF, LLNL, Livermore, Californiaoccurred; 8.6 MJ yield and target gain 4.13 later reportedNo exact minute/second; do not normalize “shortly after” to 4:00 a.m.; target gain is not facility/grid gainLLNL shot account
FUS-ASSET-20250527Secretary Wright visit used as later DOE card-photo provenance2025-05-27; time not publicly stateddate; date_only_no_clockMatter in Extreme Conditions instrument, SLAC National Accelerator Laboratory, Menlo Park, Californiaoccurred; identifies the earlier source imageNot an August 15 facility event or a fusion-state changeSLAC photo record
FUS-CFS-GOOGLE-20250630CFS/Google 200 MW PPA publicly announced2025-06-30; signature and publication times not publicly stateddate; date_only_no_clockARC project is proposed in Chesterfield County, Virginia; agreement-signature locus unresolvedoccurred; company-reported commercial offtake objectNot construction, generation, interconnection or deliveryCFS announcement
FUS-TYPEONE-PSS-PUB-20250722Type One/TVA Power Service Shops contracts release; publication clock2025-07-22, 4:13:40 p.m. EDT; UTC 20:13:40Zdatetime; exact_second; America/New_YorkOnline publication; Knoxville dateline is not proof of publication originoccurred; limited fabrication/welding contracts publicly announcedUnderlying execution times unresolved; not Infinity Two constructionType One release
FUS-TYPEONE-LOI-PUB-20250919Type One/TVA letter-of-intent release; publication clock2025-09-19, 8:36:27 p.m. EDT; UTC 2025-09-20T00:36:27Zdatetime; exact_second; America/New_YorkOnline publication; Oak Ridge dateline is not proof of publication originoccurred; conditional deployment interest publicly announcedLOI signature/issuance time unresolved; not a PPA, TVA Board authorization or plant approvalType One release
FUS-CFS-MAGNET-20250930CFS reports DOE validation of full-scale SPARC TF magnet milestone and $8M payment2025-09-30; validation and payment times not stateddate; date_only_no_clockCFS/DOE administrative and technical loci unresolved; SPARC at Devensoccurred as company-reported DOE verification/paymentNot SPARC first plasma, gain or ARC plant performanceCFS announcement
FUS-RMAP1-20251016Fusion S&T Roadmap Part I public unveiling2025-10-16; time not publicly stateddate; date_only_no_clockDOE release associates the week's Fusion Enterprise events with Washington, D.C.; exact release/event locus unresolvedoccurred; first roadmap part publishedNot Roadmap Part II, an award or construction authorizationDOE Part I release
GEN-EO-20251124EO 14363 signed/dated; Genesis establishment clock2025-11-24; signature time not publicly stateddate; date_only_no_clockOfficial text carries “THE WHITE HOUSE”; physical signing location not independently establishedoccurred; Genesis Mission charteredSignature, OFR filing and Federal Register publication are separateOfficial EO text
GEN-OFR-20251126EO 14363 filed for public inspection2025-11-26, 11:15 a.m. ETdatetime; exact_minute; EST / America/New_York; UTC 16:15ZOffice of the Federal Register, Washington, D.C. administrative locusoccurred; public-inspection filing clockNot the President's signature or the November 28 publicationOfficial EO notice
GEN-FR-20251128EO 14363 Federal Register publication2025-11-28; publication day, no distinct release instant stateddate; date_only_no_clockFederal Register publication / Washington, D.C. legal locusoccurred; official publicationNot the November 24 establishment/signature clockFederal Register
FUS-THEA-DESIGN-20260113Thea reports DOE certification/approval of Helios preconceptual design2026-01-13; DOE decision and publication times not publicly stateddate; date_only_no_clockCompany online publication; underlying DOE review locus unresolvedoccurred as company-reported DOE design milestoneNot an operating Eos/Helios machine, license, site, electricity or standalone DOE action recordThea release
FUS-APPROP-20260123FY2026 Fusion Energy Sciences appropriation enacted within P.L. 119-742026-01-23; time not publicly stateddate; date_only_no_clockExact signature site not established in the enacted recordoccurred; FES account funding enactedHouse passage Jan. 8, Senate passage Jan. 15, presentation Jan. 22 and enactment Jan. 23 are separate; FY label is not enactmentP.L. 119-74
FUS-LIC-20260129Type One / Bull Run initial byproduct-material application reported submitted2026-01-29; filing time not publicdate; date_only_no_clockFiling locus unresolved; Nashville is the release dateline; Bull Run near Clinton, Tennessee is the project siteoccurred as company-reported initial submissionNo TDEC receipt timestamp, completeness finding, disposition, license or operationType One release
FUS-TYPEONE-APP-PUB-20260129Type One initial-application announcement; publication clock2026-01-29, 9:36 a.m. EST; UTC 14:36Zdatetime; exact_minute; America/New_YorkOnline publication; Nashville dateline is not proof of publication originoccurred; exact communications clock for the company-reported submissionNot the filing/receipt instant, completeness, disposition or licenseType One release
GEN-CHALLENGES-20260212DOE publicly announces 26 Genesis challenges2026-02-12; publication time not publicly stateddate; date_only_no_clockOnline DOE publication; physical publication origin not establishedoccurred; challenge set publicly announcedDoes not reveal internal submission/review timestamps or prove IOCDOE announcement
FUS-NRC-DOC-20260223NRC proposed-rule document dated2026-02-23; time not applicable/not stateddate; date_only_no_clockNRC document locus; no physical act established by the document date aloneoccurred as the agency document dateNot public inspection, publication, finalization or effectivenessOfficial notice text
FUS-NRC-OFR-20260225NRC proposal filed for public inspection2026-02-25, 8:45 a.m. ETdatetime; exact_minute; EST / America/New_York; UTC 13:45ZOffice of the Federal Register, Washington, D.C. administrative locusoccurred; exact public-inspection filingNot NRC adoption, February 26 publication, a final rule or effective ruleGovInfo notice · NARA filing procedure
FUS-NRC-PUB-20260226NRC fusion-machine proposed rule published2026-02-26; no distinct publication time stateddate; date_only_no_clockFederal Register / Washington, D.C. legal-publication locusoccurred; proposed framework opened for commentProposal is not final or effective and does not issue a project licenseGovInfo notice
FUS-TN-RULE-FILE-20260311Tennessee fusion-rule filing received by Secretary of State2026-03-11, 10:37 a.m.; source timezone not stateddatetime; exact_minute text with unresolved zoneFiling form names Division of Publications, Nashville; physical/electronic receipt mode unresolvedoccurred; Sequence 03-11-26, Rule IDs 10543–10549 receivedNo defensible UTC conversion; not the June 9 effective clock or a project licenseTennessee filing
FUS-CFS-PJM-20260428CFS announces ARC/Fall Line PJM interconnection application2026-04-28; application/announcement time not publicly stateddate; date_only_no_clockProposed plant Chesterfield County, Virginia; PJM receipt locus/time unresolvedoccurred; company application publicly established and PJM confirmed fusion among Cycle 1 applicants next dayNot queue validation, study, interconnection agreement, synchronization or exportCFS announcement · PJM confirmation
FUS-ZAP-DESIGN-20260519Zap reports DOE approval of about-50-MWe-net-per-module preconceptual design2026-05-19; DOE decision and publication times not publicly stateddate; date_only_no_clockCompany online publication; DOE review locus unresolvedoccurred as company-reported DOE design milestoneNot a built module, selected site, license, gain or generated electricityZap release
FUS-NRC-CLOSE-20260527NRC proposal comment period closes2026-05-27; no universal deadline hour stateddate; date_only_no_clockDistributed submission routes; 4:15 p.m. Rockville cutoff applies only to hand deliveryoccurred; comment-period calendar date reachedNever infer 11:59 p.m.; submission-mode-specific cutoffs must remain separateGovInfo notice
FUS-TN-ANN-20260601Tennessee announces its June 9 fusion regulations2026-06-01, page displays 9:00 a.m.; timezone not stateddatetime; exact_minute text with unresolved zoneTDEC online publication; physical origin not establishedoccurred; announcement publishedDo not assume Central Time or turn Nashville into the online-publication locusTDEC release
FUS-XCIMER-PHOENIX-20260603Xcimer announces start of Phoenix laser-prototype operations2026-06-03; operating-start and publication times not publicly stateddate; date_only_no_clockPhoenix laser bay, Denver, Coloradooccurred; integrated excimer amplification/compression platform operating above 1 kJNot a fusion shot, ignition, gain, heat or electricityXcimer release
GEN-JP-20260604U.S.–Japan Genesis partnership publicly announced2026-06-04; time not publicly stateddate; date_only_no_clockDOE online publication; physical release/signing locus not establishedoccurred; planned five-year partnership announced, subject to appropriationsNot an appropriation, executed project award or operating capabilityDOE announcement
FUS-THEA-TWIN-20260608Thea announces Helios digital-twin and AI-surrogate collaboration2026-06-08; publication time not publicly stateddate; date_only_no_clockDistributed company, NVIDIA, Synopsys, Argonne and PPPL design/model workoccurred; named fusion AI/model collaboration establishedNot Genesis IOC, DCP operating proof or plant performanceThea release
FUS-RMAP2-20260609Finalized Fusion S&T Roadmap / Part II publicly released2026-06-09; release time not publicly stateddate; date_only_no_clockDOE body dateline WASHINGTON—; Washington, D.C. is an institutional/dateline anchor, not a proven CMS-device locationoccurred; finalized strategy publishedNo exact public-release time; webpage and PDF metadata clocks below are different objectsDOE release · Roadmap
FUS-TN-EFF-20260609Tennessee Chapter 0400-20-14 becomes effective2026-06-09; exact effective time not stateddate; date_only_no_clockStatewide Tennessee legal effect; no single physical event locationoccurred; Agreement State fusion-machine framework effectiveNever infer midnight as historical effect; not an issued Bull Run licenseTDEC release
FUS-XCIMER-DESIGN-20260610Xcimer reports DOE approval of Athena preconceptual design and roadmap2026-06-10; DOE decision and publication times not publicly stateddate; date_only_no_clockCompany online publication; DOE review locus unresolvedoccurred as company-reported DOE design milestoneNot Phoenix fusion operation, Vulcan engineering breakeven, a site/license or 400 MWe generationXcimer release
FUS-REALTA-DEC-20260619WHAM direct-energy-conversion experiment; physical event2026-06-19; experiment time not publicly stateddate; date_only_no_clockWHAM, Physical Sciences Laboratory, Stoughton, Wisconsinoccurred; multiple amps at about 100 volts converted from plasma kinetic energyMostly recovered supplied input power; expressly not net electricity or large-scale conversion of fusion-born powerRealta technical account
FUS-NIF-20260620NIF eleventh ignition; physical experiment2026-06-20; shot time not publicly stateddate; date_only_no_clockNIF, LLNL, Livermore, Californiaoccurred; 7.9 ± 0.4 MJ and target gain about 3.8 reportedShot ID, time and zone unresolved; target gain is not facility/grid gainNIF ignition record
FUS-REALTA-DEC-PUB-20260630Realta DEC press-release publication2026-06-30, 7:00 a.m. ET; UTC 11:00Zdatetime; exact_minute; EDT / America/New_YorkOnline publication; physical publication origin not statedoccurred; exact communications clock for the June 19 resultNot the physical experiment timePRNewswire release
FUS-REALTA-FORGE-PUB-20260715Realta Forge/Hammir site and incentives announcement2026-07-15, 8:00 a.m. ET; UTC 12:00Zdatetime; exact_minute; EDT / America/New_YorkProject site OM Station, Madison, Wisconsin; online publication origin not statedoccurred; site/incentive plan publicly announcedNot groundbreaking, construction, commissioning or a power-plant sitePRNewswire release · WEDC
GEN-FUSION-SELECT-20260722Genesis project selections include named fusion/DCP work2026-07-22; publication time not publicly stateddate; date_only_no_clockDistributed project portfolio; no single operating locusoccurred; selection for award negotiationsNot an executed OTA/FWP, obligation, platform access, workflow or physical resultDOE release · project list
FUS-X-20260815DOE Energy Without Limits root post; online publication2026-08-15, 1:34:04.501 p.m. EDT; UTC 17:34:04.501Zdatetime; exact_second plus milliseconds deterministically derived from X Snowflake ID; America/New_York is display conversionOnline publication; no geo, place or coordinates; physical origin unknownoccurred; official communications activationNot a new experiment, roadmap, award, facility, license or electricity event; Washington is only the wheel convention, not posting provenanceDOE root post · X Snowflake documentation
GEN-IOC-20260821Genesis IOC-seeking calendar target derived from 270 days after EO date2026-08-21; no hour or ceremony statedconditional; date_only_no_clock; derived calendar dateDOE/national platform; operating locus to be identified by any completion recordscheduled; source directs DOE to seek to demonstrate IOC, subject to appropriationsNot an occurred event or proof that fusion is the selected challengeEO 14363
SCI-PLAN-20261019Qualifying-agency implementation plans due; 90-day derived date2026-10-19; no hour statedconditional; date_only_no_clock; derived calendar dateSubmission/receiving locus unresolvedscheduled; implementation-plan clockVerify OMB interpretation, extensions and actual receipt before marking delinquent or completeNSTM-5 / M-26-16
GEN-REPORT-20261124First Genesis annual report due2026-11-24; no hour statedconditional; date_only_no_clock; one-year deadlineDOE/White House reporting locus unresolvedscheduled; annual reporting clockPublic release is not guaranteed and would be a separate publication clockEO 14363
FUS-NRC-DEADLINE-20271231NEIMA section 103(a)(4) technology-inclusive optional-framework rulemaking deadline, as amended2027-12-31; no hour statedconditional; date_only_no_clockNRC federal rulemaking / Washington, D.C. legal locusscheduled; statutory completion deadlineFinal-rule adoption, publication and effective date remain separate; Agreement State clocks continue independentlyNEIMA section 103(a)(4), 132 Stat. 5572 · ADVANCE section 205(b), 138 Stat. 1461
FUS-PILOT-2031-2035DOE pilot-plants-delivering-electrons target window2031–2035; no day/timeconditional; year window; not_applicable_partial_dateNamed project/site not yet identifiedscheduled target window, not an occurred eventNo point chart; wait for a named award, site, build, commissioning, synchronization or metered-delivery eventDOE roadmap

DOE thread micro-sequence

The three posts are one atomic communications event anchored to the root post. The reply clocks are preserved for sequence reconstruction, not promoted as three separate campaign launches.

Order / cardsX status IDUTC creationWashington displayRelationship
Root / cards 1–220886806377293169252026-08-15T17:34:04.501Z2026-08-15 1:34:04.501 p.m. EDTThread root and canonical event clock
Cards 3–420886806401494266392026-08-15T17:34:05.078Z2026-08-15 1:34:05.078 p.m. EDTReply to root; +0.577 seconds
Card 520886806493264855512026-08-15T17:34:07.266Z2026-08-15 1:34:07.266 p.m. EDTReply to post 2; complete chain +2.765 seconds

X's direct syndication created_at fields are whole-second values. The millisecond values above are deterministically decoded from the official 64-bit Snowflake IDs using X's documented epoch. All three official payloads omit geo, place and coordinates.

Roadmap webpage and file metadata — not the release clock

These exact timestamps are retained because they may help future provenance work. None should replace FUS-RMAP2-20260609 as the public-release record.

Metadata objectUTCWashington displayRuling
DOE HTML datePublished / CMS node creation2026-06-04T20:19:25Z2026-06-04 4:19:25 p.m. EDTPage preparation/CMS creation; conflicts with visible June 9 release date and is not a defensible release clock
DOE HTML dateModified2026-06-10T01:44:14Z2026-06-09 9:44:14 p.m. EDTExact page-modification clock; may be charted only if explicitly labeled as webpage modification
Current roadmap PDF XMP creation2026-06-11T15:59:13Z2026-06-11 11:59:13 a.m. EDTLater file-production clock; not release
Current roadmap PDF XMP modification2026-06-15T19:11:27Z2026-06-15 3:11:27 p.m. EDTLater file-revision clock; not release
Current PDF HTTP Last-Modified2026-06-15T20:19:17Z2026-06-15 4:19:17 p.m. EDTServer/file metadata; not release

Astrology boundary

The former chart-readiness overlay is preserved in Chronicle Astrology Files at 03 - Astrology/Astrology Files/Mundane Story Overlaps/Federal Fusion Chart Readiness 2020-2035.md. This Research copy retains only factual clocks, source precision, places, unknowns and retrieval questions.

Open retrieval queue

1. NIF shot-log timestamp and identifier for June 20, 2026.

2. Exact minute/second for the April 7, 2025 NIF shot.

3. TDEC receipt stamp, filing medium and receiving locus for the January 29 Bull

Run application.

4. Source-stated timezone for the TDEC June 1 page's 9:00 a.m. display.

5. A primary release timestamp for DOE's June 9 roadmap announcement, if one

exists outside current page/file metadata.

6. Actual opening time and physical/virtual venue for the March 17, 2022 fusion

summit.

7. Exact signature times/sites for P.L. 118-67, P.L. 119-74 and EO 14363.

8. Named challenge, platform components, users, test, operating locus and exact

completion clock for any Genesis IOC claim.

9. Exact physical-event times for WHAM first plasma and the June 19, 2026

direct-energy-conversion experiment.

10. Operative Massachusetts SPARC license and exact issuance clock; matching

DOE action/decision records and clocks for Thea, Xcimer and Zap's

company-reported design approvals.

11. Source timezone for Tennessee's March 11, 2026 10:37 a.m. rule-filing

receipt stamp.

12. Execution/signature clocks for the TVA PSS contracts and LOI; PJM receipt,

validation and later study/agreement clocks for ARC/Fall Line.

13. TIA amendment, verification, invoice and payment clocks needed to join

USAspending obligations/outlays to named technical milestones.

Promotion and interpretation firewall

- A later exact timestamp supplements the matching clock_id; it does not

silently rewrite an approximate or date-only source into an exact event.

- If an object exposes several clocks, preserve each role. Do not replace a

physical shot with a press-release timestamp or a legal act with webpage metadata.

- A future deadline becomes an occurred event only when an authoritative source

records the act, receipt, test or state change that satisfied it.

- Any later chart artifact must cite this ledger row, state its D.C. clock basis,

calculate through the shared chart engine and remain separate from the factual fusion bridge.

- Interpretation belongs in astrology or Transit essays. Literal, falsifiable

predictions belong in the Forecast Ledger; this file contains none.

The two rows above now follow the September 7 correction already recorded in the fusion bridge: NEIMA section 103(a)(4), enacted January 14, 2019, originated the December 31, 2027 optional-framework rulemaking deadline. ADVANCE section 205 amended definitions and related NEIMA provisions; section 205(c) required a separate mass-manufactured-fusion report. A November 8 bounded check of the enacted texts confirms that attribution. The dates, precision, statuses, loci and August 15 implementation cutoff remain unchanged. The reconciliation record preserves the exact earlier ledger bytes and the two changed rows.

Sources

Document details and formats

Saved research reading. Its original dates and claim limits control; the export date does not refresh the evidence.